CN107754533A - A kind of bubbling restrains dedusting and desulfurizing tower - Google Patents

A kind of bubbling restrains dedusting and desulfurizing tower Download PDF

Info

Publication number
CN107754533A
CN107754533A CN201711120757.4A CN201711120757A CN107754533A CN 107754533 A CN107754533 A CN 107754533A CN 201711120757 A CN201711120757 A CN 201711120757A CN 107754533 A CN107754533 A CN 107754533A
Authority
CN
China
Prior art keywords
flue gas
tower body
desulfurizing
dedusting
bubbling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711120757.4A
Other languages
Chinese (zh)
Inventor
史国强
王志峰
张璀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pro-Environment Group Co Ltd Of Jiangsu Guoqiang
Original Assignee
Pro-Environment Group Co Ltd Of Jiangsu Guoqiang
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pro-Environment Group Co Ltd Of Jiangsu Guoqiang filed Critical Pro-Environment Group Co Ltd Of Jiangsu Guoqiang
Priority to CN201711120757.4A priority Critical patent/CN107754533A/en
Publication of CN107754533A publication Critical patent/CN107754533A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D50/00Combinations of methods or devices for separating particles from gases or vapours
    • B01D50/40Combinations of devices covered by groups B01D45/00 and B01D47/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/48Sulfur compounds
    • B01D53/50Sulfur oxides
    • B01D53/501Sulfur oxides by treating the gases with a solution or a suspension of an alkali or earth-alkali or ammonium compound
    • B01D53/504Sulfur oxides by treating the gases with a solution or a suspension of an alkali or earth-alkali or ammonium compound characterised by a specific device

Abstract

A kind of bubbling restrains dedusting and desulfurizing tower, including vertical cylinder shape tower body, tower body top offers exhaust opening, the nearly bottom side wall of tower body is provided with into/drainpipe, tower body is divided into three regions from top to bottom, upper strata turbulent flow dust-removal and desulfurizing section, middle level sprays the eddy flow bubbling tube bank dedusting section of desulfurization section and lower floor, the eddy flow bubbling tube bank dedusting section includes central tube, central tube bottom forms cistern to the chamber between bottom of towe, flue gas inlet channel is formed between center drum outer wall and tower body inwall, central tube up/down perforation, form flue gas outlet passageway, the nearly top of flue gas inlet channel is provided with spray head, flue gas inlet channel bottom is provided with swirl-flow devices, swirl-flow devices include several cyclone cylinders around center of circle arrangement, packing matcrial seals in gap between cyclone cylinder.

Description

A kind of bubbling restrains dedusting and desulfurizing tower
Technical field
The present invention relates to dust-removal and desulfurizing field, more particularly to dedusting and desulfurizing tower.
Background technology
Existing dust removing desulphurization plant carries out dedusting using moisture film or bath or cloth bag, then enters the flue gas after dedusting Enter desulfurizing tower and carry out spray desulfurization, occupation area of equipment is big, complex process, has much room for improvement.
China Patent Publication No. CN105727721A, a kind of heat source furnace water bath dust-removing desulfurizing tower, including:Air inlet pipe, water spray Pipe, water pump, sieve tray, blast pipe, shell, pond plus alkali machine, overflow pipe, pump vacuum device, clear water reserviors, dust discharge mud mouth;It is special Sign is:Dust-removal and desulfurizing shell reinforced concrete is cast-in-place to be formed, and leftover bits and pieces is connected with pond, there is overflow pipe, outlet and clear water on pond Pond connects, and also has overflow pipe on clear water reserviors;Water pump self-suction vacuum is installed on pump water inlet, is connected with pump intake, Pumping line connects with sparge pipe;Flue dust air inlet pipe was gone here and there on straight skewer waterline through top cover and sieve tray center, sieve tray weldering In in air inlet pipe;Dedusting and desulfurizing tower shell upper is provided with blast pipe and is connected with steam-water separator, steam-water separator exhaust outlet with Air-introduced machine is connected;Basin bottom has dust discharge mud mouth;It is provided with pond and adds alkali machine;Water bath dust-removing desulfurization tower process is advanced, equipment Simply, little power consumption, dust-removal and desulfurizing effect is good, is a kind of advanced dust removing desulphurization plant being worthy to be popularized.Its technical scheme passes through The flue gas that central tube enters carries out impact to the water surface, is removed using principle of the water in adsorbing powder dust, then passes through sieve tray Uniform flue gas simultaneously sets spray equipment to carry out spray desulfurization, then by steam-water separation chamber by water and qi leel from but its flue gas uses Simply with water slug dedusting, dust removing effects are unsatisfactory, are further improved.
The content of the invention
In view of the deficiencies of the prior art, the present invention provides a kind of floor space is small, dust clearance is up to 97%, desulfurization Efficiency up to more than 95% bubble type dedusting and desulfurizing tower.
To realize the object of the invention, there is provided following technical scheme:A kind of bubbling restrains dedusting and desulfurizing tower, including vertical circle Tubular tower body, tower body top offer exhaust opening, and the nearly bottom side wall of tower body is provided with into/drainpipe, it is characterised in that tower body from On be down divided into three regions, the eddy flow bubbling pipe of upper strata turbulent flow dust-removal and desulfurizing section, middle level spray desulfurization section and lower floor Beam dedusting section, the eddy flow bubbling tube bank dedusting section include central tube, and central tube bottom forms water storage to the chamber between bottom of towe Pond, flue gas inlet channel is formed between center drum outer wall and tower body inwall, central tube up/down perforation, forms flue gas outlet passageway, The nearly top of flue gas inlet channel is provided with spray head, and flue gas inlet channel bottom is provided with swirl-flow devices, and swirl-flow devices include enclosing Packing matcrial sealing in gap between several cyclone cylinders of center of circle arrangement, cyclone cylinder, each cyclone cylinder is interior to be set There is the cyclone blade for making that circular passage is formed in cyclone cylinder, be provided with and cut in the tower body tower wall between cyclone cylinder top and spray head To smoke inlet, the flue gas inlet channel between cyclone cylinder top and spray head is formed one cyclonic room, two are formed in cyclone cylinder Level cyclone chamber.
Preferably, middle level spray desulfurization layer includes being arranged above central tube and spaced flue gas even distribution plate, sets At least first grade desulfurizing liquid spray equipment being placed in above flue gas even distribution plate.
Preferably, upper strata turbulent flow dust-removal and desulfurizing section include be arranged in tower body some ventilation ducts, be arranged at ventilation The deflector at ttom of pipe end, the vertical locating dowel being fixed in the middle part of ventilation duct and except dustball, described except on dustball deflector, filling Between ventilation duct and locating dowel, inclined pod apertures are offered on deflector, ventilation duct, which is mutually juxtaposed, is spliced into turbulent flow dedusting Desulfurization layer, the turbulent flow dust-removal and desulfurizing layer are arranged at least one layer of.
Preferably, the maximum diameter of hole of pod apertures is less than the diameter of spheroid, has to place between adjacent guide hole and remove dustball Platform.
Preferably, central tube bottom side edge edge offers outlet breach.
Preferably, enter/drainpipe connection liquid level device for limiting.
Preferably, tower body, which is located in the side wall of cistern, offers maintenance conditions manhole.
Preferably, cyclone cylinder material is high temperature wear resistant ceramic, it is embedded between center drum outer wall and tower body inwall, and with Both are tightly connected.
Preferably, cyclone blade is stainless steel.
Preferably, cyclone blade is spiral helicine twayblade or multiple-blade.
Preferably, tower body includes shell and internal layer, shell is carbon steel, its inside and outside wall all derust polishing after brushing epoxy Lacquer type organic coating, internal layer are spliced into circle by ceramic wafer, and wear-resisting acid resistant adhesive mortar smears seam.
Beneficial effect of the present invention:The present invention by set upper strata turbulent flow dust-removal and desulfurizing section, middle level spray desulfurization section and under The eddy flow bubbling tube bank dedusting section of layer, substantially increases dedusting and desulfuration efficiency, and efficiency of dust collection is up to more than 97%, desulfuration efficiency Up to more than 95%.
Brief description of the drawings
Fig. 1 is the front view of the present invention.
Fig. 2 is Fig. 1 schematic internal view.
Fig. 3 is Fig. 2 B-B sectional views.
Fig. 4 is Fig. 2 C-C sectional views.
Fig. 5 is Fig. 2 D-D sectional views.
Fig. 6 is ventilation duct internal structure schematic diagram in Fig. 2.
Fig. 7 is the structural representation of embodiment 2.
Fig. 8 is the structural representation of embodiment 3.
Fig. 9 is Fig. 8 B-B sectional views.
Figure 10 is Fig. 8 C-C sectional views.
Figure 11 is Fig. 8 D-D sectional views.
Embodiment
Embodiment 1:A kind of bubbling restrains dedusting and desulfurizing tower, including vertical cylinder shape tower body 1, the top of tower body 1 offer row Mouth 2, the nearly bottom side wall of tower body 1 are provided with into/drainpipe 3, and tower body 1 is divided into three regions, upper strata turbulent flow from top to bottom The eddy flow bubbling tube bank dedusting section 1.3 of dust-removal and desulfurizing section 1.1, middle level spray desulfurization section 1.2 and lower floor, the tube bank of eddy flow bubbling removes Dirt section 1.3 includes the central tube 4 being arranged in tower body, and the bottom of central tube 4 forms cistern 5, center to the chamber between bottom of towe Flue gas inlet channel 6 is formed between 4 outer walls of cylinder and the inwall of tower body 1, the up/down perforation of central tube 4, forms flue gas outlet passageway 7, in The bottom side edge of heart cylinder 4 edge offers zigzag outlet breach 4.1.6 nearly top of flue gas inlet channel is provided with spray head 8, spray head 8 The center of circle of tower body 1 is provided with 4, the nozzle of spray head 8 is located at the center line of flue gas inlet channel 6 and set straight down.Cigarette The bottom of gas inlet channel 6 is provided with swirl-flow devices, and swirl-flow devices include 8 cyclone cylinders 9 around center of circle arrangement, the material of cyclone cylinder 9 Matter is high temperature wear resistant ceramic, and cyclone cylinder 9 is embedded between the outer wall of central tube 4 and the inwall of tower body 1, and is tightly connected with both, rotation Packing matcrial 10 seals in gap between air duct 9, and being provided with each cyclone cylinder 9 makes to form annular lead in cyclone cylinder 9 The cyclone blade 11 in road, cyclone blade 11 are stainless steel, and cyclone blade 11 is spiral helicine twayblade, the top of cyclone cylinder 9 Tangential smoke inlet 12 is provided with the tower wall of tower body 1 between spray head 8, makes the flue gas between the top of cyclone cylinder 9 and spray head 8 Inlet channel 6 forms one cyclonic room, and two level cyclone chamber is formed in cyclone cylinder 9.Enter/drainpipe 3 is connected with for controlling water storage The liquid level device for limiting 13 of the liquid level of pond 5.Tower body 1, which is located in the side wall of cistern 5, offers maintenance conditions manhole 14.
Middle level spray desulfurization layer 1.2 includes being arranged at the top of central tube 4 and spaced flue gas even distribution plate 15, is arranged at The two-step desulfurization liquid spray equipment 20 of the top of flue gas even distribution plate 15, every grade of doctor solution spray equipment 20 include what is set around the center of circle 4 doctor solution spray heads 20.1.
Upper strata turbulent flow dust-removal and desulfurizing section 1.1 include be arranged in tower body 16 ventilation ducts 16, be arranged at the bottom of ventilation duct 16 The deflector 17 at end, the vertical locating dowel 18 for being fixed on the middle part of ventilation duct 16 and except dustball 19, it is described except dustball 19 is positioned over On deflector 17, it is filled between ventilation duct 16 and locating dowel 18, inclined pod apertures 17.1 is offered on deflector 17, divulges information Pipe 16, which is mutually juxtaposed, is spliced into turbulent flow dust removing units, and the turbulent flow dust removing units are arranged to two layers.The largest hole of pod apertures 17.1 Footpath is less than the diameter of dedusting spheroid 19, has the platform placed except dustball 19 between adjacent guide hole 17.1.
Eddy flow bubbling restrains dedusting section operation principle:Pending flue gas tangentially enters one cyclonic room from smoke inlet 12, The water smoke that the top spray head 8 of smoke inlet 12 is sprayed at the shower nozzle can moisten flue gas in dust, dust is by water in this process Mist moistening makes its weight increase and be advantageous to be separated.Afterwards, flue gas initially enters two level cyclone chamber, is dispersed into single rotation In air duct 9, i.e., into the annular space between cyclone cylinder 9 and cyclone blade 11, cyclone blade 11 makes gas be become by linear motion For circular motion, single swirling eddy is formed, the overwhelming majority of swirling eddy is twist downward along the inwall of cyclone cylinder 9, towards tower The water surface impact flow of 1 bottom cistern of body 5;Dusty gas produces centrifugal force in rotary course simultaneously, and density is more than into gas Grit get rid of to barrel.Grit contacts with barrel, just loses inertia force and leans on the momentum of entrance velocity and downward gravity edge Wall drops downward into the bottom water surface of tower body 1.When the outer rotational gas flow that rotation declines reaches 4 cylinder lower end position of central tube, produce the bottom of to The impact of portion's water surface, skimmed at a relatively high speed from the narrow gap of the bottom of central tube 4 and water.Due to flue gas high-speed motion, swash Play spray and form water droplet and foam, the grit remained in flue gas by water droplet, foam adhesion and in the water that drops, flue gas is from central tube In 4 upwards, discharged by exhaust opening 2.
Spray desulfurization section operation principle:The flue gas for continuing to rise along central tube enters the flue gas even distribution plate in tower body stage casing, In the presence of flue gas even distribution plate so that flue gas uniformly rises in tower body, and good reaction condition is created to spray desulfurization.Uniformly The flue gas of rising sequentially passes through the high density spray washing reaction zone of two-stage spray equipment formation and absorbing reaction area, doctor solution lead to It is that flue gas and being sufficiently mixed for doctor solution provide huge contact area to cross spiral nozzle and generate superfine droplet so that gas-liquid Two-phase carries out sufficient mass transfer and the physical-chemical reaction of heat transfer, and SO2 is absorbed in droplet descent and catches profit grit, from And reaching SO2 efficient removal, the grit of moistening flows downwardly into tower body bottom, and sedimentation basin is discharged into from drainpipe.
Turbulent flow dust-removal and desulfurizing section operation principle:Continue to rise through spray desulfurization section flue gas, into turbulent flow dust-removal and desulfurizing section, Entrainment of substantial amounts of vapor and a number of dust in flue gas, the small-sized of multiple ventilation ducts formation is entered in uphill process Passage, the interior effect by tilting pod apertures on deflector of passage forms small-sized vortex chamber, and top is full of dedusting spheroid, dedusting Spherome surface forms liquid film, dust and liquid film contact and is captured, and aggregation, flue gas and dedusting spheroid hair are produced on dedusting spheroid After the effects such as raw inertial collision, adhesion, aggegation, dust and water is set to be separated with gas by sedimentation theory.As flue gas presss from both sides The water vapour of band is constantly added, and the dust of dedusting spherome surface attachment is rinsed, constantly updates the liquid film of spherome surface, The water droplet of dust is carried secretly from bottom of towe cistern on dedusting spheroid.So circulation, finally realizes depth dedusting function.
Doctor solution in the flue gas risen in bubble type dedusting and desulfurizing tower entrainment of certain ingredients is broken down into multiple small-sized Passage enters turbulence device, and the flue gas driving vortex chamber interior spheroid of rising rotates, and the flue gas passed through can be produced scattered and again The effect of gas field is integrated, significantly increases gas liquid interfacial area and time, so that turbulence device forms secondary desulfuration device (Spray is considered as once desulfurization), thus improve desulfuration efficiency.
Compared to static deflection plate demister, low power consuming, high-effective dust-removing desulfurization turbulence device have self-cleaning function.Work as ash When dirt is adhered to spherome surface, it can be slid because of continuous motion collision, the phase mutual friction of spheroid, so as to thoroughly prevent tradition The easy fouling of demister, susceptible to plugging problem.
Last clean flue gas is drawn by arranging bead, completes whole dust-removal and desulfurizing program.
Dust-laden waste liquid is discharged into sedimentation basin by cylinder body bottom drainpipe,(Drainpipe has water seal design to prevent gas leakage, and is provided with Cleaning eye is convenient for cylinder body bottom cleaning)Through precipitation(Ash disposal)And add alkali(Regeneration)Posterior circle uses.
Embodiment 2:With reference to embodiment 1, rinse spray device 21 is provided with the top tower body of turbulent flow dust-removal and desulfurizing section 1.1, The top of rinse spray device 21 can also add demister 22.
Embodiment 3:With reference to embodiment 1, exhaust opening is offered in the side wall of central tube 4, is provided with exhaust opening detachable Flue 22, cyclone cylinder 9 is embedded between the outer wall of central tube 4 and the inwall of tower body 1 and is removable assembling structure.Middle level spray is de- Sulphur layer 1.2 includes being arranged at the top of central tube 4 and spaced flue gas even distribution plate 15, is arranged at the top of flue gas even distribution plate 15 Two-grade desulfurizing liquid spray equipment 20, doctor solution spray equipment 20 include spray supervisor 20.2, and spray supervisor offers two sprays First 20.1.
In above-described embodiment 1, the material of tower body 1 can be the materials such as ceramic material or carbon steel.
Cyclone blade 11 can be spiral helicine leafy sheet form or other can form the form of annular channel.Encapsulant 10 Can be that wear-resisting acid resistant adhesive mortar etc. pours material.

Claims (10)

1. a kind of bubbling restrains dedusting and desulfurizing tower, including vertical cylinder shape tower body, tower body top offer exhaust opening, the nearly bottom of tower body Side wall is provided with into/drainpipe, it is characterised in that tower body is divided into three regions, upper strata turbulent flow dust-removal and desulfurizing from top to bottom The eddy flow bubbling tube bank dedusting section of section, middle level spray desulfurization section and lower floor, the eddy flow bubbling tube bank dedusting section include center Cylinder, central tube bottom form cistern to the chamber between bottom of towe, and flue gas air inlet is formed between center drum outer wall and tower body inwall Passage, central tube up/down perforation, flue gas outlet passageway is formed, the nearly top of flue gas inlet channel is provided with spray head, flue gas air inlet Passage bottom is provided with swirl-flow devices, and swirl-flow devices include several cyclone cylinders around center of circle arrangement, between cyclone cylinder between Packing matcrial is sealed in gap, and the cyclone blade for making that circular passage is formed in cyclone cylinder, whirlwind are provided with each cyclone cylinder Tangential smoke inlet is provided with tower body tower wall between cylinder top and spray head, makes the flue gas between cyclone cylinder top and spray head Inlet channel forms one cyclonic room, and two level cyclone chamber is formed in cyclone cylinder.
2. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that middle level spray desulfurization layer includes It is arranged above central tube and spaced flue gas even distribution plate, at least first grade desulfurizing liquid spray that is arranged above flue gas even distribution plate Shower device.
A kind of 3. bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that upper strata turbulent flow dust-removal and desulfurizing section Including be arranged in tower body some ventilation ducts, be arranged at the deflector of ventilation duct bottom, be fixed on it is perpendicular in the middle part of ventilation duct It is described except on dustball deflector, being filled between ventilation duct and locating dowel, offered on deflector to locating dowel and except dustball Inclined pod apertures, ventilation duct, which is mutually juxtaposed, is spliced into turbulent flow dust-removal and desulfurizing layer, and the turbulent flow dust-removal and desulfurizing layer is arranged at least One layer.
4. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 3, it is characterised in that the maximum diameter of hole of pod apertures is small There is the platform placed except dustball between the diameter of spheroid, adjacent guide hole.
5. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that central tube bottom side edge edge opens up There is outlet breach.
6. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that enter/drainpipe connection liquid level limit Determine device.
7. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that tower body is located at the side of cistern Maintenance conditions manhole is offered on wall.
8. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that cyclone cylinder material is that high temperature is resistance to Mill ceramics, are embedded between center drum outer wall and tower body inwall, and are tightly connected with both.
9. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 1, it is characterised in that cyclone blade is stainless steel Matter.
10. a kind of bubbling tube bank dedusting and desulfurizing tower according to claim 8, it is characterised in that cyclone blade is spiral helicine Twayblade or multiple-blade.
CN201711120757.4A 2017-11-14 2017-11-14 A kind of bubbling restrains dedusting and desulfurizing tower Withdrawn CN107754533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711120757.4A CN107754533A (en) 2017-11-14 2017-11-14 A kind of bubbling restrains dedusting and desulfurizing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711120757.4A CN107754533A (en) 2017-11-14 2017-11-14 A kind of bubbling restrains dedusting and desulfurizing tower

Publications (1)

Publication Number Publication Date
CN107754533A true CN107754533A (en) 2018-03-06

Family

ID=61272950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711120757.4A Withdrawn CN107754533A (en) 2017-11-14 2017-11-14 A kind of bubbling restrains dedusting and desulfurizing tower

Country Status (1)

Country Link
CN (1) CN107754533A (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2522155Y (en) * 2001-09-29 2002-11-27 温州阳光环保设备有限公司 Heat-exchanging type sweetening cleaner
CN2547382Y (en) * 2002-04-01 2003-04-30 谭景世 Wet type dust collector
CN101130152A (en) * 2007-08-14 2008-02-27 湖南大学 Injecting, bubbling ,dust settling, desulfurating and absorbing tower with vertical screen deck
CN201543367U (en) * 2009-11-21 2010-08-11 罗忠凯 Wet flue gas desulfuration dedusting device
CN201894904U (en) * 2010-06-13 2011-07-13 贾玉德 Dual-cylinder rotational-flow bubbling dust removal and desulfurization gas cleaning device
CN203954970U (en) * 2014-06-18 2014-11-26 广东科大环境工程有限公司 The pneumatic desulfation dust-extraction device that revolves of mist sieve
CN105381689A (en) * 2015-12-18 2016-03-09 湖南科技大学 String ball filler and vertical annular demisting desulfurization absorption tower
CN205287962U (en) * 2015-12-07 2016-06-08 新疆心连心能源化工有限公司 Desulfurization absorption tower is with rapid ball self -purification combination formula defogging device
CN106237774A (en) * 2016-08-29 2016-12-21 河南心连心化肥有限公司 Honeycomb turbulent ball type urea dust recovery device and recovery method thereof
CN206121418U (en) * 2016-09-26 2017-04-26 吉林润垚环境生物科技有限公司 Compound wet dust collector of whirl water film multitube
CN107029536A (en) * 2017-01-25 2017-08-11 大连铭晟环保设备有限公司 Spiral blender and the denitrification apparatus using the blender
CN206613274U (en) * 2017-04-14 2017-11-07 宜兴市东方锅炉除尘设备厂有限公司 Wind guiding device and cyclonic separation unit

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2522155Y (en) * 2001-09-29 2002-11-27 温州阳光环保设备有限公司 Heat-exchanging type sweetening cleaner
CN2547382Y (en) * 2002-04-01 2003-04-30 谭景世 Wet type dust collector
CN101130152A (en) * 2007-08-14 2008-02-27 湖南大学 Injecting, bubbling ,dust settling, desulfurating and absorbing tower with vertical screen deck
CN201543367U (en) * 2009-11-21 2010-08-11 罗忠凯 Wet flue gas desulfuration dedusting device
CN201894904U (en) * 2010-06-13 2011-07-13 贾玉德 Dual-cylinder rotational-flow bubbling dust removal and desulfurization gas cleaning device
CN203954970U (en) * 2014-06-18 2014-11-26 广东科大环境工程有限公司 The pneumatic desulfation dust-extraction device that revolves of mist sieve
CN205287962U (en) * 2015-12-07 2016-06-08 新疆心连心能源化工有限公司 Desulfurization absorption tower is with rapid ball self -purification combination formula defogging device
CN105381689A (en) * 2015-12-18 2016-03-09 湖南科技大学 String ball filler and vertical annular demisting desulfurization absorption tower
CN106237774A (en) * 2016-08-29 2016-12-21 河南心连心化肥有限公司 Honeycomb turbulent ball type urea dust recovery device and recovery method thereof
CN206121418U (en) * 2016-09-26 2017-04-26 吉林润垚环境生物科技有限公司 Compound wet dust collector of whirl water film multitube
CN107029536A (en) * 2017-01-25 2017-08-11 大连铭晟环保设备有限公司 Spiral blender and the denitrification apparatus using the blender
CN206613274U (en) * 2017-04-14 2017-11-07 宜兴市东方锅炉除尘设备厂有限公司 Wind guiding device and cyclonic separation unit

Similar Documents

Publication Publication Date Title
CN105854425B (en) A kind of depth dedusting demister
CN207576058U (en) A kind of bubbling restrains dedusting and desulfurizing tower
CN201543367U (en) Wet flue gas desulfuration dedusting device
CN105727701B (en) A kind of super ultra-clean desulfation dust-extraction device of integration
CN201823405U (en) Cyclone demister exhausting gas down
CN106040452A (en) Cyclone separator
CN208541953U (en) Wet-type spray deduster
CN101322908A (en) Wet-type high-efficient desulfation dust-extraction device and method
KR20100061622A (en) Immersion Scrubber
CN112774320A (en) Device and method for preventing secondary carrying and dedusting and demisting of rotational flow plate
RU129017U1 (en) BATTERY EMULSOR
CN107754533A (en) A kind of bubbling restrains dedusting and desulfurizing tower
CN208742179U (en) A kind of workshop dust-extraction unit
CN108905463A (en) A kind of Furniture manufacturing air pollution processing unit
CN207899173U (en) A kind of eddy flow bundled tube gas wash tower
CN205700049U (en) The super ultra-clean desulfation dust-extraction device of a kind of integration
CN205672674U (en) A kind of degree of depth dedusting demister
CN107971151A (en) A kind of liquid film type multicyclone
CN2184472Y (en) High efficient water seal duster
CN111672233A (en) Water curtain device of painting machine
CN108579278A (en) Wet-type spray deduster
CN105363310B (en) Even distribution type Rankine vortex dedusting demister and its control method
CN2559899Y (en) Turbulent type flue gas desulfurization dust remover
CN205164418U (en) Equipartition formula rankine vortex dust removal defogging device
CN210410025U (en) Glass fiber reinforced plastic dust removal tower

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180306

WW01 Invention patent application withdrawn after publication