CN107740540B - Mortise and tenon type steel core concrete column connector - Google Patents

Mortise and tenon type steel core concrete column connector Download PDF

Info

Publication number
CN107740540B
CN107740540B CN201711218822.7A CN201711218822A CN107740540B CN 107740540 B CN107740540 B CN 107740540B CN 201711218822 A CN201711218822 A CN 201711218822A CN 107740540 B CN107740540 B CN 107740540B
Authority
CN
China
Prior art keywords
steel core
concrete column
core concrete
slot
inserted block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711218822.7A
Other languages
Chinese (zh)
Other versions
CN107740540A (en
Inventor
李威
程玉锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201711218822.7A priority Critical patent/CN107740540B/en
Publication of CN107740540A publication Critical patent/CN107740540A/en
Application granted granted Critical
Publication of CN107740540B publication Critical patent/CN107740540B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section

Abstract

The present invention relates to technical field of structural engineering, provide a kind of mortise and tenon type steel core concrete column connector.The connector includes inserted link, the first steel core concrete column and the second steel core concrete column, the end face of first steel core concrete column is equipped with slot, the end face of second steel core concrete column is equipped with the inserted block cooperated with slot, the first through hole offered for wearing inserted link is extended transversely through on inserted block, and the second through-hole corresponding with first through hole is equipped on the side wall of slot two sides.The configuration of the present invention is simple, construction are convenient, not only eliminate the link of welding and cast-in-place concrete, the labor intensity of staff is greatly reduced, construction efficiency is improved, reduces environmental pollution, but also is not necessarily to additional ancillary equipment, significantly reduces construction cost.In addition, can not only constrain the relative movement of slot and inserted block by making inserted link through inserted block and slot, and also ensure between the side wall of inserted block and the side wall of slot it is reliable, effectively transmit pulling force.

Description

Mortise and tenon type steel core concrete column connector
Technical field
The present invention relates to technical field of structural engineering, and in particular to a kind of mortise and tenon type steel core concrete column connector.
Background technique
In recent years, with the continuous improvement of Chinese Urbanization level, people are to the quality of construction, speed and to ring Border influences have higher requirement.
Currently, being generally used poured in place concrete when construction or welding the mode of construction of steel, this construction Not only the construction time is long for mode, and construction quality is affected by field condition, and is easy to produce and builds waste material, generates to environment Pollution.
Summary of the invention
The object of the present invention is to provide a kind of structures simply, the convenient and fast mortise and tenon type steel core concrete column connector of construction, with Shorten the construction time, reduce environmental pollution.
To achieve the above object, the present invention provides a kind of mortise and tenon type steel core concrete column connector, which includes The end face of inserted link, the first steel core concrete column and the second steel core concrete column, first steel core concrete column is equipped with slot, The end face of second steel core concrete column is equipped with the inserted block cooperated with the slot, extends transversely through and offers on the inserted block For wearing the first through hole of the inserted link, corresponding with the first through hole second is equipped on the side wall of the slot two sides Through-hole.
Wherein, first steel core concrete column includes the first shell with the first accommodating chamber, first accommodating chamber Inside it is cast with concrete.
Wherein, second steel core concrete column includes the second shell with the second accommodating chamber, and the inserted block includes tool There is the shell of inner cavity, second accommodating chamber is connected to, to form filling chamber with the inner cavity, and the filling is intracavitary to be cast with coagulation Soil.
Wherein, the cross-sectional shape of the first steel core concrete column and/or the second steel core concrete column is rectangle, circle or ellipse It is round.
Wherein, the quantity of the first through hole be it is multiple, multiple first through hole along the inserted block length direction according to Secondary setting.
Wherein, the quantity of the slot is multiple, and the inserted block and the slot correspond.
Wherein, the slot is dovetail groove, and the inserted block is swallowtail-shaped structure.
Wherein, the dovetail angle of the dovetail groove and the swallowtail-shaped structure is 45~75 °.
It wherein, further include pushing against part, the height of the inserted block is greater than the depth of the slot, second concrete filled steel tube The end face of column is equipped with jack, and the first end for pushing against part is inserted in the jack, second end is for pushing against described first The end face of steel core concrete column.
Wherein, the abutting part is screw rod, and the jack is the threaded hole being cooperatively connected with the screw rod.
The configuration of the present invention is simple, construction are convenient, by welding prefabricated the first steel core concrete column equipped with slot in factory Be equipped with the second steel core concrete column of inserted block, and open up respectively on inserted block and slot the first through hole passed through for inserted link and Second through-hole so that staff need to only carry out simple assembly at the scene when construction, and then not only eliminates welding and existing The link of field casting concrete greatly reduces the labor intensity of staff, improves construction efficiency, reduces environment dirt Dye, but also it is not necessarily to additional ancillary equipment, significantly reduce construction cost.In addition, by making inserted link through inserted block and inserting Slot, can not only constrain the relative movement of slot and inserted block, and also ensure between the side wall of inserted block and the side wall of slot it is reliable, Effective transmitting pulling force.
Detailed description of the invention
Fig. 1 is the explosive view of one of embodiment of the present invention mortise and tenon type steel core concrete column connector;
Fig. 2 is the section view of one of embodiment of the present invention mortise and tenon type steel core concrete column connector;
Fig. 3 is the structural schematic diagram of one of embodiment of the present invention mortise and tenon type steel core concrete column connector;
Fig. 4 is the signal in mortise and tenon type steel core concrete column connector in the embodiment of the present invention after inserted block and slot grafting Figure;
Fig. 5 is to plug the schematic diagram after inserted link in mortise and tenon type steel core concrete column connector in the embodiment of the present invention;
Fig. 6 is the schematic diagram that the mortise and tenon type steel core concrete column connector in the embodiment of the present invention is installed.
Appended drawing reference:
1, the first steel core concrete column;1-1, first shell;1-2, slot;
1-3, the second through-hole;2, the second steel core concrete column;2-1, second shell;
2-2, inserted block;2-3, first through hole;2-4, jack;3, part is pushed against;4, inserted link;
5, concrete.
Specific embodiment
To keep the purposes, technical schemes and advantages of invention clearer, below in conjunction with the attached drawing in invention, in invention Technical solution be explicitly described, it is clear that described embodiment is invention a part of the embodiment, rather than whole realities Apply example.It is obtained by those of ordinary skill in the art without making creative efforts based on the embodiment in invention Every other embodiment belongs to the range of invention protection.
In the description of the present invention, unless otherwise indicated, the orientation or position of the instructions such as term "top", "bottom", "upper", "lower" Setting relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, rather than The system or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot It is interpreted as limitation of the present invention.
It should be noted that unless otherwise clearly defined and limited, term " connection " shall be understood in a broad sense, for example, can To be to be fixedly connected, may be a detachable connection, or be integrally connected;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected.For the ordinary skill in the art, tool of the above-mentioned term in invention can be understood with concrete condition Body meaning.
As shown in Figure 1, the present invention provides a kind of mortise and tenon type steel core concrete column connector, the connector include inserted link 4, First steel core concrete column 1 and the second steel core concrete column 2, the end face of the first steel core concrete column 1 are equipped with slot 1-2, the The end face of two steel core concrete columns 2 is equipped with the inserted block 2-2 that cooperates with slot 1-2, extends transversely through to offer on inserted block 2-2 and is used for The first through hole 2-3 of inserted link 4 is worn, second through-hole 1- corresponding with first through hole 2-3 is equipped on the side wall of the two sides slot 1-2 The quantity of 3, i.e. first through hole 2-3 and the second through-hole 1-3 are identical, and after slot 1-2 and inserted block 2-2 grafting, first through hole 2-3 with Corresponding second through-hole 1-3 is coaxial.
Staff only need to be by the inserted link 4 being prefabricated in the factory, the first steel core concrete column 1 and welding when constructing as a result, There is the second steel core concrete column 2 of inserted block 2-2 scene of transporting to carry out assembled.It should be noted that inserted block 2-2 is in addition to can Can also be integrally formed with the second steel core concrete column 2 with other than the welding of the second steel core concrete column 2.
When assembled: firstly, the inserted block 2-2 on the second steel core concrete column 2 is inserted into inserting on the first steel core concrete column 1 In slot 1-2;Then, one end of inserted link 4 is made to sequentially pass through the second through-hole 1-3, inserted block on the one of side wall of slot 1-2 First through hole 2-3 on 2-2 and the second through-hole 1-3 on another side wall of slot 1-2.As it can be seen that the present invention is logical It crosses and welds prefabricated the first steel core concrete column 1 equipped with slot 1-2 in factory and equipped with the second steel core concrete column of inserted block 2-2 2, and open up the first through hole 2-3 and the second through-hole 1-3 passed through for inserted link 4 respectively on inserted block 2-2 and slot 1-2, so that When construction, staff need to only carry out simple assembly at the scene, and then not only eliminate welding and cast-in-place concrete Link, greatly reduce the labor intensity of staff, improve construction efficiency, reduce environmental pollution, but also be not necessarily to Additional ancillary equipment, significantly reduces construction cost.In addition, by making inserted link 4 through inserted block 2-2 and slot 1-2, not only The relative movement of slot 1-2 and inserted block 2-2 can be constrained, and is also ensured between the side wall of inserted block 2-2 and the side wall of slot 1-2 Reliably, pulling force is effectively transmitted.
Preferably, as shown in Fig. 2, the first steel core concrete column 1 includes the first shell 1-1 with the first accommodating chamber, the Concrete 5 is cast in one accommodating chamber.Second steel core concrete column 2 includes the second shell 2-1 with the second accommodating chamber, inserted block 2-2 includes the shell with inner cavity, and the second accommodating chamber is connected to, to form filling chamber with inner cavity, and filling is intracavitary to be cast with concrete 5.It is highly preferred that second shell 2-1 and shell are integrally formed.
Wherein, the material of first shell 1-1, second shell 2-1 and shell are ordinary steel, high strength steel, fire-resistant and weather-resistant steel Or stainless steel.Concrete 5 is normal concrete or high performance concrete.
Preferably, the cross-sectional shape of the first steel core concrete column 1 and/or the second steel core concrete column 2 is rectangle, circle Or ellipse.It should be noted that the cross-sectional shape of the first steel core concrete column 1 and/or the second steel core concrete column 2 is not It is confined to rectangle, round or ellipse, as long as can guarantee its strength and stiffness.
Preferably, inserted link 4 is pin.Wherein, the material of inserted link 4 is ordinary steel, high strength steel, fire-resistant and weather-resistant steel or stainless Steel.
Preferably, the quantity of first through hole 2-3 be it is multiple, multiple first through hole 2-3 along inserted block 2-2 length direction successively Setting, that is to say, that it is logical that the length direction on slot 1-2 along slot 1-2 also is provided with identical with first through hole 2-3 quantity second Hole 1-3.When construction, multiple inserted links 4 are plugged in corresponding second through-hole 1-3 and first through hole 2-3 by staff respectively, just Active force suffered by each inserted link 4 can be significantly reduced, the service life of inserted link 4 is greatly improved.
Preferably, the quantity of slot 1-2 is multiple, and inserted block 2-2 and slot 1-2 are corresponded.
Preferably, slot 1-2 is dovetail groove, and inserted block 2-2 is swallowtail-shaped structure.Wherein, dovetail groove and swallowtail-shaped structure The size at dovetail angle can be determined according to the calculated result of stress envelope, for example, the dovetail angle of dovetail groove and swallowtail-shaped structure It is 45~75 °.
In addition, the connector further includes pushing against part 3, the height of inserted block 2-2 is greater than the depth of slot 1-2, and the second steel pipe is mixed The end face of solidifying earth pillar 2 is equipped with jack 2-4, and the first end of abutting part 3 is inserted in jack 2-4, second end is for pushing against first The end face of steel core concrete column 1.Since the height of inserted block 2-2 is greater than the depth of slot 1-2, when inserted block 2-2 is fully inserted into When in slot 1-2, i.e. when the bottom surface of the top surface of inserted block 2-2 and slot 1-2 contact, the end face of the first steel core concrete column 1 and the There is gap, so that inserted link 4 is inserted into corresponding second through-hole 1-3 and first through hole between the end face of two steel core concrete columns 2 After 2-3, staff just can adjust end of the second end for pushing against part 3 relative to the second steel core concrete column 2 by the gap The height in face, so that the second end for pushing against part 3 is supported set on the end face of the first steel core concrete column 1.And part 3 is pushed against to the first steel pipe The end face of concrete column 1, which applies upward active force, can further compress inserted link 4, push against part 3 to ensure that, inserted link 4, insert Pressure, shearing force, moment of flexure and torque can reliably, be effectively transmitted between block 2-2 and slot 1-2.
Wherein, pushing against part 3 can be screw rod, and jack 2-4 is the threaded hole being cooperatively connected with screw rod.When installation, staff Spanner turn screw rod need to only be passed through, so that it may height of the top of adjustment screw with respect to the end face of the first steel core concrete column 1.It needs Illustrate, for how to pass through the end face for pushing against part 3 and pushing against the first steel core concrete column 1, those skilled in the art are easy to Expect realizing by a variety of conventional means, for example pushing against part 3 can also be by electromagnet, rod set and the magnetic shaft being inserted in rod set Composition, electromagnet are fixedly mounted in jack 2-4, and rod set is fixedly mounted on the top of electromagnet, are powered to electromagnet, by changing Time-dependent current changes the polarity and electromagnetism intensity of electromagnet, so that electromagnet is generated opposite repulsive force to magnetic shaft, so that it may by magnetic Property bar release rod set and push against the first steel core concrete column 1 end face;Or pushing against part 3 is screw.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of invention, rather than its limitations;Although ginseng Invention is described in detail according to previous embodiment, those skilled in the art should understand that: it still can be right Technical solution documented by foregoing embodiments is modified or equivalent replacement of some of the technical features;And this It modifies or replaces, the spirit and scope for each embodiment technical solution of invention that it does not separate the essence of the corresponding technical solution.

Claims (5)

1. a kind of mortise and tenon type steel core concrete column connector, which is characterized in that including inserted link, push against part, the first concrete filled steel tube The end face of column and the second steel core concrete column, first steel core concrete column is equipped with slot, second concrete filled steel tube The end face of column is equipped with the inserted block cooperated with the slot, extends transversely through and is offered for wearing the inserted link on the inserted block First through hole is equipped with the second through-hole corresponding with the first through hole on the side wall of the slot two sides;The height of the inserted block Degree is greater than the depth of the slot, and the end face of second steel core concrete column is equipped with jack, the first end for pushing against part It is inserted in the jack, second end is for pushing against the end face of first steel core concrete column;The abutting part is screw rod, institute Stating jack is the threaded hole being cooperatively connected with the screw rod;
First steel core concrete column includes the first shell with the first accommodating chamber, is cast in first accommodating chamber mixed Solidifying soil;Second steel core concrete column includes the second shell with the second accommodating chamber, and the inserted block includes having inner cavity Shell, second accommodating chamber are connected to, to form filling chamber with the inner cavity, and the filling is intracavitary to be cast with concrete;It is described The material of first shell, the second shell and the shell is ordinary steel, high strength steel, fire-resistant and weather-resistant steel or stainless steel;Institute Stating slot is dovetail groove, and the inserted block is swallowtail-shaped structure.
2. mortise and tenon type steel core concrete column connector according to claim 1, which is characterized in that the first steel core concrete column And/or second steel core concrete column cross-sectional shape be rectangle, round or ellipse.
3. mortise and tenon type steel core concrete column connector according to claim 1, which is characterized in that the number of the first through hole It is multiple for measuring, and multiple first through hole are set gradually along the length direction of the inserted block.
4. mortise and tenon type steel core concrete column connector according to claim 1, which is characterized in that the quantity of the slot is Multiple, the inserted block and the slot correspond.
5. mortise and tenon type steel core concrete column connector according to claim 1, which is characterized in that the dovetail groove and described The dovetail angle of swallowtail-shaped structure is 45~75 °.
CN201711218822.7A 2017-11-28 2017-11-28 Mortise and tenon type steel core concrete column connector Active CN107740540B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711218822.7A CN107740540B (en) 2017-11-28 2017-11-28 Mortise and tenon type steel core concrete column connector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711218822.7A CN107740540B (en) 2017-11-28 2017-11-28 Mortise and tenon type steel core concrete column connector

Publications (2)

Publication Number Publication Date
CN107740540A CN107740540A (en) 2018-02-27
CN107740540B true CN107740540B (en) 2019-11-22

Family

ID=61239609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711218822.7A Active CN107740540B (en) 2017-11-28 2017-11-28 Mortise and tenon type steel core concrete column connector

Country Status (1)

Country Link
CN (1) CN107740540B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612259B (en) * 2018-06-28 2023-07-04 济南轨道交通集团有限公司 Assembled lattice column convenient to disassemble and use method
CN109026928B (en) * 2018-08-30 2020-04-10 东台永坚不锈钢制品有限公司 Firm type stainless steel pipe
CN109058602B (en) * 2018-08-30 2020-06-16 东台永坚不锈钢制品有限公司 Heat dissipation type stainless steel pipe
CN108999342B (en) * 2018-09-11 2023-06-20 深圳大学 Prefabricated modular assembled frame structure column-column connecting node and manufacturing method
CN110939464B (en) * 2019-11-29 2022-11-01 天地科技股份有限公司 Gob-side entry retaining combined supporting method for adjacent working faces
CN112832825B (en) * 2021-01-19 2022-04-12 华北理工大学 Assembled hollow sandwich concrete filled steel tube arch center and construction method thereof
CN113047455A (en) * 2021-04-07 2021-06-29 西安建筑科技大学 Assembled PC post-tenon formula bolted connection node
CN113445627A (en) * 2021-06-23 2021-09-28 北京建筑大学 Steel pipe concrete assembly and column structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4325639A1 (en) * 1993-07-30 1995-03-09 Michael Schreier Device for connecting column elements
CN202706210U (en) * 2012-08-27 2013-01-30 杭州港龙工艺品有限公司 House beam with mortise-tenon structure
CN106567598A (en) * 2016-11-11 2017-04-19 长兴海普机械科技有限公司 Electric pole assembly capable of being dismounted rapidly and assembling method thereof
CN207609091U (en) * 2017-11-28 2018-07-13 清华大学 Mortise and tenon type steel core concrete column connector

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4325639A1 (en) * 1993-07-30 1995-03-09 Michael Schreier Device for connecting column elements
CN202706210U (en) * 2012-08-27 2013-01-30 杭州港龙工艺品有限公司 House beam with mortise-tenon structure
CN106567598A (en) * 2016-11-11 2017-04-19 长兴海普机械科技有限公司 Electric pole assembly capable of being dismounted rapidly and assembling method thereof
CN207609091U (en) * 2017-11-28 2018-07-13 清华大学 Mortise and tenon type steel core concrete column connector

Also Published As

Publication number Publication date
CN107740540A (en) 2018-02-27

Similar Documents

Publication Publication Date Title
CN107740540B (en) Mortise and tenon type steel core concrete column connector
CN207609091U (en) Mortise and tenon type steel core concrete column connector
CN203891031U (en) Steel pipe pile continuous wall and assistant construction pile frame thereof
CN107724528A (en) One kind is used for the prefabricated overall beam column construction of " dry type " assembling concrete frame structure
CN109098280A (en) Bolt assembled beam-column frame structure and its assembly method
CN107664040A (en) A kind of prefabricated middle partition wall structure of subway tunnel
CN111561072B (en) Assembled concrete frame shear wall structure
KR101565154B1 (en) Screw pile for supporting
CN109538833A (en) It punches after outer wall of basement and adds cannula structure and its construction method
CN106480874B (en) Using the built pile and its construction method of H profile steel and concrete
CN202265941U (en) Connecting sleeve used for pressure grouting
CN103898918A (en) Combined supporting structure and construction method
CN214461822U (en) Vertical steel bar grouting sleeve of assembled shear wall structure
CN105019401A (en) Fender pile structure
CN104594533A (en) Adjustable flexible connecting structure for masonry filler wall and frame column
CN109235460A (en) A kind of double limbs energy consumption friction pile and its construction method
CN205576894U (en) A cleaning device for underground continuous wall cross -shaped steel plate connects
JP4897208B2 (en) Sleeve rebar joint structure
CN212224161U (en) Safe type drainage inspection shaft lid
CN108487311B (en) Underground comprehensive pipe rack and construction method thereof
KR200211308Y1 (en) Longitudinal coupling structure of assembled culverts
CN209670134U (en) Assembled wall right angle connecting structure
CN208830128U (en) A kind of grout sleeve
CN106760186B (en) Thin wall concrete beam in a kind of prefabricated hollow formula
CN109898749A (en) A kind of reinforcing steel bar connecting device and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant