CN107739810A - Roll steel heat treatment carrier - Google Patents

Roll steel heat treatment carrier Download PDF

Info

Publication number
CN107739810A
CN107739810A CN201711035479.2A CN201711035479A CN107739810A CN 107739810 A CN107739810 A CN 107739810A CN 201711035479 A CN201711035479 A CN 201711035479A CN 107739810 A CN107739810 A CN 107739810A
Authority
CN
China
Prior art keywords
bending segment
tube body
support tube
heat treatment
steel heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711035479.2A
Other languages
Chinese (zh)
Inventor
丁冠文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd
Original Assignee
ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd filed Critical ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd
Priority to CN201711035479.2A priority Critical patent/CN107739810A/en
Publication of CN107739810A publication Critical patent/CN107739810A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0006Details, accessories not peculiar to any of the following furnaces
    • C21D9/0025Supports; Baskets; Containers; Covers
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Clamps And Clips (AREA)

Abstract

The invention provides one kind to roll steel heat treatment carrier, belongs to equipment technical field used for metal thermal treatment.It solves the problems such as prior art design is unreasonable.Originally rolling steel heat treatment carrier includes some stiffener assemblies, all stiffener assemblies are in be coaxially disposed, include some reinforcement pipe fittings in horizontal positioned steel per stiffener assembly, middle part per all reinforcements pipe fittings in stiffener assembly is provided with size identical angle between vertical two overlapping and adjacent reinforcement pipe fittings successively, and the both ends of all reinforcement pipe fittings in every stiffener assembly are fixed with a size, shape identical is in support tube body of vertically arranged steel etc..Originally steel heat treatment is rolled with the advantages of carrier to be:The setting of the reinforcement pipe fitting of steel and support tube body enhances working strength, and settings of petal support feet improves the smoothness of support, and it is simple in construction, manufacture easy for installation, production cost is low.

Description

Roll steel heat treatment carrier
Technical field
The invention belongs to equipment technical field used for metal thermal treatment, and steel heat treatment carrying is rolled more particularly, to one kind Frame.
Background technology
Metal heat treatmet is one of important process in machine-building, and compared with other processing technologys, heat treatment is general not Change the shape of workpiece and overall chemical composition, but by changing the microscopic structure of inside workpiece, or change workpiece surface Chemical composition, assign or improve workpiece performance.It is characterized in improving the inherent quality of workpiece, and this is generally not meat What eye can be seen.To make metal works that there is required mechanical property, physical property and chemical property, except reasonable selection material Outside material and various forming technologies, Technology for Heating Processing is often essential.Steel are as material most widely used in mechanical industry Material, microstructure of iron and steel is complicated, can be controlled by heat treatment, so the heat treatment of steel is the main of metal heat treatmet Content, therefore steel are by using being preceding required for through Overheating Treatment, as the carrier that steel are carried in metal heat treatmet, and Complicated, production cost height be present in the carrier of carrying steel of the prior art, and intolerant to burning, working strength during heat treatment Low, easy the defects of caving in.
In order to solve the problems, such as that prior art is present, people have carried out long-term exploration, it is proposed that miscellaneous solution Scheme.For example, Chinese patent literature discloses a kind of bracket and device [application number for the heat treatment of batch reinforcing bar: 201320560018.8], including:The dentation knot for carrying pending batch reinforcing bar is provided with the surface of the bracket Structure, to prevent the pending batch slip of bar;It is provided with the bracket for fixing the pending batch steel The fixing band of muscle;The side of the bracket is fixed in one end of the fixing band, and the other end is removably fixed in the bracket Another opposite side etc..
Above-mentioned scheme improves the subproblem of prior art to a certain extent, and still, the program is also at least present Following defect:Complicated, steel load and unload the problems such as inconvenient.
The content of the invention
Regarding the issue above, the present invention provides a kind of reasonable in design, using effect is good to be rolled at steel heat Reason carrier.
To reach above-mentioned purpose, present invention employs following technical proposal:The present invention's rolls steel heat treatment carrying Frame, including some stiffener assemblies, for all stiffener assemblies in being coaxially disposed, it is in horizontal positioned steel to include some per stiffener assembly Reinforcement pipe fitting, pipe fittings vertical overlapping and adjacent two are strengthened in middle parts per all reinforcement pipe fittings in stiffener assembly successively Between be provided with size identical angle, be fixed with size, a shape per the both ends of all reinforcement pipe fittings in stiffener assembly Identical is in the support tube body of vertically arranged steel, and support tube body upper end bends inwards the bending segment of shape first, support tube First outwards horizontal buckling forms the second bending segment, backward interior horizontal buckling forms the 3rd bending segment for body lower end, and all first is curved Trisection in a ring be fixedly arranged on provided with hook flap seat on, the second bending segment and the 3rd bending segment are symmetrical set to form a flower Lobed support feet.The setting of the reinforcement pipe fitting and support tube body of steel enhances working strength, and simple in construction, manufacture installation Convenient, production cost is low.
Preferably, the 3rd bending segment free end is bent to form the 4th bending segment, the 4th bending segment and adjacent one laterally The second bending segment on individual support tube body is fixedly connected.Improve the stability and firmness of the support of this carrier.
Preferably, the 4th bending segment is set with the second bending segment on an adjacent support tube body in parallel, and the The side of the second bending segment on four bending segments on an adjacent support tube body is consolidated with second bending segment completely Fixed connection.Improve support strength.
Preferably, support on the 4th bending segment on tube body close to the support that the 3rd bending segment one end is adjacent with this Triangle connecting plate is provided between the second bending segment on tube body.Support degree is strengthened, and improves security.
Preferably, the quantity of the reinforcement pipe fitting in stiffener assembly is arranged for two and into right-angled intersection.
Preferably, the quantity of stiffener assembly for two and be respectively arranged at 1/3rd of support tube body height and three At/bis-.Improve the bonding strength to supporting tube body.
Compared with prior art, steel heat treatment is originally rolled with the advantages of carrier to be:The reinforcement pipe fitting and branch of steel The setting of stay tube body enhances working strength, and the setting of petal support feet improves the smoothness of support, and simple in construction, Manufacture easy for installation, production cost is low.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 provides the structural representation in the embodiment of the present invention.
In figure, strengthen pipe fitting 11, support tube body 2, the first bending segment 21, the second bending segment 22, the 3rd bending segment 23, the Four bending segments 24, triangle connecting plate 25, hook 3, flap seat 4.
Embodiment
Below in conjunction with the accompanying drawings and the present invention is described in further detail by embodiment, and following examples are to this hair Bright explanation and the invention is not limited in following examples.
As shown in figure 1, steel heat treatment carrier is originally rolled, including some stiffener assemblies, all stiffener assemblies are in same Axle is set, and includes some reinforcement pipe fittings 11 in horizontal positioned steel per stiffener assembly, often all in stiffener assembly plus The middle part of strong pipe fitting 11 is provided with size identical angle between vertical two overlapping and adjacent reinforcement pipe fittings 11 successively, often reinforcement group The both ends of all reinforcement pipe fittings 11 in part are respectively fixed with a size, shape identical is in the support of vertically arranged steel Tube body 2, support tube body 2 upper end bend inwards the first bending segment of shape 21, the first outside horizontal buckling shape in support tube body 2 lower end Into the second bending segment 22, it is backward in horizontal buckling form the 3rd bending segment 23, all first bending segments 21 being fixedly arranged in a ring On flap seat 4 provided with hook 3, the second bending segment 22 and the 3rd bending segment 23 are symmetrical set to form a petal support feet, The setting of the reinforcement pipe fitting 11 of steel and support tube body 2 enhances working strength, and it is simple in construction, manufacture is easy for installation, raw It is low to produce cost.
Specifically, the free end of the 3rd bending segment 23 here is bent to form the 4th bending segment 24, the 4th bending segment laterally 24 are fixedly connected with the second bending segment 22 on an adjacent support tube body 2, improve the stabilization of the support of this carrier Property and firmness;Here the 4th bending segment 24 is in set parallel with the second bending segment 22 on an adjacent support tube body 2 Put, and the side of the second bending segment 22 on the 4th bending segment 24 on the adjacent support tube body 2 completely with this Second bending segment 22 is fixedly connected, and improves support strength;Here close to the on the 4th bending segment 24 on support tube body 2 Triangle connecting plate is provided between the second bending segment 22 on the support tube body 2 adjacent with this of the one end of three bending segment 23 25, support degree is strengthened, and improves security.
Further, the quantity of the reinforcement pipe fitting 11 in stiffener assembly here is arranged for two and into right-angled intersection;This In stiffener assembly quantity for two and be respectively arranged on support the height of tube body 2 1/3rd at and 2/3rds at, Improve the bonding strength to supporting tube body 2.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.
Although more used herein reinforcement pipe fitting 11, support tube body 2, the first bending segment 21, the second bending segment 22, The terms such as the 3rd bending segment 23, the 4th bending segment 24, triangle connecting plate 25, hook 3, flap seat 4, but be not precluded from using other The possibility of term.It is used for the purpose of more easily describing and explaining the essence of the present invention using these terms;They are explained The limitation additional into any one is all disagreed with spirit of the present invention.

Claims (6)

1. one kind rolls steel heat treatment carrier, including some stiffener assemblies, it is characterised in that:All described reinforcement groups Part includes some reinforcement pipe fittings in horizontal positioned steel in being coaxially disposed, per described stiffener assembly(11), per described All described reinforcement pipe fittings in stiffener assembly(11)Middle part vertical overlapping and adjacent two strengthen pipe fittings successively(11) Between be provided with size identical angle, per all described reinforcement pipe fittings in described stiffener assembly(11)Both ends it is each be connected There is the support tube body that a size, shape identical are in vertically arranged steel(2), described support tube body(2)Upper end The bending segment of the shape that bends inwards first(21), described support tube body(2)First outwards horizontal buckling forms the second bending segment for lower end (22), it is backward in horizontal buckling form the 3rd bending segment(23), all the first described bending segments(21)Being fixedly arranged in a ring Provided with hook(3)Flap seat(4)On, the second described bending segment(22)With the 3rd bending segment(23)It is symmetrical set to form one Petal support feet.
2. according to claim 1 roll steel heat treatment carrier, it is characterised in that the 3rd described bending segment (23)Free end is bent to form the 4th bending segment laterally(24), described the 4th bending segment(24)With an adjacent support tube Body(2)On the second bending segment(22)It is fixedly connected.
3. according to claim 2 roll steel heat treatment carrier, it is characterised in that the 4th described bending segment (24)With an adjacent support tube body(2)On the second bending segment(22)Set in parallel, and the 4th described bending segment (24)Upper close adjacent support tube body(2)On the second bending segment(22)Side completely with second bending segment (22)It is fixedly connected.
4. according to claim 2 roll steel heat treatment carrier, it is characterised in that described support tube body (2)On the 4th described bending segment(24)Upper close 3rd bending segment(23)One end support tube body adjacent with this (2)On the second bending segment(22)Between be provided with triangle connecting plate(25).
5. according to claim 1 roll steel heat treatment carrier, it is characterised in that in described stiffener assembly Strengthen pipe fitting(11)Quantity for two and into right-angled intersection arrange.
6. according to claim 1 roll steel heat treatment carrier, it is characterised in that the number of described stiffener assembly Amount for two and be respectively arranged on support tube body(2)At 1/3rd of height and at 2/3rds.
CN201711035479.2A 2017-10-30 2017-10-30 Roll steel heat treatment carrier Pending CN107739810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711035479.2A CN107739810A (en) 2017-10-30 2017-10-30 Roll steel heat treatment carrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711035479.2A CN107739810A (en) 2017-10-30 2017-10-30 Roll steel heat treatment carrier

Publications (1)

Publication Number Publication Date
CN107739810A true CN107739810A (en) 2018-02-27

Family

ID=61233465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711035479.2A Pending CN107739810A (en) 2017-10-30 2017-10-30 Roll steel heat treatment carrier

Country Status (1)

Country Link
CN (1) CN107739810A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB328506A (en) * 1929-07-08 1930-05-01 William Shaw Improvements in, or relating to, annealing dishes
CN201459182U (en) * 2009-03-30 2010-05-12 奥达科金属制品(上海)有限公司 Heat treatment wire frame
CN202208750U (en) * 2011-07-25 2012-05-02 芜湖双源管业有限公司 Steel tape annealing material-loading device and material-isolating tray
US20130127095A1 (en) * 2010-06-14 2013-05-23 Andritz Thermtec B.V. Annealing installation with m-shaped strip treatment tunnel
CN203602680U (en) * 2013-12-02 2014-05-21 河冶科技股份有限公司 Material rack for well-type annealing furnace for annealing steel wire rod
CN203993837U (en) * 2014-08-25 2014-12-10 四川华力电子有限公司 A kind of fin post processing hanger
CN205528899U (en) * 2016-01-29 2016-08-31 乐山市金宇工业有限公司 Heat treatment system of steel
CN205741129U (en) * 2016-07-11 2016-11-30 温州元鼎铜业有限公司 A kind of annealing material rest
CN107242654A (en) * 2017-06-23 2017-10-13 厦门源创意智能科技有限公司 Multiway cane formula walk helper
CN207512230U (en) * 2017-10-30 2018-06-19 浙江超龙汽车零部件有限公司 Roll steel heat treatment carrier

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB328506A (en) * 1929-07-08 1930-05-01 William Shaw Improvements in, or relating to, annealing dishes
CN201459182U (en) * 2009-03-30 2010-05-12 奥达科金属制品(上海)有限公司 Heat treatment wire frame
US20130127095A1 (en) * 2010-06-14 2013-05-23 Andritz Thermtec B.V. Annealing installation with m-shaped strip treatment tunnel
CN202208750U (en) * 2011-07-25 2012-05-02 芜湖双源管业有限公司 Steel tape annealing material-loading device and material-isolating tray
CN203602680U (en) * 2013-12-02 2014-05-21 河冶科技股份有限公司 Material rack for well-type annealing furnace for annealing steel wire rod
CN203993837U (en) * 2014-08-25 2014-12-10 四川华力电子有限公司 A kind of fin post processing hanger
CN205528899U (en) * 2016-01-29 2016-08-31 乐山市金宇工业有限公司 Heat treatment system of steel
CN205741129U (en) * 2016-07-11 2016-11-30 温州元鼎铜业有限公司 A kind of annealing material rest
CN107242654A (en) * 2017-06-23 2017-10-13 厦门源创意智能科技有限公司 Multiway cane formula walk helper
CN207512230U (en) * 2017-10-30 2018-06-19 浙江超龙汽车零部件有限公司 Roll steel heat treatment carrier

Similar Documents

Publication Publication Date Title
CN207512230U (en) Roll steel heat treatment carrier
CN107739810A (en) Roll steel heat treatment carrier
CN207463892U (en) Directly into square unit diameter-setting equipment
CN202007079U (en) Steel coil lifting machine
CN207512226U (en) A variety of roll when steel are heat-treated uses carrier with
CN205701918U (en) A kind of nine rollers pinch straightener
CN107805702A (en) It is a variety of to roll mixed carrier during steel heat treatment
CN206335008U (en) Tube bending processing unit (plant)
CN207512213U (en) It is not easy to use loading frame with when de- material a variety of roll steel annealing
CN207512235U (en) It is simple reliably to roll steel heat treatment materials frame
CN207512233U (en) Roll steel heat treatment high intensity loading frame
CN207512229U (en) Cast steel annealing loading frame
CN207403319U (en) Binder blanking subsystem is rolled in hot pressing hybrid system
CN207512227U (en) Steel annealing is rolled with big carrying capacity rack
CN207512231U (en) Cast steel annealing rack not easily to fall off
CN207512228U (en) High intensity uses type carrier with during a variety of cast steel annealings
CN107805701A (en) Cast steel annealing loading frame
CN208527694U (en) Square rectangle wedge angle pipe hot forming production line
CN107805699A (en) Roll steel heat treatment high intensity loading frame
CN107739811A (en) It is simple reliably to roll steel heat treatment materials frame
CN209452527U (en) A kind of device of the ultra-fine microfilament of afterturn form metal
CN103639196B (en) A kind of production method of energy-saving building cold-rolled threaded reinforcing steel
CN1027967C (en) High Precision pipe straightener
CN210754501U (en) Curved guider of production with book of commodity circulation container
CN208735254U (en) A kind of High-strength compression resistant type aluminum profile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180227

WD01 Invention patent application deemed withdrawn after publication