CN107805699A - Roll steel heat treatment high intensity loading frame - Google Patents

Roll steel heat treatment high intensity loading frame Download PDF

Info

Publication number
CN107805699A
CN107805699A CN201711035482.4A CN201711035482A CN107805699A CN 107805699 A CN107805699 A CN 107805699A CN 201711035482 A CN201711035482 A CN 201711035482A CN 107805699 A CN107805699 A CN 107805699A
Authority
CN
China
Prior art keywords
steel
support tubes
material containing
base frame
containing base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711035482.4A
Other languages
Chinese (zh)
Inventor
丁冠文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd
Original Assignee
ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd filed Critical ZHEJIANG SUPER DRAGON AUTO PARTS Co Ltd
Priority to CN201711035482.4A priority Critical patent/CN107805699A/en
Publication of CN107805699A publication Critical patent/CN107805699A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0006Details, accessories not peculiar to any of the following furnaces
    • C21D9/0025Supports; Baskets; Containers; Covers
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/52Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for wires; for strips ; for rods of unlimited length

Abstract

The invention provides one kind to roll steel heat treatment high intensity loading frame, belongs to equipment technical field used for metal thermal treatment.It solves the problems such as prior art design is unreasonable.Originally rolling steel heat treatment high intensity loading frame includes the circular material containing base frame that carrying rolls the steel of steel, it is in the connection component being coaxially disposed that top in the middle part of circular material containing base frame, which is provided with least one and circular material containing base frame, connection component includes the center connecting pipe of steel, the center connecting pipe the week side of boss of steel is provided with some to each in the first junction steel plate for being correspondingly arranged, and every first junction steel plate outer end and the first support tubes in vertically arranged steel being fixedly arranged on circular material containing base frame are affixed etc..Originally steel heat treatment is rolled with the advantages of high intensity loading frame to be:The setting of the circular material containing base frame of steel, the first support tubes, the second support tubes and gland component ensure that the security for rolling steel of carrying, and it is simple in construction, be easy to manufacture.

Description

Roll steel heat treatment high intensity loading frame
Technical field
The invention belongs to equipment technical field used for metal thermal treatment, rolls steel more particularly, to one kind and is heat-treated with high-strength Spend loading frame.
Background technology
Metal heat treatmet is one of important process in machine-building, and compared with other processing technologys, heat treatment is general not Change the shape of workpiece and overall chemical composition, but by changing the microscopic structure of inside workpiece, or change workpiece surface Chemical composition, assign or improve workpiece performance.It is characterized in improving the inherent quality of workpiece, and this is generally not meat What eye can be seen.To make metal works that there is required mechanical property, physical property and chemical property, except reasonable selection material Outside material and various forming technologies, Technology for Heating Processing is often essential.Steel are as material most widely used in mechanical industry Material, microstructure of iron and steel is complicated, can be controlled by heat treatment, so the heat treatment of steel is the main of metal heat treatmet Content, therefore steel are by using being preceding required for through Overheating Treatment, as the carrier that steel are carried in metal heat treatmet, and Complicated, production cost height be present in the carrier of carrying steel of the prior art, and intolerant to burning, working strength during heat treatment Low, easy the defects of caving in.
In order to solve the problems, such as that prior art is present, people have carried out long-term exploration, it is proposed that miscellaneous solution Scheme.For example, Chinese patent literature discloses a kind of bracket and device [application number for the heat treatment of batch reinforcing bar: 201320560018.8], including:The dentation knot for carrying pending batch reinforcing bar is provided with the surface of the bracket Structure, to prevent the pending batch slip of bar;It is provided with the bracket for fixing the pending batch steel The fixing band of muscle;The side of the bracket is fixed in one end of the fixing band, and the other end is removably fixed in the bracket Another opposite side etc..
Above-mentioned scheme improves the subproblem of prior art to a certain extent, and still, the program is also at least present Following defect:Complicated, steel load and unload the problems such as inconvenient.
The content of the invention
Regarding the issue above, the present invention provides a kind of reasonable in design, using effect is good to be rolled at steel heat Reason uses high intensity loading frame.
To reach above-mentioned purpose, present invention employs following technical proposal:The steel that roll of the present invention are heat-treated with high-strength Loading frame is spent, including carrying rolls the circular material containing base frame of the steel of steel, it is characterised in that:It is upper in the middle part of circular material containing base frame It is in the connection component being coaxially disposed that side, which is provided with least one and circular material containing base frame, and connection component includes the center connecting tube of steel Part, the center connecting pipe the week side of boss of steel are provided with some to being in each the first junction steel plate being correspondingly arranged, every first connection steel Plate outer end and the first support tubes in vertically arranged steel being fixedly arranged on circular material containing base frame are affixed, every first support tube Part outside spacers are provided with corresponding second support tubes in vertically arranged steel, every first support tubes and The gland component that the vertical upper end side of two support tubes offers some steels for rolling steel landing for preventing carrying is inserted The the first protection jack for entering and fixing, first protects the cutting that steel is inserted with jack.The circular material containing base frame of steel, first The setting of stay tube part, the second support tubes and gland component ensure that the security for rolling steel of carrying, and simple in construction, just In manufacture.
Preferably, gland component includes cover clamp, and the upper surface of cover clamp is provided with hanger, erected on the lower surface of cover clamp To provided with the quantity intubation consistent with the quantity summation of the first support tubes and the second support tubes, intubation is provided with quantity, big The second protection jack that small, shape is adapted with the first protection jack.Manufacturing cost is low, is easy to dismount, uses.
Preferably, it is intubated upper end outward bending and forms an annular flange plate completely affixed with cover clamp upper surface.Carry The high degree of being connected firmly of intubation.
Preferably, the second junction steel plate is provided between every first support tubes and corresponding second support tubes.Add Strong bonding strength between first support tubes and the second support tubes.
Preferably, it is installed with triangular reinforcing plate one between the first support tubes side and circular material containing base frame;Second Triangular reinforcing plate two is installed between stay tube part side and circular material containing base frame.Improve the first support tubes, the second support Bonding strength between pipe fitting and circular material containing base frame.
Preferably, circular material containing base frame includes annular pipe fitting, and being interval with annular pipe fitting some has identical central angle Fan-shaped loading plate, the first support tubes and the second support tubes are fixedly arranged on fan-shaped loading plate.Ensureing the feelings of working strength Under shape, material is saved, reduces manufacturing cost.
Preferably, the number of connection component is one, and the lower surface of the connection component is fixedly arranged on circular material containing base frame. Further increase the firmness of connection component.
Compared with prior art, steel heat treatment is originally rolled with the advantages of high intensity loading frame to be:The circular load of steel Expect that the setting of base frame, the first support tubes, the second support tubes and gland component ensure that the security for rolling steel of carrying, And it is simple in construction, be easy to manufacture.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 provides the structural representation top view of the embodiment of the present invention.
Fig. 2 provides the structural representation side view of the gland component in the embodiment of the present invention.
Fig. 3 provides the structural representation when embodiment of the present invention does not install gland component.
In figure, circular material containing base frame 1, annular pipe fitting 11, fan-shaped loading plate 12, center connecting pipe 21, first connect steel Plate 22, the second junction steel plate 23, the first support tubes 3, the second support tubes 4, hanger 5, triangular reinforcing plate 1, triangle Reinforcing plate 2 62, first protects jack 71, second to protect jack 72, cover clamp 81, intubation 82, annular flange plate 83.
Embodiment
Below in conjunction with the accompanying drawings and the present invention is described in further detail by embodiment, and following examples are to this hair Bright explanation and the invention is not limited in following examples.
As shown in Figures 1 to 3, steel heat treatment high intensity loading frame is originally rolled, including carrying rolls the steel of steel Circular material containing base frame 1, it is characterised in that:The top at the circular middle part of material containing base frame 1 is in circular material containing base frame 1 provided with least one The connection component being coaxially disposed, connection component include the center connecting pipe 21 of steel, the week side of boss of center connecting pipe 21 of steel Provided with some to each in the first junction steel plate 22 being correspondingly arranged, every outer end of first junction steel plate 22 is with being fixedly arranged on circular material containing Affixed in the first support tubes 3 of vertically arranged steel on base frame 1, every outside spacers of first support tubes 3 are provided with one Corresponding the second support tubes 4 in vertically arranged steel, every support tubes 4 of first support tubes 3 and second are erected To upper end side offer it is some for prevent carrying roll steel landing steels gland components be inserted and fixed first Protect jack 71, be inserted with the cutting of steel in the first protection jack 71, the circular material containing base frame 1 of steel, the first support tubes 3, The setting of second support tubes 4 and gland component ensure that the security for rolling steel of carrying, and it is simple in construction, be easy to make Make.
Specifically, gland component here includes cover clamp 81, and the upper surface of cover clamp 81 is provided with hanger 5, cover clamp The quantity intubation 82 consistent with the quantity summation of the first support tubes 3 and the second support tubes 4 is vertically provided with 81 lower surface, Intubation 82 is provided with the second protection jack 72 that quantity, size, shape are adapted with the first protection jack 71, and manufacturing cost is low, It is easy to dismount, uses;Here the upper end outward bending of intubation 82 forms an annular completely affixed with the upper surface of cover clamp 81 Flanged plate 83, improve the degree of being connected firmly of intubation 82;Here every first support tubes 3 and corresponding second support tube The second junction steel plate 23 is provided between part 4, strengthens bonding strength between the first support tubes 3 and the second support tubes 4;Here The side of the first support tubes 3 and circular material containing base frame 1 between be installed with triangular reinforcing plate 1, the second support tubes 4 one Triangular reinforcing plate 2 62 is installed between side and circular material containing base frame 1, improves the first support tubes 3, the second support tubes 4 With the bonding strength between circular material containing base frame 1.
Further, circular material containing base frame 1 here includes annular pipe fitting 11, and some tools are interval with annular pipe fitting 11 There is the fan-shaped loading plate 12 of identical central angle, the first support tubes 3 and the second support tubes 4 are fixedly arranged on fan-shaped loading plate 12, In the case of working strength is ensured, material is saved, reduces manufacturing cost;Here the number of connection component is one, And the lower surface of the connection component is fixedly arranged on circular material containing base frame 1, the firmness of connection component is further increased.
Specific embodiment described herein is only to spirit explanation for example of the invention.Technology belonging to the present invention is led The technical staff in domain can be made various modifications or supplement to described specific embodiment or be replaced using similar mode Generation, but without departing from the spiritual of the present invention or surmount scope defined in appended claims.
Although circular material containing base frame 1, annular pipe fitting 11, fan-shaped loading plate 12, center connecting tube have more been used herein Part 21, the first junction steel plate 22, the second junction steel plate 23, the first support tubes 3, the second support tubes 4, hanger 5, triangle add Strong plate 1, triangular reinforcing plate 2 62, first protect jack 71, second to protect jack 72, cover clamp 81, intubation 82, annular The grade term of flanged plate 83, but it is not precluded from the possibility using other terms.Using these terms just for the sake of more easily Describe and explain the essence of the present invention;Being construed as any additional limitation is disagreed with spirit of the present invention 's.

Claims (7)

1. one kind rolls steel heat treatment high intensity loading frame, including carrying rolls the circular material containing base frame of the steel of steel (1), it is characterised in that:Described circular material containing base frame(1)The top at middle part is provided with least one and circular material containing base frame(1)It is in The connection component being coaxially disposed, described connection component include the center connecting pipe of steel(21), the center of described steel Connecting pipe(21)The week side of boss is provided with some to each in the first junction steel plate being correspondingly arranged(22), per the first described connection steel Plate(22)Outer end is with being fixedly arranged on circular material containing base frame(1)On the first support tubes in vertically arranged steel(3)It is affixed, often The first described support tubes(3)Outside spacers are provided with corresponding second support tubes in vertically arranged steel (4), per the first described support tubes(3)With the second support tubes(4)Vertical upper end side offer it is some for preventing from holding The first protection jack that the gland component of the steel for rolling steel landing of load is inserted and fixed(71), described first protection inserts Hole(71)Inside it is inserted with the cutting of steel.
2. according to claim 1 roll steel heat treatment high intensity loading frame, it is characterised in that described gland group Part includes cover clamp(81), described cover clamp(81)Upper surface be provided with hanger(5), described cover clamp(81)Lower end Quantity and the first support tubes are vertically provided with face(3)With the second support tubes(4)The consistent intubation of quantity summation(82), institute The intubation stated(82)It is provided with quantity, size, shape and the first protection jack(71)The second protection jack being adapted(72).
3. according to claim 2 roll steel heat treatment high intensity loading frame, it is characterised in that per described intubation (82)Upper end outward bending forms one and cover clamp(81)The completely affixed annular flange plate in upper surface(83).
4. according to claim 1 roll steel heat treatment high intensity loading frame, it is characterised in that per described first Support tubes(3)With corresponding second support tubes(4)Between be provided with the second junction steel plate(23).
5. according to claim 1 roll steel heat treatment high intensity loading frame, it is characterised in that described first Stay tube part(3)Side and circular material containing base frame(1)Between be installed with triangular reinforcing plate one(61);The second described support tubes (4)Side and circular material containing base frame(1)Between be installed with triangular reinforcing plate two(62).
6. according to claim 1 roll steel heat treatment high intensity loading frame, it is characterised in that described circular load Expect base frame(1)Including annular pipe fitting(11), described annular pipe fitting(11)Inside it is interval with some fans with identical central angle Shape loading plate(12), described the first support tubes(3)With the second support tubes(4)It is fixedly arranged on fan-shaped loading plate(12)On.
7. according to claim 1 roll steel heat treatment high intensity loading frame, it is characterised in that described connection group The number of part is one, and the lower surface of the connection component is fixedly arranged on circular material containing base frame(1)On.
CN201711035482.4A 2017-10-30 2017-10-30 Roll steel heat treatment high intensity loading frame Pending CN107805699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711035482.4A CN107805699A (en) 2017-10-30 2017-10-30 Roll steel heat treatment high intensity loading frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711035482.4A CN107805699A (en) 2017-10-30 2017-10-30 Roll steel heat treatment high intensity loading frame

Publications (1)

Publication Number Publication Date
CN107805699A true CN107805699A (en) 2018-03-16

Family

ID=61582944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711035482.4A Pending CN107805699A (en) 2017-10-30 2017-10-30 Roll steel heat treatment high intensity loading frame

Country Status (1)

Country Link
CN (1) CN107805699A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0567435A1 (en) * 1992-04-22 1993-10-27 Efsa Reel for storing and transporting flexible material such as cables
CN201601022U (en) * 2010-01-06 2010-10-06 佛山市的特非晶电气有限公司 Iron-core annealing bracket of transformer
CN201678709U (en) * 2010-04-30 2010-12-22 安徽精诚铜业股份有限公司 Bell-type annealing furnace rack
CN202208750U (en) * 2011-07-25 2012-05-02 芜湖双源管业有限公司 Steel tape annealing material-loading device and material-isolating tray
CN202337784U (en) * 2011-11-29 2012-07-18 自贡大业高压容器有限责任公司 Biogas generating tower and padding support frame thereof
CN202830107U (en) * 2012-09-20 2013-03-27 洛阳鼎辉特钢制品股份有限公司 Steel wire rod annealing rack applicable to pit furnace
DE102014205426A1 (en) * 2014-03-24 2015-09-24 Siemens Aktiengesellschaft Frame for holding components
CN205709501U (en) * 2016-04-25 2016-11-23 中国海洋石油总公司 A kind of shipment suspension bucket being easy to material handling
CN205936981U (en) * 2016-08-22 2017-02-08 三一重型能源装备有限公司 A a frame construction and a tower section of thick bamboo for a tower section of thick bamboo
CN207512233U (en) * 2017-10-30 2018-06-19 浙江超龙汽车零部件有限公司 Roll steel heat treatment high intensity loading frame

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0567435A1 (en) * 1992-04-22 1993-10-27 Efsa Reel for storing and transporting flexible material such as cables
CN201601022U (en) * 2010-01-06 2010-10-06 佛山市的特非晶电气有限公司 Iron-core annealing bracket of transformer
CN201678709U (en) * 2010-04-30 2010-12-22 安徽精诚铜业股份有限公司 Bell-type annealing furnace rack
CN202208750U (en) * 2011-07-25 2012-05-02 芜湖双源管业有限公司 Steel tape annealing material-loading device and material-isolating tray
CN202337784U (en) * 2011-11-29 2012-07-18 自贡大业高压容器有限责任公司 Biogas generating tower and padding support frame thereof
CN202830107U (en) * 2012-09-20 2013-03-27 洛阳鼎辉特钢制品股份有限公司 Steel wire rod annealing rack applicable to pit furnace
DE102014205426A1 (en) * 2014-03-24 2015-09-24 Siemens Aktiengesellschaft Frame for holding components
CN205709501U (en) * 2016-04-25 2016-11-23 中国海洋石油总公司 A kind of shipment suspension bucket being easy to material handling
CN205936981U (en) * 2016-08-22 2017-02-08 三一重型能源装备有限公司 A a frame construction and a tower section of thick bamboo for a tower section of thick bamboo
CN207512233U (en) * 2017-10-30 2018-06-19 浙江超龙汽车零部件有限公司 Roll steel heat treatment high intensity loading frame

Similar Documents

Publication Publication Date Title
CN207512233U (en) Roll steel heat treatment high intensity loading frame
CN103510044A (en) Tool for performing preservative treatment on zinc-nickel seeping layers of steel rail fastener elastic strips
CN107805699A (en) Roll steel heat treatment high intensity loading frame
CN207512213U (en) It is not easy to use loading frame with when de- material a variety of roll steel annealing
CN206219057U (en) A kind of steel bar truss floor support plate suspender
CN207512226U (en) A variety of roll when steel are heat-treated uses carrier with
CN107805702A (en) It is a variety of to roll mixed carrier during steel heat treatment
CN207512231U (en) Cast steel annealing rack not easily to fall off
CN104803308A (en) Hoisting apparatus for assembly of steel tube stiffening rings
CN207512229U (en) Cast steel annealing loading frame
CN107739786A (en) It is not easy a variety of of de- material and rolls mixed loading frame during steel annealing
CN107760851A (en) Cast steel annealing bin difficult for drop-off
CN107805700A (en) High intensity uses type carrier with during a variety of cast steel annealings
CN207512228U (en) High intensity uses type carrier with during a variety of cast steel annealings
CN107739811A (en) It is simple reliably to roll steel heat treatment materials frame
CN107805701A (en) Cast steel annealing loading frame
CN105712183B (en) A kind of high angle belt conveyer special hanger
CN207512227U (en) Steel annealing is rolled with big carrying capacity rack
CN107059031A (en) The preparation method of galvanizing by dipping pickling process spacing Special hoisting hanger and its application
CN209396396U (en) Fashioned iron auxiliary processing device
CN208732439U (en) The vertical suspended travel device of steel pipe
CN207211481U (en) Keel are stitched in one kind
CN207062411U (en) Blind hole class workpiece Electropolating hangers device
CN208680169U (en) A kind of four-high mill rack working roll wear-resistant liner special hoisting tooling
CN107760853A (en) Steel annealing is rolled with big carrying capacity bin

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180316