CN107730048A - 一种风电‑电动汽车联合系统随机鲁棒优化调度方法 - Google Patents

一种风电‑电动汽车联合系统随机鲁棒优化调度方法 Download PDF

Info

Publication number
CN107730048A
CN107730048A CN201711010394.9A CN201711010394A CN107730048A CN 107730048 A CN107730048 A CN 107730048A CN 201711010394 A CN201711010394 A CN 201711010394A CN 107730048 A CN107730048 A CN 107730048A
Authority
CN
China
Prior art keywords
mrow
msub
electric automobile
wind power
power output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711010394.9A
Other languages
English (en)
Other versions
CN107730048B (zh
Inventor
娄素华
蒋效康
吴耀武
范臻
王永灿
高逸
邓婷婷
王淑云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Original Assignee
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology filed Critical Huazhong University of Science and Technology
Priority to CN201711010394.9A priority Critical patent/CN107730048B/zh
Publication of CN107730048A publication Critical patent/CN107730048A/zh
Application granted granted Critical
Publication of CN107730048B publication Critical patent/CN107730048B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/40Engine management systems

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Wind Motors (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种风电‑电动汽车联合系统随机鲁棒优化调度方法,应用于电动汽车集群优化调度技术领域,所述方法包括:基于风电历史出力数据,生成风电出力概率场景;以最小化系统运行成本为目标,结合风电出力概率场景,建立二阶段日前随机调度模型;基于鲁棒理论建立含电动汽车的二阶段日前随机鲁棒调度模型,对系统常规机组出力及电动汽车充放电进行优化。本发明结合风电出力概率场景,基于二阶段随机优化方法和鲁棒理论,以系统运行成本最小化为目标,建立含电动汽车的二阶段日前随机鲁棒优化调度模型。对于指导电动汽车以集群形式接入电网进行参与统一调度,有一定的参考价值。

Description

一种风电-电动汽车联合系统随机鲁棒优化调度方法
技术领域
本发明属于电动汽车集群优化调度技术领域,更具体地,涉及一种风 电-电动汽车联合系统随机鲁棒优化调度方法。
背景技术
到2020年,中国风电装机预计将达到2.4亿kW。由于风电具有随机 性和波动性,大规模风电并网会增大电力系统调度压力,并导致严重的风 电消纳问题。因而常规电源的调节能力和电网传统的调度运行方式已经不 能满足大规模风电的调度和消纳需求。同时,随着电动汽车充换电站的建 设和推广,电动汽车作为一种新的负荷资源参与到电网调度中。然而,大 规模电动汽车无序充电易造成电网负荷“峰上加峰”等不利影响。因此, 建立科学的电动汽车充放电策略,合理安排电动汽车参与含风电电力系统 日前调度具有重要意义。
发明内容
针对现有技术的以上缺陷或改进需求,本发明提供了一种风电-电动汽 车联合系统随机鲁棒优化调度方法,由此解决由于大规模电动汽车无序充 电易而造成电网负荷“峰上加峰”等不利影响的技术问题。
为实现上述目的,本发明提供了一种风电-电动汽车联合系统随机鲁棒 优化调度方法,包括:
(1)由历史风电出力曲线确定初始聚类中心,根据每条历史风电出力 曲线与各初始聚类中心的距离对历史风电出力曲线进行分类,计算每个类 别中新的聚类中心并重新聚类,直至聚类准则函数不再发生变化,以得到 各类风电出力场景的概率;
(2)以最小化系统运行成本为目标,结合各类风电出力场景的概率, 建立二阶段日前随机调度模型;
(3)基于二阶段日前随机调度模型以及鲁棒理论,以各调度时段处于 行驶状态的电动汽车数量为扰动变量,建立含电动汽车的二阶段日前随机 鲁棒调度模型,以对系统常规机组出力及电动汽车充放电进行优化。
优选地,步骤(1)具体包括:
(1.1)从k条历史风电出力曲线Pm(m=1,2,3,...,k)中选出n条风电出力曲 线作为初始聚类中心Mi(i=1,2,3,...,n);
(1.2)根据用户需求确定各调度时段风电出力在聚类过程中所占的权 重系数wt(t=1,2,3,...,24);
(1.3)依次计算每条风电出力曲线与各初始聚类中心Mi的距离lkn,将 风电出力曲线分类到与该风电出力曲线距离最近的初始距聚类中心对应的 类别中,其中,Pmt表示风电出力曲线Pm在t时刻的出力 值,Mit表示初始聚类中心Mi在t时刻的出力值,NT为调度时段数目;
(1.4)计算每个类别中新的聚类中心并重新聚类,直至聚类准则函数 不再发生变化,以得到各类风电出力场景的概率。
优选地,所述聚类准则函数为:其中,emi为状态变量,且Ri为第i个风电出力场景中所有风电出力 曲线的集合,N表示聚类中心数目,D表示加权欧式距离;
第i类风电出力场景的概率为
优选地,所述二阶段日前随机调度模型表示为:其中,NT为调度时段数 目,NG为常规机组数目,Nw为风电场数目,Ns为风电出力的场景数目,为常规机组g在时段t的启动费用,为风电场w的单位弃风惩罚费用, 为风电场w的弃风量,ug,t,s为常规机组g在时段t的启停状态,为0或 1变量,为1表示运行状态,为0表示停运状态,ρs为风电出力场景s出现 的概率,Pg,t,s为常规机组g第t时段出力,CEV,t为电动汽车放电补贴费用,为电动汽车放电功率,f(Pg,t,s)为Pg,t,s出力下常规机组的运行成本。
优选地,所述二阶段日前随机调度模型满足的约束条件为:功率平衡 约束、输电容量约束、机组爬坡约束、机组启停约束、电动汽车电池电量 约束以及电动汽车功率约束。
优选地,所述含电动汽车的二阶段日前随机鲁棒调度模型表示为:
其中,Xt,sHt,s均为等价转换中引入的辅助决策变量,无 具体意义,Γ为鲁棒系数,NTR,t表示t时刻处于行驶状态的电动汽车总数,Nd,t为t时刻处于行驶状态的电动汽车数量的预测值,Nf,t为t时刻处于行驶状 态的电动汽车数量的最大波动范围,为t时段的处于放电状态的电动汽 车数量,为t时段的处于充电状态的电动汽车数量,当Γ为0时,该模 型为确定性模型,未考虑电动汽车不确定性的影响,当Γ为1时,该模型为最保守形式下的随机鲁棒日前调度模型。
总体而言,通过本发明所构思的以上技术方案与现有技术相比,能够 取得下列有益效果:
(1)本发明将电动汽车视为虚拟机组参与含风电电力系统日前调度;
(2)本发明通过概率场景处理风电不确定性,通过鲁棒理论处理电动 汽车不确定性,充分考虑风电和电动汽车给电力系统日前调度带来的影响;
(3)本发明适用于含风电、电动汽车的电力系统日前调度建模仿真, 对于指导电动汽车以集群形式接入电网进行统一调度有一定参考价值。
附图说明
图1为本发明实施例公开的一种风电-电动汽车联合系统随机鲁棒优化 调度方法的流程示意图;
图2为本发明实施例公开的一种调度周期内各时段处于行驶状态电动 汽车数量;
图3为本发明实施例公开的一种风电出力概率场景图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图 及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体 实施例仅用以解释本发明,并不用于限定本发明。此外,下面所描述的本 发明各个实施方式中所涉及到的技术特征只要彼此之间未构成冲突就可以 相互组合。
如图1所示为本发明实施例公开的一种风电-电动汽车联合系统随机鲁 棒优化调度方法的流程示意图,在图1所示的方法中,包括以下步骤:
(1)由历史风电出力曲线确定初始聚类中心,根据每条历史风电出力 曲线与各初始聚类中心的距离对历史风电出力曲线进行分类,计算每个类 别中新的聚类中心并重新聚类,直至聚类准则函数不再发生变化,以得到 各类风电出力场景的概率;
(2)以最小化系统运行成本为目标,结合各类风电出力场景的概率, 建立二阶段日前随机调度模型;
(3)基于二阶段日前随机调度模型以及鲁棒理论,以各调度时段处于 行驶状态的电动汽车数量为扰动变量,建立含电动汽车的二阶段日前随机 鲁棒调度模型,以对系统常规机组出力及电动汽车充放电进行优化。
在一个可选的实施方式中,步骤(1)具体包括:
(1.1)从k条历史风电出力曲线Pm(m=1,2,3,...,k)中选出n条风电出力曲 线作为初始聚类中心Mi(i=1,2,3,...,n);
(1.2)根据用户需求确定各调度时段风电出力在聚类过程中所占的权 重系数wt(t=1,2,3,...,24);
(1.3)依次计算每条风电出力曲线与各初始聚类中心Mi的距离lkn,将 风电出力曲线分类到与该风电出力曲线距离最近的初始距聚类中心对应的 类别中,其中,Pmt表示风电出力曲线Pm在t时刻的出力 值,Mit表示初始聚类中心Mi在t时刻的出力值,NT为调度时段数目,优选 为24;
(1.4)计算每个类别中新的聚类中心并重新聚类,直至聚类准则函数 不再发生变化,以得到各类风电出力场景的概率。
其中,聚类准则函数为:其中,emi为状 态变量,且Ri为第i个风电出力场景中所有风电出力曲线 的集合,N表示聚类中心数目,D表示加权欧式距离;
第i类风电出力场景的概率为
在一个可选的实施方式中,步骤(2)中的二阶段日前随机调度模型表 示为:
其中,NT为调度时 段数目,NG为常规机组数目,Nw为风电场数目,Ns为风电出力的场景数目, 为常规机组g在时段t的启动费用,为风电场w的单位弃风惩罚费 用,为风电场w的弃风量,ug,t,s为常规机组g在时段t的启停状态,为 0或1变量,为1表示运行状态,为0表示停运状态,ρs为风电出力场景s 出现的概率,Pg,t,s为常规机组g第t时段出力,CEV,t为电动汽车放电补贴费 用,为电动汽车放电功率,f(Pg,t,s)为Pg,t,s出力下常规机组的运行成本。
在一个可选的实施方式中,步骤(2)中的二阶段日前随机调度模型满 足的约束条件为:功率平衡约束、输电容量约束、机组爬坡约束、机组启 停约束、电动汽车电池电量约束以及电动汽车功率约束。
其中,功率平衡约束为:其中Ld,t,s为负 荷点d在时段t的负荷预测值,Pw,t,s为风电场w在时段t的出力,分 别为时段t电动汽车充、放电功率,ND表示负荷节点总数;
输电容量约束为:其中,T为功率传输分配系数矩阵,为时段t系统的注入功率列向量,F分别为线路输电容量上下限的列向 量;
机组爬坡约束为:其中,rup,g和rdn,g分别为常规 机组g的上下爬坡速率;
机组启停约束为:其中分别为常 规机组g的最小运行时间和最小停机时间;
电动汽车电池电量约束为:其中Es,t为电动汽车集在t时段的总电量,ηc为充电效率,ηd为放电效率,为个体平均充电功率,为个体平均放电功率,为t时段的处于充电 状态的电动汽车数量,为t时段的处于放电状态的电动汽车数量,NTR,t表 示t时段的处于行驶状态的电动汽车数量,NEV表示电动汽车总数,Dav为电 动汽车日均行驶里程,λ为电动汽车单位里程耗电量,Es,t-1表示电动汽车集 在t-1时段的总电量;
电动汽车功率约束为:
在一个可选的实施方式中,在步骤(3)中的含电动汽车的二阶段日前 随机鲁棒调度模型表示为:
其中,Xt,sHt,s均为等价转换中引入的辅助决策变量,无 具体意义,Γ为鲁棒系数,NTR,t表示t时刻处于行驶状态的电动汽车总数,Nd,t为t时刻处于行驶状态的电动汽车数量的预测值,Nf,t为t时刻处于行驶状 态的电动汽车数量的最大波动范围,为t时段的处于放电状态的电动汽 车数量,为t时段的处于充电状态的电动汽车数量,当Γ为0时,该模 型为确定性模型,未考虑电动汽车不确定性的影响,当Γ为1时,该模型为最保守形式下的随机鲁棒日前调度模型。
以下结合附图及实施例对本发明方法进行举例说明。
以RTS-24节点系统作为算例进行验证,在节点21接入600MW,系统 日最大负荷为3250MW,接入系统中的电动汽车数量为50000辆,电动汽 车参数参见表1,各调度时段处于行驶状态的电动汽车数量预测值参见图2。 风电聚类结果参见图3。在模型计算中,取电动汽车在计算时段行驶数量最 大偏差为其预测值的30%。测试计算采用MATLAB软件Gurobi求解器进 行求解。不同鲁棒系数下系统日前调度优化结果参加表2。
根据表2,对比不同鲁棒系数下的结果可见,随着鲁棒系数的增大,系 统日运行成本逐渐增大。这是由于当鲁棒系数的增大时,即电动汽车集群 各时刻消耗电量的实际值与预测值之间偏差增大,为了保证系统内部的功 率平衡,调度决策方案趋于保守,相应的日运行成本增大。算例结果验证 了该方法的有效性。
表1
表2
鲁棒系数 0 0.2 0.4
总费用(103$) 14605.5 14670.3 14679.8
常规机组费用(103$) 14594.2 14660.9 14670.03
启停费用(103$) 6.3 5.25 5.6
弃风费用(103$) 0 0 0
电动汽车放电成本(103$) 4.670 4.1653 4.1654
本领域的技术人员容易理解,以上所述仅为本发明的较佳实施例而已, 并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等 同替换和改进等,均应包含在本发明的保护范围之内。

Claims (6)

1.一种风电-电动汽车联合系统随机鲁棒优化调度方法,其特征在于,包括:
(1)由历史风电出力曲线确定初始聚类中心,根据每条历史风电出力曲线与各初始聚类中心的距离对历史风电出力曲线进行分类,计算每个类别中新的聚类中心并重新聚类,直至聚类准则函数不再发生变化,以得到各类风电出力场景的概率;
(2)以最小化系统运行成本为目标,结合各类风电出力场景的概率,建立二阶段日前随机调度模型;
(3)基于二阶段日前随机调度模型以及鲁棒理论,以各调度时段处于行驶状态的电动汽车数量为扰动变量,建立含电动汽车的二阶段日前随机鲁棒调度模型,以对系统常规机组出力及电动汽车充放电进行优化。
2.根据权利要求1所述的方法,其特征在于,步骤(1)具体包括:
(1.1)从k条历史风电出力曲线Pm(m=1,2,3,...,k)中选出n条风电出力曲线作为初始聚类中心Mi(i=1,2,3,...,n);
(1.2)根据用户需求确定各调度时段风电出力在聚类过程中所占的权重系数wt(t=1,2,3,...,24);
(1.3)依次计算每条风电出力曲线与各初始聚类中心Mi的距离lkn,将风电出力曲线分类到与该风电出力曲线距离最近的初始距聚类中心对应的类别中,其中,Pmt表示风电出力曲线Pm在t时刻的出力值,Mit表示初始聚类中心Mi在t时刻的出力值,NT为调度时段数目;
(1.4)计算每个类别中新的聚类中心并重新聚类,直至聚类准则函数不再发生变化,以得到各类风电出力场景的概率。
3.根据权利要求2所述的方法,其特征在于,所述聚类准则函数为:其中,emi为状态变量,且Ri为第i个风电出力场景中所有风电出力曲线的集合,N表示聚类中心数目,D表示加权欧式距离;
第i类风电出力场景的概率为
4.根据权利要求1至3任意一项所述的方法,其特征在于,所述二阶段日前随机调度模型表示为:
其中,NT为调度时段数目,NG为常规机组数目,Nw为风电场数目,Ns为风电出力的场景数目,为常规机组g在时段t的启动费用,为风电场w的单位弃风惩罚费用,为风电场w的弃风量,ug,t,s为常规机组g在时段t的启停状态,为0或1变量,为1表示运行状态,为0表示停运状态,ρs为风电出力场景s出现的概率,Pg,t,s为常规机组g第t时段出力,CEV,t为电动汽车放电补贴费用,为电动汽车放电功率,f(Pg,t,s)为Pg,t,s出力下常规机组的运行成本。
5.根据权利要求4所述的方法,其特征在于,所述二阶段日前随机调度模型满足的约束条件为:功率平衡约束、输电容量约束、机组爬坡约束、机组启停约束、电动汽车电池电量约束以及电动汽车功率约束。
6.根据权利要求5所述的方法,其特征在于,所述含电动汽车的二阶段日前随机鲁棒调度模型表示为:
<mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <mi>F</mi> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>T</mi> </msub> </munderover> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>g</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>G</mi> </msub> </munderover> <msubsup> <mi>S</mi> <mrow> <mi>g</mi> <mo>,</mo> <mi>t</mi> </mrow> <mrow> <mi>o</mi> <mi>n</mi> </mrow> </msubsup> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>s</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>S</mi> </msub> </munderover> <msub> <mi>&amp;rho;</mi> <mi>s</mi> </msub> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>T</mi> </msub> </munderover> <mo>&amp;lsqb;</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>g</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>G</mi> </msub> </munderover> <msub> <mi>u</mi> <mrow> <mi>g</mi> <mo>,</mo> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> </msub> <mi>f</mi> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mrow> <mi>g</mi> <mo>,</mo> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>+</mo> <msub> <mi>C</mi> <mrow> <mi>E</mi> <mi>V</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <msubsup> <mi>P</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> <mo>&amp;rsqb;</mo> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mi>N</mi> <mo>=</mo> <mo>{</mo> <msub> <mi>N</mi> <mrow> <mi>T</mi> <mi>R</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>N</mi> <mrow> <mi>d</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>+</mo> <msub> <mi>z</mi> <mi>t</mi> </msub> <msub> <mi>N</mi> <mrow> <mi>f</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>,</mo> <mo>&amp;ForAll;</mo> <mi>t</mi> <mo>&amp;Element;</mo> <msub> <mi>N</mi> <mi>T</mi> </msub> <mo>|</mo> <msub> <mi>z</mi> <mi>t</mi> </msub> <mo>|</mo> <mo>&amp;le;</mo> <mn>1</mn> <mo>;</mo> <mo>&amp;ForAll;</mo> <mi>t</mi> <mo>&amp;Element;</mo> <msub> <mi>N</mi> <mi>T</mi> </msub> <mo>|</mo> <msub> <mi>z</mi> <mi>t</mi> </msub> <mo>|</mo> <mo>&amp;le;</mo> <mi>&amp;Gamma;</mi> <mo>}</mo> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Gamma;N</mi> <mrow> <mi>f</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>&amp;GreaterEqual;</mo> <msub> <mi>X</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> </msub> <mo>-</mo> <msub> <mi>H</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> </msub> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Gamma;N</mi> <mrow> <mi>f</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>W</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> <mo>-</mo> <msubsup> <mi>N</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Gamma;N</mi> <mrow> <mi>f</mi> <mo>,</mo> <mi>t</mi> </mrow> </msub> <mo>&amp;le;</mo> <msubsup> <mi>W</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> <mo>-</mo> <msubsup> <mi>N</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mn>0</mn> <mo>&amp;le;</mo> <mi>&amp;Gamma;</mi> <mo>&amp;le;</mo> <mn>1</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>X</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> </msub> <mo>,</mo> <msub> <mi>H</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> </msub> <mo>,</mo> <msubsup> <mi>W</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> <mo>,</mo> <msubsup> <mi>W</mi> <mrow> <mi>t</mi> <mo>,</mo> <mi>s</mi> </mrow> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msubsup> <mo>&amp;GreaterEqual;</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced>
其中,Xt,sHt,s均为等价转换中引入的辅助决策变量,无具体意义,Γ为鲁棒系数,NTR,t表示t时刻处于行驶状态的电动汽车总数,Nd,t为t时刻处于行驶状态的电动汽车数量的预测值,Nf,t为t时刻处于行驶状态的电动汽车数量的最大波动范围,为t时段的处于放电状态的电动汽车数量,为t时段的处于充电状态的电动汽车数量,当Γ为0时,该模型为确定性模型,未考虑电动汽车不确定性的影响,当Γ为1时,该模型为最保守形式下的随机鲁棒日前调度模型。
CN201711010394.9A 2017-10-26 2017-10-26 一种风电-电动汽车联合系统随机鲁棒优化调度方法 Active CN107730048B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711010394.9A CN107730048B (zh) 2017-10-26 2017-10-26 一种风电-电动汽车联合系统随机鲁棒优化调度方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711010394.9A CN107730048B (zh) 2017-10-26 2017-10-26 一种风电-电动汽车联合系统随机鲁棒优化调度方法

Publications (2)

Publication Number Publication Date
CN107730048A true CN107730048A (zh) 2018-02-23
CN107730048B CN107730048B (zh) 2021-05-18

Family

ID=61213549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711010394.9A Active CN107730048B (zh) 2017-10-26 2017-10-26 一种风电-电动汽车联合系统随机鲁棒优化调度方法

Country Status (1)

Country Link
CN (1) CN107730048B (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108549958A (zh) * 2018-04-11 2018-09-18 国网经济技术研究院有限公司 考虑风电接入的基于序数效用论的日前低碳调度决策方法
CN109948823A (zh) * 2018-10-29 2019-06-28 河海大学 一种光储充电塔自适应鲁棒日前优化调度方法
CN110365041A (zh) * 2019-06-05 2019-10-22 华南理工大学 基于gan场景模拟的风电多场景鲁棒调度方法
CN112581313A (zh) * 2020-12-23 2021-03-30 北京理工大学 一种光伏充电站资源的分配调节方法和系统
CN112736894A (zh) * 2020-11-30 2021-04-30 国网陕西省电力公司电力科学研究院 一种计及风电与电动汽车随机性的两阶段机组组合建模方法
CN113937760A (zh) * 2021-10-12 2022-01-14 浙江华云电力工程设计咨询有限公司 一种多站融合场景下仿射鲁棒模型优化调度方法
CN113937798A (zh) * 2021-10-12 2022-01-14 浙江华云电力工程设计咨询有限公司 一种多站融合场景下考虑新能源消纳的储能系统配置方法
CN114037463A (zh) * 2021-10-13 2022-02-11 南京邮电大学 一种电动汽车参与发电与备用市场的联合调度优化方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2461454A2 (en) * 2010-11-30 2012-06-06 General Electric Company Integration of renewable power generating technologies with integrated volt/var control systems
CN104466999A (zh) * 2014-12-06 2015-03-25 国网浙江省电力公司电动汽车服务分公司 一种含电动汽车和风电机组的虚拟发电厂竞价策略的确定方法
CN106410861A (zh) * 2016-11-04 2017-02-15 浙江工业大学 一种基于可调度能力的微电网优化运行实时控制方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2461454A2 (en) * 2010-11-30 2012-06-06 General Electric Company Integration of renewable power generating technologies with integrated volt/var control systems
CN104466999A (zh) * 2014-12-06 2015-03-25 国网浙江省电力公司电动汽车服务分公司 一种含电动汽车和风电机组的虚拟发电厂竞价策略的确定方法
CN106410861A (zh) * 2016-11-04 2017-02-15 浙江工业大学 一种基于可调度能力的微电网优化运行实时控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁子鹏 等: "含电动汽车的微网鲁棒经济调度", 《电网技术》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108549958A (zh) * 2018-04-11 2018-09-18 国网经济技术研究院有限公司 考虑风电接入的基于序数效用论的日前低碳调度决策方法
CN109948823B (zh) * 2018-10-29 2022-01-28 河海大学 一种光储充电塔自适应鲁棒日前优化调度方法
CN109948823A (zh) * 2018-10-29 2019-06-28 河海大学 一种光储充电塔自适应鲁棒日前优化调度方法
CN110365041A (zh) * 2019-06-05 2019-10-22 华南理工大学 基于gan场景模拟的风电多场景鲁棒调度方法
CN110365041B (zh) * 2019-06-05 2021-05-14 华南理工大学 基于gan场景模拟的风电多场景鲁棒调度方法
CN112736894A (zh) * 2020-11-30 2021-04-30 国网陕西省电力公司电力科学研究院 一种计及风电与电动汽车随机性的两阶段机组组合建模方法
CN112581313A (zh) * 2020-12-23 2021-03-30 北京理工大学 一种光伏充电站资源的分配调节方法和系统
CN112581313B (zh) * 2020-12-23 2022-02-22 北京理工大学 一种光伏充电站资源的分配调节方法和系统
CN113937760A (zh) * 2021-10-12 2022-01-14 浙江华云电力工程设计咨询有限公司 一种多站融合场景下仿射鲁棒模型优化调度方法
CN113937798A (zh) * 2021-10-12 2022-01-14 浙江华云电力工程设计咨询有限公司 一种多站融合场景下考虑新能源消纳的储能系统配置方法
CN113937760B (zh) * 2021-10-12 2024-03-22 浙江华云电力工程设计咨询有限公司 一种多站融合场景下仿射鲁棒模型优化调度方法
CN113937798B (zh) * 2021-10-12 2024-04-30 浙江华云电力工程设计咨询有限公司 一种多站融合场景下考虑新能源消纳的储能系统配置方法
CN114037463A (zh) * 2021-10-13 2022-02-11 南京邮电大学 一种电动汽车参与发电与备用市场的联合调度优化方法
CN114037463B (zh) * 2021-10-13 2023-07-11 南京邮电大学 一种电动汽车参与发电与备用市场的联合调度优化方法

Also Published As

Publication number Publication date
CN107730048B (zh) 2021-05-18

Similar Documents

Publication Publication Date Title
CN107730048A (zh) 一种风电‑电动汽车联合系统随机鲁棒优化调度方法
CN110533225B (zh) 一种基于机会约束规划的商业园区综合能源系统优化调度方法
CN105160451B (zh) 一种含电动汽车的微电网多目标优化调度方法
CN107863784A (zh) 含可中断负荷的风电及电动汽车联合系统的日前调度方法
CN106026149B (zh) 一种考虑电网备用容量配置与风电利用率的电动汽车优化调度方法
CN107069776B (zh) 一种平滑微网联络线功率的储能前瞻分布式控制方法
CN104966127B (zh) 一种基于需求响应的电动汽车经济调度方法
CN105207259B (zh) 基于能量管理的并网状态下的微电网系统调度方法
CN111626527B (zh) 计及可调度电动汽车快/慢充放电形式的智能电网深度学习调度方法
CN103679299A (zh) 兼顾车主满意度的电动汽车最优峰谷分时电价定价方法
CN114021390A (zh) 城市综合能源系统随机鲁棒优化方法及其应用
CN109948823B (zh) 一种光储充电塔自适应鲁棒日前优化调度方法
CN104734200A (zh) 一种基于虚拟发电的主动配电网优化调度方法
CN110378548A (zh) 一种电动汽车虚拟电厂多时间尺度响应能力评估模型构建方法
CN107590607A (zh) 一种基于光伏预测的微电网优化调度系统和方法
CN109742755B (zh) 基于节点分区的含电动汽车的主动配电网运行调度方法
CN112668791A (zh) 热电联供系统的优化方法
CN111681127B (zh) 一种居民小区电动汽车有序充放电控制方法
CN114897346A (zh) 计及不确定性和需求响应的虚拟电厂鲁棒优化调度方法
CN117578537A (zh) 基于碳交易和需求响应的微电网优化调度方法
CN112510690B (zh) 考虑风火储联合和需求响应奖惩的优化调度方法及系统
CN107016504A (zh) 一种计及电动汽车随机模糊需求响应的调度优化建模及算法
CN114285093B (zh) 一种源网荷储互动调度方法及系统
Zhang et al. Coordinated dispatch of the wind-thermal power system by optimizing electric vehicle charging
CN112003279B (zh) 层次化微电网新能源消纳能力的评估方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant