CN107728527A - Plant task creating method, device, electronic equipment and storage medium - Google Patents

Plant task creating method, device, electronic equipment and storage medium Download PDF

Info

Publication number
CN107728527A
CN107728527A CN201711041285.3A CN201711041285A CN107728527A CN 107728527 A CN107728527 A CN 107728527A CN 201711041285 A CN201711041285 A CN 201711041285A CN 107728527 A CN107728527 A CN 107728527A
Authority
CN
China
Prior art keywords
plant
planting
plantation
data
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711041285.3A
Other languages
Chinese (zh)
Inventor
潘振鹏
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Qianhai Hongjia Technology Co Ltd
Original Assignee
Shenzhen Qianhai Hongjia Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Qianhai Hongjia Technology Co Ltd filed Critical Shenzhen Qianhai Hongjia Technology Co Ltd
Priority to CN201711041285.3A priority Critical patent/CN107728527A/en
Publication of CN107728527A publication Critical patent/CN107728527A/en
Priority to PCT/CN2018/085897 priority patent/WO2019085429A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/24Pc safety
    • G05B2219/24024Safety, surveillance

Abstract

The present invention provides a kind of plantation task creating method, and methods described includes:Obtain the planting scheme data of the next kind of plant of the current kind plant of the planting area;Obtain the planting information of the next kind of plant;According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, the plantation mission bit stream of the generation next kind of plant.The present invention also provides a kind of plantation task generating device.The present invention can carry out scientic planting according to the real-time plantation situation of the planting area, and be avoided that planting area is vacant and the waste of material.

Description

Plant task creating method, device, electronic equipment and storage medium
Technical field
The present invention relates to planting technology field, more particularly to one kind to plant task creating method, device, electronic equipment and deposit Storage media.
Background technology
China's traditional agriculture is more, and automatization level is relatively low in units of family oriented is planted, and plantation is more by rule of thumb, without standard The management process of change.With the development of mechanization of agriculture, large-scale planting base proceeds by mechanization production, a plant personnel More panel regions can be managed, at the same time, plantation work also begins to become to become more meticulous, and plant personnel proceeds by the division of labor, each People may be responsible for specific transactions, and such as existing agricultural production management is counted mainly by people, is calculated by people, and Cultivate administration personnel write everyday, day It is calculated, without flow and standard.
Greenhouse is the important component of industrialized agriculture, is to integrate application project equipment technology and Environmental Technology, enters The modern agricultural production mode of row crop production, continuous cropping and anniversary plantation can be realized.Chamber planting includes nursery, determined Multiple stage links such as plant, seedling management, each process are required for standardized planting, and existing chamber planting is not broken away from still The pattern of tradition plantation, is planted by the experience of plant personnel, formulates planting scheme.Chamber planting can be to planting environment It is controlled, realizes the growth of crop anniversary, continuous plantation, therefore, it is necessary to formulate planting scheme in advance, prepares kind of a vegetable material, Continuous plantation can be realized, avoids material waste or planting area vacant.
But following plantation problem often occurs mainly by the plantation experience of plant personnel in existing agricultural planting management: Firstth, it is superfluous to plant vegetable material.Need to purchase a variety of kinds of vegetable materials in advance before the planting, the shelf-life be present in some kind vegetable materials, It can not deposit for a long time, because chamber planting is influenceed by planting area, planting scheme, if can not timely use or not make subsequently With material waste can be caused;Secondth, planting area is vacant.It after the completion of previous stage plantation, can not be colonized, be started next The Cultivate administration in stage.
The content of the invention
In view of the foregoing, it is necessary to a kind of plantation task creating method, device, electronic equipment and storage medium are provided, Scientic planting can be carried out according to the real-time plantation situation of the planting area, and be avoided that planting area is vacant and the wave of material Take.
One kind plantation task creating method, methods described include:
Obtain the planting scheme data of the next kind of plant of the current kind plant of the planting area;
Obtain the planting information of the next kind of plant;
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, institute is generated State the plantation mission bit stream of next kind of plant.
According to an alternative embodiment of the invention, the next kind of plant of the current kind plant for obtaining the planting area Planting scheme data include following one or more:
When the plan implantation time of current time and advance typing matches, the implantation time of the typing in advance is obtained The planting scheme data of corresponding kind of plant, and the planting scheme data of acquisition are defined as to the plantation of the next kind of plant Planning data;Or
The plantation layout data of the planting area pre-set is obtained, the plantation layout data includes multiple plantations The plantation order of thing, the growth phase data of the current kind plant are obtained, when the growth phase data of the current kind plant When reaching preparatory condition, according to the plantation order of the multiple kind of plant, the current next kind of plant for planting plant is determined, Obtain the planting scheme data of the next kind of plant.
According to an alternative embodiment of the invention, methods described also includes:
Determined according to the planting information of the planting information of the next kind of plant and/or the current kind plant described pre- If condition.
According to an alternative embodiment of the invention, methods described also includes:Prestore the planting information of a variety of kinds of plants.
According to an alternative embodiment of the invention, the planting information according to the next kind of plant and described next The planting scheme data of kind plant, generating the plantation mission bit stream of the next kind of plant includes:
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, institute is generated State the mission bit stream in each plantation stage of next kind of plant;
Send the mission bit stream in each stage.
According to an alternative embodiment of the invention, methods described also includes:
Obtain the growth monitoring data of each kind of plant monitored in real time;
According to the growth monitoring data of each kind of plant, the planting information of each kind of plant of storage is updated.
According to an alternative embodiment of the invention, methods described also includes:
Obtain the growth monitoring data of the current kind plant monitored in real time;
According to the growth monitoring data of the current plant, determine the current plant growth monitoring data whether have it is different Often;
When the growth monitoring data of the current plant has abnormal, abnormal data is sent to corresponding plant personnel In terminal device.
A kind of electronic equipment, the electronic equipment include memory and processor, and the memory is used to store at least one Individual instruction, the processor are used to perform at least one instruction to realize plantation task generation side described in any embodiment Method.
A kind of computer-readable recording medium, the computer-readable recording medium storage has at least one instruction, described Plantation task creating method is realized at least one instruction when being executed by processor, the plantation task creating method includes any reality Apply and task creating method is planted described in example.
One kind plantation task generating device, described device include:
Acquisition module, possess the planting scheme number of the next kind of plant for the current kind plant for obtaining the planting area According to;
The acquisition module is additionally operable to obtain the planting information of the next kind of plant;
Generation module, based on the plantation of the planting information according to the next kind of plant and the next kind of plant Data are drawn, generate the plantation mission bit stream of the next kind of plant.
Found out by above technical scheme, the present invention passes through the next plantation for the current kind plant for obtaining the planting area The planting scheme data of thing;Obtain the planting information of the next kind of plant;Believed according to the plantation of the next kind of plant Breath and the planting scheme data of the next kind of plant, generate the plantation mission bit stream of the next kind of plant.The present invention Scientic planting can be carried out according to the real-time plantation situation of the planting area, and be avoided that planting area is vacant and the wave of material Take.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this The embodiment of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis The accompanying drawing of offer obtains other accompanying drawings.
Fig. 1 is the flow chart of the preferred embodiment of present invention plantation task creating method.
Fig. 2 is the functional block diagram of the preferred embodiment of present invention plantation task generating device.
Fig. 3 is the structural representation of the electronic equipment for the preferred embodiment that the present invention realizes plantation task creating method.
Main element symbol description
Electronic equipment 3
Dispensing device 31
Memory 32
Processor 33
Reception device 34
Plant task generating device 11
Acquisition module 100
Update module 101
Determining module 102
Sending module 103
Generation module 104
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
In order to facilitate the understanding of the purposes, features and advantages of the present invention, it is below in conjunction with the accompanying drawings and specific real Applying mode, the present invention is further detailed explanation.
As shown in figure 1, it is the flow chart of the preferred embodiment of present invention plantation task creating method.According to different need Ask, the order of step can change in the flow chart, and some steps can be omitted.
S10, electronic equipment obtain the planting scheme data of the next kind of plant of the current kind plant of the planting area.
In the alternative embodiment of the present invention, the continuous cropping of multiple kinds of plants can be realized in the planting area in greenhouse.Often Individual planting area has plantation layout data.The plantation layout data includes the plantation order of multiple kinds of plants.For example, greenhouse has 2 planting areas, A planting areas, B planting areas, cucumber, tomato, potato, cucumber are planted successively in A planting areas.It is i.e. yellow Tomato is planted after melon harvesting, potato is planted after tomato harvesting, cucumber is planted after potato harvesting.
Each kind plant is corresponding with planting information and planting scheme data, and prestores more a variety of in the planting area The planting information of plant.The planting information is used to represent in the planting link (such as nursery, field planting) associated with planting plant Data, include, but are not limited to following one or more kinds of combination:Seedling raise period, nursery quantity, the material of nursery, nursery Greenhouse experiment, seedling, resident time, field planting quantity, the material of field planting, the greenhouse experiment etc. of field planting.The thing Material includes, but are not limited to:Nutrient solution, material etc..The greenhouse experiment includes, but are not limited to:Temperature, illumination, moisture etc..
The planting scheme data include, but are not limited to:Plan implantation time, plan planting number.The plan plantation Time includes following one or more kinds of combination, but is not limited to:Plan seedling raise period, plan resident time, plan nursery number Amount, plan field planting quantity etc..
In an alternative embodiment, the electronic equipment obtains the growth monitoring data of each kind of plant monitored in real time;Root According to the growth monitoring data of each kind of plant, the planting information of each kind of plant of storage is updated.
Further, the electronic equipment communicates with multiple monitoring devices, and the multiple monitoring device is used for plantation The growth of thing is monitored, and growth monitoring data are sent into the electronic equipment, and the electronic equipment is to growth monitoring number According to being analyzed, and each planting information of kind plant according to analysis result real-time update.The growth monitoring data is used In the characteristic for representing each growth phase, such as germinate data, maturity state, health status.The monitoring device bag Include, but be not limited to:Infrared sensing equipment, picture pick-up device etc..
In an alternative embodiment, the plantation meter of the next kind of plant of the current kind plant for obtaining the planting area Drawing data includes obtaining by following any-mode:
First method:When the implantation time of current time and advance typing matches, the meter of the typing in advance is obtained The planting scheme data of kind plant corresponding to implantation time are drawn, and the planting scheme data of acquisition are defined as described next kind The planting scheme data of plant.
Second method:The plantation layout data of the planting area pre-set is obtained, obtains the current kind plant Growth phase data, when the growth phase data of the current kind plant reach preparatory condition, according to the multiple plantation The plantation order of thing, the next kind of plant of the current kind plant is determined, obtain the planting scheme of the next kind of plant Data.
In an alternative embodiment, according to the planting information of the next kind of plant and/or the kind of the current kind plant Plant information and determine the preparatory condition.For example, currently kind plant is cucumber, next kind of plant is tomato, can pass through west The plan implantation time of red persimmon sets the preparatory condition, and it is second day that cucumber comes to the ripening period such as to set preparatory condition Deng when the growth phase data of cucumber reach second day of the maturity period, the kind of the next kind of plant will be obtained automatically Planning data is planted, generates the plantation task of the next kind of plant, without artificial supervision distribution, realizes automatic passization management.
Because the planting information of each kind of plant can be with real-time update, accordingly it is also possible to reference to the current kind plant Planting information, Mobile state adjustment is entered to the preparatory condition.For example, the preparatory condition started setting up is what cucumber came to the ripening period Second day, but because cucumber is precocious three days, that just needs to adjust preparatory condition, enters for example, preparatory condition is adjusted into cucumber Enter the 5th day of the maturity period etc..So can sophisticated systems data, and then make plantation mission bit stream more accurate in real time.
In an alternative embodiment, the electronic equipment obtains the growth monitoring number of the current kind plant monitored in real time According to;Whether according to the growth monitoring data of the current plant, determining the growth monitoring data of the current plant has exception;When When the growth monitoring data of the current plant has abnormal, abnormal data is sent to corresponding plant personnel.
S11, the electronic equipment obtain the planting information of the next kind of plant.
S12, the electronic equipment is according to the planting information of the next kind of plant and the kind of the next kind of plant Planning data is planted, generates the plantation mission bit stream of the next kind of plant.
In an alternative embodiment, the planting information according to the next kind of plant and the next kind of plant Planting scheme data, generating the plantation mission bit stream of the next kind of plant includes:
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, institute is generated State the mission bit stream in each plantation stage of next kind of plant;
Send the mission bit stream in each stage.
Further, according to the planting information of the next kind of plant and the planting scheme number of the next kind of plant According to the mission bit stream in the nursery stage of the generation next kind of plant and the mission bit stream for generating the field planting stage.
Further, the mission bit stream in the nursery stage is used for the nursery work for indicating plantation person, including but unlimited In:Seedling raise period, nursery quantity, the nursery material that need to prepare, other related data of greenhouse experiment etc. nursery in nursery. The mission bit stream in the plant stage includes, but are not limited to:Resident time, field planting quantity, need to prepare field planting material, field planting when Other related data of greenhouse experiment etc. field planting etc..So plantation person can be according to the real-time plantation feelings of the planting area Condition, scientic planting is carried out, and be avoided that planting area is vacant and the waste of material etc..
The planting scheme data for the next kind of plant that the present invention passes through the current kind plant that obtains the planting area;Obtain Take the planting information of the next kind of plant;According to the planting information of the next kind of plant and the next kind of plant Planting scheme data, generate the plantation mission bit stream of the next kind of plant.The present invention can be according to the planting area Plantation situation in real time, scientic planting is carried out, and be avoided that planting area is vacant and the waste of material.
As shown in Fig. 2 the functional block diagram of the preferred embodiment of present invention plantation task generating device.The plantation task Generating means 11 include acquisition module 100, update module 101, determining module 102, sending module 103 and generation module 104.This The alleged module of invention refers to a kind of performed by the processing equipment of base station and can to complete a series of of fixing function Computer program code segments, it is stored in the storage device of base station.In the present embodiment, the function on each module is by follow-up It is described in detail in embodiment.
The acquisition module 100 obtains the planting scheme number of the next kind of plant of the current kind plant of the planting area According to.
In the alternative embodiment of the present invention, the continuous cropping of multiple kinds of plants can be realized in the planting area in greenhouse.Often Individual planting area has plantation layout data.The plantation layout data includes the plantation order of multiple kinds of plants.For example, greenhouse has 2 planting areas, A planting areas, B planting areas, cucumber, tomato, potato, cucumber are planted successively in A planting areas.It is i.e. yellow Tomato is planted after melon harvesting, potato is planted after tomato harvesting, cucumber is planted after potato harvesting.
Each kind plant is corresponding with planting information and planting scheme data, and prestores and each planted in the planting area The planting information of plant.The planting information is used to represent in the planting link (such as nursery, field planting) associated with planting plant Data, include, but are not limited to following one or more kinds of combination:Seedling raise period, nursery quantity, the material of nursery, nursery Greenhouse experiment, seedling, resident time, field planting quantity, the material of field planting, the greenhouse experiment etc. of field planting.The thing Material includes, but are not limited to:Nutrient solution, material etc..The greenhouse experiment includes, but are not limited to:Temperature, illumination, moisture etc..
The planting scheme data include, but are not limited to:Plan implantation time, plan planting number.The plan plantation Time includes following one or more kinds of combination, but is not limited to:Plan seedling raise period, plan resident time, plan nursery number Amount, plan field planting quantity etc..
In an alternative embodiment, the acquisition module 100 obtains the growth monitoring data of each kind of plant monitored in real time; The update module 101 is carried out according to the growth monitoring data of each kind of plant to the planting information of each kind of plant of storage Renewal.
Further, the electronic equipment communicates with multiple monitoring devices, and the multiple monitoring device is used for plantation The growth of thing is monitored, and growth monitoring data are sent into the electronic equipment, and the update module 101 is to growth monitoring Data are analyzed, and each planting information of kind plant according to analysis result real-time update.The growth monitoring data For representing the characteristic of each growth phase, such as germinate data, maturity state, health status.The monitoring device Include, but are not limited to:Infrared sensing equipment, picture pick-up device etc..
In an alternative embodiment, the acquisition module 100 obtains next kind of the current kind plant of the planting area The planting scheme data of plant include obtaining by following any-mode:
First method:When the implantation time of current time and advance typing matches, the meter of the typing in advance is obtained The planting scheme data of kind plant corresponding to implantation time are drawn, and the planting scheme data of acquisition are defined as described next kind The planting scheme data of plant.
Second method:The plantation layout data of the planting area pre-set is obtained, obtains the current kind plant Growth phase data, when the growth phase data of the current kind plant reach preparatory condition, according to the multiple plantation The plantation order of thing, the next kind of plant of the current kind plant is determined, obtain the planting scheme of the next kind of plant Data.
In an alternative embodiment, the determining module 102 is according to the planting information of the next kind of plant and/or described The planting information of current kind plant determines the preparatory condition.For example, currently kind plant is cucumber, next kind of plant is western red Persimmon, the preparatory condition can be set by the plan implantation time of tomato, such as set preparatory condition to be adjusted to cucumber entrance Second day etc. of maturity period, when the growth phase data of cucumber reach second day of maturity period, it will obtain automatically described The planting scheme data of next kind of plant, the plantation task of the next kind of plant is generated, it is real without artificial supervision distribution Now automatic passization management.
Because the planting information of each kind of plant can be with real-time update, therefore, the determining module 102 can also combine institute The planting information of current kind plant is stated, Mobile state adjustment is entered to the preparatory condition.For example, the preparatory condition started setting up is Huang Come to the ripening period second day of melon, but because cucumber is precocious three days, that just needs to adjust preparatory condition, for example, by default bar Part is the 5th day etc. that cucumber comes to the ripening period.So can sophisticated systems data, and then make plantation mission bit stream more in real time Accurately.
In an alternative embodiment, the acquisition module 100 obtains the growth monitoring of the current kind plant monitored in real time Data;The determining module 102 determines the growth monitoring of the current plant according to the growth monitoring data of the current plant Whether data have exception;The sending module 103 is when the growth monitoring data of the current plant has abnormal, by abnormal data Send to corresponding plant personnel.
The acquisition module 100 obtains the planting information of the next kind of plant.
The generation module 104 is according to the planting information of the next kind of plant and the plantation of the next kind of plant Planning data, generate the plantation mission bit stream of the next kind of plant.
In an alternative embodiment, the generation module 104 according to the planting information of the next kind of plant and it is described under The planting scheme data of one kind plant, generating the plantation mission bit stream of the next kind of plant includes:
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, institute is generated State the mission bit stream in each plantation stage of next kind of plant;
Send the mission bit stream in each stage.
Further, the generation module 104 is according to the planting information of the next kind of plant and described next kind The planting scheme data of plant, generate the mission bit stream in the nursery stage of the next kind of plant and appointing for generation field planting stage Business information.
Further, the mission bit stream in the nursery stage is used for the nursery work for indicating plantation person, including but unlimited In:Seedling raise period, nursery quantity, the nursery material that need to prepare, other related data of greenhouse experiment etc. nursery in nursery. The mission bit stream in the plant stage includes, but are not limited to:Resident time, field planting quantity, need to prepare field planting material, field planting when Other related data of greenhouse experiment etc. field planting etc..So plantation person can be according to the real-time plantation feelings of the planting area Condition, scientic planting is carried out, and be avoided that planting area is vacant and the waste of material etc..
The planting scheme data for the next kind of plant that the present invention passes through the current kind plant that obtains the planting area;Obtain Take the planting information of the next kind of plant;According to the planting information of the next kind of plant and the next kind of plant Planting scheme data, generate the plantation mission bit stream of the next kind of plant.The present invention can be according to the planting area Plantation situation in real time, scientic planting is carried out, and be avoided that planting area is vacant and the waste of material.
The above-mentioned integrated unit realized in the form of software function module, can be stored in one and computer-readable deposit In storage media.Above-mentioned software function module is stored in a storage medium, including some instructions are causing a computer It is each that equipment (can be personal computer, server, or network equipment etc.) or processor (processor) perform the present invention The part steps of embodiment methods described.
As shown in figure 3, Fig. 3 is the structure for the electronic equipment that the present invention realizes the preferred embodiment for planting task creating method Schematic diagram.The electronic equipment 3 include at least one dispensing device 31, at least one memory 32, at least one processor 33, At least one reception device 34 and at least one communication bus.Wherein, the communication bus is used to realize between these components Connection communication.
The electronic equipment 3 be it is a kind of can according to the instruction for being previously set or storing, it is automatic carry out numerical computations and/or The equipment of information processing, its hardware include but is not limited to microprocessor, application specific integrated circuit (Application Specific Integrated Circuit, ASIC), programmable gate array (Field-Programmable Gate Array, FPGA), number Word processing device (Digital Signal Processor, DSP), embedded device etc..The electronic equipment 3 may also include network Equipment and/or user equipment.Wherein, the network equipment includes but is not limited to single network server, multiple webservers The server group of composition or the cloud being made up of a large amount of main frames or the webserver based on cloud computing (Cloud Computing), Wherein, cloud computing is one kind of Distributed Calculation, a super virtual computing being made up of the computer collection of a group loose couplings Machine.
The electronic equipment 3, which may be, but not limited to, any one, to pass through keyboard, touch pad or voice-operated device with user Etc. the electronic product that mode carries out man-machine interaction, for example, tablet personal computer, smart mobile phone, personal digital assistant (Personal Digital Assistant, PDA), intellectual Wearable, picture pick-up device, the terminal such as monitoring device.
Network residing for the electronic equipment 3 includes, but are not limited to internet, wide area network, Metropolitan Area Network (MAN), LAN, virtual Dedicated network (Virtual Private Network, VPN) etc..
Wherein, the reception device 34 and the dispensing device 31 can be wired sending ports, or wirelessly set It is standby, such as including antenna assembly, for entering row data communication with other equipment.
The memory 32 is used for store program codes.The memory 32 can not have physical form in integrated circuit The circuit with store function, such as RAM (Random-Access Memory, random access memory), FIFO (First In First Out) etc..Or the memory 32 can also be the memory for having physical form, such as memory bar, TF card (Trans-flash Card), smart media card (smart media card), safe digital card (secure digital Card), storage facilities such as flash memory cards (flash card) etc..
The processor 33 can include one or more microprocessor, digital processing unit.The processor 33 is adjustable With the program code stored in memory 32 with perform correlation function.For example, the unit described in Fig. 3 is stored in institute The program code in memory 32 is stated, and as performed by the processor 33, to realize a kind of plantation task creating method.It is described Processor 33 is also known as central processing unit (CPU, Central Processing Unit), is one piece of ultra-large integrated circuit, It is arithmetic core (Core) and control core (Control Unit).
With reference to Fig. 1, the memory 32 in the electronic equipment 3 stores multiple instruction to realize that a kind of plantation task is given birth to Into method, the processor 33 can perform the multiple instruction so as to realize:Obtain the current kind plant of the planting area The planting scheme data of next kind of plant;Obtain the planting information of the next kind of plant;According to next plantation The planting information of thing and the planting scheme data of the next kind of plant, generate the plantation task letter of the next kind of plant Breath.
According to an alternative embodiment of the invention, the next kind of plant of the current kind plant for obtaining the planting area Planting scheme data include following one or more:
When the plan implantation time of current time and advance typing matches, the implantation time of the typing in advance is obtained The planting scheme data of corresponding kind of plant, and the planting scheme data of acquisition are defined as to the plantation of the next kind of plant Planning data;Or
The plantation layout data of the planting area pre-set is obtained, the plantation layout data includes multiple plantations The plantation order of thing, the growth phase data of the current kind plant are obtained, when the growth phase data of the current kind plant When reaching preparatory condition, according to the plantation order of the multiple kind of plant, the current next kind of plant for planting plant is determined, Obtain the planting scheme data of the next kind of plant.
According to an alternative embodiment of the invention, the multiple instruction that the processor 33 performs also includes:
Determined according to the planting information of the planting information of the next kind of plant and/or the current kind plant described pre- If condition.
According to an alternative embodiment of the invention, methods described also includes:Prestore a variety of plantations in the planting area The planting information of thing.
According to an alternative embodiment of the invention, the planting information according to the next kind of plant and described next The planting scheme data of kind plant, generating the plantation mission bit stream of the next kind of plant includes:
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, institute is generated State the mission bit stream in each plantation stage of next kind of plant;
Send the mission bit stream in each stage.
According to an alternative embodiment of the invention, methods described also includes:
Obtain the growth monitoring data of each kind of plant monitored in real time;
According to the growth monitoring data of each kind of plant, the planting information of each kind of plant of storage is updated.
According to an alternative embodiment of the invention, the multiple instruction that the processor 33 performs also includes:
Obtain the growth monitoring data of the current kind plant monitored in real time;
According to the growth monitoring data of the current plant, determine the current plant growth monitoring data whether have it is different Often;
When the growth monitoring data of the current plant has abnormal, abnormal data is sent to corresponding plant personnel.
In several embodiments provided by the present invention, it should be understood that disclosed system, apparatus and method can be with Realize by another way.For example, device embodiment described above is only schematical, for example, the module Division, only a kind of division of logic function, can there is other dividing mode when actually realizing.
The module illustrated as separating component can be or may not be physically separate, show as module The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of module therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional module in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of hardware adds software function module.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any attached associated diagram mark in claim should not be considered as into the involved right of limitation will Ask.Furthermore, it is to be understood that the word of " comprising " one is not excluded for other units or step, odd number is not excluded for plural number.Stated in system claims Multiple units or device can also be realized by a unit or device by software or hardware.Second grade word is used for table Show title, and be not offered as any specific order.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although reference The present invention is described in detail for preferred embodiment, it will be understood by those within the art that, can be to the present invention's Technical scheme is modified or equivalent substitution, without departing from the spirit and scope of technical solution of the present invention.

Claims (10)

1. one kind plantation task creating method, it is characterised in that methods described includes:
Obtain the planting scheme data of the next kind of plant of the current kind plant of the planting area;
Obtain the planting information of the next kind of plant;
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, under generation is described The plantation mission bit stream of one kind plant.
2. plantation task creating method as claimed in claim 1, it is characterised in that described to obtain the current of the planting area The planting scheme data of the next kind of plant of kind plant include following one or more:
When the plan implantation time of current time and advance typing matches, the implantation time for obtaining the typing in advance is corresponding Kind plant planting scheme data, and the planting scheme data of acquisition are defined as to the planting scheme of the next kind of plant Data;Or
Obtain the plantation layout data of the planting area pre-set, the plantation layout data includes multiple kinds of plants Plantation order, the growth phase data of the current kind plant are obtained, when the growth phase data of the current kind plant reach During preparatory condition, according to the plantation order of the multiple kind of plant, the next kind of plant of the current kind plant is determined, is obtained The planting scheme data of the next kind of plant.
3. plantation task creating method as claimed in claim 2, it is characterised in that methods described also includes:
The default bar is determined according to the planting information of the planting information of the next kind of plant and/or the current kind plant Part.
4. plantation task creating method as claimed in claim 1, it is characterised in that methods described also includes:Prestore more The planting information of a variety of plants.
5. plantation task creating method as claimed in claim 1, it is characterised in that described according to the next kind of plant Planting information and the planting scheme data of the next kind of plant, generate the plantation mission bit stream bag of the next kind of plant Include:
According to the planting information of the next kind of plant and the planting scheme data of the next kind of plant, under generation is described The mission bit stream in each plantation stage of one kind plant;
Send the mission bit stream in each stage.
6. the plantation task creating method as described in any one of claim 1 to 5, it is characterised in that methods described also includes:
Obtain the growth monitoring data of each kind of plant monitored in real time;
According to the growth monitoring data of each kind of plant, the planting information of each kind of plant of storage is updated.
7. the plantation task creating method as any one of claim 1 to 5, it is characterised in that methods described also includes:
Obtain the growth monitoring data of the current kind plant monitored in real time;
Whether according to the growth monitoring data of the current plant, determining the growth monitoring data of the current plant has exception;
When the growth monitoring data of the current plant has abnormal, abnormal data is sent to the terminal of corresponding plant personnel In equipment.
8. a kind of electronic equipment, it is characterised in that the electronic equipment includes memory and processor, and the memory is used to deposit At least one instruction is stored up, the processor is used to perform at least one instruction to realize such as any one of claim 1 to 7 The plantation task creating method.
9. a kind of computer-readable recording medium, it is characterised in that the computer-readable recording medium storage has at least one Instruction, at least one instruction realize plantation task creating method, the plantation task creating method when being executed by processor Including planting task creating method any one of claim 1 to 7.
10. one kind plantation task generating device, it is characterised in that described device includes:
Acquisition module, possess the planting scheme data of the next kind of plant for the current kind plant for obtaining the planting area;
The acquisition module is additionally operable to obtain the planting information of the next kind of plant;
Generation module, for the planting information according to the next kind of plant and the planting scheme number of the next kind of plant According to the plantation mission bit stream of the generation next kind of plant.
CN201711041285.3A 2017-10-30 2017-10-30 Plant task creating method, device, electronic equipment and storage medium Pending CN107728527A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711041285.3A CN107728527A (en) 2017-10-30 2017-10-30 Plant task creating method, device, electronic equipment and storage medium
PCT/CN2018/085897 WO2019085429A1 (en) 2017-10-30 2018-05-07 Planting task generation method and apparatus, electronic device and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711041285.3A CN107728527A (en) 2017-10-30 2017-10-30 Plant task creating method, device, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN107728527A true CN107728527A (en) 2018-02-23

Family

ID=61202113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711041285.3A Pending CN107728527A (en) 2017-10-30 2017-10-30 Plant task creating method, device, electronic equipment and storage medium

Country Status (2)

Country Link
CN (1) CN107728527A (en)
WO (1) WO2019085429A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537371A (en) * 2018-03-27 2018-09-14 深圳春沐源控股有限公司 A kind of production forecast method and device
WO2019085429A1 (en) * 2017-10-30 2019-05-09 深圳春沐源控股有限公司 Planting task generation method and apparatus, electronic device and storage medium
CN109767347A (en) * 2018-12-29 2019-05-17 山东丰信农业服务连锁有限公司 A kind of agricultural planting management system based on internet and intelligence

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327347A (en) * 2016-08-24 2017-01-11 通辽市绿云信息有限公司 Method and system for providing auxiliary management information of crop planting
CN106613297A (en) * 2017-03-01 2017-05-10 深圳春沐源农业科技有限公司 Planting management method and device
CN106960392A (en) * 2017-03-15 2017-07-18 西安会泽计算机科技有限公司 A kind of planting technology service system and method towards medium and small grower

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107241403A (en) * 2017-05-31 2017-10-10 深圳前海弘稼科技有限公司 Method for pushing and pusher, server, equipment and readable storage medium storing program for executing
CN107728527A (en) * 2017-10-30 2018-02-23 深圳前海弘稼科技有限公司 Plant task creating method, device, electronic equipment and storage medium

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106327347A (en) * 2016-08-24 2017-01-11 通辽市绿云信息有限公司 Method and system for providing auxiliary management information of crop planting
CN106613297A (en) * 2017-03-01 2017-05-10 深圳春沐源农业科技有限公司 Planting management method and device
CN106960392A (en) * 2017-03-15 2017-07-18 西安会泽计算机科技有限公司 A kind of planting technology service system and method towards medium and small grower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019085429A1 (en) * 2017-10-30 2019-05-09 深圳春沐源控股有限公司 Planting task generation method and apparatus, electronic device and storage medium
CN108537371A (en) * 2018-03-27 2018-09-14 深圳春沐源控股有限公司 A kind of production forecast method and device
CN109767347A (en) * 2018-12-29 2019-05-17 山东丰信农业服务连锁有限公司 A kind of agricultural planting management system based on internet and intelligence

Also Published As

Publication number Publication date
WO2019085429A1 (en) 2019-05-09

Similar Documents

Publication Publication Date Title
York et al. Intensive field phenotyping of maize (Zea mays L.) root crowns identifies phenes and phene integration associated with plant growth and nitrogen acquisition
CN107728527A (en) Plant task creating method, device, electronic equipment and storage medium
CN103226791B (en) The measuring method of grain production water footprint of region
CN106599136A (en) Method and device for guiding agricultural production based on big data
CN106779452A (en) The method for setting up crops data growth model
CN110059915A (en) A kind of winter wheat meteorological disaster integrated risk dynamic evaluation method and device
Böttcher et al. A phenological model of winter oilseed rape according to the BBCH scale
Povilaitis et al. Relationship between spring barley productivity and growing management in Lithuania’s lowland
CN103927627A (en) Sugarcane intelligent fertilization and land parcel information management system
Todorovic et al. Hydro-tech: An automated smart-tech decision support tool for eco-efficient irrigation management
CN107657385A (en) A kind industry data system
CN112330149A (en) Crop management system, method and device and electronic equipment
CN114190264A (en) Method and system for determining accurate irrigation scheme and terminal equipment
Van Oosterom et al. Simulating growth, development, and yield of tillering pearl millet: I. Leaf area profiles on main shoots and tillers
CN108056010A (en) Control method of irrigation and electronic equipment
CN109597451A (en) Vegetable cultivation interactive approach
CA2761682C (en) Real-time process for targeting trait phenotyping of plant breeding experiments
Mishoe et al. Using crop and pest models for management applications
CN108171417A (en) Planting task adjusting method, electronic device and storage medium
CN106780082A (en) Stocking rate measuring method and device
Hanafie et al. Ergonomic Evaluation of Anthropometry Based Hydroponic Plants Watering Automation System
CN114332427A (en) Method and device for monitoring agricultural production based on digital twinning
CN111563824B (en) Artificial forest land research system and method based on Chinese pine
Dı́az-Ambrona et al. Faba bean canopy modelling with a parametric open L-system: a comparison with the Monsi and Saeki model
CN108040840A (en) Control method of irrigation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information

Address after: 518052 Guangdong city of Shenzhen province Qianhai Shenzhen Hong Kong cooperation zone before Bay Road No. 1 building 201 room A

Applicant after: Shenzhen Chun Mu source Holdings Limited

Address before: 518052 Guangdong city of Shenzhen province Qianhai Shenzhen Hong Kong cooperation zone before Bay Road No. 1 building 201 room A

Applicant before: Shenzhen Qianhai Hong Jia Technology Co., Ltd.

CB02 Change of applicant information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223

RJ01 Rejection of invention patent application after publication