A kind of ruggedized construction of the decoration awning of municipal administration garden architecture
Technical field
The present invention relates to a kind of awning, in particular to a kind of ruggedized construction of the decoration awning of municipal garden architecture.
Background technique
Awning be located above building entrance or top balcony be used to keep off the rain, keep out the wind, one that anti-high-altitude junk injures by a crashing object
Kind building facility.Traditional building awning using steel structure framework as support, and is laid with awning cloth on steel structure framework.
While in order to increase the stability of awning, it will usually in the supported underneath tripod of steel skeleton.Above-mentioned supporting way, although can
Reinforce the stability of awning, but limit the angle of awning completely, can not make adjustment.
Since awning cloth has flexibility, it is easy to sink when rainfall is excessive, so as to cause awning ponding;Furthermore with
Using the increase of duration, the upper surface of awning cloth also becomes easily infected by dust, and awning angle be defined to people exclude ponding with
Cleaning awning cloth causes difficulty, therefore there is also certain rooms for improvement.
Summary of the invention
The object of the present invention is to provide a kind of ruggedized constructions of the decoration awning of municipal garden architecture, can not only guarantee rain
The stability of canopy, moreover it is possible to adjust the angle of awning.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of ruggedized construction of the decoration awning of municipal administration garden architecture, including two symmetrically set curb girder, two curb girders
The rotational plane that wall and curb girder are articulated in positioned at ipsilateral end is in be vertically arranged;Awning is equipped with above two curb girders
Several crossbeams are connected between cloth and two curb girders;Flexible connecting member is provided on the crossbeam, the top of the curb girder is aerial
There is the wrap-up for being fixed on wall and being used for folding and unfolding flexible connecting member;It is described soft when wrap-up winds flexible connecting member
Property connector driving curb girder be flipped up;Conversely, the curb girder downwardly turns over when wrap-up lengthens flexible connecting member.
Using the above scheme, the curb girder for being articulated in wall can be such that awning is overturn on wall, so as to adjust awning
Angle on vertical direction;Crossbeam not only can increase the overall structural strength of awning, but also can provide impetus for flexible connecting member;It is logical
Crossing wrap-up folding and unfolding flexible connecting member can effectively drive awning to carry out the overturning on vertical direction, to quickly adjust awning
Angle, and then facilitate the ponding on discharge awning cloth, and awning cloth can be convenient to clean.
Preferably, be provided with support rod between the curb girder and wall, one end of the support rod be articulated in wall and
For rotational plane in being vertically arranged, the side on the curb girder close to support rod offers several arranged along its length for branch
The slot of the movable end clamping of strut.
Using the above scheme, after wrap-up driving awning is overturn to special angle, by by the movable end of support rod
In clamping to corresponding slot, supporting point can be formed on curb girder, so that entire awning can more be stably kept in this
Angle, to reinforce the position of awning;And the end of support rod is plugged in the slot of different location, support rod can be made to exist
In the case where not changing length, the awning of different flip angles is adapted to, the scope of application is increased;In the mistake of replacement supporting point
Cheng Zhong, support rod can carry out corresponding angular transformation by pin-jointed structure;And work as support rod when not in use, it can be in gravity
It is lower automatic sagging, thus reduce lateral occupied space, it is more beautiful.
Preferably, the support rod is lightweight support rod.
Using the above scheme, the weight of support rod can be effectively reduced in light weight beam, so that process of the people in operation support rod
In being capable of more laborsaving convenience.
Preferably, the end of the support rod is provided with magnetic part, the bottom surface of the slot is provided with inhales for magnetic part
Attached ferromagnet.
Using the above scheme, enable the end stronger ground inlay card of support rod in slot, and be not easy to loosen, together
When facilitate the end of support rod to be separated with slot.
Preferably, it is connected with pivoted pole between two curb girders and in the position close to its pivot end, the pivoted pole
Shaft is simultaneously connected to positioning component in intermediate position revotating card, and the positioning component includes two and is in horizontally arranged and is successively arranged
Supporting plate, the supporting plate fitting are fixed in the casing on pivoted pole, the outer wall of two casings and in the side close to wall
It is fixed on wall;The tube wall of two casings offers the notch being caught in for pivoted pole, and two notches are located at pivoted pole
Upper and lower two sides, and the size of each notch is respectively less than the outer diameter of pivoted pole;Interval is maintained between two casings, between described
Every the outer diameter for being more than or equal to pivoted pole;The two sides of the positioning component are provided with the pin joint seat positioned at the same horizontal position, institute
The length of pivoted pole is stated less than the distance between two pin joint seats;Two opposite sides of two pin joint seats, which are run through, pivot joint
Hole, the both ends of the surface of the pivoted pole have axially penetrated through slip hole, and sliding is connected with telescopic rod in two slip holes, described to stretch
The end that contracting bar is located remotely from each other rotates be plugged in the pivoted hole of two pin joint seats respectively.
Using the above scheme, two casing levels can be fixed on wall by supporting plate, by by the shaft of pivoted pole
It is connected in the interval between two casings, can tentatively limit position of the pivoted pole on wall;By centered on the interval
Pivoted pole is rotated, the shaft two sides of pivoted pole can be made respectively close to two casings;Notch is that the shaft of pivoted pole is caught in set
Channel is provided in pipe, when two casings, which pass through notch, is sheathed on the shaft of pivoted pole, the shaft of pivoted pole is just in water
Flat setting, while pivoted pole can not be moved axially by preliminary latch, to complete the Primary Location of awning;Telescopic rod energy
It is flexible that sliding is enough carried out in slip hole, by the way that telescopic rod to be inserted into the pivoted hole of respective side pin joint seat, can effectively be limited
Determine the position of the both ends of pivoted pole in the horizontal direction, and pivoted pole can be made to be rotated between two pin joint seats, to make
Awning is able to carry out overturning;The distance between two pin joint seats are greater than the length of pivoted pole, and the shaft of pivoted pole is existed
It is rotated on vertical direction, without being hindered;When dismantling awning, telescopic rod is retracted in slip hole, it can be fast
Speed releases the locking between telescopic rod and pin joint seat, by rotating backward pivoted pole, by two casings from the shaft of pivoted pole
It disengages, just can release the locking of pivoted pole, then pivoted pole is separated between two casings, it just can be quickly by pivoted pole from wall
On disassemble, without by external tool.
Preferably, the outer wall of the pivoted pole, which runs through, spaced several threaded holes along its length, it is described
The shaft of telescopic rod offers fixation hole;When telescopic rod slides onto corresponding with the threaded hole position of fixation hole, the screw thread
Hole internal screw thread is connected with the screw rod being plugged in fixation hole.
Using the above scheme, by the way that screw rod to be plugged in threaded hole and fixation hole simultaneously, screw thread can effectively be limited
Relative position between hole and fixation hole avoids telescopic rod from inserting to effectively limit axial position of the telescopic rod in slip hole
Axial position offset occurs after entering to pivoted hole, to promote the stability after pivoted pole installation.
Preferably, having connecting plate between two casings and in the linking close to the position of supporting plate, the connecting plate is separate
The plate face of supporting plate and the inner wall flush of casing.
Using the above scheme, connecting plate can be by two casing connections together, to promote the jail between two casings
Solidity and stability, while when two casings are sheathed on pivoted pole, the plate face on connecting plate far from supporting plate can be just
It is adapted to the outer peripheral surface shape of pivoted pole well, the shaft of pivoted pole is enabled more to fit in the plate face of connecting plate, to mention
The stability and fastness when supporting plate and pivoted pole interconnection are risen, and then firm when promotion pivoted pole and wall connecting
Property.
Preferably, the two sides of the connecting plate are along the section flush respectively with supporting plate close on ipsilateral notch.
Using the above scheme, so that connecting plate two sides along can respectively on ipsilateral notch close to supporting plate section
Transition obtain it is more smooth, when relatively rotating between the pivoted pole and supporting plate being connected between two casings, pivoted pole
Shaft can more move smoothly through in notch rotary clamping to casing, to improve operating efficiency.
Preferably, the wrap-up is hoist engine.
Using the above scheme, hoist engine is the small-sized lifting with reel winding wire ropes or chain lifting or traction
Equipment, also known as winch;Hoist engine can with vertical-lift, horizontally or diagonally drag and draw weight, supporting power is big, control flexibly, can
The quickly flip angle of adjustment awning.
In conclusion awning can be made enterprising in wall the invention has the following advantages: being articulated in the curb girder of wall
Row overturning, so as to adjust the angle on awning vertical direction;Crossbeam not only can increase the overall structural strength of awning, but also can be flexibility
Connector provides impetus;Awning can be effectively driven to carry out turning on vertical direction by wrap-up folding and unfolding flexible connecting member
Turn, to quickly adjust the angle of awning, and then facilitates the ponding on discharge awning cloth, and awning cloth can be convenient to clean.
Detailed description of the invention
Fig. 1 is the structural schematic diagram one of the present embodiment;
Fig. 2 is the structural schematic diagram two of the present embodiment;
Fig. 3 is the enlarged diagram in the portion A shown in Fig. 2;
Fig. 4 is the enlarged diagram in the portion B shown in Fig. 2;
Fig. 5 is the explosive view in the present embodiment between pivoted pole and positioning component;
Fig. 6 is the enlarged diagram in the portion C shown in Fig. 2;
Fig. 7 is the partial sectional view of the present embodiment.
In figure: 1, curb girder;2, awning cloth;3, crossbeam;4, flexible connecting member;5, wrap-up;6, wall;7, support rod;
8, slot;9, magnetic part;11, pivoted pole;12, casing;13, supporting plate;14, notch;15, pin joint seat;16, pivoted hole;17, sliding
Move hole;18, telescopic rod;19, threaded hole;20, fixation hole;21, connecting plate;22, supporting plate;23, screw rod.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
A kind of ruggedized construction of the decoration awning of municipal administration garden architecture disclosed in the present embodiment, as depicted in figs. 1 and 2, packet
Include two symmetrically set curb girder 1, two curb girders 1 are located at that ipsilateral end is articulated in wall 6 and the rotational plane of curb girder 1 is in
It is vertically arranged.More specifically, the end of curb girder 1 is connect by hinge with wall 6, one of blade of hinge passes through expanding screw
Silk is fixed on wall 6, another blade is fixed on the pivot end of curb girder 1, and curb girder 1 is enabled to do vertical direction on wall 6
Overturning.
The top of two curb girders 1, which is equipped between awning cloth 2 and two curb girders 1, is connected with several crossbeams 3, the length of crossbeam 3
Direction is spent perpendicular to curb girder 1.Flexible connecting member 4 is provided on crossbeam 3, which is preferably wirerope, and one end is excellent
The midpoint of the crossbeam 3 farthest apart from wall 6 is fixed in choosing.The top of curb girder 1, which makes somebody a mere figurehead to have, is fixed on wall 6 and for folding and unfolding
The wrap-up 5 of flexible connecting member 4, wrap-up 5 are hoist engine, and the control for controlling its operation is connected on hoist engine
Device.When wrap-up 5 winds flexible connecting member 4, flexible connecting member 4 drives curb girder 1 to be flipped up;Conversely, working as wrap-up 5
Lengthen flexible connecting member 4 when, curb girder 1 downwardly turns over.
Support rod 7 is provided between curb girder 1 and wall 6, support rod 7 is lightweight support rod 7, preferably by aluminium alloy system
At not only having can guarantee the support strength of support rod 7, but also the quality of support rod 7 can be mitigated.In the present embodiment, the quantity of support rod 7 is excellent
Two are selected as, two support rods 7 are symmetrically disposed on wall 6, are corresponded in the vertical direction with two curb girders 1.
As shown in figure 3, one end of support rod 7 is articulated in wall 6 and rotational plane is in being vertically arranged, more specifically, support
The end of bar 7 is connect also by hinge with wall 6, and wherein hinge a blade is fixed on wall 6 by setscrew, another
A blade is fixed on the pivot end of support rod 7, and support rod 7 is enabled to do the flip-flop movement of vertical direction on wall 6.Curb girder
Side on 1 close to support rod 7 offers several slots 8 for arranging the movable end clamping for support rod 7 along its length,
The slot 8 is in be arranged at equal intervals.The end of support rod 7 is provided with magnetic part 9, which is preferably permanent magnet.Slot 8
Bottom surface be provided with the ferromagnet adsorbed for magnetic part 9, which is preferably to be set to the stainless steel substrates of 8 bottom surface of slot, is made
The movable end for the support rod 7 that must be plugged in slot 8 can be firmly adsorbed in slot 8, and not easily to fall off;To make support rod
7 movable end can form supporting point in slot 8, to support curb girder 1, and then increase the stability of entire awning.
As shown in Figure 4 and Figure 5, it is connected with pivoted pole 11 between two curb girders 1 and in the position close to its pivot end, the pivot
The cross-sectional shape of extension bar 11 is preferably rounded.The shaft of pivoted pole 11 is simultaneously connected to positioning component in intermediate position revotating card,
Positioning component include two in the horizontally arranged and casing 12 that is successively sheathed on pivoted pole 11, the outer wall of two casings 12 and in
Side close to wall 6 is fixed with supporting plate 13, i.e. two casings 12 are both secured on supporting plate 13;The fitting of supporting plate 13 is fixed
In on wall 6, in the present embodiment, pass through expanding screw along supporting plate 22, supporting plate 22 is extended in the two sides up and down of supporting plate 13
Bolt is fixed on wall 6.
The tube wall of two casings 12 offers the notch 14 being caught in for pivoted pole 11, and two notches 14 are located at pivot joint
The upper and lower two sides of bar 11, and the size of each notch 14 is respectively less than the outer diameter of pivoted pole 11.Between being maintained between two casings 12
Every the interval is more than or equal to the outer diameter of pivoted pole 11.There is company between two casings 12 and in the linking close to the position of supporting plate 13
Fishplate bar 21, the inner wall flush of plate face of the connecting plate 21 far from supporting plate 13 and casing 12.The two sides of connecting plate 21 are along respectively
With the section flush on ipsilateral notch 14 close to supporting plate 13.
As shown in Figure 6 and Figure 7, the two sides of positioning component are provided with the pin joint seat 15 positioned at the same horizontal position, depending on
Hyte part is located at the middle position of two pin joint seats 15, and the length of pivoted pole 11 is less than the distance between two pin joint seats 15.
Two opposite sides of two pin joint seats 15, which are run through, pivoted hole 16, the rounded setting of pivoted hole 16, and the two of pivoted pole 11
End face has axially penetrated through slip hole 17, and sliding is connected with telescopic rod 18 in two slip holes 17, and telescopic rod 18 is preferably in circle
Column.The end that telescopic rod 18 is located remotely from each other rotates be plugged in the pivoted hole 16 of two pin joint seats 15 respectively.Pivoted pole 11
Through having along its length, spaced several threaded holes 19, the shaft of telescopic rod 18 offer fixation hole 20 to outer wall;When
When telescopic rod 18 slides onto fixation hole 20 with 19 corresponding position of threaded hole, 19 internal screw thread of threaded hole, which is connected with, is plugged in fixation
Screw rod 23 in hole 20.
Specific work process is as follows:
When installing awning, by the vertical inlay card of the shaft of pivoted pole 11 in the interval of two casings 12, then vertical
Side is rotated up pivoted pole 11, so that the shaft of pivoted pole 11 is caught in by notch 14 to corresponding casing 12, to make pivot
The both ends of the surface of extension bar 11 can respectively with 16 face of pivoted hole on the pin joint seat 15 of two sides.Then by telescopic rod 18 from slip hole
It removes, and is inserted into corresponding pivoted hole 16 in 17.When on telescopic rod 18 fixation hole 20 and threaded hole 19 relatively after, pass through
It is screwed into screw in corresponding threaded hole 19, and is inserted into corresponding fixation hole 20, telescopic rod 18 can be effectively limited and slide
Axial position in hole 17 avoids it that axial displacement occurs.
After pivoted pole 11 is installed, the flexible connecting member 4 on wrap-up 5 is fixed on farthest apart from wall 6
On crossbeam 3, and awning cloth 2 is layed in 3 top of curb girder 1 and crossbeam.It is run, can effectively be controlled by control wrap-up 5
Curb girder 1 is spun upside down, to control the tilt angle of entire awning.After determining the tilt angle of awning, by support rod 7
Shaft turns over, and its end is plugged on curb girder 1, the magnetic part 9 of 7 end of support rod in corresponding slot 8, is enabled to inhale
The ferromagnet of 8 bottom of slot is invested, to complete the support of awning.
When needing to dismantle awning, first awning cloth 2 is removed from two curb girders 1, then by flexible connecting member 4 from crossbeam
It is unloaded on 3.Then screw rod 23 is back-outed out of threaded hole 19 and fixation hole 20, to release the locking of telescopic rod 18, and will stretches
Bar 18 removes the pivoted hole 16 on pin joint seat 15.The shaft of pivoted pole 11 is finally rotated backward, so that two casings 12 are by lacking
Mouth 14 is detached from the shaft of pivoted poles 11 and takes out pivoted pole 11 out of two casings 12 interval.