CN107724645A - The big fulcrum of ornamental strip second connection system and its installation method - Google Patents

The big fulcrum of ornamental strip second connection system and its installation method Download PDF

Info

Publication number
CN107724645A
CN107724645A CN201711016956.0A CN201711016956A CN107724645A CN 107724645 A CN107724645 A CN 107724645A CN 201711016956 A CN201711016956 A CN 201711016956A CN 107724645 A CN107724645 A CN 107724645A
Authority
CN
China
Prior art keywords
groove
flat board
bolt
ornamental strip
fulcrum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711016956.0A
Other languages
Chinese (zh)
Other versions
CN107724645B (en
Inventor
黄拥军
李江
张心彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Shanghai Jangho Curtain Wall System Engineering Co Ltd
Original Assignee
SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd filed Critical SHANGHAI JIANGHE WALL SYSTEM ENGINEERING Co Ltd
Priority to CN201711016956.0A priority Critical patent/CN107724645B/en
Publication of CN107724645A publication Critical patent/CN107724645A/en
Application granted granted Critical
Publication of CN107724645B publication Critical patent/CN107724645B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of fulcrum of big ornamental strip second connection system and its installation method, the connection system includes the structural steel beam being fixed in agent structure, the structural steel beam lateral surface is welded with flat board, the flat board is provided with vertical groove, the groove is welded with towards the side of the structural steel beam and breathes out fragrant groove, and opening and the groove of the Kazakhstan sweet smell groove align;Slidable T-bolt is provided with the Kazakhstan sweet smell groove;The flat board lateral surface is provided with horizontal connecting cross beam, and the connecting cross beam side is fixedly connected with the flat board by the adaptor of L-type;The adaptor has orthogonal first side and second side;The first side is fixedly connected by the T-bolt with the flat board, and the second side is fixedly connected by fixing bolt with the connecting cross beam.The present invention can avoid live a large amount of welding, realize that three-dimensional is adjustable, so as to effectively control installation quality, eliminate safe hidden trouble, increase the ability of absorbing structure deviation, reduce the destruction to finished product.

Description

The big fulcrum of ornamental strip second connection system and its installation method
Technical field
The invention belongs to building curtain wall technical field, the particularly a kind of fulcrum of big ornamental strip second connection system and its installation Method.
Background technology
Existing the second fulcrum of big ornamental strip mounting means is all that adaptor is mounted directly on the body construction by welding, Some following weak point be present in this technology:
1st, scene largely uses welding manner, the more difficult control of welding quality.During welding, because operating space is narrow and small, and to face upward Weldering, higher is required to worker's technical merit, welding quality is difficult control, and chooses larger outside ornamental strip, and lateral force is larger, exists Larger potential safety hazard.
2nd, it is unfavorable for finished product protection.Live largely to use welding, installation gap is smaller, and mounted aluminium and glass are easily Scald, causes the destruction of unrepairable.
3rd, installation accuracy requires higher.After the completion of welding, left and right can not be adjusted, therefore higher to steel part positioning requirements.
The content of the invention
It is an object of the invention to provide a kind of big fulcrum of ornamental strip second connection system, and it can avoid live a large amount of welderings Connect, realize that three-dimensional is adjustable, so as to effectively control installation quality, eliminate safe hidden trouble, increase the ability of absorbing structure deviation, Reduce the destruction to finished product.
It is a further object of the present invention to provide a kind of installation method of the big fulcrum of ornamental strip second connection system, it can keep away Exempt from live a large amount of welding, installation process is simple, can protect peripheral member.
To achieve the above object, the present invention takes following technical scheme:
A kind of fulcrum of big ornamental strip second connects system, and it includes the structural steel beam being fixed in agent structure, the structure Girder steel lateral surface is welded with flat board, and the flat board is provided with vertical groove, and the groove welds towards the side of the structural steel beam Have and breathe out fragrant groove, opening and the groove of the Kazakhstan sweet smell groove align;Slidable T-bolt is provided with the Kazakhstan sweet smell groove;On the outside of the flat board Face is provided with horizontal connecting cross beam, and the connecting cross beam side is fixedly connected with the flat board by the adaptor of L-type;The adaptor has There are orthogonal first side and second side;The first side is fixedly connected by the T-bolt with the flat board, and this second Side is fixedly connected by fixing bolt with the connecting cross beam.
Further, the first side is provided with the first horizontal elongated hole, and the T-bolt is located in first elongated hole.
Further, the connecting cross beam is provided with the second vertical elongated hole, and the second side is provided with the 3rd horizontal length Hole, the fixing bolt are each passed through second elongated hole and the 3rd elongated hole.
Further, first elongated hole and the 3rd elongated hole side face are equipped with vertical sawtooth, the T-bolt end and The fixing bolt end is equipped with the pad with vertical sawtooth.
Further, ribs is provided between the first side and second side.
A kind of installation method of the above-mentioned big fulcrum of ornamental strip second connection system, in the horizontal work of the reserved installation of building body Font structure girder steel, two are symmetrically installed on the inside of the structural steel beam with the flat board for vertically breathing out fragrant groove, and by the Kazakhstan sweet smell groove T-bolt stretched out by the vertical groove of the flat board;The first side of the adaptor of L-type is put down by the T-bolt with this Plate is fixedly connected;Second side of the two sides of the connecting cross beam for connecting ornamental strip respectively with two connectors is passed through again Fixing bolt connects.
The beneficial effects of the invention are as follows:The fulcrum of ornamental strip second connection system of the invention big and its installation method, it can be with Live a large amount of welding are avoided, realizes that three-dimensional is adjustable, so as to effectively control installation quality, eliminates safe hidden trouble, increase and absorb The ability of structural deviation, reduce the destruction to finished product.
Brief description of the drawings
Fig. 1 is the elevational schematic of the big fulcrum of ornamental strip second connection system of the invention.
Fig. 2 is the cross-sectional schematic diagram of the big fulcrum of ornamental strip second connection system of the invention.
Embodiment
Embodiment of the present invention is further described below with reference to accompanying drawing.
As shown in Figure 1 and Figure 2, the present invention provides a kind of big fulcrum of ornamental strip second connection system, and it includes being fixed on main body Structural steel beam 2 in structure 1, the lateral surface of structural steel beam 2 are welded with flat board 3, and the flat board 3 is provided with vertical groove, should Groove is welded with towards the side of the structural steel beam 2 and breathes out fragrant groove 4, and opening and the groove of the Kazakhstan sweet smell groove 4 align.The Kazakhstan sweet smell groove 4 It is interior to be provided with slidable T-bolt 5.The lateral surface of flat board 3 is provided with horizontal connecting cross beam 6, and the side of connecting cross beam 6 is flat with this Plate 3 is fixedly connected by the adaptor 7 of L-type.The adaptor 7 has orthogonal first side 71 and second side 72.Should First side 71 is fixedly connected by the T-bolt 5 with the flat board 3, and the second side 72 is connected horizontal stroke by fixing bolt 8 with this Beam 6 is fixedly connected.Ribs 73 can be provided between first side 71 and second side 72.
For the ease of three-dimensional regulation, the first side 71 is provided with the first horizontal elongated hole, the T-bolt 5 be located at this first In elongated hole.The connecting cross beam 6 is provided with the second vertical elongated hole, and the second side 72 is provided with the 3rd horizontal elongated hole, the fixation spiral shell Bolt 8 is each passed through second elongated hole and the 3rd elongated hole.
In order to which after adjustment securely fixed position, first elongated hole and the 3rd elongated hole side face vertical saw can be equipped with Tooth, the end of T-bolt 5 and the end of fixing bolt 8 are equipped with the pad 9 with vertical sawtooth.
The present invention also provides a kind of installation method of the above-mentioned big fulcrum of ornamental strip second connection system, is reserved in building body Horizontal I-shaped structure girder steel is installed, two are symmetrically installed on the inside of the structural steel beam with the flat board for vertically breathing out fragrant groove, and T-bolt in the Kazakhstan sweet smell groove is stretched out by the vertical groove of the flat board;The first side of the adaptor of L-type is passed through into the T Type bolt is fixedly connected with the flat board;Again by the two sides of the connecting cross beam for connecting ornamental strip respectively with two connectors Second side is connected by fixing bolt.
When in-site installation cell cube, the adaptor of the second fulcrum can be installed into positioning temporarily before installation unit body, After cell cube installation is in place, the second fulcrum has three-dimensional adjustability so that and the installation of the second fulcrum is more convenient, and all using spiral shell Tether and connect, without any welding, safety of structure improves, and is advantageous to site operation safety and finished product protection, to construction condition Also it is greatly improved.
The present invention is combined using fragrant groove is breathed out with flat board, can realize regulation up and down, and adaptor uses two-way drawing tooth, can be real Existing left and right, front and rear regulation, so as to realize three-dimensional adjustable function.Breathing out fragrant groove has anti-sideward sliding function, and interim positioning function can be achieved, Bolt can still realize positioning in the case where not tightening.Adaptor uses steel material, can be in lateral any ribbed panel;Because of big dress Increasing is chosen outside panel, and is mostly used in high level, blast is larger, and lateral ribbed panel is advantageous to bending resistance, saves material.
In the installation of large-scale ornamental strip, in order to ensure the structural strength of Integral decoration bar, usually with agent structure Connecting portion is using the technique all welded.But the high temperature of welding can easily scald the aluminium of installation and glass, cause not Recoverable destruction.And be all connected by screw bolts during present invention installation, installation is simple, and does not destroy peripheral member, meanwhile, Tested by brattice simulation test, ornamental strip impact resistance, obtained test result shows that Integral decoration bar is without permanent deformation, nothing Any damage, have no abnormal sound.The simpler connected mode of the present invention, has obtained the structure being connected with welding manner in the prior art Same structural strength, and installation difficulty is reduced, protect peripheral member.
The principle and its effect of the merely exemplary explanation present invention of above-described embodiment, not for the limitation present invention.The present invention Also many aspects can be improved on the premise of without prejudice to overall thought, and any person skilled in the art all can be not Under the spirit and scope for running counter to the present invention, modifications and changes are carried out to above-described embodiment.Therefore, have such as in art All equivalent modifications or change that usually intellectual is completed under without departing from disclosed spirit and technological thought, It should be covered by the claim of the present invention.

Claims (6)

1. a kind of fulcrum of big ornamental strip second connects system, it is characterised in that it includes the structural steel being fixed in agent structure Beam, the structural steel beam lateral surface are welded with flat board, and the flat board is provided with vertical groove, and the groove is towards the structural steel beam Side, which is welded with, breathes out fragrant groove, and opening and the groove of the Kazakhstan sweet smell groove align;Slidable T-bolt is provided with the Kazakhstan sweet smell groove;Should Flat board lateral surface is provided with horizontal connecting cross beam, and the connecting cross beam side is fixedly connected with the flat board by the adaptor of L-type;Should Adaptor has orthogonal first side and second side;The first side is fixed by the T-bolt and the flat board to be connected Connect, the second side is fixedly connected by fixing bolt with the connecting cross beam.
2. the fulcrum of big ornamental strip second according to claim 1 connects system, it is characterised in that:The first side is provided with The first horizontal elongated hole, the T-bolt are located in first elongated hole.
3. the fulcrum of big ornamental strip second according to claim 2 connects system, it is characterised in that:The connecting cross beam is provided with The second vertical elongated hole, the second side are provided with the 3rd horizontal elongated hole, and the fixing bolt is each passed through second elongated hole With the 3rd elongated hole.
4. the fulcrum of big ornamental strip second according to claim 3 connects system, it is characterised in that:First elongated hole and Three elongated hole side faces are equipped with vertical sawtooth, and the T-bolt end and the fixing bolt end are equipped with vertical sawtooth Pad.
5. the fulcrum of big ornamental strip second according to any one of claim 1 to 4 connects system, it is characterised in that:It is described Ribs is provided between first side and second side.
6. a kind of installation method of the fulcrum of the big ornamental strip second connection system any one of claim 1-5, its feature It is, in the horizontal I-shaped structure girder steel of the reserved installation of building body, two is symmetrically installed on the inside of the structural steel beam and is carried The flat board of fragrant groove is vertically breathed out, and the T-bolt in the Kazakhstan sweet smell groove is stretched out by the vertical groove of the flat board;By the switching of L-type The first side of part is fixedly connected by the T-bolt with the flat board;Again by the both sides of the connecting cross beam for connecting ornamental strip Second side of the face respectively with two connectors is connected by fixing bolt.
CN201711016956.0A 2017-10-26 2017-10-26 Large decorative strip second fulcrum connecting system and mounting method thereof Active CN107724645B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711016956.0A CN107724645B (en) 2017-10-26 2017-10-26 Large decorative strip second fulcrum connecting system and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711016956.0A CN107724645B (en) 2017-10-26 2017-10-26 Large decorative strip second fulcrum connecting system and mounting method thereof

Publications (2)

Publication Number Publication Date
CN107724645A true CN107724645A (en) 2018-02-23
CN107724645B CN107724645B (en) 2020-04-03

Family

ID=61214005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711016956.0A Active CN107724645B (en) 2017-10-26 2017-10-26 Large decorative strip second fulcrum connecting system and mounting method thereof

Country Status (1)

Country Link
CN (1) CN107724645B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2727305Y (en) * 2004-07-15 2005-09-21 方大集团股份有限公司 Curtain wall with decorative strips
CN201778398U (en) * 2010-08-06 2011-03-30 赵小明 Slot type embedded part
CN202148625U (en) * 2011-07-08 2012-02-22 沈阳远大铝业工程有限公司 Hanging and connecting system for unit curtain wall
CN202194278U (en) * 2011-07-06 2012-04-18 沈阳远大铝业工程有限公司 Unit curtain wall connecting system capable of achieving three-dimensional adjustment, preventing dropping and being limited by bolt
CN202194281U (en) * 2011-07-08 2012-04-18 沈阳远大铝业工程有限公司 Adjustable falling-preventive unit screen wall connecting system
CN203569753U (en) * 2013-10-21 2014-04-30 天颂建设集团有限公司 Three-dimensional adjustable curtain wall structure
CN203613690U (en) * 2013-10-25 2014-05-28 天颂建设集团有限公司 Curtain wall connecting structure
CN205907868U (en) * 2016-08-22 2017-01-25 东亚装饰股份有限公司 Install glass curtain wall node structure of large -scale ornamental strip
CN206053061U (en) * 2016-08-29 2017-03-29 深圳广田集团股份有限公司 A kind of attachment structure of the column and main body for having ornamental strip effect concurrently

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2727305Y (en) * 2004-07-15 2005-09-21 方大集团股份有限公司 Curtain wall with decorative strips
CN201778398U (en) * 2010-08-06 2011-03-30 赵小明 Slot type embedded part
CN202194278U (en) * 2011-07-06 2012-04-18 沈阳远大铝业工程有限公司 Unit curtain wall connecting system capable of achieving three-dimensional adjustment, preventing dropping and being limited by bolt
CN202148625U (en) * 2011-07-08 2012-02-22 沈阳远大铝业工程有限公司 Hanging and connecting system for unit curtain wall
CN202194281U (en) * 2011-07-08 2012-04-18 沈阳远大铝业工程有限公司 Adjustable falling-preventive unit screen wall connecting system
CN203569753U (en) * 2013-10-21 2014-04-30 天颂建设集团有限公司 Three-dimensional adjustable curtain wall structure
CN203613690U (en) * 2013-10-25 2014-05-28 天颂建设集团有限公司 Curtain wall connecting structure
CN205907868U (en) * 2016-08-22 2017-01-25 东亚装饰股份有限公司 Install glass curtain wall node structure of large -scale ornamental strip
CN206053061U (en) * 2016-08-29 2017-03-29 深圳广田集团股份有限公司 A kind of attachment structure of the column and main body for having ornamental strip effect concurrently

Also Published As

Publication number Publication date
CN107724645B (en) 2020-04-03

Similar Documents

Publication Publication Date Title
CN108819972A (en) A kind of rail vehicle and its hitch mounting assembly
CN207464402U (en) One kind is used for crossed steel column processing support device
CN103967246B (en) Welding post-install system and construction method thereof
CN107724645A (en) The big fulcrum of ornamental strip second connection system and its installation method
CN106401170B (en) A kind of aluminum alloy mould plate connects high plate exterior wall strengthening device
CN208615871U (en) Energy-absorption box and collision prevention beam component
CN204571000U (en) Node installed by a kind of flexible connecting device and side fascia
CN208352090U (en) A kind of iron-core reactor
CN106477493B (en) A kind of scalable anticollision device, collision-prevention device of self-propelled aloft working platform
CN211143492U (en) Steel beam protection device in assembled steel structure house
CN205348477U (en) Steel aluminium combines curtain stand form
CN205077887U (en) Novel elevartor shaft guard gate
CN206722228U (en) A kind of attachment means on Antiseismic building seam roof
CN208327053U (en) A kind of sightseeing elevator car top protective device
CN207813068U (en) A kind of assembled tower crane protection canopy
CN205303951U (en) Novel improve switch board frame of structure
CN202454916U (en) Low voltage switch cabinet with arc extinguishing shield arranged at air-hole grate
CN207197740U (en) A kind of heating tube air-tightness detection device
CN203579026U (en) Combined steel beam welding protective device
CN105089159B (en) Portable casing post Butt Assembling connector with liner
CN205819339U (en) A kind of attachment structure of new-energy automobile rear portion collision prevention girders
CN106969431A (en) A kind of air-conditioning steel structure support
CN205976586U (en) Modified building construction protection device
CN217371948U (en) Spark prevention device of abrasive wheel cutting machine
CN212180739U (en) Air pollution alarm device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant