CN107720493A - Architectural engineering cargo lift quick discharging method and car - Google Patents

Architectural engineering cargo lift quick discharging method and car Download PDF

Info

Publication number
CN107720493A
CN107720493A CN201711076898.0A CN201711076898A CN107720493A CN 107720493 A CN107720493 A CN 107720493A CN 201711076898 A CN201711076898 A CN 201711076898A CN 107720493 A CN107720493 A CN 107720493A
Authority
CN
China
Prior art keywords
turnover door
casing
switch board
unloading
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711076898.0A
Other languages
Chinese (zh)
Inventor
徐敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Industry Polytechnic College
Original Assignee
Chongqing Industry Polytechnic College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Industry Polytechnic College filed Critical Chongqing Industry Polytechnic College
Priority to CN201711076898.0A priority Critical patent/CN107720493A/en
Publication of CN107720493A publication Critical patent/CN107720493A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0035Arrangement of driving gear, e.g. location or support
    • B66B11/0045Arrangement of driving gear, e.g. location or support in the hoistway
    • B66B11/005Arrangement of driving gear, e.g. location or support in the hoistway on the car
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/006Applications of loading and unloading equipment for lifts associated with buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/02Cages, i.e. cars
    • B66B11/0226Constructional features, e.g. walls assembly, decorative panels, comfort equipment, thermal or sound insulation

Abstract

The present invention relates to construction quick discharging method and load-carrying device, specifically a kind of architectural engineering cargo lift quick discharging method and car, architectural engineering cargo lift is that a fan turnover door is set on the rear wall of the casing of car with quick discharging method, and unloading plate is provided with the inner chamber bottom plate of the casing of car.Architectural engineering cargo lift includes casing with car, turnover door on casing, the turnover door is located on the rear wall of casing, the wainscot top of the turnover door is fixed with least one drawstring fixed seat with the wainscot of turnover door one, each one end of drawstring fixed seat with a drawstring is fixed, the other end of drawstring is connected with hoist engine, and unloading supporting plate is provided with the inner chamber of casing.Present invention reduces unloading time, improve conevying efficiency, shorten construction period, beneficial to improving building surrounding ground tidiness, improve security, reduce and undertake the construction of cost and improve the feature of environmental protection.

Description

Architectural engineering cargo lift quick discharging method and car
Technical field
It is especially a kind of to shorten unloading time, carry the present invention relates to construction quick discharging method and load-carrying device High conevying efficiency, shorten construction period, beneficial to improve building surrounding ground tidiness, improve security, reduce undertake the construction of cost and Improve architectural engineering cargo lift quick discharging method and the car of the feature of environmental protection.
Background technology
In existing Bases in High Building Construction construction process, typically using tower crane or lifting cargo lift, tower crane and lifting loading The method that elevator combines is carried to required place to construction material.
Existing lifting cargo lift generally comprises the protective fence positioned at ground, with the gradual increased guide rail bracket of story height Standard knot, car, driving car move up and down driving structure, the control cabinet in protective fence and car.Driving structure It is general to use pinion and-rack or steel wire rope type again.Car typically includes casing again, the opposite opened elevator door being opened on casing, The motor for driving opposite opened elevator door to open and close.Such car in use, positioned at ground worker first by building materials carry into In car, car rises to designated floor under driving structure effect, then by worker artificial discharging.Due to opposite opened elevator door Structure, it can only typically accommodate two or three of workers while building materials are carried, after all building materials have been carried, lifting cargo lift is again Ground is displaced downwardly to, carries out the loading and carrying of building materials next time.For worker in unloading, the car for lifting cargo lift must position Position at unloading floor, and wait worker to carry out building materials carrying, and in the floor of every floor next time after having unloaded On need to build discharging platform, discharging platform be substantially fix between the floor in outer foundation frame and per floor bamboo springboard or Wooden springboard, consumable quantity is quite big, and use cost is higher, while potential safety hazard be present.Based on cost budgeting and undertake the construction of cost Control, existing conventional method are at interval of 3 to 5 layer building, one discharging platform, are mostly unloaded using one at interval of 5 layer building Expect platform so that the cost of wheeling of building materials remains high, and progress is slow in place for building materials, influences project progress.
The content of the invention
Shorten unloading time it is an object of the invention to provide one kind, improve conevying efficiency, shortening construction period, beneficial to raising Surrounding ground tidiness is built, security is improved, reduces and undertake the construction of cost and improve the architectural engineering cargo lift of the feature of environmental protection with soon Fast discharging method.
The technical scheme used to achieve the above object is such, i.e. architectural engineering cargo lift is with quickly unloading cargo interests Method, wherein:On the basis of existing engineering construction cargo lift, by the opposite opened electricity on the car of existing engineering construction cargo lift Terraced door is cancelled, and sets a fan turnover door on the rear wall of the casing of car, by the bin enclosure of car under the turnover door normality, The turnover door external force effect is placed on the floor of skyscraper after may be reversed, and the upset of the turnover door is being rolled up by steel cable The folding and unfolding on machine is raised to realize;
Unloading plate is provided with the inner chamber bottom plate of the casing of car, it is parallel with the inner chamber bottom plate of casing under the unloading plate normality;
The unloading plate is by the way that using the edge close to turnover door as fulcrum, external force acts on lower tilted upward, is had a down dip on plate of unloading Hydraulic cylinder or pneumatic cylinder is leaned to realize;
In use, the switch board white collar worker positioned at ground opens turnover door, loader's loading, after having freighted by switch board Switch board white collar worker closes turnover door, starts ascending for elevator to designated floor;Worker on floor by intercom with Switch board white collar worker is contacted and sends door open command, and switch board white collar worker is overturn after receiving signal by switch board opening Door, it is overlapped on after turnover door upset on the floor of designated floor;Worker in designated floor sends out to switch board white collar worker Go out unloading instruction, switch board white collar worker starts hydraulic cylinder by switch board after receiving unloading instruction or pneumatic cylinder realizes unloading plate Oblique unloading is cut, goods moment is slowly poured on the floor of designated floor, the unloading worker on the floor of designated floor The goods not being scattered to floor positioned at turnover door is quickly moved away from into turnover door, then the worker on the floor of designated floor Discharged instruction is sent to switch board white collar worker, switch board white collar worker controls turnover door to reset by switch board, upset Switch board white collar worker controls car to come downwards to ground and resetted by switch board after door resets, and turnover door resets and car comes downwards to During ground resets, the unloading worker on the floor of designated floor carries out goods carrying.
The purpose of the present invention also provides a kind of shortening unloading time, improves conevying efficiency, shortens construction period, beneficial to raising Building surrounding ground tidiness, improve security, reduce the architectural engineering cargo lift sedan-chair undertaken the construction of cost and improve the feature of environmental protection Railway carriage or compartment.
The technical scheme used to achieve the above object is such, i.e. architectural engineering cargo lift car, including The casing of rectangular-shape;Wherein:Turnover door on casing, the turnover door is located on the rear wall of casing, in casing Rear wall bottom is provided with installing plate, and the bottom plate of the installing plate and casing is fixed as one;
The lower end of the turnover door and the top of installing plate are articulated as one by hinge, or under the two side of the turnover door End is connected as one by two edge of rotary shaft and installing plate;
The wainscot top of the turnover door is fixed with least one drawstring fixed seat with the wainscot of turnover door one, each The one end of individual drawstring fixed seat with a drawstring is fixed, and the other end of the drawstring passes through after cable-through hole to be slided around being oriented to successively It is fixed on after wheel and tension pulley block on the elevator disk of hoist engine, the cable-through hole is located on the top plate of casing;
The leading block and tension pulley block are fixed on independent support bar by independent rotating shaft, two support bars It is fixed on the top plate of casing, the height of the support bar below leading block is higher than the support bar below tension pulley block Height;
The tension pulley block between leading block and hoist engine, the leading block be located at tension pulley block and cable-through hole it Between;
Unloading supporting plate is provided with the inner chamber of casing, one group is respectively fixed with the corner of the bottom panel of the unloading supporting plate Mounting ear, support rotating shaft is fixed with each group of mounting ear;Two support rotating shafts close to turnover door are located at the top of support column In rotating hole, two support rotating shafts in addition are located in the rotating hole of piston rod part;The bottom of the support column is fixed on casing Bottom plate on, the lower end of the piston rod is fixed as one with the piston in the inner chamber of hydraulic cylinder or cylinder, the hydraulic pressure The cylinder body lower end of cylinder or cylinder is fixed on the bottom plate of casing;
The hydraulic cylinder or cylinder are connected by flexible pipe with hydraulic system or baric systerm, and the hydraulic system or baric systerm pass through It is arranged on the switch board control operation on ground, the hoist engine and hydraulic system or baric systerm is electrical with switch board by cable Connection.
The method of the invention and structure this have the advantage that:Unloading time is shortened, conevying efficiency is improved, shortens Construction period, beneficial to improving building surrounding ground tidiness, improve security, reduce and undertake the construction of cost and improve environmental protection Property.
Brief description of the drawings
The present invention can be further illustrated by the nonlimiting examples that accompanying drawing provides.
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the principal direction structural representation of the present invention.
Fig. 3 is the internal structure schematic diagram of the casing principal direction of the present invention.
Fig. 4 is the structural representation that rotary shaft is used at the turnover door of the present invention.
Fig. 5 is the side structure schematic view of the turnover door of the present invention.
Fig. 6 is the structural representation of present invention unloading supporting plate.
In figure:1st, casing;2nd, turnover door;3rd, installing plate;4th, hinge;5th, rotary shaft;6th, drawstring fixed seat;7th, drawstring;8、 Cable-through hole;9th, leading block;10th, tension pulley block;11st, hoist engine;12nd, elevator disk;13rd, unloading supporting plate;14th, mounting ear;15、 Support rotating shaft;16th, support column;17th, piston rod;18th, hydraulic cylinder or cylinder;19th, hydraulic system or baric systerm;20th, hang plate; 21st, channel-shaped sliding panel;22nd, motor is lifted;23rd, speed changer is lifted;24th, drive gear;25th, motor installation is lifted Frame.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples:
A kind of quick discharging method of architectural engineering cargo lift, wherein:, will be existing on the basis of existing engineering construction cargo lift There is the opposite opened elevator door on the car of engineering construction cargo lift to cancel, set a fan to turn on the rear wall of the casing of car Revolving door, the bin enclosure of car, the turnover door external force effect are placed on skyscraper after may be reversed under the turnover door normality Floor on, the upset of the turnover door is realized by folding and unfolding of the steel cable on hoist engine;
Unloading plate is provided with the inner chamber bottom plate of the casing of car, it is parallel with the inner chamber bottom plate of casing under the unloading plate normality;
The unloading plate is by the way that using the edge close to turnover door as fulcrum, external force acts on lower tilted upward, is had a down dip on plate of unloading Hydraulic cylinder or pneumatic cylinder is leaned to realize;
In use, the switch board white collar worker positioned at ground opens turnover door, loader's loading, after having freighted by switch board Switch board white collar worker closes turnover door, starts ascending for elevator to designated floor;Worker on floor by intercom with Switch board white collar worker is contacted and sends door open command, and switch board white collar worker is overturn after receiving signal by switch board opening Door, it is overlapped on after turnover door upset on the floor of designated floor;Worker in designated floor sends out to switch board white collar worker Go out unloading instruction, switch board white collar worker starts hydraulic cylinder by switch board after receiving unloading instruction or pneumatic cylinder realizes unloading plate Oblique unloading is cut, goods moment is slowly poured on the floor of designated floor, the unloading worker on the floor of designated floor The goods not being scattered to floor positioned at turnover door is quickly moved away from into turnover door, then the worker on the floor of designated floor Discharged instruction is sent to switch board white collar worker, switch board white collar worker controls turnover door to reset by switch board, upset Switch board white collar worker controls car to come downwards to ground and resetted by switch board after door resets, and turnover door resets and car comes downwards to During ground resets, the unloading worker on the floor of designated floor carries out goods carrying.By this method, can make Obtain guide rail bracket standard knot close building as near as possible so that the turnover door of car close building as near as possible, shorten Unloading time, improve conevying efficiency, shorten construction period, floor building material can be carried to designated floor in time, be beneficial to Improve building surrounding ground tidiness, it is no longer necessary to plate of unloading, improve security, reduce and undertake the construction of cost and improve environmental protection Property.
Referring to accompanying drawing 1 to 6, the architectural engineering cargo lift car in figure, include the casing 1 of rectangular-shape, wherein:Position In the turnover door 2 on casing 1, the turnover door 2 is located on the rear wall of casing 1, and the rear wall bottom of casing 1 is provided with peace Loading board 3, the bottom plate of the installing plate 3 and casing 1 are fixed as one;
The lower end of the turnover door 2 is articulated as one with the top of installing plate 3 by hinge 4, or the both sides of the turnover door 2 Wall lower end is connected as one by rotary shaft 5 and two edge of installing plate 3;
The wainscot top of the turnover door 2 is fixed with least one drawstring fixed seat 6 with the wainscot of turnover door 2 one, Each one end of drawstring fixed seat 6 with a drawstring 7 is fixed, the other end of the drawstring 7 pass through after cable-through hole 8 successively around It is fixed on after crossing leading block 9 and tension pulley block 10 on the elevator disk 12 of hoist engine 11, the cable-through hole 8 is located at the top of casing 1 On plate;
The leading block 9 and tension pulley block 10 are fixed on independent support bar by independent rotating shaft, two branch Strut is fixed on the top plate of casing 1, is higher than positioned at the height of the support bar of the lower section of leading block 9 positioned at the lower section of tension pulley block 10 Support bar height;
For the tension pulley block 10 between leading block 9 and hoist engine 11, the leading block 9 is located at tension pulley block 10 and mistake Between string holes 8;
Unloading supporting plate 13, each fixation on the corner of the bottom panel of the unloading supporting plate 13 are provided with the inner chamber of casing 1 There is one group of mounting ear 14, support rotating shaft 15 is fixed with each group of mounting ear 14;Two close to turnover door 2 support rotating shaft 15 In the rotating hole at the top of support column 16, two support rotating shafts 15 in addition are located in the rotating hole at the top of piston rod 17;The branch The bottom of dagger 16 is fixed on the bottom plate of casing 1, the lower end of the piston rod 17 and the inner chamber for being located at hydraulic cylinder or cylinder 18 In piston be fixed as one, the cylinder body lower end of the hydraulic cylinder or cylinder 18 is fixed on the bottom plate of casing 1;
The hydraulic cylinder or cylinder 18 is connected by flexible pipe with hydraulic system or baric systerm 19, the hydraulic system or baric systerm 19 by be arranged on the switch board on ground control operation, the hoist engine 11 and hydraulic system or baric systerm 19 by cable with Switch board is electrically connected with.In the embodiment, the structure can cause guide rail bracket standard knot close building as near as possible, make The turnover door of car close building as near as possible is obtained, worker's unloading space is significantly lifted, shortens unloading time, improves Conevying efficiency, construction period is shortened, floor building material can be carried to designated floor in time, and surrounding ground is built beneficial to improving Tidiness, it is no longer necessary to build unloading plate in addition, improve security, reduce and undertake the construction of cost and improve the feature of environmental protection.
To ensure activity space of the drawstring 7 when controlling turnover door 2 to overturn, the safety in utilization of drawstring 7, above-mentioned implementation are improved In example, preferably:The cable-through hole 8 is bar shape trench hole.
To ensure that the hole wall that drawstring 7 moves back and forth not with cable-through hole 8 contacts, the safety in utilization of drawstring 7 is further improved, on State in embodiment, preferably:A width of 10-30 centimetres of the hole of the bar shape trench hole, the length of the bar shape trench hole is 80-120 centimetres.
To ensure that building materials are quickly scattered from turnover door 2, in above-described embodiment, preferably:The outer panels of the turnover door 2 Top is fixed with tilting rack or hang plate 20 with the outer panels of turnover door 2 one.
Further to improve unloading security, ensure the supporting power of turnover door 2, in above-described embodiment, preferably:The drawing Fixed seat 6 of restricting is two, and two drawstring fixed seats 6 are located at the top two corners of the wainscot of turnover door 2, each drawstring respectively Fixed seat 6 is connected by the drawstring 7 being independently connected with it with independent hoist engine 11, and two hoist engines 11 are respectively positioned on casing 1 In the middle part of top plate.
In above-described embodiment, preferably:Installation and decelerator on the output shaft of the hoist engine 11, the elevator disk 12 Rotating shaft is connected as one by the output shaft of shaft coupling and decelerator.
During to cause turnover door 2 with the one of unloading supporting plate 13 as unloading plate, the gap between them is small as far as possible, Ensure that building materials are steadily slided on turnover door 2 from unloading supporting plate 13, in above-described embodiment, preferably:The lower end of the turnover door 2 And/or unloading supporting plate 13 close to the end of turnover door 2 be circular arc.
To cause this car to be applied to steel wire rope type driving structure, in above-described embodiment, preferably:The top of the casing 1 The connecting seat connected for lifting steel cable with counterweight steel cable is provided with plate.
To cause this car to be applied to pinion and-rack driving structure, in above-described embodiment, preferably:The casing 1 The channel-shaped sliding panel 21 with the one of casing 1 is fixed with left side wall or right side wall, is set on two cell wall bodies of the channel-shaped sliding panel 21 It is equipped with the sliding part with the guide rail of guide rail bracket standard knot;
At least one lifting motor 22 is provided with the top plate of the casing 1, the lifting motor 22 is slided close to channel-shaped Dynamic plate 21;
The clutch end of the lifting motor 22 is provided with lifting speed changer 23, and the output shaft of the lifting speed changer 23 is worn The bottom plate of channel-shaped sliding panel 21 is crossed, drive gear 24 is fixed with the end of the output shaft of lifting speed changer 23;
The drive gear 24 is used to engage with the magnetic stripe on guide rail bracket standard knot;
The lifting motor 22 is electrically connected with by cable and switch board.In this embodiment, the lifting motor 22 are each attached on lifting motor mounting bracket 25 with lifting speed changer 23, and best mode is that lifting motor 22 uses two Platform.
All parts are market products in above-described embodiment.Technical scheme of the present invention is particularly suitable for use in pre-buried The transport of the building materials such as tubing, pipe joint, lapping fastener.
Obviously, above-mentioned all embodiments are the part of the embodiment of the present invention, rather than whole embodiments.Based on this hair The bright embodiment, all other embodiment that those skilled in the art are obtained under the premise of creative work is not made, Belong to the category that the present invention protects.
In summary, due to the above method and structure, present invention reduces unloading time, conevying efficiency, shortening are improved Construction period, beneficial to improving building surrounding ground tidiness, improve security, reduce and undertake the construction of cost and improve environmental protection Property.

Claims (10)

  1. A kind of 1. quick discharging method of architectural engineering cargo lift, it is characterised in that:In existing engineering construction cargo lift base On plinth, the opposite opened elevator door on the car of existing engineering construction cargo lift is cancelled, on the rear wall of the casing of car One fan turnover door is set, placed the bin enclosure of car, the turnover door external force effect after may be reversed under the turnover door normality On the floor of skyscraper, the upset of the turnover door is to lean on folding and unfolding of the steel cable on hoist engine to realize;
    Unloading plate is provided with the inner chamber bottom plate of the casing of car, it is parallel with the inner chamber bottom plate of casing under the unloading plate normality;
    The unloading plate is by the way that using the edge close to turnover door as fulcrum, external force acts on lower tilted upward, is had a down dip on plate of unloading Hydraulic cylinder or pneumatic cylinder is leaned to realize;
    In use, the switch board white collar worker positioned at ground opens turnover door, loader's loading, after having freighted by switch board Switch board white collar worker closes turnover door, starts ascending for elevator to designated floor;Worker on floor by intercom with Switch board white collar worker is contacted and sends door open command, and switch board white collar worker is overturn after receiving signal by switch board opening Door, it is overlapped on after turnover door upset on the floor of designated floor;Worker in designated floor sends out to switch board white collar worker Go out unloading instruction, switch board white collar worker starts hydraulic cylinder by switch board after receiving unloading instruction or pneumatic cylinder realizes unloading plate Oblique unloading is cut, goods moment is slowly poured on the floor of designated floor, the unloading worker on the floor of designated floor The goods not being scattered to floor positioned at turnover door is quickly moved away from into turnover door, then the worker on the floor of designated floor Discharged instruction is sent to switch board white collar worker, switch board white collar worker controls turnover door to reset by switch board, upset Switch board white collar worker controls car to come downwards to ground and resetted by switch board after door resets, and turnover door resets and car comes downwards to During ground resets, the unloading worker on the floor of designated floor carries out goods carrying.
  2. 2. a kind of architectural engineering cargo lift car, include the casing of rectangular-shape(1), it is characterised in that:Positioned at casing(1) On turnover door(2), the turnover door(2)Positioned at casing(1)Rear wall on, in casing(1)Rear wall bottom be provided with Installing plate(3), the installing plate(3)With casing(1)Bottom plate be fixed as one;
    The turnover door(2)Lower end and installing plate(3)Top pass through hinge(4)It is articulated as one, or the turnover door (2)Two side lower end pass through rotary shaft(5)With installing plate(3)Two edge connect as one;
    The turnover door(2)Wainscot top be fixed with and turnover door(2)Wainscot one at least one drawstring fix Seat(6), each drawstring fixed seat(6)With a drawstring(7)One end fix, the drawstring(7)The other end passed through String holes(8)Bypass leading block successively afterwards(9)And tension pulley block(10)After be fixed on hoist engine(11)Elevator disk(12)On, institute State cable-through hole(8)Positioned at casing(1)Top plate on;
    The leading block(9)And tension pulley block(10)It is fixed on by independent rotating shaft on independent support bar, described two Root support bar is fixed on casing(1)Top plate on, positioned at leading block(9)The height of the support bar of lower section is higher than to be slided positioned at tensioning Wheel(10)The height of the support bar of lower section;
    The tension pulley block(10)Positioned at leading block(9)With hoist engine(11)Between, the leading block(9)Slided positioned at tensioning Wheel(10)With cable-through hole(8)Between;
    In casing(1)Inner chamber in be provided with unloading supporting plate(13), the unloading supporting plate(13)Bottom panel corner on Respectively it is fixed with one group of mounting ear(14), each group of mounting ear(14)On be fixed with support rotating shaft(15);Close to turnover door(2)Two Root supports rotating shaft(15)Positioned at support column(16)In the rotating hole at top, two support rotating shafts in addition(15)Positioned at piston rod(17) In the rotating hole at top;The support column(16)Bottom be fixed on casing(1)Bottom plate on, the piston rod(17)Lower end With positioned at hydraulic cylinder or cylinder(18)Inner chamber in piston be fixed as one, the hydraulic cylinder or cylinder(18)Cylinder body lower end It is fixed on casing(1)Bottom plate on;
    The hydraulic cylinder or cylinder(18)Pass through flexible pipe and hydraulic system or baric systerm(19)Connection, the hydraulic system or air pressure System(19)Operation, the hoist engine are controlled by the switch board for being arranged on ground(11)With hydraulic system or baric systerm(19) It is electrically connected with by cable and switch board.
  3. 3. architectural engineering cargo lift car according to claim 2, it is characterised in that:The cable-through hole(8)For bar Shape slotted eye.
  4. 4. architectural engineering cargo lift car according to claim 3, it is characterised in that:The hole of the bar shape trench hole is wide For 10-30 centimetres, the length of the bar shape trench hole is 80-120 centimetres.
  5. 5. architectural engineering cargo lift car according to claim 2, it is characterised in that:The turnover door(2)It is outer Panel top is fixed with and turnover door(2)Outer panels one tilting rack or hang plate(20).
  6. 6. architectural engineering cargo lift car according to claim 2, it is characterised in that:The drawstring fixed seat(6) For two, two drawstring fixed seats(6)It is located at turnover door respectively(2)Wainscot top two corners, each drawstring fixes Seat(6)Pass through the drawstring being independently connected with it(7)With independent hoist engine(11)Connection, two hoist engines(11)It is respectively positioned on casing (1)Top plate in the middle part of.
  7. 7. the architectural engineering cargo lift car according to claim 2 or 6, it is characterised in that:The hoist engine(11) Output shaft on installation again decelerator, the elevator disk(12)Rotating shaft be connected as one by the output shaft of shaft coupling and decelerator Body.
  8. 8. architectural engineering cargo lift car according to claim 2, it is characterised in that:The turnover door(2)Under End and/or unloading supporting plate(13)Close to turnover door(2)End be circular arc.
  9. 9. architectural engineering cargo lift car according to claim 2, it is characterised in that:The casing(1)Top plate On be provided with the connecting seat connected for lifting steel cable with counterweight steel cable.
  10. 10. architectural engineering cargo lift car according to claim 2, it is characterised in that:The casing(1)Left side It is fixed with wall or right side wall and casing(1)The channel-shaped sliding panel of one(21), the channel-shaped sliding panel(21)Two cell wall bodies on It is provided with the sliding part with the guide rail of guide rail bracket standard knot;
    The casing(1)Top plate on be provided with least one lifting motor(22), the lifting motor(22)Close to Channel-shaped sliding panel(21);
    The lifting motor(22)Clutch end lifting speed changer is installed(23), the lifting speed changer(23)It is defeated Shaft passes through channel-shaped sliding panel(21)Bottom plate, lifting speed changer(23)The end of output shaft be fixed with drive gear (24);
    The drive gear(24)For being engaged with the magnetic stripe on guide rail bracket standard knot;
    The lifting motor(22)It is electrically connected with by cable and switch board.
CN201711076898.0A 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car Pending CN107720493A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711076898.0A CN107720493A (en) 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711076898.0A CN107720493A (en) 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car

Publications (1)

Publication Number Publication Date
CN107720493A true CN107720493A (en) 2018-02-23

Family

ID=61221567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711076898.0A Pending CN107720493A (en) 2017-11-06 2017-11-06 Architectural engineering cargo lift quick discharging method and car

Country Status (1)

Country Link
CN (1) CN107720493A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112693993A (en) * 2020-12-31 2021-04-23 南阳中原智能电梯有限公司 Three-dimensional transfer equipment
CN114229244A (en) * 2021-12-21 2022-03-25 重庆四正激光科技有限公司 Telescopic combined bin and control method
CN116199070A (en) * 2023-05-05 2023-06-02 四川长能装配式建筑科技有限公司 Assembled building wallboard lifting conveying device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201261674Y (en) * 2008-09-08 2009-06-24 长沙科达建设机械制造有限公司 Suspension cage with turning door
CN203474189U (en) * 2013-08-30 2014-03-12 江苏中南建筑产业集团有限责任公司 Passenger-and-freight elevator moving
CN204237411U (en) * 2014-11-24 2015-04-01 台州富士电梯制造有限公司 Baggage elevator
CN204897121U (en) * 2015-08-19 2015-12-23 苏州工业园区建设监理有限责任公司 People's goods elevator with passageway draw bridge
CN205602950U (en) * 2016-04-07 2016-09-28 苏州捷菱快速电梯有限公司 Freight elevator
CN205616397U (en) * 2016-03-10 2016-10-05 中国建筑第五工程局有限公司深圳分公司 Novel rotatory passageway formula elevator car
CN205739937U (en) * 2016-05-17 2016-11-30 康达电梯有限公司 A kind of baggage elevator being easy to handling goods
CN206108672U (en) * 2016-08-31 2017-04-19 天津京龙工程机械有限公司 Safe type lift with stable structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201261674Y (en) * 2008-09-08 2009-06-24 长沙科达建设机械制造有限公司 Suspension cage with turning door
CN203474189U (en) * 2013-08-30 2014-03-12 江苏中南建筑产业集团有限责任公司 Passenger-and-freight elevator moving
CN204237411U (en) * 2014-11-24 2015-04-01 台州富士电梯制造有限公司 Baggage elevator
CN204897121U (en) * 2015-08-19 2015-12-23 苏州工业园区建设监理有限责任公司 People's goods elevator with passageway draw bridge
CN205616397U (en) * 2016-03-10 2016-10-05 中国建筑第五工程局有限公司深圳分公司 Novel rotatory passageway formula elevator car
CN205602950U (en) * 2016-04-07 2016-09-28 苏州捷菱快速电梯有限公司 Freight elevator
CN205739937U (en) * 2016-05-17 2016-11-30 康达电梯有限公司 A kind of baggage elevator being easy to handling goods
CN206108672U (en) * 2016-08-31 2017-04-19 天津京龙工程机械有限公司 Safe type lift with stable structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112693993A (en) * 2020-12-31 2021-04-23 南阳中原智能电梯有限公司 Three-dimensional transfer equipment
CN114229244A (en) * 2021-12-21 2022-03-25 重庆四正激光科技有限公司 Telescopic combined bin and control method
CN116199070A (en) * 2023-05-05 2023-06-02 四川长能装配式建筑科技有限公司 Assembled building wallboard lifting conveying device
CN116199070B (en) * 2023-05-05 2023-07-11 四川长能装配式建筑科技有限公司 Assembled building wallboard lifting conveying device

Similar Documents

Publication Publication Date Title
CN107720493A (en) Architectural engineering cargo lift quick discharging method and car
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN111453585A (en) Assembled intelligent single-tower nested double-cage construction elevator
CN103863955A (en) Self-introduction system and tower crane with self-introduction system
CN112900825A (en) Well is from climbing operation platform
CN107814299A (en) Construction discharging platform fast construction method and car of quickly unloading
CN209797314U (en) adjustable assembled door-shaped frame for assembling and disassembling tower crane
JP2008248664A (en) Hoisting method of curtain wall
CN205892577U (en) Fast set up tower crane's supplementary jib loading boom with water tank counterweight
CN207061690U (en) Bridge crane with suspender maintenance rig
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
JP3533858B2 (en) EP internal component installation method and EP internal component installation structure
CN212105183U (en) Safe formula is used for high-rise building's platform of unloading
JPH0530758B2 (en)
CN208265567U (en) Machine room right-angled door-opened elevator
CN107572434B (en) Safe tackling system
CN111891919A (en) Method for replacing and hoisting window cleaning machine of high building
CN205419582U (en) Floor hoist
JPH0628548Y2 (en) Lifting device for self-propelled work platform
JPH04306364A (en) Fitting construction of outer wall pc parts
CN213976663U (en) Lifting device for installing water conservancy gate
CN215974668U (en) Building construction material lifting device
CN217756403U (en) Material lifting machine that conveying efficiency is high
CN114412154B (en) Operating system for dismantling vertical mast
CN219993058U (en) Supporting platform for elevator well protection and construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180223