CN107718605A - One kind transmitting box body and preparation method thereof, firing box and preparation method thereof - Google Patents

One kind transmitting box body and preparation method thereof, firing box and preparation method thereof Download PDF

Info

Publication number
CN107718605A
CN107718605A CN201711136564.8A CN201711136564A CN107718605A CN 107718605 A CN107718605 A CN 107718605A CN 201711136564 A CN201711136564 A CN 201711136564A CN 107718605 A CN107718605 A CN 107718605A
Authority
CN
China
Prior art keywords
preparation
fibrous layer
metal alloy
box body
winding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711136564.8A
Other languages
Chinese (zh)
Inventor
徐飞强
宋方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Polytron Technologies Inc
Original Assignee
Xi'an Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Polytron Technologies Inc filed Critical Xi'an Polytron Technologies Inc
Priority to CN201711136564.8A priority Critical patent/CN107718605A/en
Publication of CN107718605A publication Critical patent/CN107718605A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/68Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts by incorporating or moulding on preformed parts, e.g. inserts or layers, e.g. foam blocks
    • B29C70/681Component parts, details or accessories; Auxiliary operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29BPREPARATION OR PRETREATMENT OF THE MATERIAL TO BE SHAPED; MAKING GRANULES OR PREFORMS; RECOVERY OF PLASTICS OR OTHER CONSTITUENTS OF WASTE MATERIAL CONTAINING PLASTICS
    • B29B11/00Making preforms
    • B29B11/06Making preforms by moulding the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/68Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts by incorporating or moulding on preformed parts, e.g. inserts or layers, e.g. foam blocks
    • B29C70/70Completely encapsulating inserts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F41WEAPONS
    • F41FAPPARATUS FOR LAUNCHING PROJECTILES OR MISSILES FROM BARRELS, e.g. CANNONS; LAUNCHERS FOR ROCKETS OR TORPEDOES; HARPOON GUNS
    • F41F1/00Launching apparatus for projecting projectiles or missiles from barrels, e.g. cannons; Harpoon guns

Abstract

The invention provides one kind transmitting box body and preparation method thereof, firing box and preparation method thereof, it is related to emitter technical field, the transmitting box body preparation method can reduce technology difficulty and production cost.A kind of preparation method for launching box body, methods described include:The drawing of metal alloy blank is formed by metal alloy inner bag using drawing process;Thermal insulation layer is formed in the outside of the metal alloy inner bag;Fibrous layer is formed in the outside of the thermal insulation layer using winding process;The fibrous layer is post-processed, to form transmitting box body.The present invention is applied to the preparation of transmitting box body, firing box.

Description

One kind transmitting box body and preparation method thereof, firing box and preparation method thereof
Technical field
The present invention relates to emitter technical field, more particularly to a kind of transmitting box body and preparation method thereof, firing box And preparation method thereof.
Background technology
Firing box is mainly used in the storage, transport and transmitting of guided missile, in various roadbeds and carrier-borne sophisticated missile armament systems In be widely used.Firing box generally comprises:The parts such as casing, case lid, finder.
Existing transmitting box body is formed using Metal Material Welding, and complex process, production cost are high, it is difficult to meet the military Requirement for low cost.
The content of the invention
Embodiments of the invention provide a kind of preparation method, preparation method of firing box for launching box body, the firing box Casing preparation method can reduce technology difficulty and production cost.
To reach above-mentioned purpose, embodiments of the invention adopt the following technical scheme that:
On the one hand, there is provided a kind of preparation method for launching box body, methods described include:
The drawing of metal alloy blank is formed by metal alloy inner bag using drawing process;
Thermal insulation layer is formed in the outside of the metal alloy inner bag;
Fibrous layer is formed in the outside of the thermal insulation layer using winding process;
The fibrous layer is post-processed, to form transmitting box body.
Optionally, it is described to be included using winding process in the outside of thermal insulation layer formation fibrous layer:
By fiber yarn sheet to be wound respectively according to the first winding angle and the second winding angle in the outer of the metal alloy inner bag Side carries out the first winding and the second winding.
Optionally, the scope of first winding angle is 85 ° -90 °, and the number of plies of first winding is 1 layer -5 layers;
The scope of second winding angle is 40 ° -50 °, and the number of plies of second winding is 80 layers -90 layers.
Optionally, it is described to be included metal alloy blank drawing formation metal alloy inner bag using drawing process:
To metal alloy blank machine-shaping, to form the first forming part and the second forming part;
First forming part and second forming part are welded;
Drawing is carried out to first forming part after welding and second forming part, to form metal alloy inner bag.
Optionally, after being post-processed to the fibrous layer, methods described also includes:
Preventing laser layer is formed in the outside of the fibrous layer.
Optionally, it is described post processing is carried out to the fibrous layer to include:
Curing process is carried out to the fibrous layer.
Optionally, it is described that fibrous layer progress curing process is included:
Within the t1 periods, the fibrous layer is heated, its temperature is raised to T2 from T1;
It is T2 to keep temperature of the fibrous layer within the t2 periods;
Within the t3 periods, the fibrous layer is heated, its temperature is raised to T3 from T2;
It is T3 to keep temperature of the fibrous layer within the t3 periods;
Wherein, the t1 periods, the t2 periods and the t3 periods are the continuous period successively.
On the other hand, there is provided a kind of preparation method of firing box, the preparation method include:Hair described in any of the above-described Penetrate the preparation method of box body.
Another further aspect, there is provided one kind transmitting box body, the transmitting box body is using the firing box described in any of the above-described The preparation method of casing is formed.
Another aspect, there is provided a kind of firing box, the firing box are formed using the preparation method of firing box described above.
The embodiment provides a kind of preparation method, preparation method of firing box for launching box body, the transmitting The preparation method of box body includes:The drawing of metal alloy blank is formed by metal alloy inner bag using drawing process;Closed in metal The outside of golden inner bag forms thermal insulation layer;Fibrous layer is formed in the outside of thermal insulation layer using winding process;Locate after being carried out to fibrous layer Reason, to form transmitting box body.This method forms metal alloy inner bag using drawing process, while forms fibre using winding process Layer is tieed up, compared to prior art, the production time is saved, reduces complex procedures and production cost.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of schematic flow sheet one of preparation method for launching box body provided in an embodiment of the present invention;
Fig. 2 is the schematic flow sheet of the specific steps that S101 includes in Fig. 1;
Fig. 3 is a kind of schematic flow sheet two of preparation method for launching box body provided in an embodiment of the present invention;
Fig. 4 is a kind of schematic flow sheet three of preparation method for launching box body provided in an embodiment of the present invention;
Fig. 5 is a kind of stereogram for launching box body provided in an embodiment of the present invention;
Fig. 6 is schematic cross-sections of the Fig. 5 along a-b directions;
Fig. 7 is a kind of structural representation for launching box body provided in an embodiment of the present invention;
Fig. 8 is the structural representation of another transmitting box body provided in an embodiment of the present invention;
Fig. 9 is another structural representation for launching box body provided in an embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Embodiment one
The embodiment provides a kind of preparation method for launching box body, with reference to shown in figure 1, this method includes:
S101, using drawing process by the drawing of metal alloy blank formed metal alloy inner bag.
Here, the specific material of metal alloy blank does not limit, and it can be the gold such as magnesium alloy, titanium alloy, aluminium alloy Belong to alloy;In view of reducing cost, preferably aluminium alloy.
Here, also it is not specifically limited for the number of drawing, can be depending on actual conditions.In view of improving drawing Precision and quality, it is preferred to use multiple drawing.Example, once thick cold-drawn can be first used, is then pulled out again using a cold sperm.
It should be noted that before the drawing of metal alloy blank is formed into metal alloy inner bag using drawing process, also Pickling processes can be carried out to metal alloy blank, to wash the oxide skin of metal alloy blank surface off, reduce friction, reduction is pulled out Power processed, so as to prevent in drawing produce road plan the defects of.In addition, metal alloy blank drawing is formed using drawing process After metal alloy inner bag, metal alloy inner bag can also be heat-treated, to reduce the degree of deformation, improve product essence Degree.Heat treatment can be solution treatment, Ageing Treatment and annealing etc..
Here, also do not limited for the shape of metal alloy inner bag, can be according to the transmitting box body for being actually subjected to production Shape depending on.Example, the shape of the metal alloy inner bag can be cylinder(Shown in Fig. 5)Or long square tube, certainly, metal The shape of alloy inner bag can also be other shapes, no longer illustrate one by one here.
S102, metal alloy inner bag outside formed thermal insulation layer.
Here, also do not limited for the specific forming method of thermal insulation layer.In addition, do not done for the specific material of thermal insulation layer Limit, at least need to meet heat-insulated requirement.
It should be noted that in subsequent technique, fibrous layer can be formed in the outside of thermal insulation layer.Launch using firing box During guided missile, amount of heat can be produced.And the performance of fibrous layer is affected by temperature bigger, exceed certain value in temperature(Such as: 100℃)When, the performance of fibrous layer and life-span can have a greatly reduced quality.Therefore, set between metal alloy inner bag and fibrous layer heat-insulated Layer can ensure the temperature of fibrous layer within its temperature in use.Meanwhile during storing with transport missile, be advantageous to protect The temperature in firing box is held in prescribed limit.
S103, using winding process thermal insulation layer outside formed fibrous layer.
Here, winding process can be wet-winding craft either dry method winding process, with specific reference to actual conditions It is fixed.The particular type of fibrous layer does not limit, it is contemplated that performance and technological problemses, preferably PE fibrous layers, PE fibrous layers refer to surpass High molecular weight polyethylene fiber layer.
S104, fibrous layer is post-processed, to form transmitting box body.
Here, post processing can be including curing process etc., to ensure to launch the performance of box body.
The embodiment provides a kind of preparation method for launching box body, the preparation method bag of the transmitting box body Include:The drawing of metal alloy blank is formed by metal alloy inner bag using drawing process;Metal alloy inner bag outside formed every Thermosphere;Fibrous layer is formed in the outside of thermal insulation layer using winding process;Fibrous layer is post-processed, to form firing box case Body.This method forms metal alloy inner bag using drawing process, while forms fibrous layer using winding process, compared to existing skill Art, the production time is saved, reduce complex procedures and production cost;Meanwhile the transmitting box body formed by this method With light weight, ballistic performance is good, intensity is big the characteristics of.
Optionally, S103, using winding process thermal insulation layer outside formed fibrous layer include:
Fiber yarn sheet to be wound is entered according to the first winding angle and the second winding angle on the outside of metal alloy inner bag respectively Row first is wound and the second winding.It can obtain winding fibrous layer uniform, of good performance by above-mentioned winding method.
Optionally, the scope of above-mentioned first winding angle is 85 ° -90 °, such as:It can be 86 °, 88 ° etc.;Above-mentioned first The number of plies of winding is 1 layer -5 layers, such as:It can be 2 layers, 4 layers etc..The scope of above-mentioned second winding angle is 40 ° -50 °, example Such as:It can be 42 °, 44 °, 48 ° etc.;The number of plies of second winding is 80 layers -90 layers, such as:It can be 84 layers, 86 layers, 88 layers etc..
It should be noted that in order to improve the intensity of winding and quality, can be to silvalin to be wound before being wound Piece carries out dipping process, while controls fiber gel content within the specific limits.If gel content is too high, the transmitting box body of formation Intensity can reduce;If gel content is too low, the increase of the transmitting box body space of formation, it can cause to launch the air-tightness of box body, resistance to Ageing properties and shear strength decline.Therefore, it is necessary to strictly control the gel content of fiber, ensure that whole winding process is front and rear and contain glue Amount is uniform.Optionally, gel content should be controlled in 17%-25%, and preferably gel content is 20%.
Further, since fiber is all to use fiber size for reinforcemeent, storage is improper also to adsorb substantial amounts of moisture.Fiber surface These free moistures influence the bonding of resin matrix and fiber, while cause stress corrosion, the defects of making micro-crack is further Extension, so that product strength and ageing-resistant performance decline.Therefore, after dipping process is carried out to silvalin piece to be wound, and Before coiling, drying and processing can also be carried out to silvalin piece to be wound.Fiber drying parameter can be according to fiber moisture content Depending on spindle size, in general, 24h can be dried at 60 DEG C -80 DEG C.
Optionally, in order to reduce drawing difficulty while improve operability, with reference to shown in figure 2, S101, using drawing process Metal alloy blank drawing formation metal alloy inner bag is included:
S201, to metal alloy blank machine-shaping, to form the first forming part and the second forming part.Here, for the first one-tenth The shape of type portion and the second forming part does not limit.
S202, the first forming part and the second forming part welded.
S203, drawing is carried out to the first forming part after welding and the second forming part, to form metal alloy inner bag.
Optionally, with reference to shown in figure 3, in S104, fibrous layer is post-processed after, this method also includes:S105, The outside of fibrous layer forms preventing laser layer.Here do not limited for the specific material of preventing laser layer.Formed by the above method The structure of casing may be referred to shown in figure, the casing has the characteristics of shellproof, preventing laser, anti-electromagnetism.
Optionally, above-mentioned preventing laser layer is titanium dioxide vanadium layers.Titanium dioxide vanadium layers can effectively prevent laser, while to fiber Layer plays a part of isolating sunshine heat.
Optionally, above-mentioned S104, post processing carried out to fibrous layer include:Curing process is carried out to fibrous layer, to ensure to send out Penetrate the performance of box body.
Optionally, it is above-mentioned that fibrous layer progress curing process is included in order to improve solidification effect:
Within the t1 periods, fibrous layer is heated, its temperature is raised to T2 from T1.
It is T2 to keep temperature of the fibrous layer within the t2 periods.
Within the t3 periods, fibrous layer is heated, its temperature is raised to T3 from T2.
It is T3 to keep temperature of the fibrous layer within the t3 periods;Wherein, t1 periods, t2 periods and t3 periods be according to The secondary continuous period.
It should be noted that t1, t2, t3, T1, T2, T3 concrete numerical value can determine according to actual conditions.Example, T1 scope can be 25min-35min, and t2 scope can be 55min-65min, and t3 scope can be 170min- 190min, T1 temperature are initial temperature, generally normal temperature;T2 scope can be 55 DEG C -65 DEG C, and T3 scope can be 120℃-130℃。
Optionally, with reference to shown in figure 4, the drawing of metal alloy blank is formed into metal alloy in S101, using drawing process After inner bag and S102, metal alloy inner bag outside formed thermal insulation layer before, this method also includes:
S106, metal alloy inner bag outside formed tack coat.
So, thermal insulation layer and metal alloy inner bag are fixed together by tack coat.Here, tack coat can be epoxy Glue-line or polyurethane glue-line.
Optionally, above-mentioned thermal insulation layer is polyurethane foam.Polyurethane foam, which can mitigate in Missile Launching Process, to be produced Influence of the raw high temp jet to fibrous layer, so as to improve the performance of transmitting box body.
Embodiment two
The embodiment provides a kind of preparation method of firing box, this method includes:Any one that embodiment one provides Transmitting box body preparation method.This method forms metal alloy inner bag using drawing process, while uses winding process shape Into fibrous layer, compared to prior art, the production time is saved, reduces complex procedures and production cost.
Embodiment three
The embodiment provides one kind to launch box body, any one that the transmitting box body is provided using embodiment one The preparation method of transmitting box body is formed.With reference to shown in figure 5 and Fig. 6, the structure of the transmitting box body 10 can be included:From interior Metal alloy inner bag 1, thermal insulation layer 2 and the fibrous layer 3 outwards set gradually;With reference to shown in figure 6, the structure of the transmitting box body is also Can include:Metal alloy inner bag 1, thermal insulation layer 2, fibrous layer 3 and the preventing laser layer 4 set gradually from inside to outside;With reference to figure 7 It is shown, the structure of the transmitting box body can also be including:The metal alloy inner bag 1 that sets gradually from inside to outside, tack coat 5, Thermal insulation layer 2 and fibrous layer 3;With reference to shown in figure 8, the structure of the transmitting box body can also be including:Set gradually from inside to outside Metal alloy inner bag 1, tack coat 5, thermal insulation layer 2, fibrous layer 3 and preventing laser layer 4.Here, fibrous layer 3 can be PE fibers Layer.
The transmitting box body formed by this method has the characteristics of light weight, ballistic performance are good, intensity is big.
Example IV
A kind of preparation method of the firing box provided the embodiment provides firing box, the firing box using embodiment two Formed.The firing box formed by this method has the characteristics of light weight, ballistic performance are good, intensity is big.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1. a kind of preparation method for launching box body, it is characterised in that methods described includes:
The drawing of metal alloy blank is formed by metal alloy inner bag using drawing process;
Thermal insulation layer is formed in the outside of the metal alloy inner bag;
Fibrous layer is formed in the outside of the thermal insulation layer using winding process;
The fibrous layer is post-processed, to form transmitting box body.
2. preparation method according to claim 1, it is characterised in that it is described using winding process in the outer of the thermal insulation layer Side, which forms fibrous layer, to be included:
By fiber yarn sheet to be wound respectively according to the first winding angle and the second winding angle in the outer of the metal alloy inner bag Side carries out the first winding and the second winding.
3. preparation method according to claim 2, it is characterised in that the scope of first winding angle is 85 ° -90 °, The number of plies of first winding is 1 layer -5 layers;
The scope of second winding angle is 40 ° -50 °, and the number of plies of second winding is 80 layers -90 layers.
4. preparation method according to claim 1, it is characterised in that described to be drawn metal alloy blank using drawing process Pull out and to form metal alloy inner bag and include:
To metal alloy blank machine-shaping, to form the first forming part and the second forming part;
First forming part and second forming part are welded;
Drawing is carried out to first forming part after welding and second forming part, to form metal alloy inner bag.
5. preparation method according to claim 1, it is characterised in that after being post-processed to the fibrous layer, institute Stating method also includes:
Preventing laser layer is formed in the outside of the fibrous layer.
6. preparation method according to claim 1, it is characterised in that described post processing is carried out to the fibrous layer to include:
Curing process is carried out to the fibrous layer.
7. preparation method according to claim 6, it is characterised in that described that curing process bag is carried out to the fibrous layer Include:
Within the t1 periods, the fibrous layer is heated, its temperature is raised to T2 from T1;
It is T2 to keep temperature of the fibrous layer within the t2 periods;
Within the t3 periods, the fibrous layer is heated, its temperature is raised to T3 from T2;
It is T3 to keep temperature of the fibrous layer within the t3 periods;
Wherein, the t1 periods, the t2 periods and the t3 periods are the continuous period successively.
A kind of 8. preparation method of firing box, it is characterised in that including:Transmitting box body described in claim any one of 1-7 Preparation method.
9. one kind transmitting box body, it is characterised in that using the preparation side of the transmitting box body described in claim any one of 1-7 Method is formed.
10. a kind of firing box, it is characterised in that formed using the preparation method of the firing box described in claim 8.
CN201711136564.8A 2017-11-16 2017-11-16 One kind transmitting box body and preparation method thereof, firing box and preparation method thereof Pending CN107718605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711136564.8A CN107718605A (en) 2017-11-16 2017-11-16 One kind transmitting box body and preparation method thereof, firing box and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711136564.8A CN107718605A (en) 2017-11-16 2017-11-16 One kind transmitting box body and preparation method thereof, firing box and preparation method thereof

Publications (1)

Publication Number Publication Date
CN107718605A true CN107718605A (en) 2018-02-23

Family

ID=61216107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711136564.8A Pending CN107718605A (en) 2017-11-16 2017-11-16 One kind transmitting box body and preparation method thereof, firing box and preparation method thereof

Country Status (1)

Country Link
CN (1) CN107718605A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323622A (en) * 2018-11-26 2019-02-12 中国科学院长春光学精密机械与物理研究所 A kind of launching tube
CN111912292A (en) * 2020-07-31 2020-11-10 西安方元明科技股份有限公司 Bulletproof and composite structure integrated launch canister and preparation method thereof
CN111997987A (en) * 2020-07-20 2020-11-27 西安方元明科技股份有限公司 Helicopter missile-tail-prevention transmission shaft and manufacturing method thereof

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4944210A (en) * 1988-08-08 1990-07-31 Hughes Aircraft Company Missile launcher
US5000990A (en) * 1985-08-22 1991-03-19 The Budd Company One piece molded composite part and method of manufacture
JP2000266243A (en) * 1999-03-15 2000-09-26 Babcock Hitachi Kk High-temperature heat insulating pipe and its manufacture
CN101417524A (en) * 2008-10-17 2009-04-29 哈尔滨工业大学 Manufacture method of carbon fiber metal composite laminated plate
CN101532595A (en) * 2009-04-13 2009-09-16 天津鹏翎胶管股份有限公司 Special-shaped fuel hose wound by 5-layer tetrafluoroethylene (TFE) resin films and preparation method thereof
CN101578469A (en) * 2007-01-31 2009-11-11 高级投资股份公司 Metal/polymer laminate ducting and method of making same
CN101828230A (en) * 2007-08-21 2010-09-08 约翰·D·布拉什公司 Bucket-style fire resistant enclosure and manufacture method thereof
US20110056363A1 (en) * 2008-04-30 2011-03-10 Saab Ab Weapon with im-characteristics
WO2013058863A2 (en) * 2011-08-04 2013-04-25 Polywad, Inc. Recoil attenuated payload launcher system
CN103538269A (en) * 2013-10-15 2014-01-29 中国船舶重工集团公司第七一〇研究所 High temperature-resistant impact-resistant composite material housing, and molding method thereof
US20150175278A1 (en) * 2009-09-25 2015-06-25 Quicklaunch, Inc. Gas gun launcher
CN204459508U (en) * 2015-03-02 2015-07-08 新疆中石油管业工程有限公司 A kind of continuous lod thermosetting resin composite pipe with two angle wound structure
CN105034402A (en) * 2015-05-22 2015-11-11 上海复合材料科技有限公司 Moulding method of missile launcher cylinder body
CN106182816A (en) * 2016-07-14 2016-12-07 王瑛玮 Pultrusion is wound around composite molding laser curing and prepares composite material hollow section bar
CN205991741U (en) * 2016-06-17 2017-03-01 浙江鑫宙竹基复合材料科技有限公司 Launch canister cylinder
CN106839874A (en) * 2017-04-14 2017-06-13 北京特种机械研究所 One kind can high efficiency temperature controlled composite cylinder
CN107314707A (en) * 2017-08-15 2017-11-03 精功(绍兴)复合材料有限公司 Composite material missile launching canister and preparation method thereof

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5000990A (en) * 1985-08-22 1991-03-19 The Budd Company One piece molded composite part and method of manufacture
US4944210A (en) * 1988-08-08 1990-07-31 Hughes Aircraft Company Missile launcher
JP2000266243A (en) * 1999-03-15 2000-09-26 Babcock Hitachi Kk High-temperature heat insulating pipe and its manufacture
CN101578469A (en) * 2007-01-31 2009-11-11 高级投资股份公司 Metal/polymer laminate ducting and method of making same
CN101828230A (en) * 2007-08-21 2010-09-08 约翰·D·布拉什公司 Bucket-style fire resistant enclosure and manufacture method thereof
US20110056363A1 (en) * 2008-04-30 2011-03-10 Saab Ab Weapon with im-characteristics
CN101417524A (en) * 2008-10-17 2009-04-29 哈尔滨工业大学 Manufacture method of carbon fiber metal composite laminated plate
CN101532595A (en) * 2009-04-13 2009-09-16 天津鹏翎胶管股份有限公司 Special-shaped fuel hose wound by 5-layer tetrafluoroethylene (TFE) resin films and preparation method thereof
US20150175278A1 (en) * 2009-09-25 2015-06-25 Quicklaunch, Inc. Gas gun launcher
WO2013058863A2 (en) * 2011-08-04 2013-04-25 Polywad, Inc. Recoil attenuated payload launcher system
CN103538269A (en) * 2013-10-15 2014-01-29 中国船舶重工集团公司第七一〇研究所 High temperature-resistant impact-resistant composite material housing, and molding method thereof
CN204459508U (en) * 2015-03-02 2015-07-08 新疆中石油管业工程有限公司 A kind of continuous lod thermosetting resin composite pipe with two angle wound structure
CN105034402A (en) * 2015-05-22 2015-11-11 上海复合材料科技有限公司 Moulding method of missile launcher cylinder body
CN205991741U (en) * 2016-06-17 2017-03-01 浙江鑫宙竹基复合材料科技有限公司 Launch canister cylinder
CN106182816A (en) * 2016-07-14 2016-12-07 王瑛玮 Pultrusion is wound around composite molding laser curing and prepares composite material hollow section bar
CN106839874A (en) * 2017-04-14 2017-06-13 北京特种机械研究所 One kind can high efficiency temperature controlled composite cylinder
CN107314707A (en) * 2017-08-15 2017-11-03 精功(绍兴)复合材料有限公司 Composite material missile launching canister and preparation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109323622A (en) * 2018-11-26 2019-02-12 中国科学院长春光学精密机械与物理研究所 A kind of launching tube
CN111997987A (en) * 2020-07-20 2020-11-27 西安方元明科技股份有限公司 Helicopter missile-tail-prevention transmission shaft and manufacturing method thereof
CN111912292A (en) * 2020-07-31 2020-11-10 西安方元明科技股份有限公司 Bulletproof and composite structure integrated launch canister and preparation method thereof

Similar Documents

Publication Publication Date Title
CN107718605A (en) One kind transmitting box body and preparation method thereof, firing box and preparation method thereof
CN106217915B (en) The manufacturing method of tank
CN104768734B (en) Cylinder-like shell and the manufacture method of cylinder-like shell
US20090314899A1 (en) Structural element of an aircraft
US10974469B2 (en) Method for manufacturing a semifinished product or a part made of metal and fiber composite
CN103603949A (en) Metal liner pressure container made of basalt fibers serving as reinforcing materials and preparation method of metal liner pressure container
CN109400194A (en) The compound composite antenna housing of W-waveband fiber reinforced ceramic-base and preparation method
US9889491B2 (en) Method for producing a seamless pressure vessel for storing hydrogen
CN105584056B (en) Composite revolving body Combined impact structure and its preparation facilities and method
US9895852B2 (en) Method for producing a composite body
CN207609489U (en) The all- composite engine jet pipe of Z-direction enhancing
CN106795576B (en) Method for the steel spring for producing cold forming
EP2675732B1 (en) Belted toroid pressure vessel and method for making the same
CN103770432A (en) Production process of composite metal plastic belt
JP2013542315A (en) Method of hot forming coated metal parts and molded parts
US4685241A (en) Graphite fiber fishing rod
CN105150639B (en) A kind of novel ballistic plate and preparation method thereof
CN106756684B (en) GH4049 spheroid aluminizing methods
CN107254568A (en) The offline production method of high-carbon steel wire rod
FI130072B (en) Pipe-shaped product with ballistic protection
CN106876015A (en) A kind of half-hard state winding wire and its processing technology
RU2634446C2 (en) Method for forming thick-walled shell structures based on polymeric composite materials
CN110217646A (en) The method for reducing carbon fiber winding process abrasion loss
CN206532620U (en) A kind of half-hard state winding wire
JP3913805B2 (en) Golf club shaft manufacturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180223