CN107706918A - A kind of new energy and power network cooperated power supply method and its calibration equipment - Google Patents

A kind of new energy and power network cooperated power supply method and its calibration equipment Download PDF

Info

Publication number
CN107706918A
CN107706918A CN201711173896.3A CN201711173896A CN107706918A CN 107706918 A CN107706918 A CN 107706918A CN 201711173896 A CN201711173896 A CN 201711173896A CN 107706918 A CN107706918 A CN 107706918A
Authority
CN
China
Prior art keywords
power
turn
power supply
path
supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711173896.3A
Other languages
Chinese (zh)
Other versions
CN107706918B (en
Inventor
延海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Guodiantong Network Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711173896.3A priority Critical patent/CN107706918B/en
Publication of CN107706918A publication Critical patent/CN107706918A/en
Application granted granted Critical
Publication of CN107706918B publication Critical patent/CN107706918B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/04Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
    • H02J3/06Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Abstract

The invention discloses a kind of method of new energy and power network cooperated power supply, comprise the following steps, whether partial electric grid running status meets condition before a. judges power-off;The current partial electric grid includes microgrid and power network;B. equivalent mathematical modeling is established according to current partial electric grid;C. the equivalent mathematical modeling is solved, obtains the power supply capacity of current partial electric grid, the power supply capacity is judged compared with present load, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;D. when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to carry out electric power for path and turn to supply according to output.The present invention can solve the problem that the technical problem of the cooperation of multi source contribution, can quickly meet the switching of supply path.

Description

A kind of new energy and power network cooperated power supply method and its calibration equipment
Technical field
The invention belongs to new energy field, more particularly to a kind of new energy to fill with power network cooperated power supply method and its verification Put.
Background technology
At this stage, microgrid function is gradually incorporated in life, and the solar power generation, wind-power electricity generation in microgrid are all using greatly certainly Right clean energy resource, play the role of important for saving the energy, environmental protection, but electric power system fault is due to for example sudden and violent The congestion etc. of the rugged environment such as rain, heavy snow, strong wind factor and increasingly old power equipment, communication port is inevitable 's.The power supply mode that this is following main flow is powered by micro-grid system and power system, when power supply system and microgrid How cooperation for the failure of power system, takes quick mode to form power supply when being powered, and this is asking of must solving Topic, and need the problem solved.
The content of the invention
Therefore, in view of the above-mentioned problems, the invention provides a kind of method of new energy and power network cooperated power supply, it include with Lower step,
A. whether partial electric grid running status meets condition before judging power-off;The current partial electric grid includes microgrid and electric power Net;
B. equivalent mathematical modeling is established according to current partial electric grid;
C. the equivalent mathematical modeling is solved, obtains the power supply capacity of current partial electric grid, the power supply capacity is born with current Row multilevel iudge is loaded into, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;
D. when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to carry out electric power for path and turn according to output For.
The method of described new energy and power network cooperated power supply, step a include:
The quantity that mark micro-capacitance sensor can be put into, diagnostic seach is carried out to micro-capacitance sensor all devices, and predict next cycle micro-capacitance sensor Power supply capacity, the micro-capacitance sensor include solar cell, wind-driven generator, energy-storage battery;
The power supply capacity of local power net is marked, the local power network meets following condition, and the condition includes:
1)Meet for all nodes in the local power net:
;N is local power net interior joint sum,For partial electric grid interior joint i voltage phase angle,For partial electric grid interior joint j voltage phase angle, j is adjacent with i Node;
2)Voltage compensating device is provided with local power net to cause the voltage magnitude of each node to fluctuate very little, so that energy The voltage magnitude perunit value for enough thinking each node is 1;
When the local power net meets above-mentioned 2 conditions simultaneously, step b is performed;When the local power net can not meet above-mentioned 2 During individual condition, local power network is diagnosed, travels through the supply path of whole local power net, cut-out can not meet The circuit of condition is stated, then, then verifies and once whether meets condition, if being still unsatisfactory for condition, terminate this method.
The method of described new energy and power network cooperated power supply, step b include:
Set and turn to supply Path selection set S:
S={s1,s2... si ..., sp, g1, g2 ... gi ... gp }, p is selective to turn to supply total number of paths, siRepresent a kind of selective Turn supply path;P is selective supply path sum, and gi is selective supply path;
Establish power system and simplify tide model:
Wherein, PiFor the active power of node i,For the local power net interior joint i of estimation voltage phase angle,To estimate The partial electric grid interior joint j of meter voltage phase angle, BijThe imaginary part of admittance, a, b, c are assigned as solar-electricity between node i, j The quantity that pond, wind-driven generator, energy-storage battery can be put into, Pv, Pg, Pb solar cell, wind-driven generator, energy-storage battery are next Cycle exportable power.
The method of described new energy and power network cooperated power supply, step c include:
Supply path gi is selected, optional supply path gi is calculated to the power supply energy of next cycle micro-capacitance sensor successively from g1 to gp Power, by the power supply capacity of the micro-capacitance sensor in next cycle successively add up summation, compared with load consuming power, calculate whether can Power supply capacity with load, if it is possible to match, then need not put into power network;If the power supply capacity of micro-capacitance sensor can not match negative The power that need to be consumed is carried, then selection is available for the power network of electric energy progressively to put into power network;If power still can not be carried out Match somebody with somebody;
Then verification can carry out turning the path supplied, and the path that forming more sets can turn to supply selects for user, and described turn for path verification bag Include and the simplification trend after turn confession is implemented for path according to this turn using electric system simulation program solution, i.e., supplied according to according to this turn Path implements to turn the active power of all nodes in the partial electric grid after supplying, and the voltage phase angle for setting voltage phase angle datum node is 0, the estimated voltage phase angle of other n-1 node in partial electric grid is solved by simplifying tide model, judges this n-1 node Whether estimated voltage phase angle is in default safe range, if it is, exporting this turn supplies path.
Using electric system simulation program solution according to this turn for path implement turn supply after simplification trend, i.e., basis according to This turn implements the active power of all nodes in the partial electric grid after turning to supply for path, sets the voltage of voltage phase angle datum node Phase angle is 0, and the estimated voltage phase angle of other n-1 node in partial electric grid is solved by simplifying tide model, judges this n-1 Whether the estimated voltage phase angle of node is in default safe range, if it is, exporting this turn supplies path.
A kind of calibration equipment of new energy and power network cooperated power supply, including:
Judge module, judge whether partial electric grid running status meets condition before powering off;
Equivalent module, equivalent mathematical modeling is established according to current partial electric grid;
Computing module, solve the equivalent mathematical modeling, obtain the power supply capacity of current partial electric grid, by the power supply capacity with Present load is compared judgement, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;
Output module, when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to enter for path according to output Row electric power turns to supply.
The calibration equipment of a kind of described new energy and power network cooperated power supply, the current partial electric grid include microgrid and electricity Power net.
The calibration equipment of a kind of described new energy and power network cooperated power supply, the microgrid include solar cell, wind-force Generator, energy-storage battery;The power network includes multiple alternative high voltage bus;The solar cell, wind-power electricity generation Machine, energy-storage battery and the multiple selectable high voltage bus are connected in parallel on power supply buses, the power supply buses input Gate-controlled switch is respectively connected with output end.
The calibration equipment of a kind of described new energy and power network cooperated power supply, in addition to controller, the controller according to The output result of the output module, the break-make of the power supply buses is controlled, to control the output shape of the microgrid and power network Into turning solution.
Power recovery method of the invention by setting consideration condition, by being selected supply path and being verified, obtain To the scheme for being rapidly performed by new energy and the recovery of power network cooperated power supply, when making following progress local microgrid control, can subtract Small electric power system fault causes electricity shortage to be influenceed caused by being loaded on power supply, makes power supply mode more intelligent.
Brief description of the drawings
Fig. 1 is the method schematic diagram of new energy and power network cooperated power supply.
Embodiment
As shown in figure 1, for the invention provides a kind of method of new energy and power network cooperated power supply, it includes following step Suddenly,
A. whether partial electric grid running status meets condition before judging power-off;The current partial electric grid includes microgrid and electric power Net;
B. equivalent mathematical modeling is established according to current partial electric grid;
C. the equivalent mathematical modeling is solved, obtains the power supply capacity of current partial electric grid, the power supply capacity is born with current Row multilevel iudge is loaded into, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;
D. when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to carry out electric power for path and turn according to output For.
The method of described new energy and power network cooperated power supply, step a include:
The quantity that mark micro-capacitance sensor can be put into, diagnostic seach is carried out to micro-capacitance sensor all devices, and predict next cycle micro-capacitance sensor Power supply capacity, the micro-capacitance sensor include solar cell, wind-driven generator, energy-storage battery;
The power supply capacity of local power net is marked, the local power network meets following condition, and the condition includes:
1)Meet for all nodes in the local power net:
;N is that local power net interior joint is total Number,For partial electric grid interior joint i voltage phase angle,For partial electric grid interior joint j voltage phase angle, j is adjacent with i Node;
2)Voltage compensating device is provided with local power net to cause the voltage magnitude of each node to fluctuate very little, so that energy The voltage magnitude perunit value for enough thinking each node is 1;
When the local power net meets above-mentioned 2 conditions simultaneously, step b is performed;When the local power net can not meet above-mentioned 2 During individual condition, local power network is diagnosed, travels through the supply path of whole local power net, cut-out can not meet The circuit of condition is stated, then, then verifies and once whether meets condition, if being still unsatisfactory for condition, terminate this method.
The method of described new energy and power network cooperated power supply, step b include:
Set and turn to supply Path selection set S:
S={s1,s2... si ..., sp, g1, g2 ... gi ... gp }, p is selective to turn to supply total number of paths, siRepresent a kind of selective Turn supply path;P is selective supply path sum, and gi is selective supply path;
Establish power system and simplify tide model:
Wherein, PiFor the active power of node i,For the local power net interior joint i of estimation voltage phase angle,To estimate The partial electric grid interior joint j of meter voltage phase angle, BijThe imaginary part of admittance, a, b, c are assigned as solar-electricity between node i, j The quantity that pond, wind-driven generator, energy-storage battery can be put into, Pv, Pg, Pb solar cell, wind-driven generator, energy-storage battery are next Cycle exportable power.
The method of described new energy and power network cooperated power supply, step c include:
Supply path gi is selected, optional supply path gi is calculated to the power supply energy of next cycle micro-capacitance sensor successively from g1 to gp Power, by the power supply capacity of the micro-capacitance sensor in next cycle successively add up summation, compared with load consuming power, calculate whether can Power supply capacity with load, if it is possible to match, then need not put into power network;If the power supply capacity of micro-capacitance sensor can not match negative The power that need to be consumed is carried, then selection is available for the power network of electric energy progressively to put into power network;If power still can not be carried out Match somebody with somebody;
Then verification can carry out turning the path supplied, and the path that forming more sets can turn to supply selects for user, and described turn for path verification bag Include and the simplification trend after turn confession is implemented for path according to this turn using electric system simulation program solution, i.e., supplied according to according to this turn Path implements to turn the active power of all nodes in the partial electric grid after supplying, and the voltage phase angle for setting voltage phase angle datum node is 0, the estimated voltage phase angle of other n-1 node in partial electric grid is solved by simplifying tide model, judges this n-1 node Whether estimated voltage phase angle is in default safe range, if it is, exporting this turn supplies path.
Using electric system simulation program solution according to this turn for path implement turn supply after simplification trend, i.e., basis according to This turn implements the active power of all nodes in the partial electric grid after turning to supply for path, sets the voltage of voltage phase angle datum node Phase angle is 0, and the estimated voltage phase angle of other n-1 node in partial electric grid is solved by simplifying tide model, judges this n-1 Whether the estimated voltage phase angle of node is in default safe range, if it is, exporting this turn supplies path.
A kind of calibration equipment of new energy and power network cooperated power supply, including:
Judge module, judge whether partial electric grid running status meets condition before powering off;
Equivalent module, equivalent mathematical modeling is established according to current partial electric grid;
Computing module, solve the equivalent mathematical modeling, obtain the power supply capacity of current partial electric grid, by the power supply capacity with Present load is compared judgement, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;
Output module, when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to enter for path according to output Row electric power turns to supply.
The calibration equipment of a kind of described new energy and power network cooperated power supply, the current partial electric grid include microgrid and electricity Power net.
The calibration equipment of a kind of described new energy and power network cooperated power supply, the microgrid include solar cell, wind-force Generator, energy-storage battery;The power network includes multiple alternative high voltage bus;The solar cell, wind-power electricity generation Machine, energy-storage battery and the multiple selectable high voltage bus are connected in parallel on power supply buses, the power supply buses input Gate-controlled switch is respectively connected with output end.
The calibration equipment of a kind of described new energy and power network cooperated power supply, in addition to controller, the controller according to The output result of the output module, the break-make of the power supply buses is controlled, to control the output shape of the microgrid and power network Into turning solution.
Power recovery method of the invention by setting consideration condition, by being selected supply path and being verified, obtain To the scheme for being rapidly performed by new energy and the recovery of power network cooperated power supply, when making following progress local microgrid control, can subtract Small electric power system fault causes electricity shortage to be influenceed caused by being loaded on power supply, makes power supply mode more intelligent.
It should be noted that above content is that to combine specific embodiment made for the present invention further specifically It is bright, it is impossible to assert that the embodiment of the present invention is only limitted to this, under the above-mentioned guidance of the present invention, those skilled in the art can To carry out various improvement and deformation on the basis of above-described embodiment, and these are improved or deformation falls in protection model of the invention In enclosing.

Claims (9)

1. a kind of method of new energy and power network cooperated power supply, it is characterised in that:Comprise the following steps,
A. whether partial electric grid running status meets condition before judging power-off;The current partial electric grid includes microgrid and electric power Net;
B. equivalent mathematical modeling is established according to current partial electric grid;
C. the equivalent mathematical modeling is solved, obtains the power supply capacity of current partial electric grid, the power supply capacity is born with current Row multilevel iudge is loaded into, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;
D. when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to carry out electric power for path and turn according to output For.
2. the method for new energy according to claim 1 and power network cooperated power supply, it is characterised in that step a includes:
The quantity that mark micro-capacitance sensor can be put into, diagnostic seach is carried out to micro-capacitance sensor all devices, and predict next cycle micro-capacitance sensor Power supply capacity, the micro-capacitance sensor include solar cell, wind-driven generator, energy-storage battery;
The power supply capacity of local power net is marked, the local power network meets following condition, and the condition includes:
Meet for all nodes in the local power net:
;N is local power net interior joint sum,For partial electric grid interior joint i voltage phase angle,For partial electric grid interior joint j voltage phase angle, j is adjacent with i Node;
Voltage compensating device is provided with local power net to cause the voltage magnitude of each node to fluctuate very little, so that can The voltage magnitude perunit value for thinking each node is 1;
When the local power net meets above-mentioned 2 conditions simultaneously, step b is performed;When the local power net can not meet above-mentioned 2 During individual condition, local power network is diagnosed, travels through the supply path of whole local power net, cut-out can not meet The circuit of condition is stated, then, then verifies and once whether meets condition, if being still unsatisfactory for condition, terminate this method.
3. the method for new energy according to claim 2 and power network cooperated power supply, it is characterised in that step b includes:
Set and turn to supply Path selection set S:
S={s1,s2... si ..., sp, g1, g2 ... gi ... gp }, p is selective to turn to supply total number of paths, siRepresent a kind of selective Turn supply path;P is selective supply path sum, and gi is selective supply path;
Establish power system and simplify tide model:
Wherein, PiFor the active power of node i,For the local power net interior joint i of estimation voltage phase angle,For estimation Partial electric grid interior joint j voltage phase angle, BijThe imaginary part of admittance between node i, j, a, b, c be assigned as solar cell, The quantity that wind-driven generator, energy-storage battery can be put into, Pv, Pg, Pb solar cell, wind-driven generator, energy-storage battery next week Phase exportable power.
4. the method for new energy according to claim 3 and power network cooperated power supply, it is characterised in that step c includes:
Supply path gi is selected, optional supply path gi is calculated to the power supply energy of next cycle micro-capacitance sensor successively from g1 to gp Power, by the power supply capacity of the micro-capacitance sensor in next cycle successively add up summation, compared with load consuming power, calculate whether can Power supply capacity with load, if it is possible to match, then need not put into power network;If the power supply capacity of micro-capacitance sensor can not match negative The power that need to be consumed is carried, then selection is available for the power network of electric energy progressively to put into power network;If power still can not be carried out Match somebody with somebody;
Then verification can carry out turning the path supplied, and the path that forming more sets can turn to supply selects for user, and described turn for path verification bag Include and the simplification trend after turn confession is implemented for path according to this turn using electric system simulation program solution, i.e., supplied according to according to this turn Path implements to turn the active power of all nodes in the partial electric grid after supplying, and the voltage phase angle for setting voltage phase angle datum node is 0, the estimated voltage phase angle of other n-1 node in partial electric grid is solved by simplifying tide model, judges this n-1 node Whether estimated voltage phase angle is in default safe range, if it is, exporting this turn supplies path.
5. the simplification trend after turn confession is implemented for path according to this turn using electric system simulation program solution, i.e., according to according to this Turn the active power of all nodes in the partial electric grid after being supplied for path implementation turn, the voltage phase of voltage phase angle datum node is set Angle is 0, and the estimated voltage phase angle of other n-1 node in partial electric grid is solved by simplifying tide model, judges this n-1 section Whether the estimated voltage phase angle of point is in default safe range, if it is, exporting this turn supplies path.
A kind of 6. calibration equipment of new energy and power network cooperated power supply, it is characterised in that:Including:
Judge module, judge whether partial electric grid running status meets condition before powering off;
Equivalent module, equivalent mathematical modeling is established according to current partial electric grid;
Computing module, solve the equivalent mathematical modeling, obtain the power supply capacity of current partial electric grid, by the power supply capacity with Present load is compared judgement, determines the power supply capacity and the matching degree of present load, judges whether to need to turn to supply;
Output module, when have turn supply and demand and ask when, allocate the input of new energy, coordinate power network, turn to enter for path according to output Row electric power turns to supply.
7. the calibration equipment of a kind of new energy as claimed in claim 5 and power network cooperated power supply, it is characterised in that:It is described current Partial electric grid includes microgrid and power network.
8. the calibration equipment of a kind of new energy as claimed in claim 6 and power network cooperated power supply, it is characterised in that:The microgrid Including solar cell, wind-driven generator, energy-storage battery;The power network includes multiple alternative high voltage bus;It is described Solar cell, wind-driven generator, energy-storage battery and the multiple selectable high voltage bus are connected in parallel on power supply buses, The power supply buses input and output end are respectively connected with gate-controlled switch.
9. the calibration equipment of a kind of new energy as claimed in claim 7 and power network cooperated power supply, it is characterised in that:Also include control Device processed, the controller controls the break-make of the power supply buses according to the output result of the output module, described micro- to control The output of net and power network forms turning solution.
CN201711173896.3A 2017-11-22 2017-11-22 New energy and power grid matched power supply method and calibration device thereof Expired - Fee Related CN107706918B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711173896.3A CN107706918B (en) 2017-11-22 2017-11-22 New energy and power grid matched power supply method and calibration device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711173896.3A CN107706918B (en) 2017-11-22 2017-11-22 New energy and power grid matched power supply method and calibration device thereof

Publications (2)

Publication Number Publication Date
CN107706918A true CN107706918A (en) 2018-02-16
CN107706918B CN107706918B (en) 2020-12-01

Family

ID=61185339

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711173896.3A Expired - Fee Related CN107706918B (en) 2017-11-22 2017-11-22 New energy and power grid matched power supply method and calibration device thereof

Country Status (1)

Country Link
CN (1) CN107706918B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738834A (en) * 2012-06-21 2012-10-17 浙江大学 Method for dynamically dividing and operating multiple islands of city micro power grid with photovoltaic power supplies
CN102983629A (en) * 2012-11-07 2013-03-20 中国电力科学研究院 Auxiliary decision-making method for on-line power system restoration
CN103855707A (en) * 2014-02-20 2014-06-11 深圳供电局有限公司 Power supply reliability assessment method of power distribution network comprising distributed power supply
US20150212534A1 (en) * 2014-01-24 2015-07-30 International Business Machines Corporation Generating electric substation load transfer control parameters
CN105470928A (en) * 2015-09-21 2016-04-06 国电南瑞科技股份有限公司 Zoned and layered load transferring method based on urban power transmission network fault recovery
CN106026085A (en) * 2016-06-27 2016-10-12 中国南方电网有限责任公司 Power distribution network closed-loop power supply transferring path optimum decision method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102738834A (en) * 2012-06-21 2012-10-17 浙江大学 Method for dynamically dividing and operating multiple islands of city micro power grid with photovoltaic power supplies
CN102983629A (en) * 2012-11-07 2013-03-20 中国电力科学研究院 Auxiliary decision-making method for on-line power system restoration
US20150212534A1 (en) * 2014-01-24 2015-07-30 International Business Machines Corporation Generating electric substation load transfer control parameters
CN103855707A (en) * 2014-02-20 2014-06-11 深圳供电局有限公司 Power supply reliability assessment method of power distribution network comprising distributed power supply
CN105470928A (en) * 2015-09-21 2016-04-06 国电南瑞科技股份有限公司 Zoned and layered load transferring method based on urban power transmission network fault recovery
CN106026085A (en) * 2016-06-27 2016-10-12 中国南方电网有限责任公司 Power distribution network closed-loop power supply transferring path optimum decision method

Also Published As

Publication number Publication date
CN107706918B (en) 2020-12-01

Similar Documents

Publication Publication Date Title
CN108039726B (en) Energy local area network distributed cooperative control method based on multi-agent system
EP3057192B1 (en) An energy internet and a hierarchical control system and a control method thereof
CN106059040B (en) A kind of power-supply system and the energy for cube star is classified regulation and control method
Qi et al. Distributed supervisory predictive control of distributed wind and solar energy systems
CN108134401B (en) Multi-target power flow optimization and control method for alternating current-direct current hybrid system
CN103094955B (en) Charge control system, device and method, and discharge control device
CN105515012B (en) A kind of energy storage participates in learning algorithms method and device
CN108039732A (en) A kind of and the one-piece type photovoltaic energy-storage system power supply of off-network and its control method
CN108258720A (en) A kind of double-bus energy grid connection topology structure and its grid-connected control method
CN110120696B (en) Large-scale energy storage SOC balance coordination control system and method
JP6109209B2 (en) Power supply system
CN107516893A (en) Energy router and the electricity-generating control method based on the energy router
CN107332277B (en) Active power distribution network island operation method considering source load storage operation characteristics
CN110912246A (en) Power coordination controller applied to optical storage system
CN112713605A (en) SOC (State of Charge) balancing method for non-equal-capacity battery energy storage unit of alternating-current micro-grid
CN103138279A (en) Method for calculating load flow of power grid alternating current and direct current power transmission system based on state switching
CN109274088A (en) Energy control method, device and energy management system and storage medium
CN107017659B (en) The method for carrying out flexible power generation based on photovoltaic power station area protection system
CN105515032B (en) intelligent micro-grid energy storage control method
CN109193902A (en) A kind of vehicle electric power supply control system
CN110323779B (en) Method and system for dynamically aggregating power of distributed power generation and energy storage device
CN108390408A (en) A kind of intelligent power distribution energy conservation and power supply system and management method
CN103094954B (en) Control device and control method
CN107706918A (en) A kind of new energy and power network cooperated power supply method and its calibration equipment
Wang et al. The design of battery energy storage system in a unified power-flow control scheme

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yu Haibo

Inventor after: Hu Hanghai

Inventor after: An Dongsheng

Inventor after: Yanhaiping

Inventor before: Yanhaiping

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20201113

Address after: 100000 building 32-3-4108-4109, 32 middle road, Haidian District, Beijing

Applicant after: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd.

Address before: 251800 Yangxin County, Binzhou, Shandong Province, a happy road

Applicant before: Yanhaiping

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201

Termination date: 20211122

CF01 Termination of patent right due to non-payment of annual fee