CN107706842A - A kind of aluminium-magnesium alloy cable bridge-support - Google Patents

A kind of aluminium-magnesium alloy cable bridge-support Download PDF

Info

Publication number
CN107706842A
CN107706842A CN201710759231.4A CN201710759231A CN107706842A CN 107706842 A CN107706842 A CN 107706842A CN 201710759231 A CN201710759231 A CN 201710759231A CN 107706842 A CN107706842 A CN 107706842A
Authority
CN
China
Prior art keywords
crane span
span structure
column
vertical
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710759231.4A
Other languages
Chinese (zh)
Inventor
张荣华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhong Yangzi Aluminium Processing Co Ltd
Original Assignee
Yangzhong Yangzi Aluminium Processing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhong Yangzi Aluminium Processing Co Ltd filed Critical Yangzhong Yangzi Aluminium Processing Co Ltd
Priority to CN201710759231.4A priority Critical patent/CN107706842A/en
Publication of CN107706842A publication Critical patent/CN107706842A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0456Ladders or other supports
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0406Details thereof

Abstract

The invention discloses a kind of aluminium-magnesium alloy cable bridge-support, including the first crane span structure, the second crane span structure, vertical crane span structure and the 3rd crane span structure, one end of first crane span structure is provided with small-bore crane span structure, the other end of first crane span structure is provided with the first connection crane span structure, the side of first connection crane span structure is provided with edge strip, the side of second crane span structure is provided with metope, side of second crane span structure along metope direction is provided with vertical crane span structure, the both sides up and down of second crane span structure are provided with right-angle connecting plate, the bottom of vertical crane span structure is provided with the second connection crane span structure, and the bottom of the first crane span structure is provided with steel column.Design is close, firm at each connector of the present invention, drastically increase the stability of cable testing bridge, avoid junction and security incident occur, steel column is very convenient when being installed using socket connection, and bearing capacity is strong, uniform force, whole cable testing bridge is without welding, conveniently repaired and changed, avoid weld corrosion and damage, substantially increase the service life of cable testing bridge.

Description

A kind of aluminium-magnesium alloy cable bridge-support
Technical field
The present invention relates to a kind of crane span structure, more particularly to a kind of aluminium-magnesium alloy cable bridge-support.
Background technology
It is well known that current cable testing bridge is usually welded at support with junction, in weld, welding is produced Raw chemical soiling solution is difficult to drive away, and can usually be overflowed from crack, causes junction corrosion, not only influences the use of cable testing bridge Life-span, and it is also extremely inconvenient in maintenance and replacing, coordinate and compatibility is also bad, therefore cable testing bridge is intensive in cable Region can not carry out cross-operation so that cable testing bridge installation rate is slack-off, long in time limit, accident is more.
The content of the invention
The technical problem to be solved in the present invention is the defects of overcoming prior art, there is provided a kind of aluminium-magnesium alloy cable bridge-support, Very convenient during installation, bearing capacity is strong, uniform force, is conveniently repaired and is changed, and avoids weld corrosion and damage, significantly Improve the service life of cable testing bridge.
In order to solve the above-mentioned technical problem, the invention provides following technical scheme:
A kind of aluminium-magnesium alloy cable bridge-support of the present invention, including the first crane span structure, the second crane span structure, vertical crane span structure and the 3rd crane span structure, it is described One end of first crane span structure is provided with small-bore crane span structure, and the both ends of first crane span structure are provided with reducer union, and the reducing connects Head be in Z-shaped, first crane span structure is connected by reducer union with small-bore crane span structure, the reducer union, the first crane span structure and Small-bore crane span structure collectively constitutes reducing mouth, and the other end of first crane span structure is provided with the first connection crane span structure, first connection The side of crane span structure is provided with edge strip, and the first connection crane span structure is connected with the first crane span structure and the second crane span structure respectively by edge strip, First crane span structure, the first connection crane span structure, the second crane span structure collectively constitute level and overstate logical, and the side of second crane span structure is provided with wall Face, is provided with wall trailing arm on the metope, and the wall trailing arm is located at the lower section of the second crane span structure, and second crane span structure is along metope side To side be provided with vertical crane span structure, the vertical crane span structure is close to be provided with support at metope, and the vertical crane span structure passes through support It is connected with metope, the both sides up and down of second crane span structure are provided with right-angle connecting plate, and second crane span structure is connected by right angle Fishplate bar is connected with vertical crane span structure, and second crane span structure collectively constitutes side perpendicular tee joint with vertical crane span structure, the vertical crane span structure Bottom is provided with the second connection crane span structure, and the both sides of the second connection crane span structure are provided with 45 degree of connecting plates, second connection Crane span structure is connected with vertical crane span structure, the 3rd crane span structure respectively by 45 degree of connecting plates, the 3rd crane span structure, vertical crane span structure and 45 degree of companies Fishplate bar is curved logical under collectively constituting vertically, and the bottom of first crane span structure is provided with steel column, and stress is provided with the steel column Seat, is provided with socket on the stress seat, and the bottom of first crane span structure is provided with eye-splice, first crane span structure by eye-splice with Steel column is connected.
As a preferred technical solution of the present invention, ejector is provided with the side of the steel column, it is described to draw Going out device includes the first fixed mount and steel pipe, and one end of the steel pipe is fixed with the first fixed mount, first fixed mount and The side wall of one crane span structure is fixedly connected, and the other end of first fixed mount is fixed with base, and pipe joint is provided with the steel pipe, The pipe joint is socket-connected with steel pipe, and suspension rod is provided with the top of the pipe joint, and it is solid that second is provided with the top of the suspension rod Determine frame.
As a preferred technical solution of the present invention, it is described go out device side be provided with the first column, described first The first column bracket arm is provided with column, the first column bracket arm is located at the lower section of the first crane span structure.
As a preferred technical solution of the present invention, hanging box, the 3rd bridge are provided with the outside of the 3rd crane span structure One end of frame is provided with terminal end socket.
As a preferred technical solution of the present invention, the hanging box side is provided with the second column, second column On be provided with the second column bracket arm, the second column bracket arm is located at the lower section of the 3rd crane span structure.
Compared with prior art, beneficial effects of the present invention are as follows:
Design is close, firm at each connector of the present invention, drastically increases the stability of cable testing bridge, avoids junction There is security incident, steel column is very convenient when being installed using socket connection, and bearing capacity is strong, uniform force, whole cable Crane span structure is conveniently repaired and changed, avoid weld corrosion and damage, substantially increase cable testing bridge uses the longevity without welding Life.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and a part for constitution instruction, the reality with the present invention Apply example to be used to explain the present invention together, be not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 be it is of the invention vertical under curved logical structural representation;
Fig. 3 is the structural representation of ejector of the present invention;
Fig. 4 is the structural representation of reducing mouth of the present invention;
Fig. 5 is that level of the present invention overstates logical structural representation;
Fig. 6 is the structural representation of side perpendicular tee joint of the present invention;
Fig. 7 is the structural representation of steel column of the present invention;
In figure:1st, the first crane span structure;2nd, the second crane span structure;3rd, vertical crane span structure;4th, the 3rd crane span structure;5th, small-bore crane span structure;6th, reducer union; 7th, reducing mouth;8th, the first connection crane span structure;9th, edge strip;10th, level is overstated logical;11st, metope;12nd, wall trailing arm;13rd, support;14th, right angle Connecting plate;15th, side perpendicular tee joint;16th, the second connection crane span structure;17th, 45 degree of connecting plates;18th, it is curved logical under vertical;19th, steel column; 20th, stress seat;21st, socket;22nd, eye-splice;23rd, ejector;24th, the first fixed mount;25th, steel pipe;26th, the second column bracket arm;27、 Base;28th, pipe joint;29th, suspension rod;30th, the second fixed mount;31st, the first column;32nd, the first column bracket arm;33rd, hanging box;34th, eventually End seal head;35th, the second column.
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein preferred real Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Embodiment 1
As shown in figs. 1-7, the present invention provides a kind of aluminium-magnesium alloy cable bridge-support, including the first crane span structure 1, the second crane span structure 2, vertical bridge The crane span structure 4 of frame 3 and the 3rd, one end of the first crane span structure 1 are provided with small-bore crane span structure 5, and the both ends of the first crane span structure 1 are provided with reducing and connect First 6, reducer union 6 is in Z-shaped, and the first crane span structure 1 is connected by reducer union 6 with small-bore crane span structure 5, reducer union 6, first Crane span structure 1 collectively constitutes reducing mouth 7 with small-bore crane span structure 5, and the other end of the first crane span structure 1 is provided with the first connection crane span structure 8, and first connects The side for connecing crane span structure 8 is provided with edge strip 9, and the first connection crane span structure 8 is connected with the first crane span structure 1 and the second crane span structure 2 respectively by edge strip 9 Connect, the first crane span structure 1, first connection crane span structure 8, the second crane span structure 9 collectively constitute level and overstate logical 10, and the side of the second crane span structure 2 is provided with Metope 11, is provided with wall trailing arm 12 on metope 11, and wall trailing arm 12 is located at the lower section of the second crane span structure 2, and the second crane span structure 2 is along metope 11 The side in direction is provided with vertical crane span structure 3, and vertical crane span structure 3 is close to be provided with support 13 at metope 11, and vertical crane span structure 3 passes through support 13 are connected with metope 11, and the both sides up and down of the second crane span structure 2 are provided with right-angle connecting plate 14, and the second crane span structure 2 is connected by right angle Fishplate bar 14 is connected with vertical crane span structure 3, and the second crane span structure 2 collectively constitutes side perpendicular tee joint 15 with vertical crane span structure 3, vertical crane span structure 3 Bottom is provided with the second connection crane span structure 16, and the both sides of the second connection crane span structure 16 are provided with 45 degree of connecting plates 17, the second connecting bridge Frame 16 is connected with vertical crane span structure 3, the 3rd crane span structure 4 respectively by 45 degree of connecting plates 17, the 3rd crane span structure 4, vertical crane span structure 3 and 45 degree Curved logical 18 under collectively constituting vertically, the bottom of the first crane span structure 1 is provided with side and is provided with steel column 19, steel column 19 connecting plate 17 On be provided with stress seat 20, socket 21 is provided with stress seat 20, the bottom of the first crane span structure 1 is provided with eye-splice 22, the first crane span structure 1 It is connected by eye-splice 22 with steel column 19.
Further, ejector 23 is provided with the side of steel column 19, ejector 23 includes the first fixed mount 24 With steel pipe 25, one end of steel pipe 25 is fixed with the first fixed mount 24, and the side wall fixation of the first fixed mount 24 and the first crane span structure 1 connects Connect, the other end of the first fixed mount 24 is fixed with base 27, and pipe joint 28, pipe joint 28 and the phase of steel pipe 25 are provided with steel pipe 25 Socket, the top of pipe joint 28 are provided with suspension rod 29, and the top of suspension rod 29 is provided with the second fixed mount 30, avoids crane span structure from pacifying Full accident.
The side of ejector 23 is provided with the first column 31, is provided with the first column bracket arm 32 on the first column 31, and first Column bracket arm 32 is located at the lower section of the first crane span structure 1, can support crane span structure with trailing arm.
The outside of 3rd crane span structure 4 is provided with hanging box 33, and one end of the 3rd crane span structure 4 is provided with terminal end socket 34, makes crane span structure more Add stabilization.
The side of hanging box 33 is provided with the second column 35, and the second column bracket arm 36, the second column bracket arm are provided with the second column 35 26 are located at the lower section of the 3rd crane span structure 4, improve the stability of crane span structure.
Specifically, when in use, reducing mouth 7 is used for adjusting the bore of cable, and reducing mouth 7 is to make the by reducer union 6 One crane span structure 1 is connected with small-bore crane span structure 5, is fixed with fastening bolt in reducer union 6, and fastening bolt is by the two of reducer union 6 End is separately fixed at the first crane span structure 1 and small-bore crane span structure 5, fixes it, both sides are also not easy to loosen, and are provided with steel column 19 Stress seat 20, the eye-splice 22 of the lower end of the first crane span structure 1, which may be inserted into the socket 21 of steel column 19, forms fixed structure, the first crane span structure 1 center of gravity is pressed downward, and the gravity of the first crane span structure 1 is fixed on the stress seat 20 of steel column 19, enables the front end of the first crane span structure 1 Enough supports, the middle-end of the first crane span structure 1 are provided with ejector 23, and the side wall of the crane span structure 1 of ejector 23 and first is fixed by first Frame 24 is connected, while pipe joint 28 is cased with steel pipe 25, and pipe joint 28 connects suspension rod 29, suspension rod 20 is connected top, Tube head pipe crook connects base 27, makes entirety more stable, can play good power-off protection, avoids the powered dangerous work of crane span structure With supporting the rear end of the first crane span structure 1 by the first column 31, the first crane span structure 1 is just supported, and level overstates that logical 10 be the first crane span structure 1 and second junction turned between crane span structure 2, it is made up of the first crane span structure 1, the second crane span structure 2, first connection crane span structure 8, by edge strip 9 First crane span structure 1, the second crane span structure 2, first connection crane span structure 8 are attached, and be fixed by fastening bolt, makes bend more Easily turnover, side perpendicular tee joint 15 are the junction of the second crane span structure 2 and vertical crane span structure 3, are connected and are incited somebody to action by right-angle connecting plate 14 Its footpath is formed, and curved logical 18 are made up of vertical crane span structure 3, second connection crane span structure 16, the 3rd crane span structure 4 under vertical, and centre uses The form at 45 degree of angles is attached, in order under it is curved when it is more smooth, reduce the damage of cable.
Design is close, firm at each connector of the present invention, drastically increases the stability of cable testing bridge, the company of avoiding There is security incident in the place of connecing, and steel column 19 is very convenient when being installed using socket connection, and bearing capacity is strong, uniform force, whole Individual cable testing bridge is conveniently repaired and changed, avoided weld corrosion and damage, substantially increase cable testing bridge without welding Service life.
Finally it should be noted that:The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, Although the present invention is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic. Within the spirit and principles of the invention, any modification, equivalent substitution and improvements made etc., it should be included in the present invention's Within protection domain.

Claims (5)

1. a kind of aluminium-magnesium alloy cable bridge-support, including the first crane span structure(1), the second crane span structure(2), vertical crane span structure(3)With the 3rd crane span structure (4), it is characterised in that first crane span structure(1)One end be provided with small-bore crane span structure(5), first crane span structure(1)Both ends It is provided with reducer union(6), the reducer union(6)In Z-shaped, first crane span structure(1)Pass through reducer union(6)With it is small Bore crane span structure(5)It is connected, the reducer union(6), the first crane span structure(1)With small-bore crane span structure(5)Collectively constitute reducing mouth (7), first crane span structure(1)The other end be provided with the first connection crane span structure(8), the first connection crane span structure(8)Side set It is equipped with edge strip(9), the first connection crane span structure(8)Pass through edge strip(9)Respectively with the first crane span structure(1)With the second crane span structure(2)It is connected Connect, first crane span structure(1), first connection crane span structure(8), the second crane span structure(9)The level of collectively constituting is overstated logical(10), second bridge Frame(2)Side be provided with metope(11), the metope(11)On be provided with wall trailing arm(12), the wall trailing arm(12)Positioned at Two crane span structures(2)Lower section, second crane span structure(2)Along metope(11)The side in direction is provided with vertical crane span structure(3), it is described to hang down Straight crane span structure(3)It is close to metope(11)Place is provided with support(13), the vertical crane span structure(3)Pass through support(13)With metope(11)Phase Connection, second crane span structure(2)Both sides up and down be provided with right-angle connecting plate(14), second crane span structure(2)Pass through right angle Connecting plate(14)With vertical crane span structure(3)It is connected, second crane span structure(2)With vertical crane span structure(3)Collectively constitute side perpendicular tee joint (15), the vertical crane span structure(3)Bottom be provided with the second connection crane span structure(16), the second connection crane span structure(16)Both sides it is equal It is provided with 45 degree of connecting plates(17), the second connection crane span structure(16)Pass through 45 degree of connecting plates(17)Respectively with vertical crane span structure(3)、 3rd crane span structure(4)It is connected, the 3rd crane span structure(4), vertical crane span structure(3)With 45 degree of connecting plates(17)It is curved under collectively constituting vertically It is logical(18), first crane span structure(1)Bottom be provided with side and be provided with steel column(19), the steel column(19)On be provided with Stress seat(20), the stress seat(20)On be provided with socket(21), first crane span structure(1)Bottom be provided with eye-splice (22), first crane span structure(1)Pass through eye-splice(22)With steel column(19)It is connected.
A kind of 2. aluminium-magnesium alloy cable bridge-support according to claim 1, it is characterised in that the steel column(19)Side On be provided with ejector(23), the ejector(23)Including the first fixed mount(24)And steel pipe(25), the steel pipe (25)One end be fixed with the first fixed mount(24), first fixed mount(24)With the first crane span structure(1)Side wall be fixedly connected, First fixed mount(24)The other end be fixed with base(27), the steel pipe(25)On be provided with pipe joint(28), it is described Pipe joint(28)With steel pipe(25)Socket-connect, the pipe joint(28)Top be provided with suspension rod(29), the suspension rod(29)'s Top is provided with the second fixed mount(30).
A kind of 3. aluminium-magnesium alloy cable bridge-support according to claim 2, it is characterised in that the ejector(23)One Side is provided with the first column(31), first column(31)On be provided with the first column bracket arm(32), the first column bracket arm (32)Positioned at the first crane span structure(1)Lower section.
A kind of 4. aluminium-magnesium alloy cable bridge-support according to claim 1, it is characterised in that the 3rd crane span structure(4)It is outer Side is provided with hanging box(33), the 3rd crane span structure(4)One end be provided with terminal end socket(34).
A kind of 5. aluminium-magnesium alloy cable bridge-support according to claim 4, it is characterised in that the hanging box(33)Side is set There is the second column(35), second column(35)On be provided with the second column bracket arm(36), the second column bracket arm(26)It is located at 3rd crane span structure(4)Lower section.
CN201710759231.4A 2017-08-30 2017-08-30 A kind of aluminium-magnesium alloy cable bridge-support Pending CN107706842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710759231.4A CN107706842A (en) 2017-08-30 2017-08-30 A kind of aluminium-magnesium alloy cable bridge-support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710759231.4A CN107706842A (en) 2017-08-30 2017-08-30 A kind of aluminium-magnesium alloy cable bridge-support

Publications (1)

Publication Number Publication Date
CN107706842A true CN107706842A (en) 2018-02-16

Family

ID=61171289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710759231.4A Pending CN107706842A (en) 2017-08-30 2017-08-30 A kind of aluminium-magnesium alloy cable bridge-support

Country Status (1)

Country Link
CN (1) CN107706842A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963909A (en) * 2018-10-09 2018-12-07 江苏泰华消防电气设备有限公司 A kind of bridge lift frame device
CN111614033A (en) * 2020-06-11 2020-09-01 上海外高桥造船有限公司 Branch connecting piece of cable tray

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2408336Y (en) * 2000-01-17 2000-11-29 郭道华 Aluminium-nagnesium alloy cable framework
CN1614278A (en) * 2004-10-30 2005-05-11 王强 Assembled cable crane span
CN200974984Y (en) * 2006-09-15 2007-11-14 东营胜邦塑胶有限公司 Self-floating type PE pipeline for dredge
CN202708327U (en) * 2012-04-26 2013-01-30 凤翔西府建筑桥架设备有限公司 Cable bridge frame
CN204030479U (en) * 2014-06-27 2014-12-17 丁启荣 A kind of alloy plastic crane span structure
CN204216515U (en) * 2014-10-18 2015-03-18 福州万山电力咨询有限公司 The mounting structure of distribution engineering cable testing bridge
CN104577895A (en) * 2015-01-09 2015-04-29 威海市天力电气有限公司 Groove type cable tray

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2408336Y (en) * 2000-01-17 2000-11-29 郭道华 Aluminium-nagnesium alloy cable framework
CN1614278A (en) * 2004-10-30 2005-05-11 王强 Assembled cable crane span
CN200974984Y (en) * 2006-09-15 2007-11-14 东营胜邦塑胶有限公司 Self-floating type PE pipeline for dredge
CN202708327U (en) * 2012-04-26 2013-01-30 凤翔西府建筑桥架设备有限公司 Cable bridge frame
CN204030479U (en) * 2014-06-27 2014-12-17 丁启荣 A kind of alloy plastic crane span structure
CN204216515U (en) * 2014-10-18 2015-03-18 福州万山电力咨询有限公司 The mounting structure of distribution engineering cable testing bridge
CN104577895A (en) * 2015-01-09 2015-04-29 威海市天力电气有限公司 Groove type cable tray

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108963909A (en) * 2018-10-09 2018-12-07 江苏泰华消防电气设备有限公司 A kind of bridge lift frame device
CN108963909B (en) * 2018-10-09 2024-03-29 江苏泰华消防电气设备有限公司 Bridge frame hanging device
CN111614033A (en) * 2020-06-11 2020-09-01 上海外高桥造船有限公司 Branch connecting piece of cable tray

Similar Documents

Publication Publication Date Title
CN104315255B (en) Anti-seismic connecting support combined structure
CN107706842A (en) A kind of aluminium-magnesium alloy cable bridge-support
CN201125276Y (en) Improved anode hang tool
CN104466845A (en) Busbar link fitting
CN107492845A (en) A kind of aluminium alloy cable support
CN204290214U (en) Bus connects gold utensil
CN216112547U (en) Mounting structure for air pipe support and hanger of suspended ceiling
CN206128411U (en) F type fossil fragments furred ceiling corner fixed knot constructs
CN204290215U (en) Bus connection structure and use this syndeton bus connect gold utensil
CN206031737U (en) Boats and ships blast pipe gallows
CN213025106U (en) Outdoor hanging type typhoon-proof structure mark
CN206111759U (en) Overhaul platform device in boiler furnace and connecting card board thereof
CN112025198A (en) Heat distribution pipeline opening aligning construction device and construction method
CN206108839U (en) Overhaul platform device in boiler furnace and spacing round of mechanism of elasticity thereof
CN208107313U (en) A kind of pole bracket
CN110863594A (en) Point-hanging curtain wall system
CN206111832U (en) Overhaul platform device in boiler furnace and folding joint thereof
CN207920131U (en) A kind of steel railing Fast Installation sample rack
CN215410526U (en) Natural gas line fixed bolster
CN217150638U (en) Cantilever girder main beam and coupling beam connecting structure
CN217355852U (en) Large-scale pipeline limiting support
CN217559210U (en) Groove type clamping type anti-seismic connecting support combined structure
CN212806573U (en) Water cooling device for carbon electrode
CN215371278U (en) Supporting and fixing device for petroleum cracking pipeline
CN211010179U (en) Connecting device for vertical constant-force hanger double pull rods and supporting and hanging component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication