CN107703888A - The data acquisition analysis method and Internet of Things communication equipment of Internet of Things communication equipment - Google Patents
The data acquisition analysis method and Internet of Things communication equipment of Internet of Things communication equipment Download PDFInfo
- Publication number
- CN107703888A CN107703888A CN201710402756.2A CN201710402756A CN107703888A CN 107703888 A CN107703888 A CN 107703888A CN 201710402756 A CN201710402756 A CN 201710402756A CN 107703888 A CN107703888 A CN 107703888A
- Authority
- CN
- China
- Prior art keywords
- monitoring data
- data
- processing
- internet
- sent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004891 communication Methods 0.000 title claims abstract description 58
- 238000004458 analytical method Methods 0.000 title claims abstract description 32
- 238000012544 monitoring process Methods 0.000 claims abstract description 174
- 238000012545 processing Methods 0.000 claims abstract description 88
- 230000006835 compression Effects 0.000 claims abstract description 26
- 238000007906 compression Methods 0.000 claims abstract description 26
- 238000006243 chemical reaction Methods 0.000 claims description 40
- 230000005540 biological transmission Effects 0.000 claims description 11
- 238000007726 management method Methods 0.000 abstract description 9
- 238000013500 data storage Methods 0.000 abstract description 6
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 15
- 238000003754 machining Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 5
- 230000006870 function Effects 0.000 description 4
- 238000002360 preparation method Methods 0.000 description 4
- 241000894007 species Species 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/4185—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by the network communication
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/33—Director till display
- G05B2219/33139—Design of industrial communication system with expert system
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Testing And Monitoring For Control Systems (AREA)
Abstract
The embodiments of the invention provide a kind of data acquisition analysis method of Internet of Things communication equipment and Internet of Things communication equipment, data acquisition analysis method to include:Receive the monitoring data that connection equipment is sent;Monitoring data is handled, the monitoring data after being handled;Monitoring data after processing is sent to cloud server.Handled by the monitoring data sent to receiving different connection equipment, monitoring data after processing has the advantages that uniform format, is easy to compression and small size, and the monitoring data after the processing of different connection equipment is uploaded into cloud server by being wirelessly transferred.The data acquisition analysis method of the Internet of Things communication equipment can realize the requirement of the monitoring data of the multiple connection equipment of Internet of Things communication equipment collection, the centralized management for the connection equipment being easy in workshop/factory, by by the supervising data storage after processing to cloud server, it is possible to achieve collect the requirement of the mass data of magnanimity factory.
Description
Technical field
The present invention relates to a kind of communications field, the data acquisition analysis method of more particularly to a kind of Internet of Things communication equipment and
Internet of Things communication equipment.
Background technology
In the factory, one or more PC (Personal Computer, PC) uses netting twine in a workshop
Connect various Digit Control Machine Tools, PLC (Programmable Logic Controller, be programmable logic controller (PLC)) or machine
Machining robot etc., if a Factory distribution can not integrate the data of whole factory more, it is not easy in workshop/factory
PC centralized management, for example, the data of other PC storage outside factory, can not be checked by terminal whenever and wherever possible;If
PC is damaged in workshop, can cause loss of data.And each factory forms a data silo, no existing equipment can collect magnanimity
The mass data of factory.
The content of the invention
In order to solve the above-mentioned technical problem, the embodiments of the invention provide a kind of data acquisition of Internet of Things communication equipment point
Analysis method and Internet of Things communication equipment.This can be achieved an Internet of Things communication equipment and reads multiple monitoring datas for connecting equipment
It is required that can solve the problems, such as the centralized management of the connection equipment in workshop/factory.
A kind of one side according to the embodiment of the present invention, there is provided data collection and analysis side of Internet of Things communication equipment
Method, including:
Receive the monitoring data that connection equipment is sent;
Monitoring data is handled, the monitoring data after being handled;
Monitoring data after processing is sent to cloud server.
Alternatively, the monitoring data that connection equipment is sent is received, including:
According to specified collection period, the monitoring data of collection connection equipment transmission.
Alternatively, monitoring data is handled, the monitoring data after being handled, including:
Format conversion processing is carried out to monitoring data, obtains the monitoring data of the unified form after form conversion;And/or
Processing is compressed to the monitoring data of collection, obtains the monitoring data after compression processing.
Alternatively, monitoring data is handled, the monitoring data after being handled, including:
Format conversion processing is carried out to the monitoring data of different-format, obtains the monitoring data of unified form;
According to the data type of monitoring data, the monitoring data of unified form is divided into event and data flow.
Alternatively, the monitoring data after processing is sent to cloud server, including:
The event for needing real-time report or data flow are sent to cloud server in real time;
By do not need real-time report data flow or event buffer database in, when the data volume in cache database reaches
After predetermined value, all in the cache database data cached are sent to cloud server.
According to the other side of the embodiment of the present invention, a kind of Internet of Things communication equipment is additionally provided, including:
Receiving module, the monitoring data sent for receiving connection equipment;
Processing module, for handling monitoring data, the monitoring data after being handled;
Sending module, for the monitoring data after processing to be sent into cloud server.
Alternatively, the receiving module, including:
Collecting unit, for the monitoring data sent according to specified collection period, collection connection equipment.
Alternatively, the processing module, including:
First format conversion unit, for carrying out format conversion processing to monitoring data, obtain the unification after form conversion
The monitoring data of form;And/or
Compression unit, for being compressed processing to the monitoring data of collection, obtain the monitoring data after compression processing.
Alternatively, the processing module, including:
Second format conversion unit, for carrying out format conversion processing to the monitoring data of different-format, obtain unified lattice
The monitoring data of formula;
Discrimination unit, for the monitoring data of unified form to be divided into event and/or data flow.
Alternatively, the sending module includes:
First transmitting element, for the data flow or event that need real-time report to be sent into cloud server in real time;
Second transmitting element, for need not will in real time be sent to the data flow or event buffer database of cloud server
In, will be all data cached in the cache database after data volume in cache database reaches predetermined value.
Embodiments of the invention have the advantages that:
First, handled by the monitoring data sent to receiving different connection equipment, form system can be obtained
First, the monitoring data after the processing of small size, by the way that the monitoring data after the processing of different connection equipment is passed through into wireless connection
Upload to cloud server.The data acquisition analysis method of the Internet of Things communication equipment can realize that an Internet of Things communication equipment is read
The requirement of the monitoring data of different connection equipment (for example, Digit Control Machine Tool or PC etc.) is taken, the connection being easy in workshop/factory is set
Standby centralized management.The data acquisition analysis method of the Internet of Things communication equipment is by the way that the supervising data storage after processing is arrived
Cloud server, it is possible to achieve collect the requirement of the mass data of magnanimity factory.
Secondly, transmission cost can be saved by being compressed processing to monitoring data.Monitoring after overcompression is handled
The volume of data is smaller, during the monitoring data after by processing uploads to cloud server by wireless connection, more saves
Save flow and more save transmission cost in other words.Equally, by by need real-time report event or data flow real-time report to cloud
Server is held, by by the event or the data flow cache database that do not need real-time report, having reached predetermined value in batches again
Be sent to cloud server, the real-time for being uploaded to cloud server that may be such that event and data flow be it is different, can also
Save the flow needed for transmission.
Brief description of the drawings
Fig. 1 is a kind of flow chart of the data acquisition analysis method of Internet of Things communication equipment provided in an embodiment of the present invention;
Fig. 2 is the flow of the data acquisition analysis method of another Internet of Things communication equipment provided in an embodiment of the present invention
Figure;
Fig. 3 is the flow of the data acquisition analysis method of another Internet of Things communication equipment provided in an embodiment of the present invention
Figure;
Fig. 4 is the flow of the data acquisition analysis method of another Internet of Things communication equipment provided in an embodiment of the present invention
Figure;
Fig. 5 is the structural representation of the Internet of Things communication equipment of the embodiment of the present invention.
Embodiment
To make the technical problem to be solved in the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and tool
Body embodiment is described in detail.
Fig. 1 is a kind of flow chart of the data acquisition analysis method of Internet of Things communication equipment provided in an embodiment of the present invention,
Referring to Fig. 1, the data acquisition analysis method of the Internet of Things communication equipment in the present embodiment comprises the following steps:
S101, receive the monitoring data that connection equipment is sent;
The connection equipment can be machining equipment or PC etc., for example, Digit Control Machine Tool or machining robot etc.,
It should be noted that the type of the connection equipment is not limited specifically in the present embodiment.
The monitoring data can be event and data flow of the connection equipment etc., be of course not solely limited to this.Need
It is bright, do not limit the species of the monitoring data specifically in the present embodiment.
For example, the event can be " lathe start-up operation ", " lathe is stopped " " lathe alarm " or " lathe is alarmed
The events such as end ".It should be noted that the explanation about the event is example and non-limiting above.The data flow can
For parameters such as " positions of each axis servomotor ", " load of each axis servomotor " or " rotating speed of main shaft ".It should be noted that with
The upper explanation about the data flow is example and non-limiting.
Alternatively, the monitoring data that connection equipment is sent is received, including:According to specified collection period, collection connection is set
The monitoring data that preparation is sent.Wherein collection period can determine according to being actually needed.
S102, monitoring data is handled, the monitoring data after being handled;
The processing mode of monitoring data can be the combination of any one or two kinds of in the following manner:
Mode one:Format conversion processing is carried out to monitoring data, obtains the monitoring data after form conversion;
The purpose of the format conversion processing is after being converted into uniform format by monitoring data, be easy to compressed format to change
Monitoring data.
Mode two:Processing is compressed to the monitoring data of collection, obtains the monitoring data after compression processing.
The purpose of the compression processing is by the monitoring data after the processing of monitoring data boil down to small size, is so being passed
During monitoring data after defeated processing, transmission flow used can be saved.
Alternatively, method can be conventional compression algorithm used by compression processing, for example, dictionary algorithm, fixed bit
Long algorithm or RLE (Run-Length-Encoding, Run- Length Coding) compression algorithm etc., is of course not solely limited to this.Need
It is bright, specific method used by compression processing is not limited in the embodiment of the present invention specifically.
Mode three:Format conversion processing is carried out to the monitoring data of different-format first, obtains the monitoring number of unified form
According to further according to the data type of monitoring data, the monitoring data of unified form is divided into event and data flow.
It should be noted that different connect the form of monitoring data caused by equipment (for example, Digit Control Machine Tool) and differ,
For example, the form of monitoring data includes but is not limited to:XML (Extensible Markup Language, extensible markup language
Speech) form, Rich Text Format or binary format etc..By carrying out format conversion processing to monitoring data, lattice are can obtain
Formula is unified, be easy to compressed format change after monitoring data, in order to subsequently being made a distinction to the monitoring data after processing and
Upload.
S103, the monitoring data after processing is sent to cloud server.
Alternatively, the monitoring data after processing can be sent into high in the clouds by wireless 4G (forth generation communication system) networks to take
Business device, is of course not solely limited to this.
In the present embodiment, handled, handled by the monitoring data sent to the different connection equipment received
Monitoring data afterwards has the advantages that uniform format, is easy to compression and small size, then the monitoring data after processing is passed through wireless
It is transferred to cloud server.The data acquisition analysis method of the Internet of Things communication equipment can realize that an Internet of Things communication equipment is read
The requirement of the monitoring data of different connection equipment (for example, Digit Control Machine Tool or PC etc.) is taken, the connection being easy in workshop/factory is set
Standby centralized management, by by the supervising data storage after processing to cloud server, it is possible to achieve collect magnanimity factory
The requirement of mass data.
Fig. 2 is the flow of the data acquisition analysis method of another Internet of Things communication equipment provided in an embodiment of the present invention
Figure, referring to Fig. 2, the data acquisition analysis method of the Internet of Things communication equipment in the present embodiment comprises the following steps:
S201, receive the monitoring data that connection equipment is sent;
The connection equipment can be machining equipment or PC etc., for example, Digit Control Machine Tool or machining robot etc.,
It should be noted that the type of the connection equipment is not limited specifically in the present embodiment.
The monitoring data can be the event (processing event) and/or processed data stream etc. of the connection equipment, certainly simultaneously
It is not limited only to this.It should be noted that do not limit the species of the monitoring data specifically in the present embodiment.
Alternatively, the monitoring data that connection equipment is sent is received, including:According to specified collection period, collection connection is set
The monitoring data that preparation is sent.
S202, processing is compressed to the monitoring data of collection, obtains the monitoring data after compression processing;
The purpose of the compression processing is by the monitoring data after the processing of monitoring data boil down to small size, is so being passed
During monitoring data after defeated processing, transmission flow used can be saved.
Alternatively, method can be conventional compression algorithm used by compression processing, for example, dictionary algorithm, fixed bit
Long algorithm or RLE (Run-Length-Encoding, Run- Length Coding) compression algorithm etc., is of course not solely limited to this.Need
It is bright, specific method used by compression processing is not limited in the embodiment of the present invention specifically.
S203, event or data flow are sent to cloud server in real time.
In the present embodiment, processing is compressed by the monitoring data sent to the different connection equipment received,
The monitoring data after the processing of small size can be obtained, the monitoring data after compression is handled radios to cloud server.
It should be noted that the volume of the monitoring data after processing is smaller, during the monitoring data after upload process, more save
Flow, transmission cost can be saved by being compressed processing to monitoring data.The data acquisition of the Internet of Things communication equipment point
Analysis method can realize that an Internet of Things communication equipment reads wanting for the monitoring data of different connection equipment (for example, Digit Control Machine Tool)
Ask, the centralized management for the connection equipment being easy in workshop/factory, pass through the supervising data storage after compression is handled to high in the clouds
Server, it is possible to achieve collect the requirement of the mass data of magnanimity factory.
Fig. 3 is the flow of the data acquisition analysis method of another Internet of Things communication equipment provided in an embodiment of the present invention
Figure, referring to Fig. 3, the data acquisition analysis method of the Internet of Things communication equipment in the present embodiment comprises the following steps:
S301, receive the monitoring data that connection equipment is sent;
The connection equipment can be machining equipment or PC etc., for example, Digit Control Machine Tool or machining robot etc.,
It should be noted that the type of the connection equipment is not limited specifically in the present embodiment.
The monitoring data can be processing event and processed data stream of the connection equipment etc., be of course not solely limited to
This.It should be noted that do not limit the species of the monitoring data specifically in the present embodiment.
Alternatively, the monitoring data that connection equipment is sent is received, including:According to specified collection period, collection connection is set
The monitoring data that preparation is sent.
S302, format conversion processing is carried out to monitoring data, obtain the monitoring data of the unified form after form conversion;
The form of monitoring data caused by difference connection equipment (for example, Digit Control Machine Tool) simultaneously differs, for example, monitoring data
Form include but is not limited to:XML (Extensible Markup Language, extensible markup language) form, common text
This form or binary format etc..By carrying out format conversion processing to monitoring data, it can obtain uniform format, be easy to compress
Form conversion after monitoring data.
S303, the monitoring data after processing is sent to cloud server.
In the present embodiment, entered by the monitoring data sent to the different connection equipment received at row format conversion
Reason, uniform format, the monitoring data being easy to after compressed format conversion, and then the monitoring data after form is changed can be obtained
Radio to cloud server.The data acquisition analysis method of the Internet of Things communication equipment can realize that an Internet of Things Network Communication is set
The requirement of the standby monitoring data for reading different connection equipment (for example, Digit Control Machine Tool), the connection equipment being easy in workshop/factory
Centralized management, by by the supervising data storage after format conversion processing to cloud server, it is possible to achieve collect magnanimity work
The requirement of the mass data of factory.
Fig. 4 is the flow of the data acquisition analysis method of another Internet of Things communication equipment provided in an embodiment of the present invention
Figure, referring to Fig. 4, the data acquisition analysis method of the Internet of Things communication equipment in the present embodiment comprises the following steps:
S401, receive the monitoring data that connection equipment is sent;
The connection equipment can be machining equipment or PC etc., for example, Digit Control Machine Tool or machining robot etc.,
It should be noted that the type of the connection equipment is not limited specifically in the present embodiment.
The monitoring data can be processing event and processed data stream of the connection equipment etc., be of course not solely limited to
This.It should be noted that do not limit the species of the monitoring data specifically in the present embodiment.
Alternatively, the monitoring data that connection equipment is sent is received, including:According to specified collection period, collection connection is set
The monitoring data that preparation is sent.
S402, format conversion processing is carried out to the monitoring data of different-format, obtains the monitoring data of unified form;
The form of monitoring data caused by difference connection equipment (for example, Digit Control Machine Tool or PC etc.) simultaneously differs, for example,
The form of monitoring data includes but is not limited to:XML (Extensible Markup Language, extensible markup language) lattice
Formula, Rich Text Format or binary format etc..By carrying out format conversion processing to the monitoring data of different connection equipment,
It can obtain uniform format, be easy to the monitoring data after the processing of compression.
S403, according to the data type of monitoring data, the monitoring data of unified form is divided into event and/or data
Stream.Wherein, event or data flow are if desired sent in real time, then perform S404.If event or data flow need not be sent in real time,
Perform S405.
For example, the event can be " lathe start-up operation ", " lathe is stopped " " lathe alarm " or " lathe is alarmed
The events such as end ".It should be noted that the explanation described above about the event is example and non-limiting.
For example, the data flow can be " position of each axis servomotor ", " load of each axis servomotor " or " turn of main shaft
The parameters such as speed ".It should be noted that the explanation described above about the data flow is example and non-limiting.
S404, it would be desirable to which the event or data flow of real-time report are sent to cloud server in real time;
S405, by do not need real-time report data flow or event buffer database in, when the data in cache database
After amount reaches predetermined value, all in the cache database data cached are sent to cloud server.
It should be noted that the predetermined value in the present embodiment is the threshold value of database caches, can set as needed pre-
The size of definite value.
In the present embodiment, by by need real-time report event or data flow real-time report to cloud server, lead to
Cross by do not need real-time report event or data flow cache database in, when the data volume in cache database reaches predetermined value
Afterwards, by all data cached uploads for being sent to cloud server, may be such that event and data flow in the cache database
Real-time to cloud server is different, can so save the flow needed for transmission.For example, in some terminal pages,
Only need to send the event in monitoring data in real time, then need event real-time report to cloud server, and by data flow cache
Into database, reported until the data flow in database reaches predetermined value, then by the data flow being buffered in database
Cloud server.But in some terminal pages, it is necessary to send data flow in real time, then need to give data flow real-time report to high in the clouds clothes
Business device, and by event buffer into database, until the event in database reaches predetermined value, then will be buffered in database
Reporting events to cloud server., can be by data flow cache database simultaneously when need not send data flow in real time
In, after the data flow batch cached in database has reached predetermined value, re-send to cloud server.
In the present embodiment, entered by the monitoring data sent to the different connection equipment received at row format conversion
Reason, unified form, the monitoring data being easy to after compressed format conversion process can be obtained, the monitoring data of unified form is distinguished
For event and/or data flow.And then according to being actually needed, it would be desirable to which the event or data flow real-time report of real-time report are to high in the clouds
Server, by do not need real-time report event or data flow cache database in, when the data volume in cache database reaches
After predetermined value, by the cache database it is all it is data cached be sent to cloud server, may be such that event and data flow
The real-time for being uploaded to cloud server be different, can so save transmission needed for flow.The Internet of Things Network Communication is set
Standby data acquisition analysis method can realize that an Internet of Things communication equipment can read different connection equipment (for example, numerical control machine
Bed) monitoring data requirement, the centralized management for the connection equipment being easy in workshop/factory, after compression is handled
Supervising data storage is to cloud server, it is possible to achieve collects the requirement of the mass data of magnanimity factory.
The embodiment of the present invention additionally provides a kind of Internet of Things communication equipment 500, referring to Fig. 5, the Internet of Things communication equipment
500 include:Receiving module 501, processing module 502 and sending module 503.
In the present embodiment, the receiving module 501 is used to receive the monitoring data that connection equipment is sent.The processing mould
Block 502 is used to handle monitoring data, the monitoring data after being handled.The sending module 503 will be used for after handling
Monitoring data be sent to cloud server.
Specifically, the receiving module 501 includes:Collecting unit.
In the present embodiment, the collecting unit is used for the prison sent according to specified collection period, collection connection equipment
Control data.
In the present invention provides one embodiment, the processing module 502 includes:First format conversion unit and/or pressure
Contracting unit.
In the present embodiment, first format conversion unit is used to carry out format conversion processing to monitoring data, obtains
The monitoring data of uniform format after form conversion;
In the present embodiment, the compression unit is used to be compressed processing to the monitoring data of collection, obtains at compression
Monitoring data after reason.In the present invention provides another embodiment, the processing module 502, including:The conversion of second form is single
Member and discrimination unit.
Second format conversion unit is used to carry out format conversion processing to the monitoring data of different-format, obtains unification
The monitoring data of form.
The discrimination unit is used to the monitoring data of unified form dividing into event and/or data flow.
Specifically, the sending module 503 includes:First transmitting element and the second transmitting element.
First transmitting element is used to the data flow or event that need real-time report being sent to cloud server in real time;
Second transmitting element is used to, by the data flow or the event buffer database that do not need real-time report, work as caching
After data volume in database reaches predetermined value, all in the cache database data cached are sent to cloud service
Device.
The Internet of Things communication equipment 500 of the embodiment of the present invention can realize that the data of Fig. 1~Fig. 4 Internet of Things communication equipment are adopted
Each process in set analysis embodiment of the method, to avoid repeating, is repeated no more here.
Receiving module 501, processing module 502 are provided with the Internet of Things communication equipment 500 of the embodiment of the present invention and is sent
Module 503, format conversion processing, then pass through sending module 503 the are carried out to collecting monitoring data by processing module 502
One transmitting element and the second transmitting element are to needing the data flow or event and the data for not needing real-time report of real-time report
Stream or event carry out that real-time is different to be reported respectively, can so save transmission cost.The Internet of Things of the embodiment of the present invention
Communication equipment 500 can realize that an Internet of Things communication equipment can read the monitoring of different connection equipment (for example, Digit Control Machine Tool)
The requirement of data, the centralized management for the connection equipment being easy in workshop/factory, while the sea for collecting magnanimity factory can be realized
Measure the requirement of data.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein
Member and algorithm steps, it can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
Performed with hardware or software mode, application-specific and design constraint depending on technical scheme.Professional and technical personnel
Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed
The scope of the present invention.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
In embodiment provided herein, it should be understood that disclosed apparatus and method, others can be passed through
Mode is realized.For example, device embodiment described above is only schematical, for example, the division of the unit, is only
A kind of division of logic function, can there is an other dividing mode when actually realizing, for example, multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual
Between coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, device or unit
Connect, can be electrical, mechanical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs
's.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also
That unit is individually physically present, can also two or more units it is integrated in a unit.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part to be contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are causing a computer equipment (can be
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the present invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, ROM, RAM, magnetic disc or CD etc. are various can be with store program codes
Medium.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained
Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by scope of the claims.
Claims (10)
- A kind of 1. data acquisition analysis method of Internet of Things communication equipment, applied to Internet of Things communication equipment, it is characterised in that institute Stating data acquisition analysis method includes:Receive the monitoring data that connection equipment is sent;Monitoring data is handled, the monitoring data after being handled;Monitoring data after processing is sent to cloud server.
- 2. data acquisition analysis method according to claim 1, it is characterised in that receive the monitoring number that connection equipment is sent According to, including:According to specified collection period, the monitoring data of collection connection equipment transmission.
- 3. data acquisition analysis method according to claim 1, it is characterised in that handle monitoring data, obtain Monitoring data after processing, including:Format conversion processing is carried out to monitoring data, obtains the monitoring data of the unified form after form conversion;And/orProcessing is compressed to the monitoring data of collection, obtains the monitoring data after compression processing.
- 4. data acquisition analysis method according to claim 1, it is characterised in that handle monitoring data, obtain Monitoring data after processing, including:Format conversion processing is carried out to the monitoring data of different-format, obtains the monitoring data of unified form;According to the data type of monitoring data, the monitoring data of unified form is divided into event and data flow.
- 5. data acquisition analysis method according to claim 4, it is characterised in that be sent to the monitoring data after processing Cloud server, including:The event for needing real-time report or data flow are sent to cloud server in real time;By do not need real-time report data flow or event buffer database in, when the data volume in cache database reaches predetermined After value, all in the cache database data cached are sent to cloud server.
- 6. a kind of Internet of Things communication equipment, it is characterised in that the Internet of Things communication equipment includes:Receiving module, the monitoring data sent for receiving connection equipment;Processing module, for handling monitoring data, the monitoring data after being handled;Sending module, for the monitoring data after processing to be sent into cloud server.
- 7. Internet of Things communication equipment according to claim 6, it is characterised in that the receiving module, including:Collecting unit, for the monitoring data sent according to specified collection period, collection connection equipment.
- 8. Internet of Things communication equipment according to claim 6, it is characterised in that the processing module, including:First format conversion unit, for carrying out format conversion processing to monitoring data, obtain the unified form after form conversion Monitoring data;And/orCompression unit, for being compressed processing to the monitoring data of collection, obtain the monitoring data after compression processing.
- 9. Internet of Things communication equipment according to claim 6, it is characterised in that the processing module, including:Second format conversion unit, for carrying out format conversion processing to the monitoring data of different-format, obtain unified form Monitoring data;Discrimination unit, for the monitoring data of unified form to be divided into event and/or data flow.
- 10. Internet of Things communication equipment according to claim 9, it is characterised in that the sending module includes:First transmitting element, for the data flow or event that need real-time report to be sent into cloud server in real time;Second transmitting element, for that need not will be sent in real time in data flow or the event buffer database of cloud server, , will be all data cached in the cache database after data volume in cache database reaches predetermined value.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710402756.2A CN107703888A (en) | 2017-06-01 | 2017-06-01 | The data acquisition analysis method and Internet of Things communication equipment of Internet of Things communication equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710402756.2A CN107703888A (en) | 2017-06-01 | 2017-06-01 | The data acquisition analysis method and Internet of Things communication equipment of Internet of Things communication equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107703888A true CN107703888A (en) | 2018-02-16 |
Family
ID=61169709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710402756.2A Pending CN107703888A (en) | 2017-06-01 | 2017-06-01 | The data acquisition analysis method and Internet of Things communication equipment of Internet of Things communication equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107703888A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108667918A (en) * | 2018-04-25 | 2018-10-16 | 青岛海信移动通信技术股份有限公司 | A kind of device status monitoring method and device |
CN109101394A (en) * | 2018-07-09 | 2018-12-28 | 珠海格力电器股份有限公司 | Data processing method and device |
CN110149320A (en) * | 2019-04-30 | 2019-08-20 | 北京云迹科技有限公司 | Data monitoring method and device for smart machine |
CN111221247A (en) * | 2018-11-23 | 2020-06-02 | 西门子股份公司 | Method and system for fault diagnosis, training method of model, and medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102201958A (en) * | 2011-06-13 | 2011-09-28 | 山东中创软件工程股份有限公司 | Internet of things data transmission method and equipment |
CN102215263A (en) * | 2011-06-07 | 2011-10-12 | 邱柏康 | Data transmission and remote control method for self-organizing wireless internet of things (IoT) system |
CN102572395A (en) * | 2011-12-29 | 2012-07-11 | 深圳创维数字技术股份有限公司 | Monitoring method, mobile terminal and digital television receiving terminal |
CN103401725A (en) * | 2013-07-11 | 2013-11-20 | 华北水利水电大学 | Cross-platform equipment monitoring system based on cloud storage and monitoring method of cross-platform equipment monitoring system |
CN103532835A (en) * | 2013-10-17 | 2014-01-22 | 江苏万全科技有限公司 | Universal internet of things gateway |
CN104219306A (en) * | 2014-09-02 | 2014-12-17 | 上海华力微电子有限公司 | Monitoring system for message-oriented middleware |
CN104345717A (en) * | 2014-10-17 | 2015-02-11 | 武汉华大优能信息有限公司 | Intelligent remote data acquisition system based on Internet of Things |
CN105512002A (en) * | 2015-11-23 | 2016-04-20 | 上海汽车集团股份有限公司 | Equipment monitoring method and monitoring server |
CN106453443A (en) * | 2015-08-04 | 2017-02-22 | 腾讯科技(深圳)有限公司 | Security monitoring method, security monitoring server and security monitoring system |
-
2017
- 2017-06-01 CN CN201710402756.2A patent/CN107703888A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102215263A (en) * | 2011-06-07 | 2011-10-12 | 邱柏康 | Data transmission and remote control method for self-organizing wireless internet of things (IoT) system |
CN102201958A (en) * | 2011-06-13 | 2011-09-28 | 山东中创软件工程股份有限公司 | Internet of things data transmission method and equipment |
CN102572395A (en) * | 2011-12-29 | 2012-07-11 | 深圳创维数字技术股份有限公司 | Monitoring method, mobile terminal and digital television receiving terminal |
CN103401725A (en) * | 2013-07-11 | 2013-11-20 | 华北水利水电大学 | Cross-platform equipment monitoring system based on cloud storage and monitoring method of cross-platform equipment monitoring system |
CN103532835A (en) * | 2013-10-17 | 2014-01-22 | 江苏万全科技有限公司 | Universal internet of things gateway |
CN104219306A (en) * | 2014-09-02 | 2014-12-17 | 上海华力微电子有限公司 | Monitoring system for message-oriented middleware |
CN104345717A (en) * | 2014-10-17 | 2015-02-11 | 武汉华大优能信息有限公司 | Intelligent remote data acquisition system based on Internet of Things |
CN106453443A (en) * | 2015-08-04 | 2017-02-22 | 腾讯科技(深圳)有限公司 | Security monitoring method, security monitoring server and security monitoring system |
CN105512002A (en) * | 2015-11-23 | 2016-04-20 | 上海汽车集团股份有限公司 | Equipment monitoring method and monitoring server |
Non-Patent Citations (1)
Title |
---|
TMQ专项测试团队著: "移动App性能评测与优化 腾讯TMQ专项测试团队实战案例精选", 《移动APP性能评测与优化 腾讯TMQ专项测试团队实战案例精选》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108667918A (en) * | 2018-04-25 | 2018-10-16 | 青岛海信移动通信技术股份有限公司 | A kind of device status monitoring method and device |
CN109101394A (en) * | 2018-07-09 | 2018-12-28 | 珠海格力电器股份有限公司 | Data processing method and device |
CN111221247A (en) * | 2018-11-23 | 2020-06-02 | 西门子股份公司 | Method and system for fault diagnosis, training method of model, and medium |
CN110149320A (en) * | 2019-04-30 | 2019-08-20 | 北京云迹科技有限公司 | Data monitoring method and device for smart machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107703888A (en) | The data acquisition analysis method and Internet of Things communication equipment of Internet of Things communication equipment | |
CN107390650B (en) | A kind of data collection system based on Internet of Things and the data compression method based on the system | |
CN108769121B (en) | Intelligent industrial equipment Internet of things data acquisition system and acquisition data uploading method | |
CN108040005B (en) | Digit control machine tool intelligent monitoring gateway based on thing networking | |
CN103760820A (en) | Evaluation device of state information of machining process of numerical control milling machine | |
CN103941693A (en) | System for intelligently monitoring factory environment quality | |
CN107800759B (en) | The method of data processing system and management equipment equipment in network | |
EP3019920B1 (en) | Data-capture unit and automation system | |
CN108566369B (en) | Data acquisition system and method based on industrial big data | |
CN110286649B (en) | Modeling system and method for data collected by sensor on numerical control machine tool | |
CN111556141B (en) | Intelligent gateway data acquisition system and method based on Json data sheet | |
CN107707601A (en) | A kind of method and device of the connection equipment of monitoring in real time | |
CN113676526A (en) | Industrial data access management system and method | |
CN108334582B (en) | Method for compressing historical data in real-time database | |
CN111860911A (en) | Intelligent supervision reservation system for large-scale fixed scientific research equipment and use method thereof | |
CN110362036A (en) | A kind of machine tool monitoring system and method based on good fortune Industrial Ethernet again | |
CN104601374A (en) | Network fault processing method and device for numerical control machine tool | |
JP7019479B2 (en) | Monitoring system for power receiving and distribution equipment | |
EP2000868A1 (en) | Method of acquiring status information of I/O units | |
CN113641684A (en) | Internet of things big data processing device and method | |
CN110320837A (en) | It is a kind of can edge calculations industrial computer | |
CN111832758A (en) | Subway platform door maintenance operation method, device and equipment based on digital twins | |
CN115865174A (en) | Method, device and equipment for transmitting meteorological station data through Beidou short message communication | |
CN106468880B (en) | Monitor switching control system | |
CN114745141A (en) | FPSO crude oil export auxiliary decision system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180216 |
|
RJ01 | Rejection of invention patent application after publication |