CN107702939A - A kind of large-scale intact loess model takes Preparation Method - Google Patents

A kind of large-scale intact loess model takes Preparation Method Download PDF

Info

Publication number
CN107702939A
CN107702939A CN201710942172.4A CN201710942172A CN107702939A CN 107702939 A CN107702939 A CN 107702939A CN 201710942172 A CN201710942172 A CN 201710942172A CN 107702939 A CN107702939 A CN 107702939A
Authority
CN
China
Prior art keywords
model
soil
cushion cap
steel plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710942172.4A
Other languages
Chinese (zh)
Other versions
CN107702939B (en
Inventor
蒲小武
王兰民
王平
徐舜华
孙平定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GANSU PROVINCIAL SEISMOLOGICAL BUREAU
Original Assignee
GANSU PROVINCIAL SEISMOLOGICAL BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GANSU PROVINCIAL SEISMOLOGICAL BUREAU filed Critical GANSU PROVINCIAL SEISMOLOGICAL BUREAU
Priority to CN201710942172.4A priority Critical patent/CN107702939B/en
Publication of CN107702939A publication Critical patent/CN107702939A/en
Application granted granted Critical
Publication of CN107702939B publication Critical patent/CN107702939B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N1/00Sampling; Preparing specimens for investigation
    • G01N1/02Devices for withdrawing samples
    • G01N1/04Devices for withdrawing samples in the solid state, e.g. by cutting

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses a kind of large-scale intact loess model to take Preparation Method, soil model is processed, is fixed with plastic foam plate, bottom reserves certain distance, model casing is enclosed on soil model, behind model casing with behind soil model between gap loess fill and be compacted;It is close to model casing both sides and places rail, steel plate cushion cap is placed on rail, and steel plate cushion cap forward edge is provided with raised propulsive element, the riser of both sides is stuck on rail, and soil model bottom is cut with hacksaw, saw while promoting steel plate cushion cap with digging machine so that the soil body is fallen within steel plate cushion cap;The model soil body is lifted to automobile with suspender, by steel wire rope link model case suspension ring after transporting to interior, model casing is transferred from, whole soil model is completely presented.The beneficial effects of the invention are as follows Large Loess sample can be obtained in the case of soil structures are not destroyed, meet requirement of experiment.

Description

A kind of large-scale intact loess model takes Preparation Method
Technical field
The invention belongs to Geotechnical Engineering field, is related to a kind of large-scale intact loess model and takes Preparation Method.
Background technology
As a kind of special soils, loess has a weak cementing, low-intensity feature, large-scale intact loess model take it is standby always with Being all the global problem in Geotechnical Engineering field, by loess characteristic and prior art conditionality, current major institutes's scientific research Or personnel, to remold soil model to replace, or taking standby less intact loess model, it is also multifarious, mesh to take Preparation Method It is only capable of taking the intact loess model within a height of 1m × 1m of standby length and width × 1m known to preceding, this present situation greatly constrains loess in rock The research work of native engineering field.
The content of the invention
It is an object of the invention to provide a kind of large-scale intact loess model to take Preparation Method, solves at present because loess has There is a weak cementing, low intensive feature, loess sampling sample smaller the problem of can not meeting experiment needs.
A kind of large-scale intact loess model of the present invention takes Preparation Method, and step is as follows:
Step 1:The first smooth location in scene, sample soil body both sides and front and rear excavate workspace;
Step 2:Soil model is processed, around and the processing of upper top surface is smooth, and bottom is connected with original soil;
Step 3:The soil model surrounding processed is fixed with plastic foam plate, bottom reserves certain distance, uses adhesive tape Plastic foam plate is wrapped, model casing is enclosed on soil model, model casing is no top surface and the cuboid of bottom surface, is kept Be close to before model casing before soil model, behind model casing with behind soil model between gap loess fill and press It is real;
Step 4:It is close to model casing both sides and places rail, and rail is scheduled on ground with steel nail;
Step 5:Steel plate cushion cap is placed on rail, and steel plate cushion cap is rectangle, and forward edge is provided with raised promotion part Part, the riser of steel plate cushion cap both sides are stuck on rail, and when propulsive element stress, steel plate cushion cap slides on rail, steel plate cushion cap Corner be provided with cushion cap suspension ring, cushion cap suspension ring are located at outside riser;Hacksaw includes strip square steel, and strip square steel side is welded with saw Piece, the both ends of strip square steel are provided with handle;Soil model bottom is cut with hacksaw, is sawed while promoting steel plate to hold with digging machine Platform so that the soil body is fallen within steel plate cushion cap;
Step 6:The model soil body is lifted to automobile, suspender with suspender and is made up of framework and steel wire rope, steel wire rope one end connects Connect framework, the cushion cap suspension ring on other end junction steel plate cushion cap, by steel wire rope link model case suspension ring, distancing after transporting to interior Model casing, whole soil model is set completely to present.
Further, saw blade forward part and square steel angle at 45 °, rear part and square steel are into 135 ° of angles.
Further, the edge width of saw blade is identical with the thickness of steel plate cushion cap.
The beneficial effects of the invention are as follows Large Loess sample can be obtained in the case of soil structures are not destroyed, meet experiment It is required that.
Brief description of the drawings
Fig. 1 is mold box configuration schematic diagram;
Fig. 2 is the schematic diagram that soil model is placed on steel plate cushion cap;
Fig. 3 is hacksaw structural representation;
Fig. 4 is suspender lifting schematic diagram;
Fig. 5 is steel plate cushion cap insertion model casing bottom schematic view.
In figure, 1. model casings, 2. steel plate cushion caps, 3. rail, 4. hacksaws, 5. suspenders, 101. model casing suspension ring, 201. promote Part, 202. risers, 203. cushion cap suspension ring, 401. strip square steel, 402. saw blades, 403. handles, 501. frameworks, 502. steel wires Rope.
Embodiment
With reference to embodiment, the present invention is described in detail.
The present invention rents the first smooth good place of digging machine as shown in Figures 1 to 5, in selected place, in order to construction operation, Excavate about 0.8 meter of wide workspace, 6~8m of length, 1~2.6m of height in sampling soil body both sides.Soil is processed at the scene of fetching earth Body Model, around and the processing of upper top surface is smooth, and bottom is connected with original soil.To the soil model surrounding plastics processed Cystosepiment is fixed, and bottom reserves certain distance, 4~6mm, then plastic foam plate is wrapped with adhesive tape.Model casing 1 is enclosed on soil On body Model, model casing 1 is no top surface and the cuboid of bottom surface, and the top corner of model casing 1 is provided with model casing suspension ring 101, is protected Hold model casing 1 above be close to before soil model, model casing 1 below with behind soil model between gap with loess fill simultaneously Compacting.Loess is filled in order that the reaction force that soil model can be enough to model casing 1 in the progradation of steel plate cushion cap 2, exempts from It must be cut in the soil model later stage.The top corner of model casing 1 is provided with model casing suspension ring 101.
It is close to the both sides of model casing 1 and is placed in parallel rail 3, and rail 3 is scheduled on ground with steel nail.
Steel plate cushion cap 2 is placed on rail 3, and steel plate cushion cap 2 is rectangle, and forward edge is provided with raised propulsive element 201, the riser 202 of the both sides of steel plate cushion cap 2 is stuck on rail, prevents the deflection when being pushed into of steel plate cushion cap 2.Steel plate cushion cap 2 Corner is provided with cushion cap suspension ring 203, and cushion cap suspension ring 203 are located at outside riser 202;Hacksaw 4 includes strip square steel 401, strip square steel 401 Side is welded with saw blade 402, the forward part of saw blade 402 and 401 angle at 45 ° of square steel, and rear part and square steel 401 are into 135 ° of angles. The both ends of strip square steel 401 are provided with handle 403;Soil model bottom is cut with hacksaw 4, is sawed while promoting steel plate with digging machine Cushion cap 2 so that the soil body is fallen within steel plate cushion cap 2.
The model soil body is lifted to automobile, suspender 5 with suspender 5 and is made up of framework 501 and steel wire rope 502, steel wire rope one end Framework 501 is connected, the cushion cap suspension ring 203 on other end junction steel plate cushion cap 2, steel wire rope 502 is connected into mould after transporting to interior Molding box suspension ring 101, model casing 1 is transferred from, whole soil model is completely presented.
The method have the advantages that a height of 2m × 1.1m of standby length and width × 1m large-scale intact loess can completely be taken, the process that fetches earth saves Shi Shengli, save manually, and can at utmost retain soil sample original state, do not destroy soil structures, disclosure satisfy that loess engineering Research need.
Described above is only the better embodiment to the present invention, not makees any formal limit to the present invention System, any simple modification that every technical spirit according to the present invention is made to embodiment of above, equivalent variations and modification, Belong in the range of technical solution of the present invention.

Claims (3)

1. a kind of large-scale intact loess model takes Preparation Method, it is characterised in that follows the steps below:
Step 1:The first smooth location in scene, sample soil body both sides and front and rear excavate workspace;
Step 2:Soil model is processed, around and the processing of upper top surface is smooth, and bottom is connected with original soil;
Step 3:The soil model surrounding processed is fixed with plastic foam plate, bottom reserves certain distance, will be moulded with adhesive tape Strand foam plate is wrapped, and model casing is enclosed on soil model, and model casing is no top surface and the cuboid of bottom surface, keeps model Be close to before case before soil model, behind model casing with behind soil model between gap loess fill and be compacted;
Step 4:It is close to model casing both sides and places rail, and rail is scheduled on ground with steel nail;
Step 5:Steel plate cushion cap is placed on rail, and steel plate cushion cap is rectangle, and forward edge is provided with raised propulsive element, steel The riser of plate cushion cap both sides is stuck on rail, and when propulsive element stress, steel plate cushion cap slides on rail, and the four of steel plate cushion cap Angle is provided with cushion cap suspension ring, and cushion cap suspension ring are located at outside riser;Hacksaw includes strip square steel, and strip square steel side is welded with saw blade, bar The both ends of shape square steel are provided with handle;Soil model bottom is cut with hacksaw, is sawed while promoting steel plate cushion cap with digging machine so that The soil body is fallen within steel plate cushion cap;
Step 6:The model soil body is lifted to automobile, suspender with suspender and is made up of framework and steel wire rope, steel wire rope one end connection frame Body, the cushion cap suspension ring on other end junction steel plate cushion cap, by steel wire rope link model case suspension ring after transporting to interior, it is transferred from model Case, whole soil model is set completely to present.
2. take Preparation Method according to a kind of large-scale intact loess model described in claim 1, it is characterised in that:Tell saw blade forward part With square steel angle at 45 °, rear part and square steel are into 135 ° of angles.
3. take Preparation Method according to a kind of large-scale intact loess model described in claim 1, it is characterised in that:The cutting edge of the saw blade Width is identical with the thickness of steel plate cushion cap.
CN201710942172.4A 2017-10-11 2017-10-11 Large undisturbed loess model preparation method Active CN107702939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710942172.4A CN107702939B (en) 2017-10-11 2017-10-11 Large undisturbed loess model preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710942172.4A CN107702939B (en) 2017-10-11 2017-10-11 Large undisturbed loess model preparation method

Publications (2)

Publication Number Publication Date
CN107702939A true CN107702939A (en) 2018-02-16
CN107702939B CN107702939B (en) 2024-02-20

Family

ID=61183571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710942172.4A Active CN107702939B (en) 2017-10-11 2017-10-11 Large undisturbed loess model preparation method

Country Status (1)

Country Link
CN (1) CN107702939B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663589A (en) * 2021-01-13 2021-04-16 南京工业大学 Large-size sample sampling device for undisturbed soil at bottom of foundation pit and using method thereof
CN113237691A (en) * 2021-05-08 2021-08-10 西安建筑科技大学 Structural undisturbed soil sampling device and sampling method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110076390A (en) * 2009-12-29 2011-07-06 거산산업주식회사 Manufacturing device for yellow soil panel
CN202002818U (en) * 2011-03-25 2011-10-05 中国科学院桃源农业生态试验站 Large undisturbed-soil sampling equipment
CN204374010U (en) * 2014-12-25 2015-06-03 西南交通大学 A kind of top-loaded system of shaking table lamination shear test soil case
CN106978824A (en) * 2017-03-09 2017-07-25 大连理工大学 A kind of soil body preparation device of simulated sea bottom complex slope and preparation method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110076390A (en) * 2009-12-29 2011-07-06 거산산업주식회사 Manufacturing device for yellow soil panel
CN202002818U (en) * 2011-03-25 2011-10-05 中国科学院桃源农业生态试验站 Large undisturbed-soil sampling equipment
CN204374010U (en) * 2014-12-25 2015-06-03 西南交通大学 A kind of top-loaded system of shaking table lamination shear test soil case
CN106978824A (en) * 2017-03-09 2017-07-25 大连理工大学 A kind of soil body preparation device of simulated sea bottom complex slope and preparation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李霞;许成顺;杜修力;: "悬挂式层状多向剪切变形模型箱的研制", 地震工程与工程振动, no. 01, 15 February 2016 (2016-02-15) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663589A (en) * 2021-01-13 2021-04-16 南京工业大学 Large-size sample sampling device for undisturbed soil at bottom of foundation pit and using method thereof
CN113237691A (en) * 2021-05-08 2021-08-10 西安建筑科技大学 Structural undisturbed soil sampling device and sampling method

Also Published As

Publication number Publication date
CN107702939B (en) 2024-02-20

Similar Documents

Publication Publication Date Title
CN107702939A (en) A kind of large-scale intact loess model takes Preparation Method
CN105951857B (en) Compound impervious wall and its construction method for water conservancy project coffering
CN203936295U (en) A kind of jumper bending device
CN202642146U (en) Vertical hydraulic wrapping machine for waste paper
CN207215482U (en) A kind of large-scale intact loess model takes standby equipment
CN201785750U (en) Easily-stripped concrete pouring pile head
CN205150438U (en) Automatic packagine machine that cuts of antenna shell fragment
CN204556345U (en) Cutting ring is utilized to make frozen soil three axle specimen appliance
CN206519480U (en) The support material-receiving device of casting punching
JP2013150957A (en) Method for manufacturing solidified body and solidified body
CN202010731U (en) Copper water stop processing die
CN202381102U (en) Simple drill and blast construction trolley
CN204936059U (en) Connecting plate portable transfer mold
CN205013035U (en) Combine and to adopt on working face corner windbreak and build and establish module
CN202483169U (en) Detached column template reinforcing equipment
CN205530248U (en) Retrieve anchor rope device of uninstalling outward
CN106549341B (en) A kind of cable laying method of cast-in-place foamed concrete sheath
CN207143972U (en) A kind of reinforced concrete support replaces structure rod structure
JP2008038437A (en) Horizontal joint type concrete slab connecting method and its connecting structure
CN205487518U (en) Strenghthened type high pressure overhead insulated cable
CN103802224A (en) Squaring method for silicon ingot
CN108656312A (en) The moulding process of assembled wallboard component
CN203834965U (en) Edge protector with embedded iron wire and fixed steel pipe
CN202627521U (en) Internal corner template transverse circumference purlin connecting device
CN208304378U (en) Wasted oil bucket processes mining water channel forming device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant