CN107702332A - A kind of coal-gasified hot-water boiler - Google Patents

A kind of coal-gasified hot-water boiler Download PDF

Info

Publication number
CN107702332A
CN107702332A CN201710870746.1A CN201710870746A CN107702332A CN 107702332 A CN107702332 A CN 107702332A CN 201710870746 A CN201710870746 A CN 201710870746A CN 107702332 A CN107702332 A CN 107702332A
Authority
CN
China
Prior art keywords
under casing
combustion chamber
coal
water boiler
hot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710870746.1A
Other languages
Chinese (zh)
Inventor
王焱华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710870746.1A priority Critical patent/CN107702332A/en
Publication of CN107702332A publication Critical patent/CN107702332A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/22Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating
    • F24H1/34Water heaters other than continuous-flow or water-storage heaters, e.g. water heaters for central heating with water chamber arranged adjacent to the combustion chamber or chambers, e.g. above or at side
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/18Arrangement or mounting of grates or heating means
    • F24H9/1809Arrangement or mounting of grates or heating means for water heaters
    • F24H9/1832Arrangement or mounting of combustion heating means, e.g. grates or burners
    • F24H9/1836Arrangement or mounting of combustion heating means, e.g. grates or burners using fluid fuel

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Solid-Fuel Combustion (AREA)

Abstract

The invention discloses a kind of coal-gasified hot-water boiler, and the present invention relates to boiler for producing technical field.The coal-gasified hot-water boiler, including under casing, the under casing is internally provided with combustion chamber, insulation material is filled between the combustion chamber and under casing, the both sides of the combustion chamber offer air hose and gas pipe respectively, the one end of the air hose away from combustion chamber is through the left side wall of insulation material and under casing and extends to the left side of under casing, and the one end of the gas pipe away from combustion chamber is through the right side wall of insulation material and under casing and extends to the right side of under casing;The inner cavity top of the combustion chamber turns all to be connected with flabellum by rotary shaft, and the bottom of combustion chamber offers dust export;By being mounted with flabellum in the inside of combustion chamber, so being moved in burning Airflow can drive fuel and air to be well mixed, and which adds the utilization rate of fuel, reduces the waste of coal gas, while leaf improves heating effect.

Description

A kind of coal-gasified hot-water boiler
Technical field
The invention belongs to boiler manfacturing technical field, more particularly to a kind of coal-gasified hot-water boiler.
Background technology
Energy-conserving and environment-protective industry refer to for save energy resources, develop a circular economy, environmental protection provides technical foundation and dress The standby industry ensured, mainly including Energy Saving Industry, resoures recycling based industry and environmental protection equipment industry, is related to energy-conserving and environment-protective technology With equipment, energy-conserving product and service etc.;Its six big field includes:Power-saving technology and equipment, energy-efficient product, energy conservation service production Industry, advanced green technology and equipment, environment-friendly products and environmental protection service.The it is proposed of " 12 " planning outline, energy-conserving and environment-protective industry weight Point develops energy-efficient, advanced environmental protection, resource circulation utilization key technology equipment, products & services.
Save and refer to be reduced as far as energy-output ratio, produce the product with original same number, same quality;Or Person is with original same amount of energy-output ratio, is produced than the original more or more preferable product of quantity equal mass. Environmental protection industry refers in Structure of national economy, by prevent and treat environmental pollution, improve the ecological environment, protect national resource for the purpose of and The general name of the activity such as the technical products exploitation of progress, commercial distribution, the utilization of resources, information service, project contracting.It claims in the U.S. For " Environmental Industry ", it is referred to as " ecological industry " or " ecology commercial affairs " in Japan.
Energy-conserving and environment-protective industry is one of 7 emerging strategic industries that country accelerates cultivation and development.Energy-conserving and environment-protective industry It is related to energy-conserving and environment-protective technical equipment, products & services etc., industry chain length, the degree of association is big, receives the capability of finding employment strong, to economic growth Pulling function is obvious.Accelerate development energy-conserving and environment-protective industry, be adjust economic structure, Economic Development Mode Conversion it is inherently required, It is to promote energy-saving and emission-reduction, develops green economy and recycling economy, Resources for construction economizing type friendly environment society, respond actively gas Change is waited, seizes the strategic choice of future competition commanding elevation.Development energy-conserving and environment-protective industry is the new kinetic energy of cultivation and development, it is green to be lifted The major action of color competitiveness, it is polishing resource environment short slab, the important support for quality of improving the ecological environment, is to promote ecology text The bright objective requirement built, build beautiful China.To accelerate to produce energy-conserving and environment-protective Industry Cultivation into the pillar of Chinese national economy Industry.
China is that the trans-utilization of coal is the important branch of national economic development using coal as main primary energy country Post.And China it is current coal conversion processes generally existing efficiency it is low, seriously polluted the problems such as, to realize comprehensively, coordinate, can hold Supervention exhibition, it is necessary to increase substantially the efficiency of coal conversion, and pollutant emission is greatly lowered, be i.e. clean coal technology.Remove Outside this, China is up to more than 40% to the interdependency of Imported oil at present, under international situation situation complicated and changeable, relies on It is an effective approach that coal gasification and coal liquefaction technology, which are reduced to the interdependency of Imported oil,.
The rich coal resources in China, oil gas is deficient, and primary energy consumption coal accounts for 62%, is the first in the world.In future tens In year, coal will occupy an leading position in China's iea, and it is the most safe and most reliable energy in China's strategy.But It is that, as energy production and consumption big country, the coal utilization technology in China is generally backward:Efficiency is low, causes the energy unrestrained Take;It is seriously polluted, cause environmental quality to deteriorate.
The development of China's economic is with resource(Including the energy)A large amount of consumption are cost, and in 21st century If state continues, with resource, largely consumptive development model is unworkable.At present, the pattern of China's raising sustainable development is The huge problem that future will face.It there are many, particularly some long term accumulations in Chinese society economic development Problem needs progressively to be solved from now on after deep-seated problems.
Hot-water boiler includes electric hot water, oil-fired water-boiler, gas-fired water heating boiler and coal-fired hot-water boiler etc., hot water Boiler is exactly the boiler for producing hot water, refers to the heat energy using fuel combustion release or other heat energy(Such as electric energy, solar energy Deng)Water is heated to a kind of thermal hardware of rated temperature;Hot-water boiler can be divided into electric hot water, combustion according to fuel difference Oily hot-water boiler, gas-fired water heating boiler, coal-fired hot-water boiler etc.;It can be divided into normal-pressure hot-water boiler and pressure-bearing according to whether pressure-bearing Two kinds of hot-water boiler, we refer to normal-pressure hot-water boiler at usually said " hot-water boiler ", because its is safe for operation, Ren Menxi Bath or heating mostly employ this normal-pressure hot-water boiler;Atmosphere entry is provided with the top of body of heater, boiler is in passive state, had no Explosion danger, complete machine are equipped with overtemperature protection simultaneously(In stove during water ultra-temperature, heating tube is automatically stopped work and buzzing alarm, two Secondary overtemperature protection(When boiler jacket temperature is more than 105 DEG C, secondary circuit is automatically cut off), anti-dry excessive low water level protection(Stove water is less than During extremely low water level, boiler is stopped and sends buzzing and alarms)Etc. multinomial safeguard protection;This kind of water bath of drum formula hot-water boiler Stove, early stage are mostly converted by steam boiler, and its pot of water belongs to Natural Circulation in boiler.To ensure boiler water cycle peace It is complete reliable, it is desirable to which that boiler will have certain altitude, therefore this kind of boiler volume is larger, and steel consumption and cost improve relatively;But due to This kind of boiler goes out water capacity greatly and can maintain Natural Circulation, when system circulation pump is out of service suddenly, can effectively prevent Pot water vapor.Also it is exactly this reason, hot water boiler with natural circulation is very fast in China's development.
Existing hot-water boiler be typically only provided with combustion case and heating shell, such design, can cause burning and Heating chamber can volatilize many heats, so in adaptation process, can consume more and energy two be unfavorable for energy conservation and environment Protection, the device also having air in burning can not be mixed uniformly with fuel, and reduce fuel uses probability, wastes energy Source.
The content of the invention
In view of the shortcomings of the prior art, the invention provides a kind of coal-gasified hot-water boiler, fuel and air are solved Mix the problem of uneven.
To realize object above, the present invention is achieved by the following technical programs:A kind of coal-gasified hot-water boiler, bag Under casing is included, the under casing is internally provided with combustion chamber, insulation material, the burning are filled between the combustion chamber and under casing The both sides of room offer air hose and gas pipe respectively, and insulation material and under casing are run through in the one end of the air hose away from combustion chamber Left side wall and extend to the left side of under casing, the one end of the gas pipe away from combustion chamber is through the right side of insulation material and under casing Wall and the right side for extending under casing;The inner cavity top of the combustion chamber turns all to be connected with flabellum by rotary shaft, and combustion chamber Bottom offers dust export, and the bottom of dust export through the bottom plate of insulation material and under casing and is extended under under casing Side.
As a preferred technical solution of the present invention, the top of the under casing is installed with top case, the top case Bottom offers heating pipe.
As a preferred technical solution of the present invention, the heating pipe is two, and the bottom of two heating pipes Once top plate, insulation material and the top plate of combustion chamber through under casing and the inside for extending to combustion chamber.
As a preferred technical solution of the present invention, the intracavity bottom of the top case is installed with rectangle by support Cartridge heater.
As a preferred technical solution of the present invention, the right side opening of the cartridge heater is provided with outlet pipe, and outlet pipe is remote One end from cartridge heater runs through the right side wall of top case and extends to the right side of top case.
As a preferred technical solution of the present invention, pressure control pipe, and pressure control Guan Yuan are offered at the top of the cartridge heater One end from cartridge heater runs through the top plate of top case and extends to the top of top case.
As a preferred technical solution of the present invention, escape pipe is offered on the left of the top case, and inside escape pipe It is provided with filtering dust net.
As a preferred technical solution of the present invention, the gas such as multilayer activated carbon granule are placed with inside the filtering dust net Body adsorbent.
Beneficial effect
The invention provides a kind of coal-gasified hot-water boiler.Possesses following beneficial effect:
(1)The coal-gasified hot-water boiler, by being mounted with flabellum in the inside of combustion chamber, so move meeting in burning Airflow Fuel and air is driven to be well mixed, which adds the utilization rate of fuel, reduces the waste of coal gas, while leaf improves Heating effect.
(2)The coal-gasified hot-water boiler, reduction dust is arrived by the way that there is provided filtering dust Wondertek inside gas outlet The purpose of discharge.When dust caused by burning is by filtering dust net, screen pack can filter a part of dust, which reduces Pollution to environment, be advantageous to protect the health of people.
Brief description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is schematic structural view of the invention.
In figure:1 under casing, 2 combustion chambers, 3 insulation materials, 4 air hoses, 5 gas pipes, 6 flabellums, 7 dust exports, 8 top cases, 9 Heating pipe, 10 cartridge heaters, 11 outlet pipes, 12 pressure control pipes, 13 escape pipes, 14 filtering dust nets.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1-2 is referred to, the present invention provides a kind of technical scheme:A kind of coal-gasified hot-water boiler, including under casing 1, bottom Case 1 is internally provided with combustion chamber 2, insulation material 3 is filled between combustion chamber 2 and under casing 1, the both sides of combustion chamber 2 are opened respectively Provided with air hose 4 and gas pipe 5, the one end of air hose 4 away from combustion chamber 2 is through the left side wall of insulation material 3 and under casing 1 and prolongs The left side of under casing 1 is extended, the one end of gas pipe 5 away from combustion chamber 2 is through the right side wall of insulation material 3 and under casing 1 and extends to The right side of under casing 1;The inner cavity top of combustion chamber 2 turns all to be connected with flabellum 6 by rotary shaft, and the bottom of combustion chamber 2 offers Dust export 7, and the bottom of dust export 7 through the bottom plate of insulation material 3 and under casing 1 and extends to the lower section of under casing 1;Under casing 1 top is installed with top case 8, and the bottom of top case 8 offers heating pipe 9, and the bottom of heating pipe 9 is once through under casing 1 Top plate, insulation material 3 and combustion chamber 2 top plate and extend to the inside of combustion chamber 2;The intracavity bottom of top case 8 is consolidated by support Dingan County is equipped with cartridge heater 10, and the right side opening of cartridge heater 10 is provided with outlet pipe 11, and the one end of outlet pipe 11 away from cartridge heater 10 is passed through Wear the right side wall of top case 8 and extend to the right side of top case 8;The top of cartridge heater 10 offers pressure control pipe 12, and pressure control pipe 12 is remote One end from cartridge heater 10 runs through the top plate of top case 8 and extends to the top of top case 8;The left side of top case 8 offers escape pipe 13, And escape pipe 13 is internally provided with filtering dust net 14 by being mounted with flabellum 6 in the inside of combustion chamber 2, so in burning space-time Flow of air can drive fuel and air to be well mixed, and which adds the utilization rate of fuel, reduces the waste of coal gas, simultaneously Leaf improves heating effect.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that Other identical element in the process including the key element, method, article or equipment also be present ".
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of coal-gasified hot-water boiler, including under casing(1), it is characterised in that:The under casing(1)Be internally provided with burning Room(2), the combustion chamber(2)With under casing(1)Between be filled with insulation material(3), the combustion chamber(2)Both sides open up respectively There is air hose(4)And gas pipe(5), the air hose(4)Away from combustion chamber(2)One end run through insulation material(3)And under casing (1)Left side wall and extend under casing(1)Left side, the gas pipe(5)Away from combustion chamber(2)One end run through insulation material (3)And under casing(1)Right side wall and extend under casing(1)Right side;The combustion chamber(2)Inner cavity top pass through rotary shaft turn All it is connected with flabellum(6), and combustion chamber(2)Bottom offer dust export(7), and dust export(7)Bottom through protect Adiabator(3)And under casing(1)Bottom plate and extend under casing(1)Lower section.
A kind of 2. coal-gasified hot-water boiler according to claim 1, it is characterised in that:The under casing(1)Top consolidate Dingan County is equipped with top case(8), the top case(8)Bottom offer heating pipe(9).
A kind of 3. coal-gasified hot-water boiler according to claim 2, it is characterised in that:The heating pipe(9)For two, And two heating pipes(9)Bottom once run through under casing(1)Top plate, insulation material(3)And combustion chamber(2)Top plate simultaneously Extend to combustion chamber(2)Inside.
A kind of 4. coal-gasified hot-water boiler according to claim 2, it is characterised in that:The top case(8)Interior bottom of chamber Portion is installed with rectangle cartridge heater by support(10).
A kind of 5. coal-gasified hot-water boiler according to claim 4, it is characterised in that:The cartridge heater(10)Right side Offer outlet pipe(11), and outlet pipe(11)Away from cartridge heater(10)One end run through top case(8)Right side wall and extend to Top case(8)Right side.
A kind of 6. coal-gasified hot-water boiler according to claim 4, it is characterised in that:The cartridge heater(10)Top Offer pressure control pipe(12), and pressure control pipe(12)Away from cartridge heater(10)One end run through top case(8)Top plate and extend to top Case(8)Top.
A kind of 7. coal-gasified hot-water boiler according to claim 1, it is characterised in that:The top case(8)Left side open Provided with escape pipe(13), and escape pipe(13)It is internally provided with filtering dust net(14).
A kind of 8. coal-gasified hot-water boiler according to claim 1, it is characterised in that:The filtering dust net(14)It is interior Portion is placed with the adsorbents such as multilayer activated carbon granule.
CN201710870746.1A 2017-09-23 2017-09-23 A kind of coal-gasified hot-water boiler Pending CN107702332A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710870746.1A CN107702332A (en) 2017-09-23 2017-09-23 A kind of coal-gasified hot-water boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710870746.1A CN107702332A (en) 2017-09-23 2017-09-23 A kind of coal-gasified hot-water boiler

Publications (1)

Publication Number Publication Date
CN107702332A true CN107702332A (en) 2018-02-16

Family

ID=61175024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710870746.1A Pending CN107702332A (en) 2017-09-23 2017-09-23 A kind of coal-gasified hot-water boiler

Country Status (1)

Country Link
CN (1) CN107702332A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2639423A1 (en) * 1988-11-21 1990-05-25 Productions Gianola Method of operating a wood-fuelled central heating installation and installation for implementing the latter
CN2119566U (en) * 1992-05-03 1992-10-21 李贵龙 Domestic internal heating gas boiler
CN101400483A (en) * 2006-03-10 2009-04-01 美克司株式会社 Gas combustion type driving tool
CN203385186U (en) * 2013-06-17 2014-01-08 湖南省特种设备检验检测研究院娄底分院 Biomass gasification hot-water boiler device
CN205909509U (en) * 2016-06-28 2017-01-25 哈尔滨市金京锅炉有限公司 Boiler with double combustion chamber

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2639423A1 (en) * 1988-11-21 1990-05-25 Productions Gianola Method of operating a wood-fuelled central heating installation and installation for implementing the latter
CN2119566U (en) * 1992-05-03 1992-10-21 李贵龙 Domestic internal heating gas boiler
CN101400483A (en) * 2006-03-10 2009-04-01 美克司株式会社 Gas combustion type driving tool
CN203385186U (en) * 2013-06-17 2014-01-08 湖南省特种设备检验检测研究院娄底分院 Biomass gasification hot-water boiler device
CN205909509U (en) * 2016-06-28 2017-01-25 哈尔滨市金京锅炉有限公司 Boiler with double combustion chamber

Similar Documents

Publication Publication Date Title
CN103575123B (en) A kind of discontinuity is diffused steam heat recovery storage and is utilized system
CN107477857A (en) A kind of energy-saving environment-friendly hot water boiler
CN206771734U (en) A kind of energy-saving high-efficient gas boiler
CN107702332A (en) A kind of coal-gasified hot-water boiler
CN203687453U (en) Constant pressure recharge system applied to water source heat pump
CN204962938U (en) Novel solar heating system
CN203927871U (en) A kind of novel waste heat boiler
CN107448928A (en) A kind of energy-saving environmental-protection gas furnace
CN204787317U (en) New forms of energy boiler
CN203346241U (en) Microwave-strengthening solar-energy reclaimed-water high-temperature double-source heat-pump sludge-drying system
CN204922919U (en) Electromagnetic heating formula steam generator
CN207816014U (en) A kind of non-oxidation reduction furnace heat source recycling system
CN206419188U (en) A kind of energy-saving control device for air compressor
CN206817466U (en) A kind of small towns consumer waste incineration processing unit
CN206247632U (en) The melting sources room of industrial waste grease
CN204589613U (en) Framing shaping machine heat energy from waste gas high temperature purification recycling system
CN205746868U (en) A kind of rubbish power generating device
CN206989256U (en) A kind of Quick heating energy-saving civil boiler
CN204100791U (en) Residual heat of tunnel kiln reclaims built-in boiler
CN206514515U (en) Novel cleaning clean coal, biomass energy-saving double-fuel environmental protection normal pressure hot-water boiler
CN107477582A (en) A kind of multifunctional environment protection energy saving burner
CN207113252U (en) Hot-air stove safety protection alarm device
CN218292106U (en) Industrial waste water normal position regeneration recycling system
CN210801113U (en) Energy-saving gas steam boiler
CN213578902U (en) Aquaculture waste water waste heat recovery system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication