CN107700507A - Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank - Google Patents

Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank Download PDF

Info

Publication number
CN107700507A
CN107700507A CN201710941455.7A CN201710941455A CN107700507A CN 107700507 A CN107700507 A CN 107700507A CN 201710941455 A CN201710941455 A CN 201710941455A CN 107700507 A CN107700507 A CN 107700507A
Authority
CN
China
Prior art keywords
water
groove
sheet pile
steel sheet
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710941455.7A
Other languages
Chinese (zh)
Other versions
CN107700507B (en
Inventor
崔瑞文
徐世立
郑洪光
胡曰顺
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Municipal Engineering Ltd By Share Ltd
Original Assignee
Weifang Municipal Engineering Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Municipal Engineering Ltd By Share Ltd filed Critical Weifang Municipal Engineering Ltd By Share Ltd
Priority to CN201710941455.7A priority Critical patent/CN107700507B/en
Publication of CN107700507A publication Critical patent/CN107700507A/en
Application granted granted Critical
Publication of CN107700507B publication Critical patent/CN107700507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/08Restraining of underground water by employing open ditches arranged below the level of the water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Abstract

Dewatering construction engineering method in a kind of steel plate pile water stopping curtain auxiliary tank, comprises the following steps:A) wire is set;B) steel sheet pile is set using piling machine;C) earth excavation;D) foundation ditch backfills;E) tube well dewatering point is set;F) groove is opened up;G) the thick permeable rubbles of 50cm are backfilled, gutter is set along groove center in channel bottom or excavation face;H) pipe laying in the trench;I) pipeline is carried out closing water experiment;G) groove is backfilled.Take full advantage of the water-stop curtain effect of steel sheet pile, reduce precipitation in groove, excavated section infiltration is through centrifuging pumped groove, limited water detaches groove by permeable metalling seepage flow to other end sump through water pump in groove, pave the leveling compacting of 30cm graded broken stones before Pipe installing on permeable rubble top, it is achieved thereby that being done inside bottom land, the environment of bright operation, reduces precipitation and precipitation time, worker's construction environment is substantially improved, improves efficiency of construction;Construction speed greatly improves, and construction quality is obvious controllable with safety.

Description

Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank
Technical field
The present invention relates to municipal road construction field, and in particular to dewatering construction in a kind of steel plate pile water stopping curtain auxiliary tank Engineering method.
Background technology
Often appearance construction pipeline is near apart from river course in municipal road construction, and level of ground water is high, and water level is in below ground At least more than 1.5m, geological condition is complicated, and buried depth of pipeline is up to 9 meters sometimes, and is limited by construction expropriation of land scope, operation side It is small, it is impossible to take slope to excavate, precipitation and supporting difficulty are big, and extreme difficulties are caused to construction.
The content of the invention
The present invention is in order to overcome the shortcomings of above technology, there is provided one kind reduces precipitation and precipitation time, changed significantly Kind worker's construction environment, improve dewatering construction engineering method in the steel plate pile water stopping curtain auxiliary tank of efficiency of construction
Technical scheme is used by the present invention overcomes its technical problem:
Dewatering construction engineering method in a kind of steel plate pile water stopping curtain auxiliary tank, comprises the following steps:
A) axis of steel sheet-pile cofferdam is made by survey crew, direction peg can be set at a certain distance, direction peg uses steel plate Stake, wire is used as using lanyard line;
B) steel sheet pile is continuously set at interval of 12 meters using piling machine, piling machine utilizes the axis of polygon control survey steel sheet pile, each Gradient during steel sheet pile inserting piling is not more than 2%;
C) it is more than or equal to below earth excavation to sheet pile top at 1 meter, carries out purlin Construction of Supporting afterwards, purlin support is arranged on steel Below sheet pile top at 0.5 meter;
D) foundation ditch is backfilled, and steel sheet pile is pulled out after backfill;
E) take along groove center arrangement, a deep 12m tube well dewaterings point is set every 100 meters in the range of steel sheet pile supporting;
F) excavate end face using excavator at 0.8 meter below tube well dewatering point and be not less than 10 for the depth of steel sheet pile supporting width The groove of rice;
G) the thick permeable rubbles of 50cm are backfilled after channel excavation shaping, draining is set along groove center in channel bottom or excavation face Ditch, one sump is respectively set at groove construction section both ends, underground water is flowed into along gutter in sump, then uses pumping equipment Extract out outside foundation ditch;
H) pipe laying in the trench;
I) pipeline is carried out closing water experiment;
G) groove is backfilled using desilting backfill, be backfilled to more than the tube top of pipeline at 0.5 meter, afterwards using plain earthen backfill And it is compacted.
Further, when pulling out steel sheet pile in above-mentioned steps d) using pile-driving and-pulling machine clamp steel sheet pile head vibration 1min~ 2min。
Further, the pipe well of tube well dewatering point is embedded using mud off impact drilled as holes or mud in above-mentioned steps e) Retaining wall boring method pore-forming, boring aperture is bigger 200mm than pipe external diameter, and foot of hole should be deeper 500 ㎜ than water-filtering well tube, and well casing sinks Before carry out cleaning filter well, punching remove sediment process, water-filtering well tube is placed in hole center, and its lower end uses steel plate back cover mouth, well casing and hole Make filter layer with the filling of 3-5mm green bean pastes between wall, tamped in below ground 1.5m with clay filled.
Further, the bottom of water-filtering well tube sets water-filtering well tube filtration, and water-filtering well tube filtration uses reinforcing bar Pipe of concrete, and completely cut off diving, the ttom of pipe of water-filtering well tube is tight using N layer 200# geotextiles parcel, the top well of water-filtering well tube Tube portion is made of more than diameter 300mm waved plastic pipe.
Further, draining furrow rim leaves groove toe and should be no less than 0.3m in above-mentioned steps g), and gutter bottom width is not 0.3m is preferably less than, head fall is 0.1~0.2%, and ditch bottom surface is lower 0.3~0.5m than trench bottom or excavation face, bottom of catchmenting ratio Low 0.5~the 1m in connected gutter or bottom of catchmenting are deeper than more than the height of suction pump water intaking valve, sump diameter(Or side It is long)For 0.7~1.0m.
The beneficial effects of the invention are as follows:The water-stop curtain effect of steel sheet pile is taken full advantage of, precipitation in groove is reduced, excavates Section infiltration is through centrifuging pumped groove, and limited water is taken out by permeable metalling seepage flow to other end sump through water pump in groove From groove, pave the leveling compacting of 30cm graded broken stones before Pipe installing on permeable rubble top, it is achieved thereby that dry inside bottom land, The environment of bright operation, reduces precipitation and precipitation time, substantially improves worker's construction environment, improves efficiency of construction;Construct into Degree greatly improves, and construction quality is obvious controllable with safety.
Embodiment
The present invention will be further described below.
Dewatering construction engineering method in a kind of steel plate pile water stopping curtain auxiliary tank, comprises the following steps:
A) axis of steel sheet-pile cofferdam is made by survey crew, direction peg can be set at a certain distance, direction peg uses steel plate Stake, wire is used as using lanyard line;
B) steel sheet pile is continuously set at interval of 12 meters using piling machine, piling machine utilizes the axis of polygon control survey steel sheet pile, each Gradient during steel sheet pile inserting piling is not more than 2%;
C) it is more than or equal to below earth excavation to sheet pile top at 1 meter, carries out purlin Construction of Supporting afterwards, purlin support is arranged on steel Below sheet pile top at 0.5 meter;
D) foundation ditch is backfilled, and steel sheet pile is pulled out after backfill;
E) take along groove center arrangement, a deep 12m tube well dewaterings point is set every 100 meters in the range of steel sheet pile supporting;
F) excavate end face using excavator at 0.8 meter below tube well dewatering point and be not less than 10 for the depth of steel sheet pile supporting width The groove of rice;
G) the thick permeable rubbles of 50cm are backfilled after channel excavation shaping, draining is set along groove center in channel bottom or excavation face Ditch, one sump is respectively set at groove construction section both ends, underground water is flowed into along gutter in sump, then uses pumping equipment Extract out outside foundation ditch;
H) pipe laying in the trench;
I) pipeline is carried out closing water experiment;
G) groove is backfilled using desilting backfill, be backfilled to more than the tube top of pipeline at 0.5 meter, afterwards using plain earthen backfill And it is compacted.
The water-stop curtain effect of steel sheet pile is taken full advantage of, reduces precipitation in groove, excavated section infiltration is through centrifuging pumping Go out groove, limited water detaches groove by permeable metalling seepage flow to other end sump through water pump in groove, before Pipe installing The 30cm graded broken stones that paved on permeable rubble top leveling compacting, it is achieved thereby that being done inside bottom land, the environment of bright operation, is reduced Precipitation and precipitation time, worker construction environment is substantially improved, improve efficiency of construction;Construction speed greatly improves, engineering matter Amount is obvious controllable with safety.
Embodiment 1:
When steel sheet pile is pulled out in above-mentioned steps d) steel sheet pile head vibration 1min~2min is clamped using pile-driving and-pulling machine.Make steel sheet pile Around soil loosening, produce " liquefaction ", reduce the native frictional resistance to stake, then up extricating oneself from a predicament and brace oneself up to action slowly.A machine is paid attention to during pile pulling Load condition, when pulling out difficulty or pull out to come up in discovery, pile pulling should be stopped, can down injection is a little in advance, then up dial, such as This repeatedly can pull out stake.
Pile pulling starting point and order, closed steel sheet pile are should be noted that during pile pulling, pile pulling starting point should leave angle stake more than 5.Can Pile pulling starting point is determined according to situation during pile sinking, the method that can be also pulled out if necessary with jump.The order of pile pulling preferably with drive piles phase Instead;Rapping is with extricating oneself from a predicament and brace oneself up to action, and during pile pulling, first sheet pile fore shaft can be shaken with vibration hammer living to reduce the adhesion of soil, then be pulled out when shaking.It is right The more difficult sheet pile pulled out first can be shaken stake lower 100~300mm with diesel hammer, then replaced with vibration hammer, rapping, extricated oneself from a predicament and brace oneself up to action;To pulling The larger steel sheet pile of resistance, using the method for intermittent control shaking, 15min is vibrated every time, vibration hammer is continuously no more than 1.5h.
Embodiment 2:
The pipe well of tube well dewatering point is embedded using mud off impact drilled as holes or holing with slurry wall protection method in above-mentioned steps e) Pore-forming, boring aperture is bigger 200mm than pipe external diameter, and foot of hole should be deeper 500 ㎜ than water-filtering well tube, and well casing carries out cleaning filter before sinking Well, punching remove sediment process, and water-filtering well tube is placed in hole center, and its lower end uses steel plate back cover mouth, and 3-5mm is used between well casing and hole wall Filter layer is made in green bean paste filling, is tamped in below ground 1.5m with clay filled.
Embodiment 3:
The bottom of water-filtering well tube sets water-filtering well tube filtration, and water-filtering well tube filtration uses concrete reinforced pipe, and every Diving absolutely, the ttom of pipe of water-filtering well tube is tight using N layer 200# geotextiles parcel, and the top well casing part of water-filtering well tube uses diameter More than 300mm waved plastic pipe is made.
Embodiment 4:
Draining furrow rim, which leaves groove toe, in above-mentioned steps g) should be no less than 0.3m, and gutter bottom width should not be less than 0.3m, indulge It is 0.1~0.2% to the gradient, ditch bottom surface is lower 0.3~0.5m than trench bottom or excavation face, and bottom of catchmenting is than connected gutter Low 0.5~1m or bottom of catchmenting are deeper than more than the height of suction pump water intaking valve, sump diameter(Or the length of side)For 0.7~ 1.0m。

Claims (5)

1. dewatering construction engineering method in a kind of steel plate pile water stopping curtain auxiliary tank, it is characterised in that comprise the following steps:
A) axis of steel sheet-pile cofferdam is made by survey crew, direction peg can be set at a certain distance, direction peg uses steel plate Stake, wire is used as using lanyard line;
B) steel sheet pile is continuously set at interval of 12 meters using piling machine, piling machine utilizes the axis of polygon control survey steel sheet pile, each Gradient during steel sheet pile inserting piling is not more than 2%;
C) it is more than or equal to below earth excavation to sheet pile top at 1 meter, carries out purlin Construction of Supporting afterwards, purlin support is arranged on steel Below sheet pile top at 0.5 meter;
D) foundation ditch is backfilled, and steel sheet pile is pulled out after backfill;
E) take along groove center arrangement, a deep 12m tube well dewaterings point is set every 100 meters in the range of steel sheet pile supporting;
F) excavate end face using excavator at 0.8 meter below tube well dewatering point and be not less than 10 for the depth of steel sheet pile supporting width The groove of rice;
G) the thick permeable rubbles of 50cm are backfilled after channel excavation shaping, draining is set along groove center in channel bottom or excavation face Ditch, one sump is respectively set at groove construction section both ends, underground water is flowed into along gutter in sump, then uses pumping equipment Extract out outside foundation ditch;
H) pipe laying in the trench;
I) pipeline is carried out closing water experiment;
G) groove is backfilled using desilting backfill, be backfilled to more than the tube top of pipeline at 0.5 meter, afterwards using plain earthen backfill And it is compacted.
2. dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank according to claim 1, it is characterised in that:The step It is rapid d) in clamp steel sheet pile head vibration 1min~2min using pile-driving and-pulling machine when pulling out steel sheet pile.
3. dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank according to claim 1, it is characterised in that:The step It is rapid e) in tube well dewatering point pipe well it is embedded using mud off impact drilled as holes or holing with slurry wall protection method pore-forming, drilling hole Footpath is bigger 200mm than pipe external diameter, and foot of hole should be deeper 500 ㎜ than water-filtering well tube, and well casing carries out cleaning filter well before sinking, and punching removes sediment Process, water-filtering well tube are placed in hole center, and its lower end uses steel plate back cover mouth, are filled between well casing and hole wall with 3-5mm green bean pastes Make filter layer, tamped in below ground 1.5m with clay filled.
4. dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank according to claim 3, it is characterised in that:Water filter well The bottom of pipe sets water-filtering well tube filtration, and water-filtering well tube filtration uses concrete reinforced pipe, and completely cuts off diving, drainage The ttom of pipe of well casing is tight using N layer 200# geotextiles parcel, and the top well casing part of water-filtering well tube uses more than diameter 300mm Waved plastic pipe is made.
5. dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank according to claim 1, it is characterised in that:The step It is rapid g) in draining furrow rim leave groove toe and should be no less than 0.3m, gutter bottom width should not be less than 0.3m, head fall 0.1 ~0.2%, ditch bottom surface is lower 0.3~0.5m than trench bottom or excavation face, bottom of catchmenting it is lower 0.5~1m than connected gutter or Bottom of catchmenting is deeper than more than the height of suction pump water intaking valve, sump diameter(Or the length of side)For 0.7~1.0m.
CN201710941455.7A 2017-10-11 2017-10-11 Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank Active CN107700507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710941455.7A CN107700507B (en) 2017-10-11 2017-10-11 Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710941455.7A CN107700507B (en) 2017-10-11 2017-10-11 Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank

Publications (2)

Publication Number Publication Date
CN107700507A true CN107700507A (en) 2018-02-16
CN107700507B CN107700507B (en) 2019-06-07

Family

ID=61185048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710941455.7A Active CN107700507B (en) 2017-10-11 2017-10-11 Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank

Country Status (1)

Country Link
CN (1) CN107700507B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109837966A (en) * 2019-03-06 2019-06-04 中国十七冶集团有限公司 The structure and construction method of cushion processing trunk canal side slope foundation pit side-wall water-stop curtain
CN110593375A (en) * 2019-08-29 2019-12-20 上海景铭建设发展有限公司 Pipe burying construction method for pipeline by adopting digging groove
CN111576459A (en) * 2020-05-08 2020-08-25 广州金辉建设集团有限公司 Deep foundation pit dewatering environment-friendly and energy-saving construction process
CN116791647A (en) * 2023-08-23 2023-09-22 华侨大学 Foundation pit dewatering device and use method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012087501A (en) * 2010-10-18 2012-05-10 Ohbayashi Corp Well, well construction method, groundwater level lowering method, method for constructing earth retaining wall, and sheet pile
CN202530464U (en) * 2012-05-17 2012-11-14 中铁四局集团第三建设有限公司 Road drainage foundation-pit supporting structure for auxiliary steel sheet pile construction of dewatering wells
CN102877420A (en) * 2012-11-06 2013-01-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN105544576A (en) * 2016-01-20 2016-05-04 山东科技大学 Foundation ditch dewatering and drainage excavation structure and application method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012087501A (en) * 2010-10-18 2012-05-10 Ohbayashi Corp Well, well construction method, groundwater level lowering method, method for constructing earth retaining wall, and sheet pile
CN202530464U (en) * 2012-05-17 2012-11-14 中铁四局集团第三建设有限公司 Road drainage foundation-pit supporting structure for auxiliary steel sheet pile construction of dewatering wells
CN102877420A (en) * 2012-11-06 2013-01-16 中铁二十二局哈尔滨铁路建设集团有限责任公司 Construction method of large tube well fixed point precipitation, sealing bottom free concrete and steel sheet pile cofferdam deepwater bearing platform
CN105544576A (en) * 2016-01-20 2016-05-04 山东科技大学 Foundation ditch dewatering and drainage excavation structure and application method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109837966A (en) * 2019-03-06 2019-06-04 中国十七冶集团有限公司 The structure and construction method of cushion processing trunk canal side slope foundation pit side-wall water-stop curtain
CN109837966B (en) * 2019-03-06 2020-10-30 中国十七冶集团有限公司 Structure for treating lateral wall waterproof curtain of foundation pit on main channel side slope by replacement and filling method and construction method
CN110593375A (en) * 2019-08-29 2019-12-20 上海景铭建设发展有限公司 Pipe burying construction method for pipeline by adopting digging groove
CN111576459A (en) * 2020-05-08 2020-08-25 广州金辉建设集团有限公司 Deep foundation pit dewatering environment-friendly and energy-saving construction process
CN116791647A (en) * 2023-08-23 2023-09-22 华侨大学 Foundation pit dewatering device and use method thereof
CN116791647B (en) * 2023-08-23 2023-12-01 华侨大学 Foundation pit dewatering device and use method thereof

Also Published As

Publication number Publication date
CN107700507B (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN107700507B (en) Dewatering construction engineering method in steel plate pile water stopping curtain auxiliary tank
CN110593375A (en) Pipe burying construction method for pipeline by adopting digging groove
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN102383412A (en) Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
LU500273B1 (en) New comprehensive dewatering and drainage method and drainage device for mudstone subway station
CN106836244A (en) A kind of method of friction pile dative guest barricade joint protection steep slope subgrade high
CN104234061A (en) Reinforced ecological concrete revetment and construction method thereof
CN110219359A (en) A kind of Submersed type inspection well and its construction method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN104947680A (en) Method for overwater bearing platform foundation pit excavation construction of quick sand stratum
CN108571000A (en) The construction method of underground water cutting when wearing existing railway under a kind of road of location along the river
CN109339079A (en) A kind of foundation pit water-stopping system and its construction technology close to river permeable stratum
CN111608174A (en) Karst area karst cave treatment method based on punched cast-in-place pile
CN210002425U (en) structure of seepage roadbed side slope drainage system
CN114575355A (en) Soil protection and descent construction method
CN108797759B (en) Underwater riprap grouting reinforcement method for suspended soft foundation below immersed tube
CN104711968A (en) Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method
CN112983461B (en) Construction method for biasing tunnel portal in slope integrated
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN110804994B (en) Reservoir dam construction method
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN112627212A (en) Water-faced cofferdam inner tube well dewatering dry excavation construction method
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
WO2009137848A2 (en) A well and a method of constructing a well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant