CN107689817A - A kind of recognition methods of user's taiwan area phase and system - Google Patents
A kind of recognition methods of user's taiwan area phase and system Download PDFInfo
- Publication number
- CN107689817A CN107689817A CN201710915850.8A CN201710915850A CN107689817A CN 107689817 A CN107689817 A CN 107689817A CN 201710915850 A CN201710915850 A CN 201710915850A CN 107689817 A CN107689817 A CN 107689817A
- Authority
- CN
- China
- Prior art keywords
- phase
- communication node
- taiwan area
- power supply
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B3/00—Line transmission systems
- H04B3/54—Systems for transmission via power distribution lines
-
- G—PHYSICS
- G08—SIGNALLING
- G08C—TRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
- G08C19/00—Electric signal transmission systems
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B2203/00—Indexing scheme relating to line transmission systems
- H04B2203/54—Aspects of powerline communications not already covered by H04B3/54 and its subgroups
- H04B2203/5429—Applications for powerline communications
- H04B2203/5433—Remote metering
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B2203/00—Indexing scheme relating to line transmission systems
- H04B2203/54—Aspects of powerline communications not already covered by H04B3/54 and its subgroups
- H04B2203/5462—Systems for power line communications
- H04B2203/5466—Systems for power line communications using three phases conductors
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims (10)
- A kind of 1. recognition methods of user's taiwan area phase, it is characterised in that in the communication node applied to power supply taiwan area, the side Method includes:A, B, C three-phase phase information of power supply taiwan area where acquisition communication node;A, B, C three-phase phase information based on the power supply taiwan area where communication node, determine the phase of communication node;Report the phase of communication node.
- 2. according to the method for claim 1, it is characterised in that A, B of the power supply taiwan area where the acquisition communication node, C three-phase phase information, including:A, B, C three-phase for the power supply taiwan area that the concentrator of power supply taiwan area where reception communication node is sent with broadcast mode Phase information.
- 3. according to the method for claim 2, it is characterised in that A, B of the power supply taiwan area based on where communication node, C three-phase phase information, the phase of communication node is determined, including:The phase information of the communication node is compared with A, B, C three-phase phase information of the power supply taiwan area, and is based on Comparison result, determine the phase of the communication node;Wherein, A, B, C three-phase phase information of the phase information by the communication node and the power supply taiwan area are compared It is right, and the phase of the communication node is determined based on comparison result, specifically include:Obtain the first phase phase information of the current zero crossing that concentrator is sent;Judge whether the communication node occurs zero passage in scheduled duration, it is described if judged result is represented there occurs zero passage The installation phase of communication node is first phase, otherwise, if judged result represents that zero passage does not occur, the communication node The phase that phase is non-first phase is installed;First phase is any one phase in A, B, C three-phase phase.
- 4. according to the method for claim 2, it is characterised in that the phase for reporting communication node, including:The phase of the communication node is reported into the concentrator.
- 5. according to the method described in claim any one of 1-4, it is characterised in that in the power supply based on where communication node A, B, C three-phase phase information of taiwan area, before the phase for determining communication node, in addition to:To A, B, C tri- of the power supply taiwan area Phase phase information carries out predetermined forward process;Wherein, A, B, C three-phase phase information to the power supply taiwan area carries out predetermined forward process, including:With A, B, C three-phase phase information of the carrier communication mode forwarding power supply taiwan area;Judge whether to receive the confirmation that other communication nodes feed back;Wherein, other described communication nodes are receiving the confession When A, B, C three-phase phase information of radio area, corresponding confirmation is fed back;If judged result represents not receive, A, B, C three-phase phase of the power supply taiwan area are forwarded again with communication Information;If judged result represents to receive, terminate to forward.
- A kind of 6. identifying system of user's taiwan area phase, it is characterised in that including:Concentrator, for sending A, B, C three-phase phase information of the power supply taiwan area where the concentrator;Respective communication node in identifier, with the power supply taiwan area is correspondingly arranged, and is arranged on where the communication node In supply line, for receiving A, B, C three-phase phase information of the power supply taiwan area, A, B, C tri- based on the power supply taiwan area Phase phase information, the phase of the communication node is determined, and the phase of the communication node is reported to the concentrator.
- 7. system according to claim 6, it is characterised in that the concentrator, send the power supply where the concentrator A, B, C three-phase phase information of taiwan area, are specifically included:A, B, C the three-phase phase information for the power supply taiwan area that the concentrator is sent with broadcast mode.
- 8. system according to claim 6, it is characterised in that A, B, the C tri- of the identifier based on the power supply taiwan area Phase phase information, the phase of the communication node is determined, is specifically included:The identifier is compared A, B, C three-phase phase information of the phase information of the communication node and the power supply taiwan area It is right, and comparison result is based on, determine the phase of the communication node;Wherein, the identifier by the phase information of the communication node with it is described power supply taiwan area A, B, C three-phase phase information It is compared, and the phase of the communication node is determined based on comparison result, specifically includes:Obtain the first phase phase information of the current zero crossing that concentrator is sent;And judge the communication node in scheduled duration Whether zero passage is occurred, if judged result represents that there occurs zero passage the installation phase of the communication node is first phase, no Then, if judged result represents that zero passage does not occur, the installation phase of the communication node is the phase of non-first phase;First phase is any one phase in A, B, C three-phase phase.
- 9. according to the system described in claim any one of 6-8, it is characterised in that the identifier is carrier wave wireless dual mode communication Terminal, the carrier wave wireless double-mode communication terminal are arranged on user side;The carrier wave wireless double-mode communication terminal is determined described logical in A, B, C three-phase phase information based on the power supply taiwan area Before the phase for believing node, it is additionally operable to:Predetermined forward process is carried out to A, B, C three-phase phase information of the power supply taiwan area;Wherein, the carrier wave wireless double-mode communication terminal, A, B, C three-phase phase information for powering taiwan area is carried out predetermined Forward process, specifically include:With A, B, C three-phase phase information of the carrier communication mode forwarding power supply taiwan area;Judge whether to receive the confirmation that other communication nodes feed back;Wherein, other described communication nodes are receiving the confession When A, B, C three-phase phase information of radio area, corresponding confirmation is fed back;If judged result represents not receive, A, B, C three-phase phase of the power supply taiwan area are forwarded again with communication Information;If judged result represents to receive, terminate to forward.
- 10. according to the system described in claim any one of 6-8, it is characterised in that the concentrator is additionally operable to:According to the phase set in advance called measured frequency timing together and call each communication node in the power supply taiwan area where surveying the concentrator together Position information, and report to main website.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710915850.8A CN107689817B (en) | 2017-09-30 | 2017-09-30 | Method and system for identifying phase of subscriber station area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710915850.8A CN107689817B (en) | 2017-09-30 | 2017-09-30 | Method and system for identifying phase of subscriber station area |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107689817A true CN107689817A (en) | 2018-02-13 |
CN107689817B CN107689817B (en) | 2021-06-04 |
Family
ID=61154107
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710915850.8A Active CN107689817B (en) | 2017-09-30 | 2017-09-30 | Method and system for identifying phase of subscriber station area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107689817B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108519514A (en) * | 2018-04-24 | 2018-09-11 | 宁波三星医疗电气股份有限公司 | Taiwan area phase recognition methods based on Pearson correlation coefficient algorithm |
CN108535599A (en) * | 2018-04-16 | 2018-09-14 | 国网河南省电力公司电力科学研究院 | Low-voltage platform area user's phase recognition methods based on voltage curve clustering |
CN108683180A (en) * | 2018-05-07 | 2018-10-19 | 国网河南省电力公司电力科学研究院 | A kind of three-phase low-voltage power distribution network topology rebuilding method |
CN109217471A (en) * | 2018-09-19 | 2019-01-15 | 北京中电普华信息技术有限公司 | The identification device of low-voltage power distribution station area's network topology |
CN109256856A (en) * | 2018-09-06 | 2019-01-22 | 石家庄科林电气股份有限公司 | The platform area topology identifying system and method realized based on power wire broadband carrier (HPLC) |
CN109327242A (en) * | 2018-10-29 | 2019-02-12 | 国网北京市电力公司 | The recognition methods in the affiliated platform area of electric energy meter and device |
CN109378898A (en) * | 2018-09-30 | 2019-02-22 | 国网天津市电力公司电力科学研究院 | A kind of distribute-electricity transformer district Intelligentized regulating and controlling system and regulation method |
CN109581084A (en) * | 2018-11-29 | 2019-04-05 | 宁波三星医疗电气股份有限公司 | Platform area phase recognition methods based on the degree of association |
CN110266348A (en) * | 2019-07-16 | 2019-09-20 | 深圳智微电子科技有限公司 | A kind of platform area recognition methods based on OFDM carrier signal |
CN110380511A (en) * | 2018-04-13 | 2019-10-25 | 重庆世纪之光科技实业有限公司 | A kind of recognition methods of platform area and equipment based on phase sequence switching |
CN110874916A (en) * | 2018-08-31 | 2020-03-10 | 重庆曼龙科技有限公司 | Phase switching-based station area subscriber-to-substation relationship identification method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101572415A (en) * | 2009-03-13 | 2009-11-04 | 西安交通大学 | Method for controlling series voltage quality compensator |
WO2012146924A1 (en) * | 2011-04-27 | 2012-11-01 | Northern Design (Electronics) Limited | Electrical measurement apparatus having a detector providing an identification signal and corresponding method |
CN104811494A (en) * | 2015-04-27 | 2015-07-29 | 上海电力学院 | Transformer power distribution area electricity user identification method |
CN106959399A (en) * | 2017-05-11 | 2017-07-18 | 长沙瑞斯康通信技术有限公司 | Platform area identifying system and its method |
-
2017
- 2017-09-30 CN CN201710915850.8A patent/CN107689817B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101572415A (en) * | 2009-03-13 | 2009-11-04 | 西安交通大学 | Method for controlling series voltage quality compensator |
WO2012146924A1 (en) * | 2011-04-27 | 2012-11-01 | Northern Design (Electronics) Limited | Electrical measurement apparatus having a detector providing an identification signal and corresponding method |
CN104811494A (en) * | 2015-04-27 | 2015-07-29 | 上海电力学院 | Transformer power distribution area electricity user identification method |
CN106959399A (en) * | 2017-05-11 | 2017-07-18 | 长沙瑞斯康通信技术有限公司 | Platform area identifying system and its method |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110380511A (en) * | 2018-04-13 | 2019-10-25 | 重庆世纪之光科技实业有限公司 | A kind of recognition methods of platform area and equipment based on phase sequence switching |
CN108535599A (en) * | 2018-04-16 | 2018-09-14 | 国网河南省电力公司电力科学研究院 | Low-voltage platform area user's phase recognition methods based on voltage curve clustering |
CN108519514A (en) * | 2018-04-24 | 2018-09-11 | 宁波三星医疗电气股份有限公司 | Taiwan area phase recognition methods based on Pearson correlation coefficient algorithm |
CN108683180A (en) * | 2018-05-07 | 2018-10-19 | 国网河南省电力公司电力科学研究院 | A kind of three-phase low-voltage power distribution network topology rebuilding method |
CN108683180B (en) * | 2018-05-07 | 2020-06-19 | 国网河南省电力公司电力科学研究院 | Three-phase low-voltage power distribution network topology reconstruction method |
CN110874916B (en) * | 2018-08-31 | 2020-11-24 | 重庆曼龙科技有限公司 | Phase switching-based station area subscriber-to-substation relationship identification method |
CN110874916A (en) * | 2018-08-31 | 2020-03-10 | 重庆曼龙科技有限公司 | Phase switching-based station area subscriber-to-substation relationship identification method |
CN109256856A (en) * | 2018-09-06 | 2019-01-22 | 石家庄科林电气股份有限公司 | The platform area topology identifying system and method realized based on power wire broadband carrier (HPLC) |
CN109256856B (en) * | 2018-09-06 | 2020-07-03 | 石家庄科林电气股份有限公司 | Power line broadband carrier (HPLC) based station area topology identification system and method |
CN109217471B (en) * | 2018-09-19 | 2020-07-03 | 北京国电通网络技术有限公司 | Identification device for network topology of low-voltage distribution station area |
CN109217471A (en) * | 2018-09-19 | 2019-01-15 | 北京中电普华信息技术有限公司 | The identification device of low-voltage power distribution station area's network topology |
CN109378898A (en) * | 2018-09-30 | 2019-02-22 | 国网天津市电力公司电力科学研究院 | A kind of distribute-electricity transformer district Intelligentized regulating and controlling system and regulation method |
WO2020063977A1 (en) * | 2018-09-30 | 2020-04-02 | 国网天津市电力公司电力科学研究院 | Distribution transformer terminal and distribution transformer region equipment state monitoring method |
US11296547B2 (en) | 2018-09-30 | 2022-04-05 | Electric Power Science & Research Institute Of State Grid Tianjin Electric Power | Distribution transformer terminal and method for monitoring a state of a distribution transformer court device |
CN109327242A (en) * | 2018-10-29 | 2019-02-12 | 国网北京市电力公司 | The recognition methods in the affiliated platform area of electric energy meter and device |
CN109327242B (en) * | 2018-10-29 | 2022-05-10 | 国网北京市电力公司 | Identification method and device for transformer area of electric energy meter |
CN109581084A (en) * | 2018-11-29 | 2019-04-05 | 宁波三星医疗电气股份有限公司 | Platform area phase recognition methods based on the degree of association |
CN110266348A (en) * | 2019-07-16 | 2019-09-20 | 深圳智微电子科技有限公司 | A kind of platform area recognition methods based on OFDM carrier signal |
CN110266348B (en) * | 2019-07-16 | 2021-09-14 | 深圳智微电子科技有限公司 | Method for identifying distribution room based on OFDM carrier signal |
Also Published As
Publication number | Publication date |
---|---|
CN107689817B (en) | 2021-06-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107689817A (en) | A kind of recognition methods of user's taiwan area phase and system | |
US7745956B2 (en) | Grid interconnection device, grid interconnection system and transfer trip system | |
US7315735B2 (en) | System and method for emergency 911 location detection | |
US20060056370A1 (en) | Data integrity in a mesh network | |
CN102177743B (en) | Method, equipment and system for offloading network traffic | |
CN105785144B (en) | A kind of whole station detecting system of wireless distributed substation's electrical quantity and method | |
CN109687590B (en) | Grading outage and restoration reporting method and system | |
CN1319319C (en) | An arrangement and a method relating to power supply in a communication network | |
CN106291245A (en) | A kind of distribution network failure actively generates and sends repaiies method and apparatus | |
TW328667B (en) | The system & method for real-time billing in radio telecommunication network | |
KR101942965B1 (en) | System and method for detecting illegal traffic | |
CN102724694B (en) | The customer terminal equipment monitoring system of power communication system | |
CN210444305U (en) | Wireless private network system | |
US20120297064A1 (en) | Method and apparatus for an mtc user equipment to detect and report a predetermined event to an mtc server | |
CN207440228U (en) | A kind of feeder line fault on-line monitoring system | |
CN105792209A (en) | Method and system for detecting pseudo base stations with mobile terminal | |
CN101867515A (en) | Data packet transmission method and terminal equipment | |
CN105931447A (en) | Downlink communication system of low-voltage power meter reading system and meter reading method | |
CN106908694A (en) | A kind of distribution line failure indicator and its detection method based on IEC61850 | |
CN110649703A (en) | Digital transformer area line loss situation perception and electricity stealing inspection method | |
CA2378391A1 (en) | Detecting and mapping power line loss | |
CN211786009U (en) | Power supply detection system based on serial server video monitoring network | |
CN213817353U (en) | Leakage monitoring switch | |
CN104602239A (en) | Mobile communication copy card determination method and system | |
CN103501376A (en) | Realization method for fluent listening mode of mobile terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 building 710 room research Applicant after: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 building 710 room research Applicant before: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Applicant before: State Grid Corporation of China Applicant before: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190725 Address after: 100085 Building 32-3-4108-4109, Pioneer Road, Haidian District, Beijing Applicant after: BEIJING GUODIANTONG NETWORK TECHNOLOGY Co.,Ltd. Applicant after: STATE GRID CORPORATION OF CHINA Applicant after: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 building 710 room research Applicant before: BEIJING CHINA POWER INFORMATION TECHNOLOGY Co.,Ltd. Applicant before: STATE GRID CORPORATION OF CHINA Applicant before: STATE GRID INFORMATION & TELECOMMUNICATION GROUP Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |