CN106908694A - A kind of distribution line failure indicator and its detection method based on IEC61850 - Google Patents

A kind of distribution line failure indicator and its detection method based on IEC61850 Download PDF

Info

Publication number
CN106908694A
CN106908694A CN201710137782.7A CN201710137782A CN106908694A CN 106908694 A CN106908694 A CN 106908694A CN 201710137782 A CN201710137782 A CN 201710137782A CN 106908694 A CN106908694 A CN 106908694A
Authority
CN
China
Prior art keywords
phase
fault
line
fault detector
message
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710137782.7A
Other languages
Chinese (zh)
Other versions
CN106908694B (en
Inventor
邢晓敏
李贻涛
王丹
郑雪瑞
张鹏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power University
Original Assignee
Northeast Dianli University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Dianli University filed Critical Northeast Dianli University
Priority to CN201710137782.7A priority Critical patent/CN106908694B/en
Publication of CN106908694A publication Critical patent/CN106908694A/en
Application granted granted Critical
Publication of CN106908694B publication Critical patent/CN106908694B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/08Locating faults in cables, transmission lines, or networks
    • G01R31/081Locating faults in cables, transmission lines, or networks according to type of conductors
    • G01R31/085Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution lines, e.g. overhead
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Locating Faults (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

A kind of distribution line failure indicator based on IEC61850, it is characterized in, it is respectively provided with each phase of built on stilts three-phase line and is connected with fault detector, three fault detectors set up communication connection using 6LoWPAN agreement MANET modes, the fault detector of B, C two-phase connection using Real-time Collection to current information and breakdown judge message be sent to the fault detector of A phase lines connection as fault comprehensive criterion;The fault detector of A phase lines connection is built-in with Big Dipper RDSS communication modules; short message can be forwarded to the system main website in transformer station with Beidou satellite system; fault message is organized into IEC61850 standard Goose messages to be sent in substation network; simultaneity factor main website has the function of monitoring intelligent grid relay protection action message message; extraction and analysis message content simultaneously coordinates the information that all fault detectors are beamed back on line related, judges fault section.And its detection method is provided.

Description

A kind of distribution line failure indicator and its detection method based on IEC61850
Technical field
The invention belongs to system for distribution network of power relay protection field, and in particular to a kind of distribution wire based on IEC61850 Line fault indicator and its detection method.
Background technology
The probability broken down in 6~66kV power distribution networks of China is of a relatively high, and obtains largely should in recent years at the scene Fault detector can allow operations staff quickly to search the location of faults such as power distribution network short circuit, ground connection, improve power supply reliable Property.At present, Some Domestic producer is proposed the fault detector with communication function, and operations staff can be further greatly decreased Workload.This kind of built-in short-distance wireless communication module of fault detector, is communicated with communication terminal special, and communication terminal connection is moved Dynamic internet, main website is uploaded by fault message.Communication terminal is powered using battery or solar panels, is referred to installed in distance fault Show the nearer position of device(As on tower bar).The problem that existing this class fault detector is present is:Itself there is no remote nothing Line communication function by communication terminal, it is necessary to be transmitted to main website;The power supply storage battery of communication terminal is difficult in maintenance, solar panels peace Fill cumbersome and influenceed greatly by dust and rainy weather;Communication terminal outdoor tower bar installment work intensity is big and in rain-proof dust-proof vibrationproof The requirement of the aspects such as lightning protection is high;Communication terminal uses public network, is unfavorable for the Network Communicate Security of power network;Indicating fault Device, communication terminal, system main website establish one's own system, and are free on outside power system, are unfavorable for the construction of intelligent grid.Therefore, it is existing Pattern manufacturing cost, installation cost, maintenance in the application of power industry of this class " fault detector+communication terminal " having Cost is all higher.
The content of the invention
In order to solve the deficiencies in the prior art, rational in infrastructure it is an object of the present invention to provide one kind, practical function is good, into This low, easy to use distribution line failure indicator based on IEC61850, and its detection method is provided,
Realizing the technical scheme that the object of the invention is used is, a kind of distribution line failure based on IEC61850 that the present invention is provided Indicator, is characterized in that it is included in each distribution substation and is provided with a system main website, is connected with transformer station three-phase line The stage casing of the three-phase long transmission line for connecing and some groups of three-phase line component inlets be equipped with and with three-phase long transmission line, some groups three The fault detector of phase line magnetic connects, each fault detector of three-phase long transmission line connection, each connected per three-phase line Fault detector is connected with Beidou satellite system and handheld communication devices signal;Each indicating fault of three-phase long transmission line connection 6LoWPAN protocol communications are used between device, 6LoWPAN protocol communications are used between the fault detector of connection per three-phase line, Wherein, the fault detector of three-phase long transmission line B phases long transmission line connection, the fault detector of C phases long transmission line connection pass data The fault detector of A phases long transmission line connection is given, the built-in Big Dipper RDSS communication modules of the fault detector that A phases long transmission line is connected Signal is used to the system main website in transformer station via Beidou satellite system forwarding short message after being processed through the examination of system main website IEC61850 communication protocols are sent to power communication net;Fault detector, C phase lines that B phase lines per three-phase line are connected The fault detector of connection transfers data to the fault detector of A phase lines connection, the indicating fault of A phase lines connection Signal is forwarded short message to the system main website in transformer station by the built-in Big Dipper RDSS communication modules of device via Beidou satellite system, After being processed through the examination of system main website power communication net is sent to IEC61850 communication protocols;System main website can use built-in Big Dipper RDSS communication modules actively send short message data by Beidou satellite system to all of fault detector;Handheld communication Equipment is communicated with fault detector nearby using 6LoWPAN agreements, arrange parameter, reads data.
A kind of detection method of distribution line failure indicator based on IEC61850 that the present invention is provided, including following step Suddenly:
1)The S1 stages of system initialization:System main website is installed in transformer station, upper electricity operation, then connected with powerline network It is logical, it is the running parameter of settable system main website with any computer:Each three-phase line title, Beidou communication terminal address, each three Phase line running current threshold value, each three-phase line normal work zero-sequence current threshold value, then, with transformer station's three-phase line The stage casing of the three-phase long transmission line of connection and some groups of three-phase line branch inlets are in each three-phase line exit of transformer station, three-phase The stage casing of long transmission line, three-phase line component inlet be equipped with and with the fault detector of respective three-phase line magnetic connects, often pacify A fault detector is installed, it is necessary to set its parameter with handheld communication devices:The working line title of three-phase line, work phase The Beidou communication terminal address of title, system main website, after the A phase lines of setting three-phase line are finished, reads three-phase current, zero sequence Electric current, with system master station communication state, sees whether this group of fault indicator is normal, and whole fault detectors are installed simultaneously After normal work, into the S2 stages;
2)Process the S2 stages of remote measurement remote regulating information:System main website is connect using IEC61850 agreements and arbitrary network terminal communication By remote measurement remote regulating request of data, if any remote measurement request, then by the finger on the given line of Beidou satellite system and three-phase line Determine fault detector communication, extract the information such as each current data, working condition under synchronised clock and return to requesting party, if any distant Request is adjusted, then by specified its running parameter of fault detector communications setting on Beidou satellite system and given line, is entered The S3 stages;
3)The S3 stages of processing terminal heartbeat message:The minimum interval that system main website every group of fault detector of reception sends 10 seconds, The interval heartbeat message message of 60 seconds most long, fault detector needs this group of three-phase line of report to connect respectively in heartbeat message Three fault detectors between whether communicate normal, whether zero-sequence current normal, and system main website this group of failure of comprehensive descision refers to Whether show device in normal operating conditions, if there is a problem it will send terminal fault message to network, wait the network terminal to look into Inquiry is processed, into the S4 stages;
4)Whether S4 stage that relay protection act message is received:Power telecom network is monitored on backstage all the time after working on power by system main website Goose messages in network, recognize type of message in this stage, if receiving short trouble message, the reclosing of line related Failure message or system single-phase earthing message, then into the S5 stages, otherwise return to the S2 stages;
5)It is the S5 stages of phase fault:In this stage, if the failure that is listened to from power telecom network of system main website Type is phase fault, then extract line name parameter, accident and the moment occurs, and is then pacified from substation line exit The fault detector of dress starts, by installation site from closely to remote order, by Beidou satellite system to the failure on the circuit Indicator group asks accident that the data of each 5 cycles before and after the moment occur successively, if the three-phase current data of upper one group of passback Increase is mutated after the accident moment, the next group of three-phase current data of passback are mutated reduction after the accident moment, then judge this Section between two groups of fault detectors is exactly fault section, and fault section message is sent to network, and by Three-Part protocol Service provider sends short message and reminds to the mobile phone for setting, and network terminal query processing is waited, into the S6 stages;
6)It is the S6 stages of singlephase earth fault:If the fault type that system main website is listened to from power telecom network is single-phase connecing Earth fault, then send out request zero-sequence current number by Beidou satellite system to the fault detector group on all line relateds immediately According to message, in the data for returning, by line name by fault detector zero-sequence current data packet inspection, become according to distance From closely to remote sequential search, if larger with a upper zero-sequence current in group, and next zero-sequence current is smaller, then sentence in power station The section between two groups of fault detectors that breaks is exactly fault section, and fault section message is sent to network, and by the 3rd Square Communications service business sends short message and reminds to the mobile phone for setting, and waits network terminal query processing, returns to the S2 stages.
The distribution line failure indicator based on IEC61850 and its advantage of detection method that the present invention is provided are embodied in:
1)Linked with big-dipper satellite, realize round-the-clock, accessible real-time Communication for Power;
2)Using IEC61850 communication protocols, it is seamlessly connected with intelligent grid;
3)Ensure without tripping, without malfunction;
4)Do not have a power failure installation, debugging, without providing power supply;
5)SMS can be sent to assigned work personnel, it is indicated that fault section;
6)It is particularly well-suited to meagrely-populated, the area that public radio communication net can not be covered uses;
7)Rational in infrastructure, practical function is good, and low cost is easy to use.
Brief description of the drawings
The distribution line failure indicator structure schematic diagram based on IEC61850 that Fig. 1 is provided for the present invention;
The distribution line failure pointer detection method flow diagram based on IEC61850 that Fig. 2 is provided for the present invention.
Specific embodiment
The distribution line failure based on IEC61850 that the present invention is provided is indicated with specific embodiment below in conjunction with the accompanying drawings Device and its detection method are described in detail.
As shown in figure 1, the distribution line failure indicator based on IEC61850 that the present invention is provided, is included in each distribution One system main website 1 is installed, in the stage casing of the three-phase long transmission line being connected with transformer station three-phase line and some groups in transformer station Three-phase line component inlet be equipped with and with three-phase long transmission line, the fault detector 2 of some groups of three-phase line magnetic connects, three Each fault detector 2 of phase long transmission line connection, per three-phase line connection each fault detector 2 and Beidou satellite system 3 and the signal of handheld communication devices 4 connection;It is logical using 6LoWPAN agreements between each fault detector 2 of three-phase long transmission line connection Letter, 6LoWPAN protocol communications are used per three-phase line between the fault detector 2 of connection, wherein, three-phase long transmission line B phases line long The fault detector 2 of road connection, the fault detector 2 of C phases long transmission line connection transfer data to the event of A phases long transmission line connection Hinder indicator 2, the built-in Big Dipper RDSS communication modules of the fault detector 2 that A phases long transmission line is connected are by signal via big-dipper satellite System 3 forwards short message to the system main website 1 in transformer station, and IEC61850 communication protocols are used after being processed through the examination of system main website 1 It is sent to power communication net;Fault detector 2, the fault detector of C phase lines connection that B phase lines per three-phase line are connected 2 transfer data to the fault detectors 2 that A phase lines are connected, the built-in Big Dipper of the fault detector 2 that A phase lines are connected Signal is forwarded short message to the system main website 1 in transformer station by RDSS communication modules via Beidou satellite system 3, through system main website After 1 examination treatment power communication net is sent to IEC61850 communication protocols;System main website 1 can use built-in Big Dipper RDSS Communication module sends short message data by the active of Beidou satellite system 3 to all of fault detector 2;Handheld communication devices 4 Communicated with fault detector 2 nearby using 6LoWPAN agreements, arrange parameter reads data.It is described i.e.:Described transformer station Three-phase line, some groups of three-phase lines refer to A phase lines, B phase lines and C phase lines;It is long that three-phase long transmission line refers to A phases Circuit, B phases long transmission line and C phase long transmission lines.
The detection method of the distribution line failure indicator based on IEC61850 that the present invention is provided, comprises the following steps:
1)The S1 stages of system initialization:System main website is installed in transformer station, upper electricity operation, then connected with powerline network It is logical, it is the running parameter of settable system main website with any computer:Each three-phase line title, Beidou communication terminal address, each three Phase line running current threshold value, each three-phase line normal work zero-sequence current threshold value, then, with transformer station's three-phase line The stage casing of the three-phase long transmission line of connection and some groups of three-phase line branch inlets are in each three-phase line exit of transformer station, three-phase The stage casing of long transmission line, three-phase line component inlet be equipped with and with the fault detector of respective three-phase line magnetic connects, often pacify A fault detector is installed, it is necessary to set its parameter with handheld communication devices:The working line title of three-phase line, work phase The Beidou communication terminal address of title, system main website, after the A phase lines of setting three-phase line are finished, reads three-phase current, zero sequence Electric current, with system master station communication state, sees whether this group of fault indicator is normal, and whole fault detectors are installed simultaneously After normal work, into the S2 stages;
2)Process the S2 stages of remote measurement remote regulating information:System main website is connect using IEC61850 agreements and arbitrary network terminal communication By remote measurement remote regulating request of data, if any remote measurement request, then by the finger on the given line of Beidou satellite system and three-phase line Determine fault detector communication, extract the information such as each current data, working condition under synchronised clock and return to requesting party, if any distant Request is adjusted, then by specified its running parameter of fault detector communications setting on Beidou satellite system and given line, is entered The S3 stages;
3)The S3 stages of processing terminal heartbeat message:The minimum interval that system main website every group of fault detector of reception sends 10 seconds, The interval heartbeat message message of 60 seconds most long, fault detector needs this group of three-phase line of report to connect respectively in heartbeat message Three fault detectors between whether communicate normal, whether zero-sequence current normal, and system main website this group of failure of comprehensive descision refers to Whether show device in normal operating conditions, if there is a problem it will send terminal fault message to network, wait the network terminal to look into Inquiry is processed, into the S4 stages;
4)Whether S4 stage that relay protection act message is received:Power telecom network is monitored on backstage all the time after working on power by system main website Goose messages in network, recognize type of message in this stage, if receiving short trouble message, the reclosing of line related Failure message or system single-phase earthing message, then into the S5 stages, otherwise return to the S2 stages;
5)It is the S5 stages of phase fault:In this stage, if the failure that is listened to from power telecom network of system main website Type is phase fault, then extract line name parameter, accident and the moment occurs, and is then pacified from substation line exit The fault detector of dress starts, by installation site from closely to remote order, by Beidou satellite system to the failure on the circuit Indicator group asks accident that the data of each 5 cycles before and after the moment occur successively, if the three-phase current data of upper one group of passback Increase is mutated after the accident moment, the next group of three-phase current data of passback are mutated reduction after the accident moment, then judge this Section between two groups of fault detectors is exactly fault section, and fault section message is sent to network, and by Three-Part protocol Service provider sends short message and reminds to the mobile phone for setting, and network terminal query processing is waited, into the S6 stages;
6)It is the S6 stages of singlephase earth fault:If the fault type that system main website is listened to from power telecom network is single-phase connecing Earth fault, then send out request zero-sequence current number by Beidou satellite system to the fault detector group on all line relateds immediately According to message, in the data for returning, by line name by fault detector zero-sequence current data packet inspection, become according to distance From closely to remote sequential search, if larger with a upper zero-sequence current in group, and next zero-sequence current is smaller, then sentence in power station The section between two groups of fault detectors that breaks is exactly fault section, and fault section message is sent to network, and by the 3rd Square Communications service business sends short message and reminds to the mobile phone for setting, and waits network terminal query processing, returns to the S2 stages.
The distribution line failure indicator based on IEC61850 that the present invention is provided, it includes triplets, three-phase line A phase lines, it is each on B phase lines and C phase lines install one, three fault detectors 2 using low-power consumption 6LoWPAN agreements MANET mode sets up communication connection.The current information that B phase lines, the fault detector 2 of C phase lines connection arrive Real-time Collection And breakdown judge message is sent to the fault detector 2 of A phase lines connection, the fault detector 2 of A phase lines connection is built-in 6LoWPAN IP Edge routers, using after whole three-phase information gatherings as fault comprehensive criterion.The failure of A phase lines connection Indicator 2 is also built-in with Big Dipper RDSS communication modules, can forward short message in transformer station with Beidou satellite system System main website 1, need not so be designed for connect wireless public network communication terminal.Overhead type fault detector 2 of the invention Using itself measurement direct power taking of CT, inside is provided with super capacitor and ensures the continuity that equipment is powered, it is not necessary to externally fed Power supply, powered installation does not have any binding post, it is not necessary to lay communication cable, it is not necessary to the data acquisition unit installed on post Or communication terminal.System main website 1 by built-in Big Dipper RDSS communication modules receive and dispatch failure on relevant distribution line refer to Show the short message of device 2, the Goose messages that necessary information is organized into IEC61850 standards are sent in substation network, notify fortune Administrative staff and daemon software.System main website 1 has the function of receiving intelligent grid relay protection action message message simultaneously, extracts Analysis message content simultaneously coordinates the information that all fault detectors 2 are beamed back on line related, judges fault section.

Claims (2)

1. a kind of distribution line failure indicator based on IEC61850, is characterized in that it is included in peace in each distribution substation Equipped with a system main website, in the stage casing of the three-phase long transmission line being connected with transformer station three-phase line and some groups of three-phase line branches Porch be equipped with and with three-phase long transmission line, the fault detector of some groups of three-phase line magnetic connects, the connection of three-phase long transmission line Each fault detector, each fault detector connected per three-phase line are believed with Beidou satellite system and handheld communication devices Number connection;6LoWPAN protocol communications are used between each fault detector of three-phase long transmission line connection, the connection per three-phase line 6LoWPAN protocol communications are used between fault detector, wherein, fault detector, the C of the connection of three-phase long transmission line B phases long transmission line The fault detector of phase long transmission line connection transfers data to the fault detector of A phases long transmission line connection, the connection of A phases long transmission line The fault detector built-in Big Dipper RDSS communication modules signal is forwarded into short message in transformer station via Beidou satellite system System main website, be sent to power communication net with IEC61850 communication protocols after being processed through system main website examination;Per three-phase line B phase lines connection fault detector, C phase lines connection fault detector transfer data to A phase lines connection Fault detector, the built-in Big Dipper RDSS communication modules of fault detector of A phase lines connection are by signal via big-dipper satellite system System forwarding short message is sent to after being processed through the examination of system main website to the system main website in transformer station with IEC61850 communication protocols Power communication net;System main website can use built-in Big Dipper RDSS communication modules by Beidou satellite system actively to all of Fault detector sends short message data;Handheld communication devices are communicated with fault detector nearby using 6LoWPAN agreements, are set Parameter, reads data.
2. a kind of detection method of the distribution line failure indicator based on IEC61850, comprises the following steps:
1)The S1 stages of system initialization:System main website is installed in transformer station, upper electricity operation, then connected with powerline network It is logical, it is the running parameter of settable system main website with any computer:Each three-phase line title, Beidou communication terminal address, each three Phase line running current threshold value, each three-phase line normal work zero-sequence current threshold value, then, with transformer station's three-phase line The stage casing of the three-phase long transmission line of connection and some groups of three-phase line branch inlets are in each three-phase line exit of transformer station, three-phase The stage casing of long transmission line, three-phase line component inlet be equipped with and with the fault detector of respective three-phase line magnetic connects, often pacify A fault detector is installed, it is necessary to set its parameter with handheld communication devices:The working line title of three-phase line, work phase The Beidou communication terminal address of title, system main website, after the A phase lines of setting three-phase line are finished, reads three-phase current, zero sequence Electric current, with system master station communication state, sees whether this group of fault indicator is normal, and whole fault detectors are installed simultaneously After normal work, into the S2 stages;
2)Process the S2 stages of remote measurement remote regulating information:System main website is connect using IEC61850 agreements and arbitrary network terminal communication By remote measurement remote regulating request of data, if any remote measurement request, then by the finger on the given line of Beidou satellite system and three-phase line Determine fault detector communication, extract the information such as each current data, working condition under synchronised clock and return to requesting party, if any distant Request is adjusted, then by specified its running parameter of fault detector communications setting on Beidou satellite system and given line, is entered The S3 stages;
3)The S3 stages of processing terminal heartbeat message:The minimum interval that system main website every group of fault detector of reception sends 10 seconds, The interval heartbeat message message of 60 seconds most long, fault detector needs this group of three-phase line of report to connect respectively in heartbeat message Three fault detectors between whether communicate normal, whether zero-sequence current normal, and system main website this group of failure of comprehensive descision refers to Whether show device in normal operating conditions, if there is a problem it will send terminal fault message to network, wait the network terminal to look into Inquiry is processed, into the S4 stages;
4)Whether S4 stage that relay protection act message is received:Power telecom network is monitored on backstage all the time after working on power by system main website Goose messages in network, recognize type of message in this stage, if receiving short trouble message, the reclosing of line related Failure message or system single-phase earthing message, then into the S5 stages, otherwise return to the S2 stages;
5)It is the S5 stages of phase fault:In this stage, if the failure that is listened to from power telecom network of system main website Type is phase fault, then extract line name parameter, accident and the moment occurs, and is then pacified from substation line exit The fault detector of dress starts, by installation site from closely to remote order, by Beidou satellite system to the failure on the circuit Indicator group asks accident that the data of each 5 cycles before and after the moment occur successively, if the three-phase current data of upper one group of passback Increase is mutated after the accident moment, the next group of three-phase current data of passback are mutated reduction after the accident moment, then judge this Section between two groups of fault detectors is exactly fault section, and fault section message is sent to network, and by Three-Part protocol Service provider sends short message and reminds to the mobile phone for setting, and network terminal query processing is waited, into the S6 stages;
6)It is the S6 stages of singlephase earth fault:If the fault type that system main website is listened to from power telecom network is single-phase connecing Earth fault, then send out request zero-sequence current number by Beidou satellite system to the fault detector group on all line relateds immediately According to message, in the data for returning, by line name by fault detector zero-sequence current data packet inspection, become according to distance From closely to remote sequential search, if larger with a upper zero-sequence current in group, and next zero-sequence current is smaller, then sentence in power station The section between two groups of fault detectors that breaks is exactly fault section, and fault section message is sent to network, and by the 3rd Square Communications service business sends short message and reminds to the mobile phone for setting, and waits network terminal query processing, returns to the S2 stages.
CN201710137782.7A 2017-03-09 2017-03-09 A kind of distribution line failure indicator and its detection method based on IEC61850 Expired - Fee Related CN106908694B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710137782.7A CN106908694B (en) 2017-03-09 2017-03-09 A kind of distribution line failure indicator and its detection method based on IEC61850

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710137782.7A CN106908694B (en) 2017-03-09 2017-03-09 A kind of distribution line failure indicator and its detection method based on IEC61850

Publications (2)

Publication Number Publication Date
CN106908694A true CN106908694A (en) 2017-06-30
CN106908694B CN106908694B (en) 2019-06-11

Family

ID=59187282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710137782.7A Expired - Fee Related CN106908694B (en) 2017-03-09 2017-03-09 A kind of distribution line failure indicator and its detection method based on IEC61850

Country Status (1)

Country Link
CN (1) CN106908694B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110889959A (en) * 2019-11-28 2020-03-17 国网山东省电力公司蓬莱市供电公司 Beidou distribution network communication system and Beidou distribution network communication method
CN112782530A (en) * 2021-01-18 2021-05-11 珠海安瑞通电子科技有限公司 Fault indicator for line real-time fault judgment and control method and equipment thereof
CN113220493A (en) * 2020-02-04 2021-08-06 北京京东尚科信息技术有限公司 Fault data processing method and device, storage medium and electronic equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090112375A1 (en) * 2007-10-30 2009-04-30 Bogdan Cristian Popescu System and method for control of power distribution
CN202330621U (en) * 2011-11-29 2012-07-11 长沙威胜信息技术有限公司 Fault positioning system of power distribution circuit
CN103592566A (en) * 2013-09-02 2014-02-19 北京交通大学 Wireless communication based power distribution network distributed online monitoring and fault positioning system
CN104914347A (en) * 2015-05-20 2015-09-16 广西电网有限责任公司桂林供电局 Grounding fault judgment method based on time axis comparison of Beidou satellite time service
CN205691715U (en) * 2016-06-06 2016-11-16 国网冀北电力有限公司张家口供电公司 Power distribution network distributed on line monitoring based on radio communication and fault location system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090112375A1 (en) * 2007-10-30 2009-04-30 Bogdan Cristian Popescu System and method for control of power distribution
CN202330621U (en) * 2011-11-29 2012-07-11 长沙威胜信息技术有限公司 Fault positioning system of power distribution circuit
CN103592566A (en) * 2013-09-02 2014-02-19 北京交通大学 Wireless communication based power distribution network distributed online monitoring and fault positioning system
CN104914347A (en) * 2015-05-20 2015-09-16 广西电网有限责任公司桂林供电局 Grounding fault judgment method based on time axis comparison of Beidou satellite time service
CN205691715U (en) * 2016-06-06 2016-11-16 国网冀北电力有限公司张家口供电公司 Power distribution network distributed on line monitoring based on radio communication and fault location system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110889959A (en) * 2019-11-28 2020-03-17 国网山东省电力公司蓬莱市供电公司 Beidou distribution network communication system and Beidou distribution network communication method
CN110889959B (en) * 2019-11-28 2021-09-21 国网山东省电力公司蓬莱市供电公司 Beidou distribution network communication system and Beidou distribution network communication method
CN113220493A (en) * 2020-02-04 2021-08-06 北京京东尚科信息技术有限公司 Fault data processing method and device, storage medium and electronic equipment
CN112782530A (en) * 2021-01-18 2021-05-11 珠海安瑞通电子科技有限公司 Fault indicator for line real-time fault judgment and control method and equipment thereof

Also Published As

Publication number Publication date
CN106908694B (en) 2019-06-11

Similar Documents

Publication Publication Date Title
CN201812025U (en) Failure detection device for power transmission line
CN106711975B (en) Fault location, isolation based on distributed differential protection and quick recovery method
CN205665347U (en) 10kV distribution lines broken string fault detection and positioning system based on three phase voltage electric current
CN106249073A (en) Distribution network failure based on LoRa communication technology instruction system
CN203422438U (en) Real-time monitoring and fault location system for overhead lines of power distribution network
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN101511097A (en) Wireless monitoring system based on high-voltage transmission line
CN204559234U (en) A kind of panorama integral intelligent distribution network failure monitoring system
CN211296946U (en) Railway electric power comprehensive operation and maintenance management system
CN105871063B (en) Fault finding system and its method are protected between station based on information fusion
CN103149421A (en) High voltage cable metal sheath grounding current online monitoring system
CN106908694B (en) A kind of distribution line failure indicator and its detection method based on IEC61850
CN109687590A (en) A kind of be classified stops send a telegram in reply report method, system
CN202455294U (en) Photovoltaic junction box monitoring system based on WIA (Windows Image Acquisition) wireless sensing network
CN205880114U (en) Join in marriage power system fault indicating system based on loRa communication technology
CN201984132U (en) Distribution line fault positioning and on-line monitoring system
CN103389408A (en) High-voltage single-core cable sheath grounding current on-line monitoring device and control method
CN102608494B (en) Monitoring method for arc light monitoring intelligent component system of medium-low voltage switch of intelligent substation
CN103645417B (en) A kind of pure internet access-prepositioneddata data acquisition method
CN207868869U (en) A kind of wireline inspection fault fast positioning detecting system based on satellite communication
CN201408239Y (en) Wireless monitoring system applied to high-tension power transmission line
CN206804794U (en) A kind of distribution line dead electricity alarm signal harvester
CN115441588A (en) Intelligent power utilization management system based on cloud-control circuit breaker
CN206132904U (en) Novel wisdom fault indication system of 10kv circuit
Tan et al. Secured RoLa-based Power Grid Monitoring and Application of Connector Temperature Analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190611

CF01 Termination of patent right due to non-payment of annual fee