CN107688380A - A kind of server complete machine breaker device and method - Google Patents

A kind of server complete machine breaker device and method Download PDF

Info

Publication number
CN107688380A
CN107688380A CN201710528227.7A CN201710528227A CN107688380A CN 107688380 A CN107688380 A CN 107688380A CN 201710528227 A CN201710528227 A CN 201710528227A CN 107688380 A CN107688380 A CN 107688380A
Authority
CN
China
Prior art keywords
signal
control
power supply
standby switch
complete machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710528227.7A
Other languages
Chinese (zh)
Inventor
梁锐
刘波
李冠广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yunhai Information Technology Co Ltd
Original Assignee
Zhengzhou Yunhai Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yunhai Information Technology Co Ltd filed Critical Zhengzhou Yunhai Information Technology Co Ltd
Priority to CN201710528227.7A priority Critical patent/CN107688380A/en
Publication of CN107688380A publication Critical patent/CN107688380A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • G06F1/30Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1415Saving, restoring, recovering or retrying at system level
    • G06F11/1441Resetting or repowering

Abstract

The present invention provides a kind of server complete machine breaker device and method, pass through the control signal in one BMC/SMC of 12V standby electricity increases, 12V standby can be made electrically disconnected, restored electricity after also being powered off Deng BMC, so as to realize to electrically operated under 12V standby electricity, the power-off of complete machine can be realized, so as to realize the recovery to realizing abnormality under individual cases.

Description

A kind of server complete machine breaker device and method
Technical field
The present invention relates to computer server technical field, and in particular to a kind of server complete machine breaker device and method.
Background technology
Present server only can be with soft reboot when safeguarding, the method that can not provide hardware power-off restarting, still Need to restart firmly from abnormal restoring sometimes, this just needs computer room to carry out power operation, convenience extreme difference to server.
The content of the invention
In order to solve the above technical problems, it is a kind of server complete machine power-off scheme that the present invention, which provides, it is specific as follows:
In a first aspect, the present invention provides a kind of server complete machine breaker device, including power supply module, standby are opened Close module, standby switch control modules, power supply supply control module, power supply module output two-way power supply signal:First Power supply signal and second source signal, wherein the first power supply signal is powered for system operation, powered in system boot, system Being disconnected during closing, second source signal is used for the continued power of a part of processor in server master board, to detect power-on command, Standby switch modules are arranged between power supply module and server master board, for according to standby switch control modules The first control signal control second source signal be switched on or switched off, standby switch control modules are by second source signal Power supply, and instructed according to the complete machine power operation of user and produce the first control signal, power supply supply control module is used to detect The powered situation of standby switch control modules and the second control signal for producing control power supply module, power supply supply mould Root tuber is according to the second control signal out-put supply signal.
Further, standby switch control modules are BMC or SMC.
Further, the first power supply signal and second source signal are 12V.
Further, when standby switch control modules do not receive the complete machine power operation instruction of user, connection is produced First control signal of second source signal, switching of the standby switch modules according to first control signal without switch Operation;When standby switch control modules receive the complete machine power operation instruction of user, produce and disconnect second source signal First control signal, standby switch modules disconnect second source signal according to first control signal.
Further, the powered situation of power supply supply control module detection standby switch control modules, is being detected When standby switch control modules lose second source signal, control power supply module output the first power supply signal and second Power supply signal.
Second aspect, the present invention provide a kind of server complete machine power-off method, including:
SS1:Standby switch modules are set between power supply module and server master board;
SS2:Standby switch control modules instruct according to the complete machine power operation of user and produce the first control signal, its Middle standby switch control modules are signal-powered by second source;
SS3:Standby switch modules control being switched on or switched off for second source signal according to the first control signal, wherein Second source signal is used for the continued power of server master board intermediate portion reason device, to detect power-on command;
SS4:Detect the powered situation of standby switch control modules and produce the second control of control power supply module Signal;
SS5:Power supply module is according to the second control signal out-put supply signal.
Further, standby switch control modules are BMC or SMC, and second source signal is 12V.
Further, step SS2 is specifically included:The complete machine for not receiving user in standby switch control modules powers off behaviour When instructing, the 3rd control signal for connecting second source signal is produced;The whole of user is received in standby switch control modules When machine power operation instructs, the 4th control signal for disconnecting second source signal is produced;
Step SS3 is specifically included:Handover operation of the standby switch modules according to the 3rd control signal without switch, Standby switch modules disconnect second source signal according to the 4th control signal.
Further, step SS5 is specifically included:Represent that standby switch control modules lose the in the second control signal During two power supply signals, power supply module exports the first power supply signal and second source signal, wherein the first power supply signal is used for System operation is powered, and is powered in system boot, and system disconnects when closing.
Further, the first power supply signal is 12V.
By the solution of the present invention, in one BMC/SMC of 12V standby electricity increases control signal, 12V can be made Standby is electrically disconnected, waits BMC to be restored electricity after also powering off, so as to realize to electrically operated under 12V standby electricity, you can To realize the power-off of complete machine, so as to realize the recovery to realizing abnormality under individual cases.
Brief description of the drawings
Fig. 1 shows the structured flowchart of server complete machine breaker device of the present invention.
Fig. 2 shows the signal connection diagram of server complete machine breaker device of the present invention.
Embodiment
Technical scheme is further illustrated below in conjunction with Figure of description and specific embodiment.It should be appreciated that this The specific embodiment of place description is not intended to limit the present invention only to explain the present invention.
Fig. 1 is the structured flowchart of the server complete machine breaker device of one embodiment of the invention, and Fig. 2 shows that the present invention is based on Server supports the signal connection diagram of PCIE bandwidth automatic switching control equipments.
As shown in Figure 1 and Figure 2, server complete machine breaker device according to embodiments of the present invention, including power supply module, Standby switch modules, standby switch control modules, power supply supply control module, power supply module output two-way power supply Signal:First power supply signal and second source signal, wherein the first power supply signal is powered for system operation, in system boot Power supply, system disconnect when closing, and second source signal is used for the continued power of a part of processor in server master board, with detection Power-on command, standby switch modules are arranged between power supply module and server master board, for being opened according to standby The the first control signal control second source signal for closing control module is switched on or switched off, and standby switch control modules are by the Two power supply signals are powered, and are instructed according to the complete machine power operation of user and produced the first control signal, power supply supply control module For detecting the powered situation of standby switch control modules and producing the second control signal of control power supply module, electricity Source supply module is according to the second control signal out-put supply signal.
Such as second source signal is the power supply letter to the microprocessor continued power such as BMC, CPLD, PSOC in server Number.
Standby switch control modules can select BMC (Baseboard Management Controller, substrate pipe Manage controller) or SMC (System Management Controller, System Management Controller).
First power supply signal and second source signal are 12V.
When standby switch control modules do not receive the complete machine power operation instruction of user, produce and connect second source First control signal of signal, handover operation of the standby switch modules according to first control signal without switch; When standby switch control modules receive the complete machine power operation instruction of user, the first control for disconnecting second source signal is produced Signal processed, standby switch modules disconnect second source signal according to first control signal.
The powered situation of power supply supply control module detection standby switch control modules, is detecting standby switches When control module loses second source signal, control power supply module exports the first power supply signal and second source signal, with Realize that the hard of server is restarted.
In addition the present invention also provides a kind of corresponding server complete machine power-off method, including:
SS1:Standby switch modules are set between power supply module and server master board;
SS2:Standby switch control modules instruct according to the complete machine power operation of user and produce the first control signal, its Middle standby switch control modules are signal-powered by second source;
SS3:Standby switch modules control being switched on or switched off for second source signal according to the first control signal, wherein Second source signal is used for the continued power of server master board intermediate portion reason device, to detect power-on command;
SS4:Detect the powered situation of standby switch control modules and produce the second control of control power supply module Signal;
SS5:Power supply module is according to the second control signal out-put supply signal.
Standby switch control modules can select BMC (Baseboard Management Controller, substrate pipe Manage controller) or SMC (System Management Controller, System Management Controller).
Second source signal is 12V.
Step SS2 is specifically included:When standby switch control modules do not receive the complete machine power operation instruction of user, Produce the 3rd control signal for connecting second source signal;The complete machine that user is received in standby switch control modules powers off behaviour When instructing, the 4th control signal for disconnecting second source signal is produced.
Step SS3 is specifically included:Handover operation of the standby switch modules according to the 3rd control signal without switch, Standby switch modules disconnect second source signal according to the 4th control signal.
Step SS5 is specifically included:Represent that standby switch control modules lose second source signal in the second control signal When, power supply module exports the first power supply signal and second source signal, to realize that the hard of server is restarted, wherein the first electricity Source signal is powered for system operation, is powered in system boot, and system disconnects when closing.
First power supply signal is 12V.
Server PS U outputs are mainly two power supply signals, and one is 12V electricity, and another is 12V standby electricity.12V Electricity act as guarantee system operation, and 12V electricity power supply when system boot, 12V is electrically disconnected when system is closed.12V Standby electro ultrafiltrations are the power supply signals to the microprocessor continued power such as BMC, CPLD, PSOC in server.
Using the present invention, in one BMC/SMC of 12V standby electricity increases control signal, 12V standby can be made It is electrically disconnected, wait BMC to be restored electricity after also powering off, so as to realize to electrically operated under 12V standby electricity, you can whole to realize The power-off of machine, so as to realize the recovery to realizing abnormality under individual cases.
Although having been described for some aspects in the context of device, it is apparent that these aspects also illustrate that corresponding method Description, wherein block or apparatus and method for step or the feature of method and step be corresponding.Similarly, in the context of method and step Described in each side also illustrate that corresponding to block or project or the feature of corresponding intrument description.(or use) can be passed through Hardware unit such as microprocessor, programmable calculator or electronic circuit etc is some or all of in method and step to perform. Can be performed by such device in most important method and step some or it is multiple.
The realization can use hardware or using software or can use for example floppy disk, DVD, blue light, CD, ROM, There is the stored digital for being stored in electronically readable control signal thereon to be situated between for PROM, EPROM, EEPROM or flash memory etc Matter performs, and the electronically readable control signal coordinates (or can coordinate with it) with so that performing with programmable computer system Corresponding method.The data medium with electronically readable control signal can be provided, the electronically readable control signal can be with Programmable computer system coordinates to perform approach described herein.
The realization can also use the form of the computer program product with program code, work as computer program product When running on computers, program code is operated to perform this method.Can in machine-readable carrier storage program generation Code.
Described above be only it is illustrative, and it is to be understood that it is described herein arrangement and details modification and Change will be apparent to those skilled in the art.It is therefore intended that only by scope of the following claims rather than by The specific detail that is presented limits by way of above description and explaining.

Claims (10)

1. a kind of server complete machine breaker device, including power supply module, standby switch modules, standby switch control Module, power supply supply control module, power supply module output two-way power supply signal:First power supply signal and second source letter Number, wherein the first power supply signal is powered for system operation, powered in system boot, system disconnects when closing, second source Signal is used for the continued power of a part of processor in server master board, to detect power-on command, it is characterised in that standby Switch module is arranged between power supply module and server master board, for first according to standby switch control modules Control signal control second source signal is switched on or switched off, and standby switch control modules are signal-powered by second source, and Instructed according to the complete machine power operation of user and produce the first control signal, power supply supply control module is opened for detecting standby Close the powered situation of control module and produce the second control signal of control power supply module, power supply module is according to second Control signal out-put supply signal.
2. server complete machine breaker device according to claim 1, wherein standby switch control modules be BMC or SMC。
3. server complete machine breaker device according to claim 1, wherein the first power supply signal and second source signal are equal For 12V.
4. server complete machine breaker device according to claim 1, wherein not receiving use in standby switch control modules Family complete machine power operation instruction when, produce connect second source signal the first control signal, standby switch modules according to First control signal without switch handover operation;The complete machine that user is received in standby switch control modules powers off behaviour When instructing, the first control signal for disconnecting second source signal is produced, standby switch modules are according to first control signal Second source signal is disconnected.
5. server complete machine breaker device according to claim 4, wherein power supply supply control module detection standby are opened The powered situation of control module is closed, when detecting that standby switch control modules lose second source signal, control power supply supplies Module is answered to export the first power supply signal and second source signal.
A kind of 6. server complete machine power-off method, it is characterised in that including:
SS1:Standby switch modules are set between power supply module and server master board;
SS2:Standby switch control modules instruct according to the complete machine power operation of user and produce the first control signal, wherein Standby switch control modules are signal-powered by second source;
SS3:Standby switch modules control being switched on or switched off for second source signal according to the first control signal, wherein second Power supply signal is used for the continued power of server master board intermediate portion reason device, to detect power-on command;
SS4:Detect the powered situation of standby switch control modules and produce the second control letter of control power supply module Number;
SS5:Power supply module is according to the second control signal out-put supply signal.
7. server complete machine power-off method according to claim 6, wherein standby switch control modules be BMC or SMC, second source signal are 12V.
8. server complete machine power-off method according to claim 6, wherein step SS2 are specifically included:Switched in standby When control module does not receive the complete machine power operation instruction of user, the 3rd control signal for connecting second source signal is produced; When standby switch control modules receive the complete machine power operation instruction of user, the 4th control for disconnecting second source signal is produced Signal processed;
Step SS3 is specifically included:Handover operation of the standby switch modules according to the 3rd control signal without switch, Standby switch modules disconnect second source signal according to the 4th control signal.
9. server complete machine power-off method according to claim 8, wherein step SS5 are specifically included:In the second control letter Number standby switch control modules are represented when losing second source signal, power supply module exports the first power supply signal and the Two power supply signals, wherein the first power supply signal is powered for system operation, powered in system boot, system disconnects when closing.
10. server complete machine power-off method according to claim 9, wherein the first power supply signal is 12V.
CN201710528227.7A 2017-07-01 2017-07-01 A kind of server complete machine breaker device and method Pending CN107688380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710528227.7A CN107688380A (en) 2017-07-01 2017-07-01 A kind of server complete machine breaker device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710528227.7A CN107688380A (en) 2017-07-01 2017-07-01 A kind of server complete machine breaker device and method

Publications (1)

Publication Number Publication Date
CN107688380A true CN107688380A (en) 2018-02-13

Family

ID=61152735

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710528227.7A Pending CN107688380A (en) 2017-07-01 2017-07-01 A kind of server complete machine breaker device and method

Country Status (1)

Country Link
CN (1) CN107688380A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109656347A (en) * 2018-12-12 2019-04-19 浪潮(北京)电子信息产业有限公司 Method, apparatus, equipment and the storage medium of server system power management

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1954283A (en) * 2004-05-22 2007-04-25 陈锦夫 Swapping 'fixed' 'system' hard disk
CN103152184A (en) * 2013-02-18 2013-06-12 中兴通讯股份有限公司 ATCA (Advanced Telecom Computing Architecture) system and ATCA power control method and device
CN104113445A (en) * 2014-06-19 2014-10-22 汉柏科技有限公司 Device and method of realizing network equipment hard restart
US20160334850A1 (en) * 2015-05-14 2016-11-17 Quanta Computer Inc. Hybrid control methods for uninterruptible power supplies
CN106527643A (en) * 2016-12-06 2017-03-22 迈普通信技术股份有限公司 Communication device and power management method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1954283A (en) * 2004-05-22 2007-04-25 陈锦夫 Swapping 'fixed' 'system' hard disk
CN103152184A (en) * 2013-02-18 2013-06-12 中兴通讯股份有限公司 ATCA (Advanced Telecom Computing Architecture) system and ATCA power control method and device
CN104113445A (en) * 2014-06-19 2014-10-22 汉柏科技有限公司 Device and method of realizing network equipment hard restart
US20160334850A1 (en) * 2015-05-14 2016-11-17 Quanta Computer Inc. Hybrid control methods for uninterruptible power supplies
CN106527643A (en) * 2016-12-06 2017-03-22 迈普通信技术股份有限公司 Communication device and power management method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109656347A (en) * 2018-12-12 2019-04-19 浪潮(北京)电子信息产业有限公司 Method, apparatus, equipment and the storage medium of server system power management

Similar Documents

Publication Publication Date Title
US8762782B2 (en) Basic input-output system circuit and method for using the same
CN105700969B (en) server system
CN100517246C (en) Computer remote control method and system
CN102339242A (en) Computer system data recovery device
CN100492305C (en) Fast restoration method of computer system and apparatus
CN100458753C (en) Hard disk hot swap system in multiple hard disks system and method
CN105700970A (en) Server system
CN103136012A (en) Computer system and update method of basic input-output system thereof
CN101645056B (en) Apparatus and method for docking of mobile device supporting docking station
CN104050061A (en) Multi-main-control-panel redundant backup system based on PCIe bus
CN104407556A (en) Hot standby redundancy module switching device
CN102478800A (en) System and method for monitoring electric power sequential signals
CN103136048A (en) Computer system
CN103077060A (en) Method, device and system for switching master basic input/output system (BIOS) and spare BIOS
CN111767244A (en) Dual-redundancy computer equipment based on domestic Loongson platform
CN111399879A (en) Firmware upgrading system and method of CP L D
CN102253703B (en) Switch-on and switch-off system of motherboards
CN107688380A (en) A kind of server complete machine breaker device and method
CN105049936A (en) Startup-shutdown method and device
CN103135728B (en) Power supply start-up control method and system thereof
CN103034511B (en) Changing method between a kind of Basic Input or Output System (BIOS) and device
CN115543907B (en) Control method and device based on PCIe chip in storage device
CN103399807A (en) Dynamic scene spontaneous recovering method used for triplication redundancy computers
CN201047943Y (en) Fast recovery equipment of computer system
CN110781111B (en) But real-time supervision's dual-redundancy USB port extension device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180213

RJ01 Rejection of invention patent application after publication