CN107687153A - A kind of bagged sand rib body construction technique - Google Patents
A kind of bagged sand rib body construction technique Download PDFInfo
- Publication number
- CN107687153A CN107687153A CN201710938043.8A CN201710938043A CN107687153A CN 107687153 A CN107687153 A CN 107687153A CN 201710938043 A CN201710938043 A CN 201710938043A CN 107687153 A CN107687153 A CN 107687153A
- Authority
- CN
- China
- Prior art keywords
- sand
- pipette tips
- filling
- underwater
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
- E02B3/108—Temporary dykes with a filling, e.g. filled by water or sand
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Revetment (AREA)
Abstract
The present invention relates to a kind of bagged sand rib body construction technique.Comprise the following steps, (1) is processed to filling sand pocket, and is transported to job site;(2) positioning is measured to the set location for filling sand pocket;(3) manually sprawled to filling sand pocket;(4) underwater suction sand pipette tips are connected by delivery hose in the entrance of slush pump, connects blast pipe in the outlet of slush pump, blast pipe is connected to the sand inlet for filling sand pocket;(5) underwater pipette tips nozzle is connected by delivery hose in the outlet of water pump, the entrance of water pump is connected to clear water puddle by pipeline, and water pump sucks the clear water in puddle, and underwater pipette tips nozzle is transported to after pressurization and is sprayed at a high speed, the sand at the bottom is broken up;(6) slush pump fills sand pocket by inhaling sand pipette tips, delivery hose and blast pipe under water and sand aqueous mixtures being sucked and are delivered to.
Description
Technical field
The invention belongs to ship dredging construction technical field, more particularly to a kind of bagged sand rib body construction technique.
Background technology
In ship dredging construction engineering, to ensure the monolithic stability of road structure, bottom first lays elongated high-strength geotechnique
Each one layer of the additional high-strength geotextile of grid, then carries out roadbed filling thereon.Roadbed uses large-scale filling bagged sand, large-scale to fill
Filled using bagged sand in the space filled out between bagged sand and mask.Pavement structure uses hydraulic fill sand, is followed successively by 400g/ ㎡ from the inside to the outside
Geotextiles, 200mm thickness bagged sands.The side-blown back-up sand slope ratio in road sea is 1 on island:30, inner side hydraulic fill sand slope ratio is 1:10;Road surface is certainly
Under it is supreme be followed successively by 500mm thickness mountain skin soil, 200mm thickness graded broken stone, 50mm thickness medium coarse sands bed course, 80mm thickness high-strength concrete connection
Closing piece, both sides of the road are respectively provided with thick 200mm Kerb of concrete.Road surface uses double drainage, the gradient 1%.
In highway engineering construction, large-scale filling bag construction is the key of whole individual works at present, therefore chooses large-scale
Fill bag process and carry out typical construction, construction is built using filling bag heap.Following difficulty in practice of construction be present, (1) takes sand difficult:
Found in construction, the construction area top layer only has 1m Extra-fine sands, and down all silty clays are unfavorable for mud pumping sand;(2)
Transport of materials is difficult:Because placing of material point is distant away from construction area, and sandy ground is unfavorable for transport of materials, therefore is unfavorable for work
Cheng Jindu carries out;(3) activity duration is short, due to during climax beach face large area ponding be unfavorable for mud pumping sand work, only according to
By construction operation during low tide, it is impossible to meet construction speed needs.
For difficult (1), it can expand by being linked up with owner, management and take sand scope mode to solve;For difficulty
(2) it, can be put into by increasing plant equipment, and do good material in advance and have bad luck work, it is ensured that the mode that material is in time
To solve.For difficult (3), then a kind of new construction technology of R & D design is needed to solve, in the prior art and in the absence of conjunction
Suitable above-mentioned technological process.
The content of the invention
The present invention provides a kind of bagged sand rib body construction technique to solve technical problem present in known technology, solves
Problem present in background technology.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:A kind of bagged sand rib body
Construction technology comprises the following steps, and (1) is processed to filling sand pocket, and transports to job site;(2) to filling the setting position of sand pocket
Put and measure positioning;(3) manually sprawled to filling sand pocket;(4) connected under water by delivery hose in the entrance of slush pump
Sand pipette tips are inhaled, connect blast pipe in the outlet of slush pump, blast pipe is connected to the sand inlet for filling sand pocket;(5) in the outlet of water pump
Underwater pipette tips nozzle is connected by delivery hose, the entrance of water pump is connected to clear water puddle by pipeline, and water pump is by the clear of puddle
Water is sucked, and underwater pipette tips nozzle is transported to after pressurization and is sprayed at a high speed, the sand at the bottom is broken up;(6) slush pump passes through underwater
Sand pipette tips, delivery hose and blast pipe is inhaled sand aqueous mixtures are sucked and are delivered to and fill sand pocket.
The advantages and positive effects of the present invention are:It is and existing the invention provides a kind of bagged sand rib body construction technique
The technological process of mud pumping sand sand washing is compared, and the scouring equipment in the technical program is not limited by tidewater, can be significantly using having
The working time is imitated, efficiency of construction is improved, meets construction intensity;The equipment only needs 1 people and mostly mechanically actuated, substantially increases and applies
Work efficiency rate;With manually filling sand facies ratio, avoid fluctuation tide and exchange the program of slush pump sandpit, and reduce the quantity of sandpit,
Scouring equipment can be moved according to section condition of construction.Whole construction technology greatly improves the efficiency of construction, shortens construction
Supply, reduce the cost of construction.
Preferably:Slush pump and water pump are on the surface platform of a floating.
Preferably:It is additionally provided with surface platform to the underwater electric block inhaled sand pipette tips and carry out height regulation.
Preferably:The filling operation that sand pocket is filled in step (6) is more than or equal to 80%.
Embodiment
In order to further understand the content, features and effects of the present invention, it is as follows hereby to lift following examples detailed description:
A kind of bagged sand rib body construction technique of the present invention comprises the following steps,
(1) it is processed, and is transported to job site to filling sand pocket;According to onsite application to the size for filling sand pocket to filling
Sand pocket is processed, and is transported by vehicle, ship to job site;
(2) positioning is measured to the set location for filling sand pocket;Carried out filling sand pocket set location according to project construction data
That enters is selected, is effectively identified at the construction field (site) after selected;
(3) manually sprawled to filling sand pocket;
(4) underwater suction sand pipette tips are connected by delivery hose in the entrance of slush pump, blast is connected in the outlet of slush pump
Pipe, blast pipe are connected to the sand inlet for filling sand pocket;
(5) underwater pipette tips nozzle is connected by delivery hose in the outlet of water pump, the entrance of water pump is connected to by pipeline
Clear water puddle, water pump suck the clear water in puddle, and underwater pipette tips nozzle is transported to after pressurization and is sprayed at a high speed, by the sand at the bottom
Break up;
(6) slush pump is filled by inhaling sand pipette tips, delivery hose and blast pipe under water and sand aqueous mixtures being sucked and are delivered to
Sand pocket.
In the present embodiment, slush pump and water pump are on the surface platform of a floating, and the height of surface platform is with tide
Fluctuation and change.
In the present embodiment, it is additionally provided with surface platform to the underwater electric block inhaled sand pipette tips and carry out height regulation.
In the present embodiment, the filling operation that sand pocket is filled in step (6) is more than or equal to 80%.
Specific constitution equipment is as follows:
(1) plant equipment is put into:Generating set 1,4, slush pump, 2, water pump, loading machine 1, digging machine one;(2)
Equipment forms:Foam plastic float, Φ 50mm steel pipes, lock, suction sand pipette tips, black delivery hose, Φ 100mm rubber tubes, 2 mud
Pump, 1 jet water pump, pulley (sand pipette tips diving depth is inhaled in regulation), distribution box 1, earth anchor 4 (fixed equipments).
Claims (4)
1. a kind of bagged sand rib body construction technique, it is characterized in that:Comprise the following steps,
(1) it is processed, and is transported to job site to filling sand pocket;
(2) positioning is measured to the set location for filling sand pocket;
(3) manually sprawled to filling sand pocket;
(4) underwater suction sand pipette tips are connected by delivery hose in the entrance of slush pump, connects blast pipe in the outlet of slush pump, blow
Sandpipe is connected to the sand inlet for filling sand pocket;
(5) underwater pipette tips nozzle is connected by delivery hose in the outlet of water pump, the entrance of water pump is connected to clear water by pipeline
Puddle, water pump suck the clear water in puddle, and underwater pipette tips nozzle is transported to after pressurization and is sprayed at a high speed, the sand at the bottom is rushed
Dissipate;
(6) slush pump fills sand pocket by inhaling sand pipette tips, delivery hose and blast pipe under water and sand aqueous mixtures being sucked and are delivered to.
2. bagged sand rib body construction technique as claimed in claim 1, it is characterized in that:What slush pump and water pump floated positioned at one
On surface platform.
3. bagged sand rib body construction technique as claimed in claim 2, it is characterized in that:It is additionally provided with surface platform and is inhaled to underwater
Sand pipette tips carry out the electric block of height regulation.
4. bagged sand rib body construction technique as claimed in claim 3, it is characterized in that:The filling operation of sand pocket is filled in step (6)
More than or equal to 80%.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710938043.8A CN107687153A (en) | 2017-10-11 | 2017-10-11 | A kind of bagged sand rib body construction technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710938043.8A CN107687153A (en) | 2017-10-11 | 2017-10-11 | A kind of bagged sand rib body construction technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107687153A true CN107687153A (en) | 2018-02-13 |
Family
ID=61154323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710938043.8A Pending CN107687153A (en) | 2017-10-11 | 2017-10-11 | A kind of bagged sand rib body construction technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107687153A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042051A (en) * | 2019-12-30 | 2020-04-21 | 中建港航局集团有限公司 | Construction process of temporary flood prevention system |
CN116556356A (en) * | 2023-03-17 | 2023-08-08 | 中交广州航道局有限公司 | High-water-seepage type deep foundation pit drop-free drainage excavation construction method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1175646A (en) * | 1997-08-25 | 1998-03-11 | 地方国营泰兴渔业机械厂 | Construction technique for water bottom building of dike (dam) in deepwater region |
CN102127908A (en) * | 2011-04-18 | 2011-07-20 | 中交四航工程研究院有限公司 | Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion |
CN106284081A (en) * | 2016-08-12 | 2017-01-04 | 中建三局基础设施工程有限公司 | A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method |
-
2017
- 2017-10-11 CN CN201710938043.8A patent/CN107687153A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1175646A (en) * | 1997-08-25 | 1998-03-11 | 地方国营泰兴渔业机械厂 | Construction technique for water bottom building of dike (dam) in deepwater region |
CN102127908A (en) * | 2011-04-18 | 2011-07-20 | 中交四航工程研究院有限公司 | Method for quickly reinforcing ultra-soft soil foundation by using bagged sand cushion |
CN106284081A (en) * | 2016-08-12 | 2017-01-04 | 中建三局基础设施工程有限公司 | A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042051A (en) * | 2019-12-30 | 2020-04-21 | 中建港航局集团有限公司 | Construction process of temporary flood prevention system |
CN116556356A (en) * | 2023-03-17 | 2023-08-08 | 中交广州航道局有限公司 | High-water-seepage type deep foundation pit drop-free drainage excavation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102322058A (en) | Construction process and equipment for downhole impacting high-pressure jet grouting pile | |
CN109594990B (en) | Large-section jacking pipe construction method for complex stratum | |
CN105714834B (en) | A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake | |
CN106284081A (en) | A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method | |
CN102628273B (en) | Utilize dredging markets to charge the large-scale of fill and charge bag fill method and an equipment thereof | |
CN100570077C (en) | The horizontal leakage preventing structure that is used for red mud dump in karst terrain | |
CN101289852A (en) | Construction process of water foundation ditch rotary churning pile water stopping curtain | |
CN208072375U (en) | A kind of vacuum method pinniform horizontal drainage structure | |
CN112195924A (en) | Method for reinforcing foundation pit base of silt silty clay layer | |
CN107059523A (en) | A kind of construction method that road is built on reclaimed ground and the subgrade strengthening structure of construction method formation | |
CN205171496U (en) | Foundation stabilization high pressure jet slip casting device | |
CN107687153A (en) | A kind of bagged sand rib body construction technique | |
CN102182174B (en) | Construction method for treating soft soil foundation by combining chemical solution injection electro-osmosis method and gravel pile | |
CN106869153B (en) | A kind of method of the quick soft soil foundation treatment of well-points dewatering | |
CN112482456B (en) | Intelligent U-shaped base and method for treating bridge pile foundation scour pit | |
CN113832979A (en) | Foundation pit water-flushing method earthwork excavation construction method | |
CN205776282U (en) | A kind of immersed tube tunnel rebuilds cofferdam structure | |
CN2908612Y (en) | Level anti-leakage structure for red mud field of karst ared | |
CN112176954A (en) | Construction method for newly excavated channel | |
CN105040705A (en) | Ground foundation treatment construction technology under multi-karst-cave geological conditions | |
CN112030931A (en) | Deep foundation soft soil interlayer replacement and reinforcement method | |
CN104612128B (en) | Vacuum preloading reinforcement construction method applicable to underwater silt environment | |
CN105568956B (en) | Well-points dewatering combined heap load precompacting bracing means and its application method for roadbed | |
CN107313420A (en) | The construction method of strong rammer densification block pier is replaced using water under high pressure | |
CN212506392U (en) | Construction structure of drainage behind barricade wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180213 |