CN107683061A - A kind of data center's capacity management system and its operation principle - Google Patents

A kind of data center's capacity management system and its operation principle Download PDF

Info

Publication number
CN107683061A
CN107683061A CN201710663007.5A CN201710663007A CN107683061A CN 107683061 A CN107683061 A CN 107683061A CN 201710663007 A CN201710663007 A CN 201710663007A CN 107683061 A CN107683061 A CN 107683061A
Authority
CN
China
Prior art keywords
rack
electrically connected
server
control system
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710663007.5A
Other languages
Chinese (zh)
Inventor
冯朝力
肖艳炜
赵玉成
储建新
雷虹云
陆建琴
陆萍
胡景博
吴桂萍
曹志勇
施敏达
潘炫霖
刘海林
张依辰
李豹
雷建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haiyan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Haiyan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haiyan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Haiyan Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201710663007.5A priority Critical patent/CN107683061A/en
Publication of CN107683061A publication Critical patent/CN107683061A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K7/00Constructional details common to different types of electric apparatus
    • H05K7/14Mounting supporting structure in casing or on frame or rack
    • H05K7/1485Servers; Data center rooms, e.g. 19-inch computer racks
    • H05K7/1498Resource management, Optimisation arrangements, e.g. configuration, identification, tracking, physical location
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3051Monitoring arrangements for monitoring the configuration of the computing system or of the computing system component, e.g. monitoring the presence of processing resources, peripherals, I/O links, software programs
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/3055Monitoring arrangements for monitoring the status of the computing system or of the computing system component, e.g. monitoring if the computing system is on, off, available, not available
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/32Monitoring with visual or acoustical indication of the functioning of the machine
    • G06F11/324Display of status information
    • G06F11/325Display of status information by lamps or LED's

Abstract

The invention belongs to computer realm, and in particular to a kind of data center's capacity management system and its operation principle.Including rack, in addition to:Control system, it is connected with rack and mobile collection equipment communication;Mobile collection equipment, communicated to connect with rack;Supervisory control desk, it is connected with control unit and mobile collection equipment communication;Rack includes:NFC label, it is attached on rack;Infrared pick-up head, installed in interior of equipment cabinet, electrically connected with control system;Temperature sensor, installed in interior of equipment cabinet, electrically connected with control system;LCDs, electrically connected with control system;Voltage-current sensor, installed in interior of equipment cabinet, electrically connected with control system;Precision air conditioner, installed in interior of equipment cabinet, electrically connected with control system;Status indicator lamp, installed in cabinet front, it is connected with server;Several servers, in rack;Liquid crystal display, electrically connected with control system;Gravity sensor, installed in rack bottom, electrically connected with control system.

Description

A kind of data center's capacity management system and its operation principle
Technical field
The invention belongs to computer realm, and in particular to a kind of data center's capacity management system and its work are former Reason.
Background technology
The planning and management of resource are one of common problems of each data center, how to carry out the management of all kinds of resources It is one of common problem of keeper of each data center, here is common need of most of data centers on resource management Ask:Fully understand data center, building, floor, physics computer room, virtual computer room, row, each aspect of rack capacity status and can Resource information;Quick positioning correct position is disposed without influenceing relevant device availability and being easy to from now on for new information technoloy equipment Standardized management;Ensure after new information technoloy equipment is installed, do not influence system safe clearance such as redundancy, Hot Spare;Be clear from whether It can dispose high density server using existing power and cooling capacity or whether need scattered deployment blade server, and Meet desired rack position;Pre-allocation of resources is carried out for the newly built construction project implementation, it is ensured that the resource reasonable distribution of engineering project With management, the wasting of resources and conflict are avoided;Understand the capacity historical information and development trend that use, as capacity plan according to According to.
Chinese publication CN103049666 A, publication date 2013 year 04 month 17 days, entitled one kind of innovation and creation Data center machine room capacity analysis processing method based on space and energy consumption, the innovation and creation disclose one kind and are based on space and energy The data center machine room capacity analysis processing method of consumption, the innovation and creation detect space in rack using infrared induction sensor Occupancy situation;Temperature in use sensor gathers the profiling temperatures in computer room;Carry out collecting device using current sensor Operating current;Rack weight is gathered using pressure sensor;And the data collected are analyzed and processed.The present invention can be with The operation opinion of actual reference is provided with for data center machine room manager, the user of these systems when in use can What is be more prone to is designed and plans to the rack in computer room and the position of equipment.
It is disadvantageous in that, this method presence in the distribution of server location may exceed rack refrigerating capacity and not The problem of useful space for rationally utilizing rack can be maximized.
The content of the invention
The purpose of the invention be to solve above-mentioned data center when server-assignment and rack are using using Wait existing the problem of exceeding refrigerating capacity and the useful space for rationally utilizing rack can not be maximized.
A kind of data center's capacity management system, including rack, in addition to:Control system, set with rack and mobile collection Standby communication connection;Mobile collection equipment, communicated to connect with rack;Supervisory control desk, with control unit and mobile collection equipment communication Connection;Rack includes:NFC label, it is attached on rack;Infrared pick-up head, installed in interior of equipment cabinet, it is electrically connected with control system Connect;Temperature sensor, installed in interior of equipment cabinet, electrically connected with control system;LCDs, electrically connected with control system;Electricity Piezoelectricity flow sensor, installed in interior of equipment cabinet, electrically connected with control system;Precision air conditioner, installed in interior of equipment cabinet, it is with control System electrical connection;Status indicator lamp, installed in cabinet front, it is connected with server;Several servers, in rack;Liquid Crystal display, electrically connected with control system;Gravity sensor, installed in rack bottom, electrically connected with control system.
Preferably, described mobile collection equipment includes:NFC inductors, are electrically connected with communication module;Camera, with Communication module electrically connects;Display, electrically connected with communication module;Communication module, communicated to connect with control system and supervisory control desk.
Preferably, described control system includes:Communication unit, communicated to connect with mobile collection equipment and master control platform; Data acquisition unit, passed with infrared camera, temperature sensor, voltage-current sensor, precision air conditioner, communication unit and gravity Sensor electrically connects;Data processing unit, electrically connected with data acquisition unit, memory cell, clock unit and output unit;Storage Unit, electrically connected with output unit and clock unit;Clock unit, with clock unit, data processing unit, data acquisition list Member, memory cell and communication unit electrical connection;Output unit, electrically connected with communication unit.
Preferably, a kind of data center's capacity management system and its operation principle, including following rate-determining steps:S1:Just Beginningization;S2:Gathered according to the default peak power data of rack, maximum cooling capacity, maximum capacity amount, maximum U positions and sensor Now used power data, refrigeration data, load-bearing data, U positions data, establish three dimensional equivalent model;S3:Master control Platform receives addition server application;S4:The rack of new server can be added by finding;S5:Console is always taken according to application The corresponding scheme of server data generation;S6:New server is added in the model of simulation according to scheme after generation scheme; S7:Server is added in rack, using the NFC label on mobile collection equipment sensing rack, data in rack updated To supervisory control desk.
Preferably, described S4 includes following sub-step:A1:Obtain the power of new application server, weight, U positions and Need the data of refrigerating capacity;A2:Whether there is the rack that residuals weight space can accommodate the server in retrieval rack, if Have, redirect A3, if not provided, redirecting A14; A3:Whether retrieval has the rack that remaining physical space can accommodate the server, If so, A4 is redirected, if not provided, redirecting A14;A4:The rack that search complete is arranged from small to large according to dump power space Sequence;A5:Contrast according to sequence, have when whether groundwork time of the server is with other server groundworks in rack Overlap, if so, A6 is redirected, if not provided, redirecting A10; A6:Whether retrieval has dump power space to accommodate the service The rack of device, if so, A7 is redirected, if not provided, redirecting A14;A7:The rack after terminating will be retrieved according to remaining refrigeration space Size sorts;A8:Whether retrieval has the rack that remaining refrigeration space can accommodate the server, if so, A9 is redirected, if do not had Have, redirect A14;A9:The minimum rack installation of final choice residue refrigeration space, generates scheme;A10:The server is simulated And be respectively put into the simulation rack screened, simulation use is carried out to rack;A11:In simulation process whether all Power space or refrigeration space deficiency be present, if redirecting A6, if not provided, redirecting A12;A12:It will simulate Do not occur the rack of refrigeration work consumption deficiency and refrigeration space deficiency in journey, arranged from small to large according to dump power space size Sequence;A13:The remaining minimum rack installation of power space is selected, generates scheme;A14:New rack is established, redirects A2.
Innovation and creation beneficial effect:The innovation and creation detect cabinet temperature by temperature sensor, pass through infrared camera The use of rack internal physical space is shot, shoots the service condition of the physical space in rack, the occupancy of U positions and vacant U positions Distribution situation;Voltage-current sensor is used for detecting the electric power situation in rack, estimates dump power space;Gravity passes Sensor, below rack, for detecting machine cabinet load-bearing, judge residuals weight space;Adopted on rack by NFC label, movement Collection equipment can obtain the residue and service condition in each space in the rack by sensing NFC label, be eventually displayed in shifting On the display of dynamic collecting device, and information can be uploaded to by supervisory control desk by the communication module of mobile collection equipment;Shape State indicator lamp can intuitively see the operation conditions of each equipment in rack in outside cabinet;, can by method mentioned above To cause in terms of the installation of the position of server and emission problem so that space availability ratio maximizes, and causes each machine The maximum that the value of cabinet plays, and be advantageous to planning management so that data center's more stable operation.
Brief description of the drawings
Fig. 1:A kind of data center's capacity management system structure chart
Fig. 2:A kind of data center's capacity management system and its fundamental diagram top
Fig. 3:A kind of data center's capacity management system and its fundamental diagram bottom
In figure:1st, NFC label, 2, infrared pick-up head, 3, temperature sensor, 4, voltage-current sensor, 5, precision air conditioner, 6, Status indicator lamp, 7, gravity sensor, 8, server, 9, communication unit, 10, data acquisition unit, 11, data processing unit, 12nd, memory cell, 13, clock unit, 14, output unit, 15, communication module, 16, display, 17, camera, 18, NFC senses Answer device, 19, supervisory control desk.
Embodiment
The purpose of the invention be to solve above-mentioned data center when the distribution of server 8 and rack are using using Wait existing the problem of exceeding refrigerating capacity and the useful space for rationally utilizing rack can not be maximized.
A kind of data center's capacity management system, including rack, in addition to:Control system, set with rack and mobile collection Standby communication connection;Mobile collection equipment, communicated to connect with rack;Supervisory control desk 19, lead to control unit and mobile collection equipment Letter connection;Rack includes:NFC label 1, is attached on rack;Infrared pick-up first 2, installed in interior of equipment cabinet, with control system electricity Connection;Temperature sensor 3, installed in interior of equipment cabinet, electrically connected with control system;LCDs, electrically connected with control system; Voltage-current sensor 4, installed in interior of equipment cabinet, electrically connected with control system;Precision air conditioner 5, installed in interior of equipment cabinet, with control System electrical connection processed;Status indicator lamp 6, installed in cabinet front, it is connected with server 8;Several servers 8, installed in machine In cabinet;Liquid crystal display 16, is electrically connected with control system;Gravity sensor 7, installed in rack bottom, it is electrically connected with control system Connect.
Described mobile collection equipment includes:NFC inductors 18, electrically connected with communication module 14;Camera 17, with communication Module 14 electrically connects;Display 16, electrically connected with communication module 14;Communication module 14, it is logical with control system and supervisory control desk 19 Letter connection.
Described control system includes:Communication unit 9, communicated to connect with mobile collection equipment and master control platform;Data acquisition Unit 10, passed with infrared camera 17, temperature sensor 3, voltage-current sensor 4, precision air conditioner 5, communication unit 9 and gravity Sensor 7 electrically connects;Data processing unit 11, with data acquisition unit 10, memory cell 12, clock unit 13 and output unit 14 Electrical connection;Memory cell 12, electrically connected with output unit 14 and clock unit 13;Clock unit 13, with clock unit 13, data Processing unit 11, data acquisition unit 10, memory cell 12 and communication unit 9 electrically connect;Output unit 14, with communication unit 9 Electrical connection.
A kind of data center's capacity management system and its operation principle, including following rate-determining steps:S1:Initialization;S2: According to the default peak power data of rack, maximum cooling capacity, maximum capacity amount, maximum U positions and sensor gather now Power data, refrigeration data, load-bearing data, U positions data through using, establish three dimensional equivalent model;S3:Supervisory control desk 19 receives Addition server 8 is applied;S4:The rack of new server 8 can be added by finding;S5:Always take service of the console according to application The corresponding scheme of the data of device 8 generation;S6:New server 8 is added in the model of simulation according to scheme after generation scheme;S7: Server 8 is added in rack, using the NFC label 1 on mobile collection equipment sensing rack, data renewal in rack arrived Supervisory control desk 19.
Described S4 includes following sub-step:A1:Obtain the new power for applying for server 8, weight, U positions and need to freeze The data of amount;A2:Whether there is the rack that residuals weight space can accommodate the server 8 in retrieval rack, if so, redirecting A3, if not provided, redirecting A14; A3:Whether retrieval has the rack that remaining physical space can accommodate the server 8, if so, A4 is redirected, if not provided, redirecting A14;A4:The rack that search complete is sorted from small to large according to dump power space;A5:Press Phototypesetting ordered pair ratio, there is coincidence when whether groundwork time of the server 8 is with other 8 groundworks of server in rack, If so, A6 is redirected, if not provided, redirecting A10; A6:Whether retrieval has dump power space to accommodate the server 8 Rack, if so, A7 is redirected, if not provided, redirecting A14;A7:The rack after terminating will be retrieved according to remaining refrigeration space size Sequence;A8:Whether retrieval has the rack that remaining refrigeration space can accommodate the server 8, if so, A9 is redirected, if not provided, Redirect A14;A9:The minimum rack installation of final choice residue refrigeration space, generates scheme;A10:The server 8 is simulated simultaneously It is respectively put into the simulation rack screened, simulation use is carried out to rack;A11:Whether all deposited in simulation process Power space or refrigeration space deficiency situation, if redirecting A6, if not provided, redirecting A12;A12:Will be in simulation process In do not occur refrigeration work consumption deficiency and refrigeration space deficiency rack, sorted from small to large according to dump power space size; A13:The remaining minimum rack installation of power space is selected, generates scheme;A14:New rack is established, redirects A2.
The innovation and creation detect cabinet temperature by temperature sensor 3, and interior of equipment cabinet thing is shot by infrared camera 17 The use in space is managed, shoots the service condition of the physical space in rack, the occupancy of U positions and the distribution situation of vacant U positions;Voltage Current sensor 4 is used for detecting the electric power situation in rack, estimates dump power space;Gravity sensor 7, installed in machine Below cabinet, for detecting machine cabinet load-bearing, residuals weight space is judged;It can be led to by NFC label 1, mobile collection equipment on rack Residue and service condition that sensing NFC label 1 obtains each space in the rack are crossed, is eventually displayed in mobile collection equipment On display 16, and information can be uploaded to by supervisory control desk 19 by the communication module 14 of mobile collection equipment;State instruction Lamp 6 can intuitively see the operation conditions of each equipment in rack in outside cabinet;By method mentioned above, can cause In terms of the installation of the position of server 8 and emission problem so that space availability ratio maximizes, and causes the valency of each rack It is worth the maximum played, and is advantageous to planning management so that data center's more stable operation.
Embodiment described above is a kind of preferable scheme of the invention, not the present invention is made any formal Limitation, on the premise of without departing from the technical scheme described in claim also have other variants and remodeling.

Claims (5)

1. a kind of data center's capacity management system, including rack, it is characterised in that also include:
Control system, it is connected with rack and mobile collection equipment communication;
Mobile collection equipment, communicated to connect with rack;
Supervisory control desk, it is connected with control unit and mobile collection equipment communication;
Rack includes:
NFC label, it is attached on rack;
Infrared pick-up head, installed in interior of equipment cabinet, electrically connected with control system;
Temperature sensor, installed in interior of equipment cabinet, electrically connected with control system;
LCDs, electrically connected with control system;
Voltage-current sensor, installed in interior of equipment cabinet, electrically connected with control system;
Precision air conditioner, installed in interior of equipment cabinet, electrically connected with control system;
Status indicator lamp, installed in cabinet front, it is connected with server;
Several servers, in rack;
Liquid crystal display, electrically connected with control system;
Gravity sensor, installed in rack bottom, electrically connected with control system.
2. a kind of data center's capacity management system according to claim 1, it is characterised in that described mobile collection is set It is standby to include:
NFC inductors, are electrically connected with communication module;
Camera, electrically connected with communication module;
Display, electrically connected with communication module;
Communication module, communicated to connect with control system and supervisory control desk.
A kind of 3. data center's capacity management system according to claim 1, it is characterised in that described control system bag Include:
Communication unit, communicated to connect with mobile collection equipment and master control platform;
Data acquisition unit, with infrared camera, temperature sensor, voltage-current sensor, precision air conditioner, communication unit and again Force snesor electrically connects;
Data processing unit, electrically connected with data acquisition unit, memory cell, clock unit and output unit;
Memory cell, electrically connected with output unit and clock unit;
Clock unit, electrically connected with clock unit, data processing unit, data acquisition unit, memory cell and communication unit;
Output unit, electrically connected with communication unit.
4. a kind of data center's capacity management system and its operation principle, suitable for a kind of data as claimed in claim 1 Cardiac volume management system, it is characterised in that including following rate-determining steps:
S1:Initialization;
S2:Gathered according to the default peak power data of rack, maximum cooling capacity, maximum capacity amount, maximum U positions and sensor The present power data used, refrigeration data, load-bearing data, U positions data, establish three dimensional equivalent model;
S3:Supervisory control desk receives addition server application;
S4:The rack of new server can be added by finding;
S5:Always take console and corresponding scheme is generated according to the server data of application;
S6:New server is added in the model of simulation according to scheme after generation scheme;
S7:Server is added in rack, using the NFC label on mobile collection equipment sensing rack, by data in rack Update supervisory control desk.
5. a kind of data center's capacity management system according to claim 4 and its operation principle, it is characterised in that described S4 include following sub-step:
A1:Obtain power, weight, U positions and the data for needing refrigerating capacity of new application server;
A2:Whether there is the rack that residuals weight space can accommodate the server in retrieval rack, if so, A3 is redirected, if No, A14 is redirected;
A3:Whether retrieval has the rack that remaining physical space can accommodate the server, if so, A4 is redirected, if not provided, jumping Turn A14;
A4:The rack that search complete is sorted from small to large according to dump power space;
A5:Contrasted according to sequence, when whether groundwork time of the server is with other server groundworks in rack There is coincidence, if so, A6 is redirected, if not provided, redirecting A10;
A6:Whether retrieval has the rack that dump power space can accommodate the server, if so, A7 is redirected, if not provided, jumping Turn A14;
A7:The rack retrieved after terminating is sorted according to remaining refrigeration space size;
A8:Whether retrieval has the rack that remaining refrigeration space can accommodate the server, if so, A9 is redirected, if not provided, jumping Turn A14;
A9:The minimum rack installation of final choice residue refrigeration space, generates scheme;
A10:The server is simulated and is respectively put into the simulation rack screened, simulation use is carried out to rack;
A11:Power space or refrigeration space deficiency in simulation process whether all be present, if redirecting A6, If not provided, redirect A12;
A12:To not occur the rack of refrigeration work consumption deficiency and refrigeration space deficiency in simulation process, it is empty according to dump power Between size sort from small to large;
A13:The remaining minimum rack installation of power space is selected, generates scheme;
A14:New rack is established, redirects A2.
CN201710663007.5A 2017-08-04 2017-08-04 A kind of data center's capacity management system and its operation principle Pending CN107683061A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710663007.5A CN107683061A (en) 2017-08-04 2017-08-04 A kind of data center's capacity management system and its operation principle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710663007.5A CN107683061A (en) 2017-08-04 2017-08-04 A kind of data center's capacity management system and its operation principle

Publications (1)

Publication Number Publication Date
CN107683061A true CN107683061A (en) 2018-02-09

Family

ID=61134493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710663007.5A Pending CN107683061A (en) 2017-08-04 2017-08-04 A kind of data center's capacity management system and its operation principle

Country Status (1)

Country Link
CN (1) CN107683061A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109165139A (en) * 2018-08-07 2019-01-08 长沙龙生光启新材料科技有限公司 A method of it is tracked inventory by cloud system
CN109189635A (en) * 2018-08-01 2019-01-11 长沙龙生光启新材料科技有限公司 A method of it is tracked inventory by cloud system
CN110389553A (en) * 2019-07-31 2019-10-29 浪潮商用机器有限公司 A kind of equipment power dissipation monitoring device and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049666A (en) * 2012-12-27 2013-04-17 德讯科技股份有限公司 Data center machine room capacity analysis processing method based on space and energy consumption
US20130265705A1 (en) * 2011-02-07 2013-10-10 Ty Schmitt System and method for an optimizable rack solution
CN104461822A (en) * 2014-11-12 2015-03-25 北京百度网讯科技有限公司 Supervision method and device for capacity of data center
CN106056237A (en) * 2016-05-19 2016-10-26 北京百度网讯科技有限公司 Server rack position distribution method and apparatus used for data center

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130265705A1 (en) * 2011-02-07 2013-10-10 Ty Schmitt System and method for an optimizable rack solution
CN103049666A (en) * 2012-12-27 2013-04-17 德讯科技股份有限公司 Data center machine room capacity analysis processing method based on space and energy consumption
CN104461822A (en) * 2014-11-12 2015-03-25 北京百度网讯科技有限公司 Supervision method and device for capacity of data center
CN106056237A (en) * 2016-05-19 2016-10-26 北京百度网讯科技有限公司 Server rack position distribution method and apparatus used for data center

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109189635A (en) * 2018-08-01 2019-01-11 长沙龙生光启新材料科技有限公司 A method of it is tracked inventory by cloud system
CN109165139A (en) * 2018-08-07 2019-01-08 长沙龙生光启新材料科技有限公司 A method of it is tracked inventory by cloud system
CN110389553A (en) * 2019-07-31 2019-10-29 浪潮商用机器有限公司 A kind of equipment power dissipation monitoring device and method

Similar Documents

Publication Publication Date Title
CN101755495B (en) Methods and systems for managing facility power and cooling
CN107437301A (en) Portable power source leases control system and lease control method
CN102509178A (en) Distribution network device status evaluating system
CN107683061A (en) A kind of data center's capacity management system and its operation principle
CN106027328A (en) Cluster monitoring method and system based on application container deployment
CN106780719A (en) The three-dimensional scenic methods of exhibiting and platform of the confined space
CN115330275B (en) Echelon utilization method and device for retired battery
CN112688431A (en) Power distribution network load overload visualization method and system based on big data
CN107590749A (en) A kind of processing method and system with electricity consumption data
CN109088747A (en) The management method and device of resource in cloud computing system
CN102708517B (en) Computer room power equipment management system and method
CN106501760A (en) A kind of electrical energy meter fault management-control method and system
CN207148566U (en) A kind of data center's capacity management system
JP2022179546A (en) Information processing device, information processing system, information processing method and computer program
CN111208384A (en) Smart power grid management system
CN105449859A (en) Away3D engine-based display method for panoramic intelligent power system
CN109523436A (en) User's learning management method, apparatus, computer installation, storage medium
CN107992951A (en) Capacity alarm method, system, memory and the electronic equipment of cloud management platform
CN211349489U (en) Tool management cabinet
CN106227431A (en) The method and apparatus of management and monitoring members list on a kind of electronic chart
CN113206770A (en) Infrastructure supervision system of novel data center
CN109739719A (en) A kind of communications equipment room infrastructure management method and device
CN103620426B (en) For providing the technology of the integral viewpoint of individual's energy expenditure
CN109754486A (en) Garden management system
Geng SUSTAINABLE DATA CENTER: STRATEGIC PLANNING, DESIGN, CONSTRUCTION, AND OPERATIONS WITH EMERGING TECHNOLOGIES

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication