CN107679690A - A kind of worksheet method, storage medium and electronic equipment - Google Patents

A kind of worksheet method, storage medium and electronic equipment Download PDF

Info

Publication number
CN107679690A
CN107679690A CN201710773140.6A CN201710773140A CN107679690A CN 107679690 A CN107679690 A CN 107679690A CN 201710773140 A CN201710773140 A CN 201710773140A CN 107679690 A CN107679690 A CN 107679690A
Authority
CN
China
Prior art keywords
work order
deadline
priority
worksheet
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710773140.6A
Other languages
Chinese (zh)
Inventor
王舒岚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hive Box Technology Co Ltd
Original Assignee
Shenzhen Hive Box Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hive Box Technology Co Ltd filed Critical Shenzhen Hive Box Technology Co Ltd
Priority to CN201710773140.6A priority Critical patent/CN107679690A/en
Publication of CN107679690A publication Critical patent/CN107679690A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06316Sequencing of tasks or work

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention discloses a kind of worksheet method, storage medium and electronic equipment, and method includes step:A, the processing time of each work order of statistics, priority, deadline, user current location, and using user current location as starting point;B, the deadline of each work order of user's processing is calculated according to starting point, the deadline includes the processing time sum of the traffic time and corresponding work order between user current location and each work order position;The work order that can not be completed within deadline is rejected according to the deadline;C, work order of the work order of highest priority as next processing is picked out from remaining work order, using the position of the work order of next processing as new starting point, return to step B, is completed until being sorted to all work orders.The present invention both considers actual effect, combines urgency level again, and final realize improves worksheet efficiency.

Description

A kind of worksheet method, storage medium and electronic equipment
Technical field
The present invention relates to Java technology development field, more particularly to a kind of worksheet method, storage medium and electronics to set It is standby.
Background technology
During service-type firm expands rapidly, how efficiency of operation is improved, cut operating costs, it appears be heavy to closing Will.Staff often has the work order of several different locations to need to handle, and the urgency level of different work orders and deadline have again Institute is different, individually considers some factor, all differs and surely obtain most efficient scheme.And map is only provided between 2 points Path planning, actual effect and urgency level without considering work order in practical business, can not meet business demand.
Therefore, prior art has yet to be improved and developed.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, it is an object of the invention to provide a kind of worksheet method, storage medium And electronic equipment, it is intended to which worksheet method efficiency is low in the prior art for solution, does not consider that actual effect, urgency level etc. are asked Topic.
Technical scheme is as follows:
A kind of worksheet method, wherein, including step:
A, processing time of each work order, priority, deadline, user current location are counted, and by user current location As starting point;
B, the deadline that user handles each work order is calculated according to starting point, the deadline include user current location with The processing time sum of traffic time between each work order position and corresponding work order;Rejected according to the deadline in cut-off The interior work order that can not be completed;
C, work order of the work order of highest priority as next processing is picked out from remaining work order, with next place Return to step B, completed as new starting point until being sorted to all work orders the position of the work order of reason.
Described worksheet method, wherein, in the step B, the work order that can not be completed within deadline is added Into overtime queue.
Described worksheet method, wherein, in the step C, when priority is forward and has the work of same priority When singly having multiple, the work order using each work order of equal priority as next processing, obtains more set worksheet schemes respectively.
Described worksheet method, wherein, in the step C, any work order conduct is picked out from remaining work order The work order of next processing, using the position of the work order of next processing as new starting point, return to step B, until to all works Single sequence is completed, and obtains more set worksheet schemes.
Described worksheet method, wherein, also include after the step C:
From more set worksheet schemes, according to the work order priority treatment that work order is minimum in overtime queue, priority is high, always The optimal worksheet scheme of time-consuming sequential selection.
Described worksheet method, wherein, also include after the step C:
On map route displaying is carried out according to the sequencing of worksheet.
Described worksheet method, wherein, in the step C, when priority first and with the first priority work When singly having multiple, the work order using each work order with the first priority as next processing, obtains more set worksheets respectively Scheme.
Described worksheet method, wherein, if having overtime queue in optimal worksheet scheme, by overtime queue In work order be placed on last processing.
A kind of storage medium, wherein a plurality of instruction is stored with, wherein, the instruction is suitable to be loaded and performed by processor:
Processing time of each work order, priority, deadline, user current location are counted, and user current location is made For starting point;
The deadline of each work order of user's processing is calculated according to starting point, the deadline is including user current location and respectively The processing time sum of traffic time between work order position and corresponding work order;Rejected according to the deadline in deadline The interior work order that can not be completed;
Work order of the work order of highest priority as next processing is picked out from remaining work order, with next processing Work order position as new starting point, continue with, completed until being sorted to all work orders.
A kind of electronic equipment, wherein, including:
Processor, each instruction is adapted for carrying out, and
Storage medium, suitable for storing a plurality of instruction, the instruction is suitable to be loaded and performed by processor:
Processing time of each work order, priority, deadline, user current location are counted, and user current location is made For starting point;
The deadline of each work order of user's processing is calculated according to starting point, the deadline is including user current location and respectively The processing time sum of traffic time between work order position and corresponding work order;Rejected according to the deadline in deadline The interior work order that can not be completed;
Work order of the work order of highest priority as next processing is picked out from remaining work order, with next processing Work order position as new starting point, continue with, completed until being sorted to all work orders.
Beneficial effect:The present invention is advising according to information such as the deadline of work order, priority and geographical position according to trying one's best The principle of the urgent work order of interior priority treatment of fixing time provides the user most efficiently solution, both considers actual effect, and comprehensive Urgency level is closed, final realize improves worksheet efficiency.
Brief description of the drawings
Fig. 1 is a kind of flow chart of worksheet method preferred embodiment of the present invention.
Embodiment
The present invention provides a kind of worksheet method, storage medium and electronic equipment, to make the purpose of the present invention, technical side Case and effect are clearer, clear and definite, and the present invention is described in more detail below.It is it should be appreciated that described herein specific real Example is applied only to explain the present invention, is not intended to limit the present invention.
Referring to Fig. 1, Fig. 1 is a kind of flow chart of worksheet method preferred embodiment of the present invention, as illustrated, it is wrapped Include step:
S1, the processing time of each work order of statistics, priority, deadline, user current location, and by user current location As starting point;
S2, the deadline that user handles each work order is calculated according to starting point, the deadline includes user current location Traffic time and the processing time sum of corresponding work order between each work order position;Rejected and ended according to the deadline The work order that can not be completed in time;
S3, work order of the work order of highest priority as next processing is picked out from remaining work order, with next Return to step S2, completed as new starting point until being sorted to all work orders the position of the work order of processing.
The present invention obtains work order according to the processing time of each work order, priority, deadline and user current location Processing scheme, most efficiently solution is provided the user, improve worksheet efficiency.
Specifically, in the step S1, by system data, count and handle the time that each work order needs, make For the processing time of each work order.The urgency level of other each work order is different, so one priority is set for each work order in advance, such as 5 grades are arranged to, respectively the first priority, the second priority, third priority, the 4th priority and the 5th priority.In step In rapid S1, the priority of these work orders is obtained, so as to understand the urgency level of each work order.Each work order has and need to completed most in addition Time afterwards, such as work order A need in the afternoon 3:Completed before 00, the final time is the deadline of corresponding work order.User works as Front position refers to the current present position of staff, and it is to determine the work of first processing for convenience to obtain user current location It is single, in general, it can be completed with priority treatment within deadline and the work order of highest priority.In step sl, first Using user current location as starting point, the traffic time between other work order positions is calculated, can be by other works in subsequent step Unit is put as starting point, starts at the traffic time between remaining work order again.
In the step S2, the deadline of each work order of user's processing is calculated according to starting point.
User current location and each work unit location two are calculated by high moral map (can certainly be other maps) Traffic time between traffic time between two, such as user current location and work order location A, user current location and work order Traffic time between B location, the traffic time between user current location and work order location of C, this traffic time refer to user The commuting time needed for each work order position is reached from user current location, this commuting time is relevant with commuting tools, and user can be pre- First select commuting tools, such as walking, ride a bicycle, ride electric car or driving etc..Each work order is may also be previously calculated out in addition The traffic time of position between any two, can so save calculation procedure in subsequent step, directly take out the result of calculating i.e. Can.
User can be calculated according to the traffic time calculated and the processing time of each work order and handle the complete of each work order Into the time, the deadline includes the processing of the traffic time and corresponding work order between user current location and each work order position Traffic time between time sum, such as user current location and work order location A is T1, the processing time T2 of the work order A, So the deadline is T1+T2, the like, you can obtain the deadline that user handles all work orders from current location.Root According to the deadline of current time and each work order of processing, you can judge whether to complete before each work order deadline, such as Work order A deadline is afternoon 3:00, work order A deadline are 1 hour, and current time is 1:00, then at explanation The time for having managed work order A is 2:00, you can work order A is completed before deadline.And work order B deadline is afternoon 1:30, And work order B deadline is 1 hour, and current time is 1:00, then it is 2 to illustrate the time for having handled work order B:00, institute So that work order B can not be completed before work order B deadline, therefore need to reject work order B.
Further, in the step S2, the work order that can not be completed within deadline is added in overtime queue.This step The work order in overtime queue in rapid may have one or more, i.e. the meaning of time-out refers to can not since user current location Corresponding work order is completed within deadline, in subsequent step, can be referred to since some work order position, can not be in deadline It is interior to complete next work order, then next work order can be added in overtime queue.
In the step S3, work of the work order of highest priority as next processing is picked out from remaining work order Single, i.e., the present invention sorts for conceptual internal work order, is to pay the utmost attention to priority i.e. urgency level, first picks out highest priority Work order and as the work order of next processing.Then using the work order position of next processing as starting point, completion is calculated again Deadline needed for other work orders, and the work order that can not be completed within deadline is determined whether, such as next processing Work order be work order A, and current time is 1:00, and work order A deadline is 1 hour, illustrate to have handled after work order A when Between be 2:00, then if using work order location A as starting point, work order B deadline is 1 hour, then explanation complete work order B when Between be 3:00, and work order B deadline is 2:30, then illustrate that work order B can not be completed before work order B deadline, so Need to reject work order B, then other work orders are judged, weed out all work orders that can not be completed, then in remaining work order Pick out work order of the work order of highest priority as next processing, such as work order C.The like, until to except overtime team All work orders sequence outside row is completed, so as to form worksheet scheme.In the worksheet scheme, it is contemplated that actual effect Property, priority has been allowed also for, has improved worksheet efficiency, also farthest ensure that urgent work order obtains preferentially Processing.
If above-mentioned worksheet scheme is most promptly that the work order of same priority is unique, then what is finally obtained is exactly most Excellent scheme, directly export.
But in practical application, the work order that may have same priority have multiple, need to consider in this case The work order of all same priorities, so in the step S3, when the work order that priority is forward and has same priority has When multiple, the work order using each work order of equal priority as next processing, obtains more set worksheet schemes respectively.
For example, by priority the first two and when having multiple with the work order of same priority, respectively by each of equal priority Work order of the work order as next processing, obtain more set worksheet schemes.Work order as such as priority first has 3, And the work order of priority second has 5, then since user current location, under the work order A conducts for first selecting priority first The work order of one processing, after drawing worksheet scheme, the work of the work order B of reselection priority first as next processing It is single, after drawing worksheet scheme, the work order of the work order C of reselection priority the 3rd as next processing.And when selection work After work orders of single A as next processing, then using work order location A as starting point, the work order D of priority second is selected as next The work order of processing, or the like, the work order E of selection priority second, work order F, work order G, work order H are as next respectively The work order of processing, so as to obtain different worksheet schemes.And after work orders of the work order B as next processing is selected, then Using work order B location as starting point, the work order D of selection priority second, work order E, work order F, work order G, work order H are as next respectively The work order of processing, so as to obtain different worksheet schemes.And after work orders of the work order B as next processing is selected, then Using work order location of C as starting point, the work order D of selection priority second, work order E, work order F, work order G, work order H are as next respectively The work order of processing, so as to obtain different worksheet schemes.Different worksheet schemes can thus be covered more.For Final worksheet Scheme Choice can voluntarily be selected by user, can also be considered by system according to different factors to determine, Currently preferred be determined by system, to reduce user's operation.
The present invention most preferably, only when priority first and when having multiple with the work order of the first priority, respectively Work order using each work order with the first priority as next processing, obtain more set worksheet schemes.That is, this Invention only considers that a work order for the first priority has multiple situations, and for the work order of other priority, even if having it is multiple not yet Give consideration.Because in general, the work order urgency level highest of only the first priority, and come for other priority Say, urgency level then seems less important, so only considering the situation of the work order of priority first.Such as according to previous example Son, only consider that work order A, work order B, work order C selection are different, and obtain different worksheet schemes.For work order D, work order E, work order F, work order G, work order H are not considered then.So in the case of other priority identical work orders have multiple, Ke Yican Other modes are examined directly to determine which work order as next processing, such as under selection deadline most fast work order is used as The work order of one processing.Such as it is all the work order D with the second priority, work order E, work order F, work using work order location A as starting point In single G, work order H, work order E deadline is most fast, such as 3:00 just can be completed, and other work orders are needed 3:Ability after 30 Complete, so work orders of the work order E as next processing can be directly selected.
According to preceding description, more set worksheet schemes may be obtained, then need from these worksheet schemes Automatically select optimal case.
That is, also include after described step S3:
From more set worksheet schemes, according to the work order priority treatment that work order is minimum in overtime queue, priority is high, always The optimal worksheet scheme of time-consuming sequential selection.
That is, in more various schemes, it is minimum preferably to choose work order in overtime queue, so can guarantee that all Work order can be completed before deadline.And if the quantity of timeout trouble ticket is identical, then it is preferential to choose the high work order of priority The scheme of the high work order negligible amounts of priority in the scheme of processing, i.e. timeout trouble ticket, specifically according to priority from high in the end Carry out quantity comparison, choose the high few scheme of quantity of priority, for example, in A schemes in overtime queue priority second work order There are three, and the work order of priority second has two in overtime queue in B schemes, then B schemes are chosen, if A schemes and B side The work order quantity of priority second is identical in case time-out queue, then compare the work order quantity of priority the 3rd, the like.This Sample can guarantee that urgency level highest work order can largely be completed before deadline.And if overtime queue in each sets of plan In each work order priority distribution it is identical when, then take the most short scheme of total time-consuming, such as A schemes total time-consuming is 11 hours, and B side Case total time-consuming is 10 hours, so B schemes can be chosen as optimal worksheet scheme.
Further, if having overtime queue in optimal worksheet scheme, the work order in overtime queue is placed on finally Processing.That is, for overtime queue, work order therein has timed, out, it is possible to is placed on last processing, avoids shadow Ring the worksheet normally to be sorted in scheme.For overtime queue, work order can be determined according to the priority of work order Processing sequence, the high work order of priority treatment priority, reprocessing priority low work order, i.e., enter from high to low according to priority Row processing, if running into equal priority, finally handled from first according to the deadline.
Further, also include after the step S3:
On map route displaying is carried out according to the sequencing of worksheet.
For example, the route planning interface of high moral map is called to show use on map according to the sequencing of worksheet Family.So user can intuitively be clearly understood that work order route, the convenient processing successively that each work order is carried out according to route.
In the present invention, different worksheet schemes might have different overtime queues, in the step S3, from residue Work order in pick out work order of any work order as next processing, new rise is used as using the position of the work order of next processing Point, return to step S2, completed until being sorted to all work orders, obtain more set worksheet schemes.
That is, arbitrarily choosing work order of the work order therein as next processing, it is different can so to obtain more sets Worksheet scheme, after these worksheet schemes are obtained, can be merged with foregoing obtained more sets of plan, so Optimal scheme is chosen according to foregoing rule afterwards.I.e. from more set worksheet schemes, according to work order in overtime queue it is minimum, The high work order priority treatment of priority, the optimal worksheet scheme of the sequential selection of total time-consuming.
The present invention also provides a kind of storage medium, wherein a plurality of instruction is stored with, wherein, the instruction is suitable to by processor Load and perform:
Processing time of each work order, priority, deadline, user current location are counted, and user current location is made For starting point;
The deadline of each work order of user's processing is calculated according to starting point, the deadline is including user current location and respectively The processing time sum of traffic time between work order position and corresponding work order;Rejected according to the deadline in deadline The interior work order that can not be completed;
Work order of the work order of highest priority as next processing is picked out from remaining work order, with next processing Work order position as new starting point, continue with, completed until being sorted to all work orders.
Particular technique details on above-mentioned storage medium has been described in detail in method above, therefore is repeated no more.
The present invention also provides a kind of electronic equipment, wherein, including:
Processor, each instruction is adapted for carrying out, and
Storage medium, suitable for storing a plurality of instruction, the instruction is suitable to be loaded and performed by processor:
Processing time of each work order, priority, deadline, user current location are counted, and user current location is made For starting point;
The deadline of each work order of user's processing is calculated according to starting point, the deadline is including user current location and respectively The processing time sum of traffic time between work order position and corresponding work order;Rejected according to the deadline in deadline The interior work order that can not be completed;
Work order of the work order of highest priority as next processing is picked out from remaining work order, with next processing Work order position as new starting point, continue with, completed until being sorted to all work orders.
Particular technique details on above-mentioned electronic equipment has been described in detail in method above, therefore is repeated no more.
In summary, the present invention is advising according to information such as the deadline of work order, priority and geographical position according to trying one's best The principle of the urgent work order of interior priority treatment of fixing time provides the user most efficiently solution, both considers actual effect, and comprehensive Urgency level is closed, final realize improves worksheet efficiency.
It should be appreciated that the application of the present invention is not limited to above-mentioned citing, for those of ordinary skills, can To be improved or converted according to the above description, all these modifications and variations should all belong to the guarantor of appended claims of the present invention Protect scope.

Claims (10)

  1. A kind of 1. worksheet method, it is characterised in that including step:
    A, count processing time of each work order, priority, deadline, user current location, and using user current location as Starting point;
    B, the deadline of each work order of user's processing is calculated according to starting point, the deadline includes user current location and each work Unit put between traffic time and corresponding work order processing time sum;Rejected according to the deadline within deadline The work order that can not be completed;
    C, work order of the work order of highest priority as next processing is picked out from remaining work order, with next processing Return to step B, completed as new starting point until being sorted to all work orders the position of work order.
  2. 2. worksheet method according to claim 1, it is characterised in that, will be within deadline not in the step B The work order that can be completed is added in overtime queue.
  3. 3. worksheet method according to claim 2, it is characterised in that in the step C, when priority is forward and has When the work order for having same priority has multiple, respectively using each work order of equal priority as the work order of next processing, obtain More set worksheet schemes.
  4. 4. worksheet method according to claim 2, it is characterised in that in the step C, chosen from remaining work order Work order of any work order as next processing is selected, using the position of the work order of next processing as new starting point, returns to step Rapid B, completed until being sorted to all work orders, obtain more set worksheet schemes.
  5. 5. the worksheet method according to claim 3 or 4, it is characterised in that also include after the step C:
    From more set worksheet schemes, according to work order is minimum in overtime queue, priority is high work order priority treatment, total time-consuming The optimal worksheet scheme of sequential selection.
  6. 6. worksheet method according to claim 1, it is characterised in that also include after the step C:
    On map route displaying is carried out according to the sequencing of worksheet.
  7. 7. worksheet method according to claim 3, it is characterised in that in the step C, when priority first and have When the work order for having the first priority has multiple, the work order using each work order with the first priority as next processing respectively, Obtain more set worksheet schemes.
  8. 8. worksheet method according to claim 5, it is characterised in that if having time-out in optimal worksheet scheme Queue, then the work order in overtime queue is placed on last processing.
  9. 9. a kind of storage medium, wherein being stored with a plurality of instruction, it is characterised in that the instruction is suitable to be loaded and held by processor OK:
    Count processing time of each work order, priority, deadline, user current location, and using user current location as rising Point;
    The deadline of each work order of user's processing is calculated according to starting point, the deadline includes user current location and each work order The processing time sum of traffic time between position and corresponding work order;Rejected according to the deadline within deadline not The work order that can be completed;
    Work order of the work order of highest priority as next processing is picked out from remaining work order, with the work of next processing Single position continues with, completed until being sorted to all work orders as new starting point.
  10. 10. a kind of electronic equipment, it is characterised in that including:
    Processor, each instruction is adapted for carrying out, and
    Storage medium, suitable for storing a plurality of instruction, the instruction is suitable to be loaded and performed by processor:
    Count processing time of each work order, priority, deadline, user current location, and using user current location as rising Point;
    The deadline of each work order of user's processing is calculated according to starting point, the deadline includes user current location and each work order The processing time sum of traffic time between position and corresponding work order;Rejected according to the deadline within deadline not The work order that can be completed;
    Work order of the work order of highest priority as next processing is picked out from remaining work order, with the work of next processing Single position continues with, completed until being sorted to all work orders as new starting point.
CN201710773140.6A 2017-08-31 2017-08-31 A kind of worksheet method, storage medium and electronic equipment Pending CN107679690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710773140.6A CN107679690A (en) 2017-08-31 2017-08-31 A kind of worksheet method, storage medium and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710773140.6A CN107679690A (en) 2017-08-31 2017-08-31 A kind of worksheet method, storage medium and electronic equipment

Publications (1)

Publication Number Publication Date
CN107679690A true CN107679690A (en) 2018-02-09

Family

ID=61135596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710773140.6A Pending CN107679690A (en) 2017-08-31 2017-08-31 A kind of worksheet method, storage medium and electronic equipment

Country Status (1)

Country Link
CN (1) CN107679690A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876122A (en) * 2018-05-31 2018-11-23 康键信息技术(深圳)有限公司 Processing method, device, computer equipment and the storage medium of batch work order
CN109299919A (en) * 2018-09-27 2019-02-01 广东电网有限责任公司 A kind of industry expands method of auditing administration and system
CN111292163A (en) * 2020-01-21 2020-06-16 青梧桐有限责任公司 Rental work order management system
CN111325446A (en) * 2020-01-21 2020-06-23 青梧桐有限责任公司 Rent work order distribution method, system, electronic equipment and readable storage medium
CN111988807A (en) * 2019-05-21 2020-11-24 中国移动通信集团湖北有限公司 Network problem positioning method and device based on big data and computing equipment
CN113361918A (en) * 2021-06-04 2021-09-07 北京百奥利盟软件技术有限公司 Production scheduling method in cell gene therapy industry
CN113900973A (en) * 2020-07-06 2022-01-07 美光科技公司 Command prioritization in command queues
CN116307286A (en) * 2023-05-19 2023-06-23 安徽数智建造研究院有限公司 Building operation and maintenance work order monitoring management system based on digitization

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120072364A1 (en) * 2007-06-05 2012-03-22 Ho William P C Transportation management processes and systems
CN105913169A (en) * 2016-03-31 2016-08-31 国网北京市电力公司 Work order processing method and device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120072364A1 (en) * 2007-06-05 2012-03-22 Ho William P C Transportation management processes and systems
CN105913169A (en) * 2016-03-31 2016-08-31 国网北京市电力公司 Work order processing method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘小兰 等: "有时间窗的车辆路径问题的近似算法研究", 《计算机集成制造系统》 *
肖峰: "邮政车辆调度问题研究", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876122A (en) * 2018-05-31 2018-11-23 康键信息技术(深圳)有限公司 Processing method, device, computer equipment and the storage medium of batch work order
CN108876122B (en) * 2018-05-31 2024-02-06 康键信息技术(深圳)有限公司 Batch work order processing method and device, computer equipment and storage medium
CN109299919A (en) * 2018-09-27 2019-02-01 广东电网有限责任公司 A kind of industry expands method of auditing administration and system
CN111988807A (en) * 2019-05-21 2020-11-24 中国移动通信集团湖北有限公司 Network problem positioning method and device based on big data and computing equipment
CN111292163A (en) * 2020-01-21 2020-06-16 青梧桐有限责任公司 Rental work order management system
CN111325446A (en) * 2020-01-21 2020-06-23 青梧桐有限责任公司 Rent work order distribution method, system, electronic equipment and readable storage medium
CN113900973A (en) * 2020-07-06 2022-01-07 美光科技公司 Command prioritization in command queues
CN113361918A (en) * 2021-06-04 2021-09-07 北京百奥利盟软件技术有限公司 Production scheduling method in cell gene therapy industry
CN116307286A (en) * 2023-05-19 2023-06-23 安徽数智建造研究院有限公司 Building operation and maintenance work order monitoring management system based on digitization
CN116307286B (en) * 2023-05-19 2023-08-22 安徽数智建造研究院有限公司 Building operation and maintenance work order monitoring management system based on digitization

Similar Documents

Publication Publication Date Title
CN107679690A (en) A kind of worksheet method, storage medium and electronic equipment
US7802204B2 (en) Data visualization for service requests
US9053237B2 (en) Test script generation
CN109740860B (en) Charging vehicle selection method
CN110428206B (en) Intelligent solution method and device for delivery of express delivery terminal, storage medium and electronic equipment
CN108073727A (en) The data processing method and device of place search
CN110309993A (en) A kind of automated guided vehicle AGV method for allocating tasks and device
CN108830433A (en) A kind of O&M route planning method based on LBS, system
Xing et al. A reactive container rerouting model for container flow recovery in a hub-and-spoke liner shipping network
CN109284180A (en) A kind of method for scheduling task, device, electronic equipment and storage medium
CN107730085A (en) A kind of multi-functional radar network mission planning method based on branch and bound method
CN106326339A (en) Task allocating method and device
CN117557179A (en) Smart city distribution platform based on cluster intelligence
Legato et al. Simulation-based optimization for the quay crane scheduling problem
Schut et al. Approach: Decentralised rotation planning for container barges
CN113190335B (en) Multi-task scheduling and collecting method of power collecting terminal and power collecting system
US20050114189A1 (en) System and method for tour optimization
Li et al. Learning to bundle proactively for on-demand meal delivery
CN115409222A (en) Graph database-based transportation route planning method, device, equipment and medium
Amrani et al. A decision-making system for container storage management in a seaport using the ant-colony optimisation algorithm
CN111260106B (en) Transportation task allocation method, device, equipment and storage medium thereof
CN113361907A (en) Tool management method, device, electronic device, and storage medium
CN104077416B (en) Data processing method, data searching method and system
CN110544043A (en) Method, device, server and storage medium for scheduling courier
CN112749822A (en) Method and device for generating route

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication