CN107676084A - Fine and close oil reservoir long horizontal sections trajectory design method - Google Patents

Fine and close oil reservoir long horizontal sections trajectory design method Download PDF

Info

Publication number
CN107676084A
CN107676084A CN201710707300.7A CN201710707300A CN107676084A CN 107676084 A CN107676084 A CN 107676084A CN 201710707300 A CN201710707300 A CN 201710707300A CN 107676084 A CN107676084 A CN 107676084A
Authority
CN
China
Prior art keywords
oil reservoir
target spot
well
construction
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710707300.7A
Other languages
Chinese (zh)
Inventor
郝炳英
牛小兵
叶博
张居增
李卫成
梁晓伟
郑庆华
马文忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201710707300.7A priority Critical patent/CN107676084A/en
Publication of CN107676084A publication Critical patent/CN107676084A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of fine and close oil reservoir long horizontal sections trajectory design method, reasonable for the specific geologic feature of fine and close oily long horizontal sections, trajectory design method, it is ensured that larger layer of sand Drilling ratio and oil reservoir brill rate;With 20 mouthfuls of water horizontal wells instructing of the present invention, layer of sand Drilling ratio reaches more than 90%, reservoir-encountered rate more than 80%, and has tried out 100m3High yield commercial oil above, it is rational to illustrate trajectory design method of the present invention.

Description

Fine and close oil reservoir long horizontal sections trajectory design method
Technical field
The present invention relates to oil field development, earthquake, geology and reservoir engineering, and in particular to a kind of fine and close oil reservoir long horizontal sections rail Mark design method.
Background technology
At present, existing horizontal well path design mainly includes herein below:According to sedimentary facies, reservoir lithology, physical property, structure Make, offset well drilling well and formation testing situation etc. determine well spacing Favorable Areas;Determine before Horizontal Well Targets away from the ginseng such as, horizontal section length and orientation Number;Reservoir three-dimensional geological model is established, determines the track of target spot.
But Ordos Basin, which grows 7 fine and close oil reservoirs, its special geology characteristic:Pore throat character is complicated, and reservoir properties are poor, Mean permeability is generally less than 0.3mD;Basin tight sandstone reservoir and hydrocarbon source rock alternating layers symbiosis, single phase sand thickness is small, every folder Layer development, conventional trajectory design method bad adaptability, layer of sand and reservoir-encountered rate are difficult to ensure that.
The content of the invention
Deficiency in existing for prior art, the present invention provide a kind of fine and close oil reservoir long horizontal sections trajectory design method, Practical, the reliable fine and close oil reservoir long horizontal sections Trajectory Design technology for being applied to long 7 fine and close oil reservoirs is provided.
To reach above-mentioned purpose, the present invention is achieved through the following technical solutions:
Fine and close oil reservoir long horizontal sections trajectory design method, comprises the following steps:
Step 1) draws the sand thickness figure of substratum according to reference lamina, thickness principle, cycle principle, subdivision substratum;
Step 2), with reference to outcrop, well-log information, divides sedimentary subfacies and microfacies based on rock core and thin slice data, It is determined that favourable sedimentary micro;
Step 3) gathers seismic data, is referred to routine, inverting seismic profile, with reference to well point geologic information, determined small The formation of amplitude construction, portray sand top construction and layer top construction;
Step 4) is on the basis of sand thickness figure, according to the physical data of individual well, physical property of sketching figure, including porosity Figure, permeability figure and core intersection figure;
Step 5) collects, arranges offset well drilling well, formation testing and the means of production;
Step 6) determines well spacing Favorable Areas;
Step 7) disposes horizontal well in well spacing Favorable Areas by vertical orientation of principal stress, and in certain intervals Determine target spot;
Step 8) calculates the construction of each target spot:
(8.1) oil reservoir well nearest from well head flatly is determined, the construction difference of this well and well head is determined on structural map, so Afterwards according to the top bottom structured value of this well oil layer section, oil reservoir top, the structured value at bottom at well head are calculated respectively;
(8.2) according to step (8.1) identical method, calculate the structured value at oil reservoir top, bottom at last target spot;
(8.3) unit of account gradient is constructed according to the oil reservoir top bottom at well head and last target spot respectively:
Oil reservoir top unit gradient=(oil reservoir top constructs at construction-last target spot of well head oil reservoir top)/well head is to the end Distance at one target spot
Oil reservoir bill kept on file position gradient=(oil reservoir bottom constructs at construction-last target spot of well head oil reservoir bottom)/well head is to the end Distance at one target spot
(8.4) construction at oil reservoir top bottom at each target spot is calculated;
Oil reservoir top construction-oil reservoir top unit gradient × well head to this target spot at oil reservoir top construction=well head at certain target spot Distance
Oil reservoir bottom construction-oil reservoir bill kept on file position gradient × well head to this target spot at oil reservoir bottom construction=well head at certain target spot Distance
(8.5) the design structured value at each target spot is determined, its method is as follows:
1. oil reservoir top construction -3 at the=the first target spot is constructed at the first target spot;
2. construction=(oil reservoir bottom at construction+last target spot of oil reservoir top at last target spot at last target spot Construction)/2;
3. according to step 1. with step 2. calculated level section well unit gradient:
Unit gradient=(being constructed at the first target spot at construction-last target spot)/horizontal section length;
4. structured value is designed among calculating at target spot:
Distance of construction-unit gradient × this target spot to the first target spot at the=the first target spot of construction at certain target spot.
Further, the favourable sedimentary micro described in step 2) is the turbidity channel microfacies of half deep lacustrine facies.
Further, the well spacing Favorable Areas that step 6) determines meets following index:
(1) the grand position of the nose of sand top structural map and transition region;
(2) long 72(or long 71) sand thickness is more than 12m;
(3) long 72(or long 71) core intersection is more than 9m;
(4) long 72(or long 71) porosity be more than 10%;
(5) long 72(or long 71) permeability is more than 0.1mD;
(6) new well spacing offset well tested production value is high, and production feature is stable.
Further, step (8.1) determines not considering every interlayer less than 2m during oil layer section, and permeability is more than 0.1mD's Dried layer is considered by oil layer section.
Further, horizontal well is disposed by vertical orientation of principal stress in well spacing Favorable Areas in step 7), and pressed 100m interval determines target spot.
Further, step (8.1) oil reservoir well refers to straight well
The fine and close oil reservoir long horizontal sections trajectory design method of the present invention, for the specific geology of compact reservoir " sand mud mixes layer " Feature, determine during Trajectory Design not considering every interlayer less than 2m during oil layer section, dried layer of the permeability more than 0.1mD is pressed Oil layer section considers, it is ensured that larger layer of sand Drilling ratio and reservoir-encountered rate;The 20 mouthfuls of water horizontal wells instructed with the present invention, layer of sand bore Encountering rate reaches more than 90%, reservoir-encountered rate more than 80%, and formation testing has tried out 100m3High yield commercial oil above, It is rational to illustrate trajectory design method of the present invention.
Brief description of the drawings
Fig. 1 is horizontal well path design flow diagram of the present invention
Embodiment
With reference to specific embodiment, the present invention will be further described, the embodiment provided only for illustrating the present invention, The scope being not intended to be limiting of the invention.
The method of the present invention is realized using following steps:
1) the sand thickness figure of substratum is drawn according to reference lamina, thickness principle, cycle principle, subdivision substratum;
2) based on rock core and thin slice data, with reference to outcrop, well-log information, sedimentary subfacies and microfacies are divided, it is determined that Favourable sedimentary micro;
Favourable sedimentary micro described in step 2) is the turbidity channel microfacies of half deep lacustrine facies;
3) seismic data is gathered, is referred to routine, inverting seismic profile, with reference to well point geologic information, it is determined that by a small margin The formation of construction, portray sand top construction and layer top construction;
4) on the basis of sand thickness figure, according to the physical data of individual well, physical property of sketching figure, including porosity figure, ooze Saturating rate figure and core intersection figure.
5) collect, arrange offset well drilling well, formation testing and the means of production;
6) well spacing Favorable Areas is determined;
The well spacing Favorable Areas that step 6) determines should meet following index:
(1) the grand position of the nose of sand top structural map and transition region;
(2) long 72(or long 71) sand thickness is more than 12m;
(3) long 72(or long 71) core intersection is more than 9m;
(4) long 72(or long 71) porosity be more than 10%;
(5) long 72(or long 71) permeability is more than 0.1mD;
(6) new well spacing offset well tested production value is higher, and production feature is stable.
7) by vertical orientation of principal stress deployment horizontal well in well spacing Favorable Areas, and determine in certain intervals Target spot;
8) construction of each target spot is calculated:
(8.1) oil reservoir well (straight well) nearest from well head flatly is determined, the construction of this well and well head is determined on structural map Difference, then according to the top bottom structured value of this well oil layer section, oil reservoir top, the structured value at bottom at well head are calculated respectively;
In step (8.1), the determination method of oil layer section:Do not considered less than 2m every interlayer, permeability is more than 0.1mD's Dried layer is considered by oil layer section.
(8.2) according to step (1) identical method, calculate the structured value at oil reservoir top, bottom at last target spot;
(8.3) unit of account gradient is constructed according to the oil reservoir top bottom at well head and last target spot respectively:
Oil reservoir top (bottom) unit gradient=(oil reservoir top (bottom) structure at construction-last target spot of well head oil reservoir top (bottom) Make) the distance of/well head at a last target spot
(8.4) construction at oil reservoir top bottom at each target spot is calculated, oil reservoir at oil reservoir top (bottom) construction=well head at certain target spot Push up the distance of (bottom) construction-oil reservoir top (bottom) unit gradient × well head to this target spot
(8.5) the design structured value at each target spot is determined, its method is as follows:
1. oil reservoir top construction -3 at the=the first target spot is constructed at the first target spot;
2. construction=(oil reservoir bottom at construction+last target spot of oil reservoir top at last target spot at last target spot Construction)/2;
3. according to 1. and 2. calculated level section well unit gradient:
Unit gradient=(being constructed at the first target spot at construction-last target spot)/horizontal section length;
4. structured value is designed among calculating at target spot:
Distance of construction-unit gradient × this target spot to the first target spot at the=the first target spot of construction at certain target spot.
Embodiment:
1) according to reference lamina, thickness principle, cycle principle, substratum is segmented, and draw the sand thickness figure of substratum.
2) based on rock core and thin slice data, with reference to outcrop, well-log information, sedimentary subfacies and microfacies are divided, it is determined that Favourable sedimentary micro.
Favourable sedimentary micro described in step 2) is the turbidity channel microfacies of half deep lacustrine facies.
3) seismic data is gathered, is referred to routine, inverting seismic profile, with reference to well point geologic information, it is determined that by a small margin The formation of construction, portray sand top construction and layer top construction.
4) on the basis of sand thickness figure, according to the physical data of individual well, physical property of sketching figure, including porosity figure, ooze Saturating rate figure and core intersection figure.
5) collect, arrange offset well drilling well, formation testing and the means of production.
6) well spacing Favorable Areas is determined.
The well spacing Favorable Areas that step 6) determines should meet following index:
(1) the grand position of the nose of sand top structural map and transition region;
(2) long 72(or long 71) sand thickness is more than 12m;
(3) long 72(or long 71) core intersection is more than 9m;
(4) long 72(or long 71) porosity be more than 10%;
(5) long 72(or long 71) permeability is more than 0.1mD;
(6) new well spacing offset well tested production value is higher, and production feature is stable.
7) by vertical orientation of principal stress deployment horizontal well in well spacing Favorable Areas, and determine in certain intervals Target spot.
8) construction of each target spot is calculated:
(8.1) oil reservoir well (straight well) nearest from well head flatly is determined, the construction of this well and well head is determined on structural map Difference, then according to the top bottom structured value of this well oil layer section, oil reservoir top, the structured value at bottom at well head are calculated respectively.
In step (8.1), the determination method of oil layer section:Do not considered less than 2m every interlayer, permeability is more than 0.1mD's Dried layer is considered by oil layer section.
(8.2) according to step (1) identical method, calculate the structured value at oil reservoir top, bottom at last target spot.
(8.3) unit of account gradient is constructed according to the oil reservoir top bottom at well head and last target spot respectively:
Oil reservoir top (bottom) unit gradient=(oil reservoir top (bottom) structure at construction-last target spot of well head oil reservoir top (bottom) Make) the distance of/well head at a last target spot
(8.4) construction at oil reservoir top bottom at each target spot is calculated, such as
Oil reservoir top (bottom) construction-oil reservoir top (bottom) unit gradient × well at oil reservoir top (bottom) construction=well head at certain target spot Mouth arrives the distance of this target spot
(8.5) the design structured value at each target spot is determined, its method is as follows:
1. oil reservoir top construction -3 at the=the first target spot is constructed at the first target spot;
2. construction=(oil reservoir bottom at construction+last target spot of oil reservoir top at last target spot at last target spot Construction)/2;
3. according to 1. and 2. calculated level section well unit gradient:
Unit gradient=(being constructed at the first target spot at construction-last target spot)/horizontal section length;
4. structured value is designed among calculating at target spot:
Distance of construction-unit gradient × this target spot to the first target spot at the=the first target spot of construction at certain target spot.

Claims (6)

1. fine and close oil reservoir long horizontal sections trajectory design method, it is characterised in that comprise the following steps:
Step 1) draws the sand thickness figure of substratum according to reference lamina, thickness principle, cycle principle, subdivision substratum;
Step 2), with reference to outcrop, well-log information, divides sedimentary subfacies and microfacies based on rock core and thin slice data, it is determined that Favourable sedimentary micro;
Step 3) gathers seismic data, is referred to routine, inverting seismic profile, with reference to well point geologic information, it is determined that by a small margin The formation of construction, portray sand top construction and layer top construction;
Step 4) is on the basis of sand thickness figure, according to the physical data of individual well, physical property of sketching figure, including porosity figure, ooze Saturating rate figure and core intersection figure;
Step 5) collects, arranges offset well drilling well, formation testing and the means of production;
Step 6) determines well spacing Favorable Areas;
Step 7) disposes horizontal well in well spacing Favorable Areas by vertical orientation of principal stress, and determines in certain intervals Target spot;
Step 8) calculates the construction of each target spot:
(8.1) oil reservoir well nearest from well head flatly is determined, the construction difference of this well and well head, Ran Hougen are determined on structural map The top bottom structured value of well oil layer section accordingly, oil reservoir top, the structured value at bottom at well head are calculated respectively;
(8.2) according to step (8.1) identical method, calculate the structured value at oil reservoir top, bottom at last target spot;
(8.3) unit of account gradient is constructed according to the oil reservoir top bottom at well head and last target spot respectively:
Oil reservoir top unit gradient=(oil reservoir top constructs at construction-last target spot of well head oil reservoir top)/well head is to last one Distance at target spot
Oil reservoir bill kept on file position gradient=(oil reservoir bottom constructs at construction-last target spot of well head oil reservoir bottom)/well head is to last one Distance at target spot
(8.4) construction at oil reservoir top bottom at each target spot is calculated;
At certain target spot at oil reservoir top construction=well head oil reservoir top construction-oil reservoir top unit gradient × well head to this target spot distance
At certain target spot at oil reservoir bottom construction=well head oil reservoir bottom construction-oil reservoir bill kept on file position gradient × well head to this target spot distance
(8.5) the design structured value at each target spot is determined, its method is as follows:
1. oil reservoir top construction -3 at the=the first target spot is constructed at the first target spot;
2. construction=(oil reservoir bottom structure at construction+last target spot of oil reservoir top at last target spot at last target spot Make)/2;
3. according to step 1. with step 2. calculated level section well unit gradient:
Unit gradient=(being constructed at the first target spot at construction-last target spot)/horizontal section length;
4. structured value is designed among calculating at target spot:
Distance of construction-unit gradient × this target spot to the first target spot at the=the first target spot of construction at certain target spot.
2. fine and close oil reservoir long horizontal sections trajectory design method as claimed in claim 1, it is characterised in that:Having described in step 2) The sedimentary micro of profit is the turbidity channel microfacies of half deep lacustrine facies.
3. fine and close oil reservoir long horizontal sections trajectory design method as claimed in claim 1, it is characterised in that:The cloth that step 6) determines Well Favorable Areas meets following index:
(1) the grand position of the nose of sand top structural map and transition region;
(2) long 72(or long 71) sand thickness is more than 12m;
(3) long 72(or long 71) core intersection is more than 9m;
(4) long 72(or long 71) porosity be more than 10%;
(5) long 72(or long 71) permeability is more than 0.1mD;
(6) new well spacing offset well tested production value is high, and production feature is stable.
4. fine and close oil reservoir long horizontal sections trajectory design method as claimed in claim 1, it is characterised in that:Step (8.1) determines Do not considered during oil layer section less than 2m every interlayer, dried layer of the permeability more than 0.1mD is considered by oil layer section.
5. fine and close oil reservoir long horizontal sections trajectory design method as claimed in claim 1, it is characterised in that:In well spacing in step 7) By vertical orientation of principal stress deployment horizontal well in Favorable Areas, and target spot is determined by 100m interval.
6. fine and close oil reservoir long horizontal sections trajectory design method as claimed in claim 1, it is characterised in that:Step (8.1) oil reservoir Well refers to straight well.
CN201710707300.7A 2017-08-17 2017-08-17 Fine and close oil reservoir long horizontal sections trajectory design method Pending CN107676084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710707300.7A CN107676084A (en) 2017-08-17 2017-08-17 Fine and close oil reservoir long horizontal sections trajectory design method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710707300.7A CN107676084A (en) 2017-08-17 2017-08-17 Fine and close oil reservoir long horizontal sections trajectory design method

Publications (1)

Publication Number Publication Date
CN107676084A true CN107676084A (en) 2018-02-09

Family

ID=61135260

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710707300.7A Pending CN107676084A (en) 2017-08-17 2017-08-17 Fine and close oil reservoir long horizontal sections trajectory design method

Country Status (1)

Country Link
CN (1) CN107676084A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113221219A (en) * 2021-05-08 2021-08-06 北京金阳普泰石油技术股份有限公司 Construction method and system for adjacent well structure profile in horizontal well target design

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695862A (en) * 2013-12-06 2015-06-10 中国石油天然气股份有限公司 Drilling geological design method of compact sandstone lithology gas reservoir horizontal well
CN105604483A (en) * 2015-12-29 2016-05-25 中国石油天然气股份有限公司 Horizontal well target design method based on isochronic plane deduction

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695862A (en) * 2013-12-06 2015-06-10 中国石油天然气股份有限公司 Drilling geological design method of compact sandstone lithology gas reservoir horizontal well
CN105604483A (en) * 2015-12-29 2016-05-25 中国石油天然气股份有限公司 Horizontal well target design method based on isochronic plane deduction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘海锋等: "低渗透层碳酸盐岩气藏水平井开发地质关键技术", 《天然气地球科学》 *
喻国良等: "《海岸工程水文学》", 31 August 2009, 上海交通大学出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113221219A (en) * 2021-05-08 2021-08-06 北京金阳普泰石油技术股份有限公司 Construction method and system for adjacent well structure profile in horizontal well target design
CN113221219B (en) * 2021-05-08 2023-09-01 北京金阳普泰石油技术股份有限公司 Construction method and system of adjacent well construction section in horizontal well target design

Similar Documents

Publication Publication Date Title
CN109441422A (en) A kind of shale gas well spacing optimizing exploitation method
CN104141481B (en) A kind of ultra-low penetration compact oil reservoir horizontal well well-arranging procedure
CN103472484B (en) Horizontal well path optimization method based on RS three-dimensional sensitive earthquake attributive analysis
CN101936165B (en) Well spacing method for karst carbonate reservoir
CN104809277A (en) Geological modeling method for horizontal wells in ultra-low permeability tight reservoirs
CN103993862A (en) Stratification developing method for complex fault block thin oil reservoir
CN105822302A (en) Oil-water distribution recognition method based on well-ground potential method
CN107045153A (en) Terrestrial lake basin sloped region Stratigraphic reservoir Dominant Facies Forecasting Methodology
CN106014372B (en) A kind of horizontal well well-arranging procedure based on sand body structure
CN104912537B (en) A kind of well net deployment method of huge thick buried hill fracture reservoir
CN103510947A (en) Beach bar sandstone microfacies recognition mode establishment method and application of beach bar sandstone microfacies recognition mode in microfacies recognition
CN105822284B (en) Triangle horizontal well patterns well-arranging procedure
CN106503295B (en) A kind of method and device for explaining oil field Water Flooding Layer using state-space model
CN104653156B (en) Fragmental rock oil and gas reservoir development unit partitioning method
CN107448197A (en) A kind of method of marine facies sandstone oil reservoir fluid-channeling channel space development quantitative judge
Wimmers et al. Integration of sedimentology, petrophysics and rock typing as key to understanding a tight gas reservoir
CN106372319A (en) Seismic model stratigraphic division comparison method
CN106501873B (en) A kind of method for recovering delta front foreset bed depositional dip based on rock core
Lun et al. Influences of delta sandstone architecture on waterflooding sweep characteristics: A case study of layer J-II of Kumkol South oilfield in South Turgay Basin, Kazakstan
Taixian et al. Techniques for high-efficient development of offshore fluvial oilfields
Liu et al. The Control Theory and Application for Well Pattern Optimization of Heterogeneous Sandstone Reservoirs
RU2493362C1 (en) Method of oil filed development
Feng et al. Discovery of “Enveloping surface of oil and gas overpressure migration” in the Songliao Basin and its bearings on hydrocarbon migration and accumulation mechanisms
CN107676084A (en) Fine and close oil reservoir long horizontal sections trajectory design method
CN109522583A (en) A kind of heterogeneity boundary for stratified reservoir development sequence combination determines method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication