CN107675840A - Roof color steel plate bridging arrangement and its installation method - Google Patents
Roof color steel plate bridging arrangement and its installation method Download PDFInfo
- Publication number
- CN107675840A CN107675840A CN201711144027.8A CN201711144027A CN107675840A CN 107675840 A CN107675840 A CN 107675840A CN 201711144027 A CN201711144027 A CN 201711144027A CN 107675840 A CN107675840 A CN 107675840A
- Authority
- CN
- China
- Prior art keywords
- roofing
- plate
- lower plate
- notch
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 41
- 239000010959 steel Substances 0.000 title claims abstract description 41
- 238000009434 installation Methods 0.000 title claims abstract description 14
- 238000000034 method Methods 0.000 title claims abstract description 11
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 35
- 238000010079 rubber tapping Methods 0.000 claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 14
- 239000004927 clay Substances 0.000 claims abstract description 7
- 239000011324 bead Substances 0.000 claims description 10
- 230000002787 reinforcement Effects 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 235000019994 cava Nutrition 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000003601 intercostal effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000004826 seaming Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/36—Connecting; Fastening
- E04D3/3605—Connecting; Fastening of roof covering supported directly by the roof structure
- E04D3/3606—Connecting; Fastening of roof covering supported directly by the roof structure the fastening means being screws or nails
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/36—Connecting; Fastening
- E04D3/365—Connecting; Fastening by simple overlapping of the marginal portions with use of separate connecting elements, e.g. hooks or bolts for corrugated sheets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/38—Devices for sealing spaces or joints between roof-covering elements
Abstract
The invention discloses a kind of roof color steel plate bridging arrangement and its installation method, including roof purline, roofing lower plate and roofing upper plate, roofing lower plate and roofing upper plate are roof color steel plate;Reinforcing plate is placed in the top surface of roof purline, the top section of roofing lower plate and the bottom section of roofing upper plate form lap segment in reinforcing plate;In lap segment, cut respectively for the male rib in roofing lower plate and roofing upper plate and female rib, form notch, be bonded to each other using the interlaced roofing lower plate made in lap segment and roofing upper plate of each notch;Top section in roofing lower plate, at notch position, utilize waterproof clay to set multi layer waterproof to keep off;Between roofing upper plate, roofing lower plate and reinforcing plate, it is fixedly connected from top to bottom using water proof type tapping screw.The present invention interrupt over-long roof color steel portion structure is firm, do not collapse, not ponding, ensure waterproof effect.
Description
Technical field
The present invention relates to a kind of roof color steel plate bridging arrangement and its installation method, especially apply in large-span steel
The overlap joint and its field fabrication installation method at factory building roof color steel termination position.
Background technology
With the fast development of steel building, green steel house and high-rise steel and concrete structure increasingly increase
It is more.Large-span steel factory building is because span is big, whole plate length reaches more than 30 meters so that and roof color steel plate needs to interrupt installation,
Cause waterproof not in place, the situation of percolating water happens occasionally, and also position installation is not firm enough, and overlapping part is strong because interrupting sometimes
Spend low, cause roof color steel plate overlapping part to collapse, form ponding and simultaneously cause large area percolating water, to producing and office causes sternly
Ghost image rings.
The content of the invention
The present invention be to avoid above-mentioned the shortcomings of the prior art in place of, there is provided a kind of roof color steel plate bridging arrangement and
Its installation method, to ensure to interrupt that portion structure is firm, do not collapse, ponding in over-long roof color steel, ensure waterproof effect
Fruit.
The present invention adopts the following technical scheme that to solve technical problem:
The characteristics of roof color steel plate bridging arrangement of the present invention is:It is described including roof purline, roofing lower plate and roofing upper plate
Roofing lower plate and roofing upper plate are roof color steel plate;Reinforcing plate, the top of roofing lower plate are placed in the top surface of the roof purline
Section and the bottom section of roofing upper plate form lap segment in the reinforcing plate;In the lap segment, for the roofing lower plate and
Male rib and female rib in roofing upper plate are cut respectively, form notch, and interlaced using each notch makes in lap segment
Roofing lower plate and roofing upper plate are bonded to each other;Top section in the roofing lower plate, at notch position, utilize marine glue
Mud sets multi layer waterproof to keep off;It is solid from top to bottom using water proof type tapping screw between roofing upper plate, roofing lower plate and reinforcing plate
Fixed connection.
The characteristics of roof color steel plate bridging arrangement of the present invention, lies also in:The reinforcing plate carries upward hook in upper end,
The opening of hook is towards roofing lower plate, and with the top bead for hanging over roofing lower plate.
The characteristics of roof color steel plate bridging arrangement of the present invention, lies also in:The multi layer waterproof gear includes being located in roofing lower plate
Kept off on notch along the upper waterproof gear of opening position and under its notch along the lower waterproof of opening position.
The characteristics of roof color steel plate bridging arrangement of the present invention, lies also in:It is 200mm to set the notch length in roofing lower plate,
Notch length in roofing upper plate is 30mm, then it is 230mm to overlap segment length, sets the width of the reinforcing plate to be not less than
230mm, the lap segment is set to be completely supported in the reinforcing plate.
The characteristics of installation method of roof color steel plate bridging arrangement of the present invention is to carry out as follows:
Step 1:The roofing lower plate to form roofing lower plate notch is laid in the top of roof purline, in laying roofing lower plate
Reinforcing plate is placed between the top surface of roof purline and roofing lower plate simultaneously, and the hook in reinforcing plate is hung over into roofing lower plate
Top bead on;
Step 2:Being located at roofing lower plate notch position using waterproof clay sets multi layer waterproof to keep off, including:Positioned at room
The upper waterproof gear of the upper edge hole position of face lower plate notch, and the lower waterproof gear positioned at the lower bead position of roofing lower plate notch;
Step 3:Roof boarding sliding support is installed, and utilizes the bottom of bearing tapping screw fixed setting roof boarding sliding support
Seat;
Step 4:Installation forms the roofing upper plate of roofing upper plate notch, makes roofing upper plate and roofing lower plate with notch stagger mode
Into overlap joint;
Step 5:Position where being kept off using water proof type tapping screw in lap segment along waterproof is fixed, and is by waterproof
Type tapping screw from it is upper and on run through and be fixedly connected with reinforcing plate in roofing upper plate, roofing lower plate successively, it is color to complete roofing
The laying of steel plate.
Compared with the prior art, the present invention has the beneficial effect that:
1st, the present invention sets reinforcing plate in roof color steel plate overlapping part, carries out structural support using reinforcing plate, makes overlap joint
Structure is more firm, does not cave in, and ponding is formed because overlapping part caves in so as to effectively prevent;
2nd, the present invention cuts out notch respectively in roofing lower plate and the lap segment of roofing upper plate for male rib and female rib,
Avoid interfering, make its mutual fitting even closer;
3rd, the present invention sets multi layer waterproof to keep off in overlapping part using waterproof clay, and waterproof effect is reliable;
4th, field-mounted process simple and fast of the present invention;
5th, the present invention is applied to the super-huge over-long roof color steel of super large, ensures bond strength, eliminates leakage hidden trouble.
Brief description of the drawings
Fig. 1 is present invention overlap joint process schematic;
Fig. 2 is bridging arrangement schematic diagram of the present invention;
Label in figure:1 roof purline, 2 reinforcing plates, 2a hooks, 3 roof boarding sliding supports, 4 bearing tapping screws, 5 roofings
Lower plate, 5a roofing lower plate notches, 6 roofing upper plates, 6a roofing upper plate notches, 7 water proof type tapping screws, waterproof gear on 8 are prevented for 9 time
Water is kept off.
Embodiment
Referring to Fig. 1 and Fig. 2, roof color steel plate bridging arrangement includes roof purline 1, roofing lower plate 5 and room in the present embodiment
Face upper plate 6, roofing lower plate 5 and roofing upper plate 6 are roof color steel plate;Reinforcing plate 2, roofing are placed in the top surface of roof purline 1
The top section of lower plate 5 and the bottom section of roofing upper plate 6 form lap segment in reinforcing plate 2.
The cross section of roof color steel plate is " U "-shaped at middle part, and side side wave peak is public rib, and opposite side side wave peak is female rib,
It is with male rib and the mutual snapping of female rib between adjacent roof color steel plate.In the present embodiment, in lap segment, for roofing lower plate
5 and the male rib in roofing upper plate 6 and female rib cut respectively, form notch respectively, be taking to roofing lower plate 5 shown in Fig. 1
The male rib of socket part point and female rib carry out cutting and form roofing lower plate notch 5a, and the male rib of overlap of roofing upper plate 6 and female rib are entered
Row cutting forms roofing upper plate notch 6a, utilizes the interlaced roofing lower plate 5 made in lap segment and roofing upper plate 6 of each notch
Mutually it is brought into close contact, eliminates the intercostal interference in same position.
Top section in roofing lower plate 5, at roofing lower plate notch 5a positions, set multiple tracks to prevent using waterproof clay
Water is kept off, and is kept off shown in Fig. 1 for twice waterproof, is to keep off 8 Hes along the upper waterproof of opening position on roofing lower plate notch 5a respectively
9 are kept off positioned at the lower waterproof of roofing lower plate notch 5a lower bead opening positions, twice waterproof gear more efficiently ensure that waterproof effect;
Between roofing upper plate 6, roofing lower plate 5, reinforcing plate 2 and roof purline 1, fixed from top to bottom using water proof type tapping screw 7
Connection.
Shown in Fig. 1, reinforcing plate 2 carries upward hook 2a in upper end in the present embodiment, links up with 2a opening towards roofing
Lower plate 5, and hung over linking up with 2a on the top bead of roofing lower plate 5, hook 2a is beneficial to the positioning to roofing lower plate 5, also just
It is fixed in the integration of reinforcing plate 2 and roofing lower plate 5.
In the present embodiment, the length for setting roofing lower plate notch 5a is 200mm, and roofing upper plate notch 6a length is
30mm, then it is 230mm to overlap segment length, sets the width of reinforcing plate 2 to be not less than 230mm, lap segment is completely supported at reinforcement
On plate 2, ensure sound construction, avoid being formed in overlapping part and cave in.
The installation method of roof color steel plate bridging arrangement is to carry out as follows in the present embodiment:
Step 1:Scene is cut respectively to the male rib and female rib of roofing lower plate 5 and aspect upper plate 6 so that under roofing
The male rib of epimere of plate 5 and female rib position are each formed with the roofing lower plate notch 5a that length is 200mm, in roofing upper plate 6
The male rib of hypomere and female rib position are each formed with the roofing upper plate notch 6a that length is 30mm, and it is not less than 230mm to take width
Reinforcing plate 2.
Step 2:The roofing lower plate 5 to form roofing lower plate notch 5a is laid in the top of roof purline 1, in the case where laying roofing
Reinforcing plate 2 is placed between the top surface of roof purline 1 and roofing lower plate 5 while plate 5, and by the hook 2a in reinforcing plate 2
Hang on the top bead of roofing lower plate 5, complete the positioning of roofing lower plate 5 and reinforcing plate 2.
Step 3:Being located at roofing lower plate notch 5a positions using waterproof clay sets multi layer waterproof to keep off, and comprises at least:
Upper waterproof positioned at roofing lower plate notch 5a upper edge hole position keeps off 8, and positioned at roofing lower plate notch 5a lower bead position
Lower waterproof gear 9.
Step 4:Roof boarding sliding support 3 is installed, and roof boarding sliding support 3 is fixedly installed using bearing tapping screw 4
Base.
Step 5:Installation forms roofing upper plate notch 6a roofing upper plate 6, makes roofing upper plate 6 and roofing lower plate 5 with notch
Overlap joint is staggered to form, overlap joint segment length is 230mm.
Step 6:Using water proof type tapping screw 7 in lap segment along lower waterproof keep off 9 place positions be fixed, be by
Water proof type tapping screw 7 from it is upper and on run through and be fixedly connected in roofing upper plate 6, roofing lower plate 5 and reinforcing plate 2 successively, it is complete
Into the laying of roof color steel plate;
Step 7:After the laying of roof color steel plate is completed, the male and female seaming overlapped is installed to overlap joint in time and carries out machinery
Lockstitch a border, in installation process, as depicted in figs. 1 and 2, roof purline 1 is supported on the middle part of reinforcing plate 2, and reinforcing plate 2 is wider than in both sides
Roof purline 1, lower waterproof gear 9 are in roof purline 1 on position vertically staggeredly, and water proof type tapping screw 7 is not related to room
Face purlin 1, roof purline are force structure, and roof color steel plate is roofing outside plate, belong to wall interior panel, the present invention both ensured structure by
Power, the firm and non-leakage of outside plate is in turn ensure that, node is perfect, makes overlapping for roofing outside plate intractable in this steel building
Problem is solved very well.
Claims (5)
- A kind of 1. roof color steel plate bridging arrangement, it is characterised in that:Including roof purline (1), roofing lower plate (5) and roofing upper plate (6), the roofing lower plate (5) and roofing upper plate (6) are roof color steel plate;Place and add in the top surface of the roof purline (1) Strong plate (2), the top section of roofing lower plate (5) and the bottom section of roofing upper plate (6) form lap segment in the reinforcing plate (2);Institute State in lap segment, cut respectively for the male rib in the roofing lower plate (5) and roofing upper plate (6) and female rib, form groove Mouthful, it is bonded to each other using the interlaced roofing lower plate made in lap segment and roofing upper plate of each notch;In the roofing lower plate (5) top section, at notch position, utilize waterproof clay to set multi layer waterproof to keep off;Under roofing upper plate (6), roofing Between plate (5) and reinforcing plate (2), it is fixedly connected from top to bottom using water proof type tapping screw (7).
- 2. roof color steel plate bridging arrangement according to claim 1, it is characterised in that:The reinforcing plate (2) is in upper end band There is upward hook (2a), link up with the opening of (2a) towards roofing lower plate (5), and roofing lower plate is hung over the hook (2a) (5) on top bead.
- 3. roof color steel plate bridging arrangement according to claim 1, it is characterised in that:The multi layer waterproof gear includes being located at Upper waterproof in roofing lower plate (5) on notch along opening position keeps off (8) and keeps off (9) along the lower waterproof of opening position under its notch.
- 4. roof color steel plate bridging arrangement according to claim 1, it is characterised in that:Groove in roofing lower plate (5) is set Mouthful length be 200mm, and the notch length in roofing upper plate (6) is 30mm, then overlap joint segment length is 230mm, sets the reinforcement The width of plate (2) is not less than 230mm, the lap segment is completely supported in the reinforcing plate (2).
- A kind of 5. installation method of the roof color steel plate bridging arrangement described in claim 1, it is characterized in that carrying out as follows:Step 1:The roofing lower plate (5) to form roofing lower plate notch (5a) is laid in the top of roof purline (1), in laying roofing Reinforcing plate (2) is placed between the top surface of roof purline (1) and roofing lower plate (5) while lower plate (5), and by reinforcing plate (2) hook (2a) on is hung on the top bead of roofing lower plate (5);Step 2:Being located at roofing lower plate notch (5a) position using waterproof clay sets multi layer waterproof to keep off, including:Positioned at room The upper waterproof gear (8) of the upper edge hole position of face lower plate notch (5a), and positioned at the lower bead position of roofing lower plate notch (5a) Lower waterproof gear (9);Step 3:Roof boarding sliding support (3) is installed, and utilizes bearing tapping screw (4) fixed setting roof boarding sliding support (3) base;Step 4:Installation forms the roofing upper plate (6) of roofing upper plate notch (6a), make roofing upper plate (6) and roofing lower plate (5) with Notch is staggered to form overlap joint;Step 5:Position where being kept off using water proof type tapping screw (7) in lap segment along waterproof is fixed, and is by waterproof Type tapping screw (7) from it is upper and on run through successively in roofing upper plate (6), roofing lower plate (5) and reinforcing plate (2) and fixed connect Connect, complete the laying of roof color steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711144027.8A CN107675840A (en) | 2017-11-17 | 2017-11-17 | Roof color steel plate bridging arrangement and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711144027.8A CN107675840A (en) | 2017-11-17 | 2017-11-17 | Roof color steel plate bridging arrangement and its installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107675840A true CN107675840A (en) | 2018-02-09 |
Family
ID=61150034
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711144027.8A Pending CN107675840A (en) | 2017-11-17 | 2017-11-17 | Roof color steel plate bridging arrangement and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107675840A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111706011A (en) * | 2020-04-30 | 2020-09-25 | 上海宝冶集团有限公司 | Double-layer color plate roof construction method |
CN113235830A (en) * | 2021-07-12 | 2021-08-10 | 森特士兴集团股份有限公司 | Novel multi-functional anti-wind metal sheet system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5146727A (en) * | 1987-12-07 | 1992-09-15 | Npf Nordisk Platformning Ab | Cladding panel |
CN101473096A (en) * | 2006-06-16 | 2009-07-01 | 克利克斯钢型材股份公司 | Sheet metal cladding panel |
CN201574529U (en) * | 2009-12-10 | 2010-09-08 | 安徽富煌钢构股份有限公司 | Buried-shirts roof plate longitudinally-connecting structure |
CN102454263A (en) * | 2010-10-20 | 2012-05-16 | 上海钢之杰钢结构建筑有限公司 | Transversely spliced daylighting panel |
CN103174262A (en) * | 2013-03-20 | 2013-06-26 | 江苏扬州建工建设集团有限公司 | Construction method for super-long steel plate roof |
CN204386040U (en) * | 2014-12-22 | 2015-06-10 | 安徽伟宏钢结构集团股份有限公司 | A kind of face, house slidingtype ribbon skylight syndeton |
CN105569279A (en) * | 2016-02-23 | 2016-05-11 | 罗保盛科技(南京)有限公司 | Roof broken joint overlapping structure and construction method thereof |
CN205894500U (en) * | 2016-06-21 | 2017-01-18 | 江苏蓝天彩涂薄板科技有限公司 | Novel sealed various steel sheet of dock |
CN207419868U (en) * | 2017-11-17 | 2018-05-29 | 安徽富煌钢构股份有限公司 | Roof color steel plate bridging arrangement |
-
2017
- 2017-11-17 CN CN201711144027.8A patent/CN107675840A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5146727A (en) * | 1987-12-07 | 1992-09-15 | Npf Nordisk Platformning Ab | Cladding panel |
CN101473096A (en) * | 2006-06-16 | 2009-07-01 | 克利克斯钢型材股份公司 | Sheet metal cladding panel |
US20100000171A1 (en) * | 2006-06-16 | 2010-01-07 | Clix Steel Profile Ab | Sheet metal cladding panel |
CN201574529U (en) * | 2009-12-10 | 2010-09-08 | 安徽富煌钢构股份有限公司 | Buried-shirts roof plate longitudinally-connecting structure |
CN102454263A (en) * | 2010-10-20 | 2012-05-16 | 上海钢之杰钢结构建筑有限公司 | Transversely spliced daylighting panel |
CN103174262A (en) * | 2013-03-20 | 2013-06-26 | 江苏扬州建工建设集团有限公司 | Construction method for super-long steel plate roof |
CN204386040U (en) * | 2014-12-22 | 2015-06-10 | 安徽伟宏钢结构集团股份有限公司 | A kind of face, house slidingtype ribbon skylight syndeton |
CN105569279A (en) * | 2016-02-23 | 2016-05-11 | 罗保盛科技(南京)有限公司 | Roof broken joint overlapping structure and construction method thereof |
CN205894500U (en) * | 2016-06-21 | 2017-01-18 | 江苏蓝天彩涂薄板科技有限公司 | Novel sealed various steel sheet of dock |
CN207419868U (en) * | 2017-11-17 | 2018-05-29 | 安徽富煌钢构股份有限公司 | Roof color steel plate bridging arrangement |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111706011A (en) * | 2020-04-30 | 2020-09-25 | 上海宝冶集团有限公司 | Double-layer color plate roof construction method |
CN113235830A (en) * | 2021-07-12 | 2021-08-10 | 森特士兴集团股份有限公司 | Novel multi-functional anti-wind metal sheet system |
CN113235830B (en) * | 2021-07-12 | 2021-09-21 | 森特士兴集团股份有限公司 | Multifunctional wind-resistant metal plate system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107675840A (en) | Roof color steel plate bridging arrangement and its installation method | |
CN102797357A (en) | Construction method of single-side mould supporting system | |
CN103352569A (en) | Construction method of integrally-poured architecture building | |
CN207419868U (en) | Roof color steel plate bridging arrangement | |
CN109386088B (en) | Archaize building roof structure | |
CN103422625B (en) | Unit telescopic type assembling metal gutter and making and installation method thereof | |
CN209854922U (en) | Prefabricated assembled reinforced concrete prefabricated house | |
CN203256981U (en) | Unit-elastic-type assembling metal gutter | |
CN212836300U (en) | Assembled steel frame light-duty energy-conserving composite board roof inner gutter connection structure | |
CN208685942U (en) | The vertical sealed secret nail waterproof solar roof sandwich panel of seam | |
AU2009213882B2 (en) | Building roof system | |
CN211666523U (en) | Prefabricated bay window and connected node thereof | |
CN210395788U (en) | Double-slope metal inclined roof ridge node | |
CN210917975U (en) | A mounting structure for waterproof insulation integration board | |
CN208578239U (en) | Precast concrete wall panel | |
CN211286219U (en) | Lighting roof structure for pool roof system | |
CN218970362U (en) | Waterproof node structure of prefabricated externally hung wallboard | |
CN214784853U (en) | Whole-covering type flexible waterproof profile | |
CN206034654U (en) | Low roofing ridge and high node construction system of striding wall of striding | |
CN219365434U (en) | Steel template sealing structure for pressure-bearing assembled steel structure building | |
CN218714101U (en) | Prefabricated embedded JDG (JDG) line pipe building wallboard structure | |
CN217461112U (en) | Anchor firm assembled environmental protection concrete prefabricated superimposed sheet | |
CN109469224B (en) | Joint of prefabricated concrete shear wall external wall panel and construction method thereof | |
CN218323307U (en) | Leveling device for assembled prefabricated part and energy-saving wall comprising leveling device | |
CN215167268U (en) | Assembled integrated roof structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |