CN103422625B - Unit telescopic type assembling metal gutter and making and installation method thereof - Google Patents
Unit telescopic type assembling metal gutter and making and installation method thereof Download PDFInfo
- Publication number
- CN103422625B CN103422625B CN201310011502.XA CN201310011502A CN103422625B CN 103422625 B CN103422625 B CN 103422625B CN 201310011502 A CN201310011502 A CN 201310011502A CN 103422625 B CN103422625 B CN 103422625B
- Authority
- CN
- China
- Prior art keywords
- gutter
- snap close
- groove body
- body section
- type groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention provides a kind of unit telescopic type assembling metal gutter, it comprises some gutter elementary sections, each described gutter elementary section comprises metal sheet system U-shaped sky groove body section and a metallic framework, the bottom of this U-shaped sky groove body section and/or the sidewall in outside set firmly described metallic framework, this metallic framework is provided with and builds the syndeton be connected; Horizontal U-type groove telescoping connection oral area is provided with integratedly at the two ends port of described U-shaped sky groove body section, the outside in the horizontal U-type groove stretching structure portion that groove body two ends, U-shaped sky are arranged is provided with the buckle structure of coupling mutually, and adjacent described gutter elementary section is connected as one by described buckle structure.The present invention also provides manufacture and the mounting method of the telescopic assembling metal gutter of said units.The present invention can realize fabricated construction, work efficiency is fast, and quality is good, easy construction, on-the-spot welding, and security risk is little, saves integrated cost 30%, improves construction and installation, production and processing effect 3 times, reduces gutter maintenance cost 80%.
Description
Technical field
The present invention relates to the drainage gutter of building roof and building curtain wall, provide a kind of unit telescopic type to assemble metal gutter.The present invention also provides described unit telescopic type to assemble the making and installation method of metal gutter.
Background technology
In prior art, the draining metal gutter on building roof or building curtain wall is the ditch body section adopting factory process to go out gutter, the method construction and installation in bulk that ditch body section couples together by the scene then arrive.The method of attachment of drainage gutter generally has following four kinds of forms:
1. overlap: upper Ya Daxia ditch, ditch, pressure takes length 50-50mm.
2. take riveted joint: add rivet again behind upper Ya Daxia ditch, ditch and carry out anchoring, take riveted joint length 30-80mm.
3. snapping: upper ditch flanging withholds lower ditch flanging, and dense extrusion reaches spreading, waterproof requirement.
4. weld: upper pressure ditch, ditch, take long 10-20mm, then full weld is carried out integrally to lap gap, reach connection and waterproof requirement.
The drainage grade > 15% of draining metal gutter adopts bridging method spreading, and drainage grade < 15% adopts welding or seam glue sizing method spreading and waterproof.
The counter-measure of draining metal gutter dilatation is generally: drainage grade > 15% adopts overlapping the slot method to adapt to dilatation.Drainage grade < 15% adopts segmentation to establish gutter method to adapt to dilatation.
The shortcoming of prior art is:
1. the on-the-spot method construction and installation in bulk of gutter, keel, ditch install spelling, riveted joint or welding job amount greatly, and work efficiency is low, difficult quality guarantee.
2. gutter welding or seam play glue, and during artificial maintenance cleaning sandy soil, gutter welding and the easy cracking destruction of glue-line, waterproof, drainage performance cannot ensure.
3. by segmentation, existing gutter expansion joint establishes that ditch method cost is high, difficulty of construction is large, and lap-joint easily leaks.Gutter welding, snapping, take riveted joint and cannot ensure dilatation needs.
4. existing gutter technology cannot carry out standardized designs, batch production processing, in-site installation assemblingization and welding construction, and its processing installation effectiveness is low, of poor quality, cost is high, difficulty of construction is large.
Summary of the invention
The object of the invention is to improve deficiency of the prior art, provide one can realize fabricated construction, work efficiency is fast, quality is good, easy construction, on-the-spot welding, the unit telescopic type assembling metal gutter that security risk is little.
Another object of the present invention is to provide described unit telescopic type to assemble metal gutter and making and installation method thereof.
The object of the present invention is achieved like this:
A kind of unit telescopic type assembling metal gutter, it comprises some gutter elementary sections, each described gutter elementary section it comprise metal sheet system U-shaped sky groove body section and a metallic framework, the bottom of this U-shaped sky groove body section and/or the sidewall in outside set firmly described metallic framework, this metallic framework is provided with and builds the syndeton be connected; Horizontal U-type groove telescoping connection oral area is provided with integratedly at the two ends port of described U-shaped sky groove body section, the outside in the horizontal U-type groove stretching structure portion that groove body two ends, U-shaped sky are arranged is provided with the buckle structure of coupling mutually, and adjacent described gutter elementary section is connected as one by described buckle structure.
Further, fluid sealant can also be set on described buckle structure.
Described buckle structure can be: metal sheet system U-shaped sky groove body section wherein the horizontal U-type groove telescoping connection oral area of one end outside side wall outwards an extended returning plate part form female snap close, and the horizontal U-type groove of the other end is stretched, the outside side wall of interface forms public snap close, when being connected with adjacent gutter elementary section, two adjacent gutter elementary sections, the outside side wall of the male snap close of one is plugged in the gap between this returning plate part and described outside side wall of female snap close of another gutter elementary section, adjacent two sections of metal sheet system U-shaped sky groove body sections are connected, in the U-type groove of described horizontal U-type groove telescoping connection oral area plugging described returning plate part, described fluid sealant is set.
The syndeton of described metal sheet system U-shaped sky groove body section and described metallic framework can be: on the outer side bottom surface and/or side outer side surface of described metal sheet system U-shaped sky groove body section, arrange weldering bolt, described metallic framework arranges weldering keyhole, plug described weldering bolt, fixed by nut, make metal sheet system U-shaped sky groove body section become to be integrated with described metallic framework.
Described metallic framework is also provided with bolt hole, wears for the bolt on the adaptor on described building and be connected.
A making and installation method for unit telescopic type assembling metal gutter, it comprises the steps:
Step 1: make metal sheet system U-shaped sky groove body section in the factory:
Metal sheet is curved U-type groove by squeezer, and by U-type groove length direction two ends in one end curve the scalable interface of horizontal U-type groove and public snap close, the other end curves horizontal U-type groove shape and female snap close of back bending Flap section of arranging of the lateral surface of U-type groove, and this completes overall cell body and bends that to bend step succession with end snap close convertible;
Step 2: in the factory or building-site metal sheet system U-shaped sky groove body section and metallic framework be connected to form gutter elementary section:
The outer side bottom surface and/or side outer side surface of described metal sheet system U-shaped sky groove body section arrange row or several row weldering bolt by weldering nail solder along the length direction of metal sheet system U-shaped sky groove body section, the syndeton that corresponding position processes some weldering keyholes and is connected with building on described metallic framework, weldering bolt in U-shaped for metal sheet system sky groove body section is located in the weldering keyhole on metallic framework, by the nut be located on weldering bolt metallic framework is fixed in metal sheet system U-shaped sky groove body section and forms gutter elementary section;
Step 3: some gutter elementary sections are coupled together at building-site:
The described back bending Flap section of female snap close of one end of one in adjacent two gutter elementary sections is plugged in the scalable interface of the horizontal U-type groove of the male snap close of another gutter elementary section, then, use locking machine to carry out male snap close that roll extrusion fastening interlocks and female snap close.
Further, described method also comprises:
Step 4: second time waterproof safety insurance process sealing is done to unit telescopic type assembling metal gutter in building site:
In the U-type groove of the scalable interface of each horizontal U-type groove for male snap close, execute fluid sealant the gap between the outside side wall of the scalable interface of the described back bending Flap section of female snap close and the horizontal U-type groove of male snap close is made up.
Described fluid sealant is the weather-proof waterproof gasket cement of high resiliency.
On this unit telescopic type assembling metal gutter roofing that can be fixed on building by the syndeton be connected with building be arranged on described metallic framework or curtain wall.
Described metallic framework can be square steel.
Unit telescopic type assembling metal gutter provided by the invention and its making and installation method tool have the following advantages:
1) the telescopic seam of gutter, is connected firmly, capable of expansion and contraction, anti-, draining reliable, can adapt to flexible and External Force Acting distortion needs of gutter temperature deformation, fill up metal sheet gutter dilatation structure and tectonic sieving blank.
2) can effectively improve design, production, efficiency of construction, ensure that drainage gutter water-proof drainage capability and performance is reliable.
3) modular gutter, fabricated construction, work efficiency is fast, and quality is good, easy construction, and on-the-spot welding, security risk is little.
1) design of modern building design construction standardization, factorial praluction, prefabricated construction three modern architecture designs, construction speed has been promoted.
Unit provided by the invention stretches assembling-type metal gutter, can be widely used in various industry and civilian construction, building curtain wall, roof, drainage gutter engineering.Its Technique Popularizing uses market larger.Production, construction technology are simple, are easy to learn and use, then the comprehensive social benefit of environmental protection and energy saving is comparatively large, can save integrated cost 30%, improve construction and installation, production and processing effect 3 times, reduce gutter maintenance cost 80%.
Below by drawings and Examples, the present invention will be further described.
Accompanying drawing explanation
Fig. 1 is the perspective view of the metal sheet system U-shaped sky groove body section in unit telescopic type provided by the invention assembling metal gutter.
Fig. 2 is that in display metal sheet system U-shaped sky groove body section, the horizontal U-type groove in two ends is stretched the perspective view of interface and male and female buckle structure.
Fig. 3 is the perspective view that adjacent two metal sheet system U-shaped sky groove body sections connect.
Detailed description of the invention
As depicted in figs. 1 and 2, a kind of unit telescopic type assembling metal gutter, it comprises some gutter elementary sections 1, each gutter elementary section 1 it comprise metal sheet system U-shaped sky groove body section 11 and a metallic framework 12, the bottom of this U-shaped sky groove body section 1 and the sidewall corner in outside arrange two square steel metallic frameworks 12, this metallic framework 12 is provided with and builds the syndeton be connected; Be provided with horizontal U-type groove telescoping connection oral area 13 integratedly at the two ends port of described U-shaped sky groove body section 11, the outside in horizontal U-type groove stretching structure portion that groove body two ends, U-shaped sky are arranged is provided with the buckle structure of coupling mutually, this buckle structure particularly:
Metal sheet system U-shaped sky groove body section 11 wherein the horizontal U-type groove telescoping connection oral area of one end outside side wall outwards an extended returning plate part form female snap close 14, and the outside side wall of the horizontal U-type groove telescoping connection oral area 13 of the other end forms public snap close 15, when adjacent gutter elementary section connects, as shown in Figure 3, two adjacent gutter elementary sections 1, stretch female snap close 14 i.e. horizontal U-type groove that the outside side wall of interface is plugged in another gutter elementary section 1 of the male snap close 15 i.e. horizontal U-type groove of one is stretched in the extended gap between this returning plate part and described outside side wall of interface outside side wall, adjacent two sections of metal sheet system U-shaped sky groove body sections are connected, in the U-type groove of described horizontal U-type groove telescoping connection oral area plugging described returning plate part, described fluid sealant is set.Adjacent described gutter elementary section is connected as one by described buckle structure, and described buckle structure arranges fluid sealant.
The syndeton of described metal sheet system U-shaped sky groove body section and described metallic framework can be: on the outer side bottom surface and/or side outer side surface of described metal sheet system U-shaped sky groove body section, arrange weldering bolt, described metallic framework and square steel arrange weldering keyhole, this weldering keyhole is preferably elongated hole, described weldering bolt is plugged in this weldering keyhole, fixed by nut, metal sheet system U-shaped sky groove body section 11 is integrated with described metallic framework 12 one-tenth.
Described metallic framework is also provided with bolt hole, wears for the bolt on the adaptor on described building and be connected.
The manufacture of the telescopic assembling metal gutter of said units and mounting method, it comprises the steps:
Step 1: make metal sheet system U-shaped sky groove body section 1 in the factory:
The metal sheet of such as 3mm thickness is curved U-type groove by squeezer, and the one end in the two ends of U-type groove length direction being curved scalable interface 13 and the public snap close 15 of horizontal U-type groove, the other end curves female snap close 14 of the scalable interface 13 of horizontal U-type groove and the back bending Flap section of the lateral surface of U-type groove setting; This two step bending precedence can according to actual process equipment situation conversion.
Step 2: in the factory or building-site metal sheet system U-shaped sky groove body section and metallic framework be connected to form gutter elementary section:
The outer side bottom surface and/or side outer side surface of described metal sheet system U-shaped sky groove body section arrange row or several row weldering bolt (not shown) by weldering nail solder along the length direction of metal sheet system U-shaped sky groove body section, the syndeton that corresponding position processes some weldering bolt elongated holes and is connected with building on metallic framework 12, it also can be such as bolt hole, weldering bolt in U-shaped for metal sheet system sky groove body section 11 is located in the weldering keyhole on metallic framework 12, by the nut be located on weldering bolt metallic framework is fixed in metal sheet system U-shaped sky groove body section and forms gutter elementary section,
Step 3: some gutter elementary sections are coupled together at building-site:
Being plugged in the scalable interface of the horizontal U-type groove of another gutter elementary section by the described back bending Flap section of female snap close 14 of one end of one in adjacent two gutter elementary sections makes male snap close 15 be plugged in female snap close 14, then, use locking machine to carry out male snap close that roll extrusion fastening interlocks and female snap close; Then closed-water test is carried out water-tight.
In order to more insure, increase the 4th step:
Step 4: unit telescopic type assembling metal gutter is sealed in building site:
After closed-water test is qualified, fluid sealant is executed again in the U-type groove of the scalable interface of each horizontal U-type groove for public snap close 15, note beat can be the weather-proof waterproof gasket cement of high resiliency, gap between the outside side wall of the scalable interface of the described back bending Flap section of female snap close and the horizontal U-type groove of male snap close is made up by (not shown), does second time waterproof safety insurance process to gutter spreading shrinkage joint.Also can apply fluid sealant in the U-shaped material of the scalable interface of the horizontal U-type groove of female snap close side, make the ditch bottom surface of whole gutter smooth.
On this unit telescopic type assembling metal gutter roofing that can be fixed on building by the syndeton be connected with building be arranged on described metallic framework or curtain wall.
In the prior art, such gutter Design and manufacture mounting method was not had.Unit telescopic type provided by the invention assembling metal gutter structure is very simple, but it by the scalable Interface realization of horizontal U-type groove temperature deformation affected by environment, can be arranged fluid sealant and also do not hinder enough temperature deformations in horizontal U-type groove.The present invention can stop the operations such as Site Welding, and work efficiency and workmanship are greatly improved.The male and female buckle structure of design makes the reliably easy to connect of metal sheet system U-shaped sky groove body section, can ensure water-tight, and by applying glue.Ensure gutter water resistance reliability.
Claims (4)
1. a making and installation method for unit telescopic type assembling metal gutter, is characterized in that, comprise the steps:
Step 1: make metal sheet system U-shaped sky groove body section in the factory:
Metal sheet is curved U-type groove by squeezer, and the one end in the two ends of U-type groove length direction is curved the scalable interface of horizontal U-type groove and public snap close, the other end curves horizontal U-type groove shape and female snap close of forming of the back bending Flap section of the lateral surface of U-type groove, and this completes overall cell body and bends that to bend step succession with end snap close convertible;
Step 2: in the factory or building-site metal sheet system U-shaped sky groove body section and metallic framework be connected to form gutter elementary section:
By weldering peg welding method on the outer side bottom surface and/or side outer side surface of described metal sheet system U-shaped sky groove body section, length direction along metal sheet system U-shaped sky groove body section arranges row or several row weldering bolt, the syndeton that corresponding position processes some weldering keyholes and is connected with building on described metallic framework, weldering bolt in U-shaped for metal sheet system sky groove body section is located in the weldering keyhole on metallic framework, by the nut be located on weldering bolt metallic framework is fixed in metal sheet system U-shaped sky groove body section and forms gutter elementary section;
Step 3: some gutter elementary sections are coupled together at building-site:
The described back bending Flap section of female snap close of one end of one in adjacent two gutter elementary sections is plugged in the scalable interface of the horizontal U-type groove of the male snap close of another gutter elementary section, then, use locking machine to carry out male snap close that roll extrusion fastening interlocks and female snap close.
2. the making and installation method of unit telescopic type assembling metal gutter according to claim 1, is characterized in that, also comprise:
Step 4: second time waterproof safety insurance process sealing is done to unit telescopic type assembling metal gutter in building site:
In the U-type groove of the scalable interface of each horizontal U-type groove for male snap close, execute fluid sealant the gap between the outside side wall of the scalable interface of the described back bending Flap section of female snap close and the horizontal U-type groove of male snap close is made up.
3. the making and installation method of unit telescopic type assembling metal gutter according to claim 2, it is characterized in that, described fluid sealant is the weather-proof waterproof gasket cement of high resiliency.
4. the making and installation method of unit telescopic type assembling metal gutter according to claim 1, it is characterized in that, on the roofing that this unit telescopic type assembling metal gutter is fixed on building by the syndeton be connected with building be arranged on described metallic framework or curtain wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310011502.XA CN103422625B (en) | 2012-12-31 | 2013-01-11 | Unit telescopic type assembling metal gutter and making and installation method thereof |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210593051 | 2012-12-31 | ||
CN2012105930510 | 2012-12-31 | ||
CN201210593051.0 | 2012-12-31 | ||
CN201310011502.XA CN103422625B (en) | 2012-12-31 | 2013-01-11 | Unit telescopic type assembling metal gutter and making and installation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103422625A CN103422625A (en) | 2013-12-04 |
CN103422625B true CN103422625B (en) | 2016-03-30 |
Family
ID=49647967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310011502.XA Active CN103422625B (en) | 2012-12-31 | 2013-01-11 | Unit telescopic type assembling metal gutter and making and installation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103422625B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103590480B (en) * | 2013-10-23 | 2015-03-11 | 苏州金螳螂建筑装饰股份有限公司 | Non-welding assembly type finished open ditch |
CN105003030B (en) * | 2015-08-04 | 2017-12-12 | 上海科胜幕墙有限公司 | A kind of segmented gutter |
CN107882224A (en) * | 2017-09-21 | 2018-04-06 | 江苏合发集团有限责任公司 | A kind of mounting structure of the stainless steel gutter of curtain wall |
CN113216530B (en) * | 2021-05-27 | 2022-12-06 | 中建五局华东建设有限公司 | Gutter structure of assembled steel construction roofing system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85101076A (en) * | 1985-04-01 | 1987-01-17 | 彼得·布龙·安德森 | Plastic trough |
JPH07133658A (en) * | 1993-06-18 | 1995-05-23 | Sekisui Chem Co Ltd | Expansion joint for eaves gutter |
CN1121736A (en) * | 1993-04-22 | 1996-05-01 | 理查德·韦汀顿 | Improved shingle roofing assembly |
CN2430494Y (en) * | 2000-08-11 | 2001-05-16 | 唐全波 | Structure improvement of roof radiation plate |
CN2835419Y (en) * | 2005-09-15 | 2006-11-08 | 李孟东 | Inner-curled-edge type rain brim gutter |
CN203256981U (en) * | 2012-12-31 | 2013-10-30 | 江河创建集团股份有限公司 | Unit-elastic-type assembling metal gutter |
-
2013
- 2013-01-11 CN CN201310011502.XA patent/CN103422625B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85101076A (en) * | 1985-04-01 | 1987-01-17 | 彼得·布龙·安德森 | Plastic trough |
CN1121736A (en) * | 1993-04-22 | 1996-05-01 | 理查德·韦汀顿 | Improved shingle roofing assembly |
JPH07133658A (en) * | 1993-06-18 | 1995-05-23 | Sekisui Chem Co Ltd | Expansion joint for eaves gutter |
CN2430494Y (en) * | 2000-08-11 | 2001-05-16 | 唐全波 | Structure improvement of roof radiation plate |
CN2835419Y (en) * | 2005-09-15 | 2006-11-08 | 李孟东 | Inner-curled-edge type rain brim gutter |
CN203256981U (en) * | 2012-12-31 | 2013-10-30 | 江河创建集团股份有限公司 | Unit-elastic-type assembling metal gutter |
Also Published As
Publication number | Publication date |
---|---|
CN103422625A (en) | 2013-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2020073776A (en) | Fitting type roofing material and connection method for that fitting type roofing material | |
CN103422625B (en) | Unit telescopic type assembling metal gutter and making and installation method thereof | |
CN209025335U (en) | New waterproof Photovoltaic Building Integration device | |
CN202731121U (en) | Waterproof node of deformation joint between high span and low span of roof | |
CN203256981U (en) | Unit-elastic-type assembling metal gutter | |
CN105525709A (en) | Waterproof structure for curtain wall as well as GRC (glass fiber reinforced concrete) curtain wall board and curtain wall with waterproof structure | |
CN103758221A (en) | Roof deformation joint structure of automobile ramp | |
CN203669179U (en) | Joint structure of steel roof at longitudinal and transverse striding position of steel structure factory building | |
CN205100244U (en) | Underground structure inwall and underground continuous wall coincide face structure | |
CN208363378U (en) | A kind of novel curtain wall expanded joint structure | |
CN102535758B (en) | Unit connecting member applied to roof sunshine plate system | |
CN102433966B (en) | Waterproof structure of contour plate roof opening | |
CN102661014B (en) | Multi-interlayer self-waterproof prefabricated heat insulation external wall panel for building | |
CN212507122U (en) | Glass awning structure | |
CN208844805U (en) | A kind of ridge node structure of steel construction | |
CN210395788U (en) | Double-slope metal inclined roof ridge node | |
CN203569672U (en) | Assembly type finished open trench without welding | |
CN102587570A (en) | Wall space contour plate and connecting member thereof | |
CN207794336U (en) | The containment member of building element and the sealing structure of building element | |
CN202227605U (en) | Waterproof structure for punching of contour plate roof | |
CN105544827A (en) | Curtain wall waterproof structure, GRC curtain wall with same and curtain wall board | |
CN213390883U (en) | Roofing eaves mouth end cap | |
CN205475750U (en) | Waterproof construction of prefabricated exterior wall of transformer substation board | |
CN214995361U (en) | Various steel tile roofing vent waterproof construction | |
CN211396322U (en) | Non-nail non-glue full-structure waterproof window frame structure of electric lighting smoke-discharging skylight |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |