CN107675813A - A kind of construction method of winter masonry project - Google Patents

A kind of construction method of winter masonry project Download PDF

Info

Publication number
CN107675813A
CN107675813A CN201710711929.9A CN201710711929A CN107675813A CN 107675813 A CN107675813 A CN 107675813A CN 201710711929 A CN201710711929 A CN 201710711929A CN 107675813 A CN107675813 A CN 107675813A
Authority
CN
China
Prior art keywords
mortar
masonry
construction method
winter
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710711929.9A
Other languages
Chinese (zh)
Inventor
房岭锋
马骏
钱毅
袁清云
胡春华
徐笑非
蒋声婴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201710711929.9A priority Critical patent/CN107675813A/en
Publication of CN107675813A publication Critical patent/CN107675813A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B20/00Use of materials as fillers for mortars, concrete or artificial stone according to more than one of groups C04B14/00 - C04B18/00 and characterised by shape or grain distribution; Treatment of materials according to more than one of the groups C04B14/00 - C04B18/00 specially adapted to enhance their filling properties in mortars, concrete or artificial stone; Expanding or defibrillating materials
    • C04B20/02Treatment
    • C04B20/04Heat treatment
    • C04B20/06Expanding clay, perlite, vermiculite or like granular materials
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Structural Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Architecture (AREA)
  • Materials Engineering (AREA)
  • Organic Chemistry (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Acoustics & Sound (AREA)
  • Thermal Sciences (AREA)
  • Aftertreatments Of Artificial And Natural Stones (AREA)

Abstract

The present invention relates to a kind of construction method of winter masonry project, comprise the following steps:S1, the dirt for removing building material surface, reject the fragment of brick freezed by immersion;If S2, lime paste freeze, melt lime paste;S3, mix well sand and it is not contained diameter and freeze block and ice cube more than 10mm;S4, in advance heating sand are to 20~35 DEG C, and for heating water to 40~70 DEG C, environment temperature is not less than 5 DEG C of mixing mortars, and mixing time increases by 0.5~1 times than normal temperature situation;S5, build masonry by laying bricks or stones, vertical mortar seam is filled up before daily knock off, does not spread mortar above, masonry upper surface is covered with insulation material.Compared with prior art, the present invention is in mortar by adding proper proportion antifreezing agent, modified foaming agent, improves the performances such as the freeze-proof of mortar, workability, durability, and the effective measure for ensureing masonry quality is proposed in work progress.

Description

一种冬季砌体工程的施工方法A construction method of masonry works in winter

技术领域technical field

本发明涉及一种砌体施工方法,尤其是涉及一种冬季砌体工程的施工方法。The invention relates to a masonry construction method, in particular to a winter masonry construction method.

背景技术Background technique

我国北方及寒冷地区的冬季,由于长时间的持续低温、温差大、强风、降雪和冰冻,气候条件差。当预计连续10天的室外平均气温低于5℃时,或在冬期施工期限以外,当日气温低于3℃时,砌筑工程要按照冬季施工要求进行。In winter in northern my country and cold regions, due to long-term continuous low temperature, large temperature difference, strong wind, snowfall and freezing, the climate conditions are poor. When the average outdoor temperature is expected to be lower than 5°C for 10 consecutive days, or outside the winter construction period, when the daily temperature is lower than 3°C, the masonry work shall be carried out in accordance with winter construction requirements.

冬季最显著的影响是砂浆受低温作用冻结。受冻结的砂浆将出现停止硬化、失去胶结作用和强度、塑性显著降低、灰缝密实度减弱、砂浆解冻后上部荷载作用下产生不均匀沉降等弊端。因此,砌体工程的冬季施工需要从多方面采取相应措施。The most significant effect in winter is that the mortar is frozen by the low temperature. The frozen mortar will stop hardening, lose its cementation and strength, significantly reduce the plasticity, weaken the density of mortar joints, and produce uneven settlement under the upper load after the mortar is thawed. Therefore, the winter construction of masonry works needs to take corresponding measures from various aspects.

发明内容Contents of the invention

本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种冬季砌体工程的施工方法。Purpose of the present invention is exactly to provide a kind of construction method of winter masonry project in order to overcome the defective that above-mentioned prior art exists.

本发明的目的可以通过以下技术方案来实现:The purpose of the present invention can be achieved through the following technical solutions:

一种冬季砌体工程的施工方法,包括以下步骤:A construction method for masonry works in winter, comprising the following steps:

S1、清除砌体材料表面的污物,剔除因浸水冻结的砖块;S1. Remove the dirt on the surface of the masonry material and remove the bricks frozen due to water immersion;

S2、若石灰膏冻结,则融化石灰膏;S2, if the lime paste freezes, then melt the lime paste;

S3、调匀砂子使其不含有直径大于10mm的冻结块和冰块;S3, mix the sand thoroughly so that it does not contain frozen blocks and ice cubes with a diameter greater than 10mm;

S4、预先加热砂子至20~35℃,加热水至40~70℃,环境温度不低于5℃拌制砂浆,搅拌时间比常温情况增长0.5~1倍;S4. Preheat the sand to 20-35°C, heat the water to 40-70°C, and mix the mortar at an ambient temperature not lower than 5°C. The mixing time is 0.5-1 times longer than that at normal temperature;

S5、砌筑砌体,在每日收工前将垂直灰缝填满,上面不铺灰浆,用保温材料覆盖砌体上表面。S5. To build masonry, fill up the vertical mortar joints before the daily work ends, do not spread mortar on the top, and cover the upper surface of the masonry with thermal insulation materials.

所述砂浆包括砂子、水、水泥、石灰膏和防冻剂。The mortar includes sand, water, cement, lime paste and antifreeze.

所述防冻剂在砂浆中的比例为6~7%。The proportion of the antifreeze in the mortar is 6-7%.

所述砂浆还包括改性微沫剂,其在砂浆中的比例为0.1~0.3%。The mortar also includes a modified microfoam agent, and its proportion in the mortar is 0.1-0.3%.

所述砂浆用在多孔砖砌筑时的稠度在90~120mm,用在毛石砌体砌筑时稠度在45~60mm。The mortar has a consistency of 90-120mm when used in porous brick masonry, and 45-60mm when used in rubble masonry.

所述砂浆拌制后直接运输,不积存二次倒运,砂浆的储存时间不超过15min。The mortar is directly transported after mixing, without accumulation for secondary transportation, and the storage time of the mortar does not exceed 15 minutes.

所述砂浆在砌筑砌体时温度在5℃以上。The temperature of the mortar is above 5°C when laying masonry.

与现有技术相比,本发明砂浆中加入适当防冻剂防止砂浆硬化,并掺入适量的改性微沫剂,从而提高砂浆的和易性、抗冻融循环性和耐久性,并可节约水泥的用量;对水和砂采用预先加热方式,搅拌时间比常温情况增长0.5~1倍,有利于砂浆的均匀性,水温在40~70℃不会因温度过高而产生假凝现象;施工中每天收工时对砌体做好保温工作,保障砌体不会发生低温冻裂的等现象。Compared with the prior art, appropriate antifreeze agent is added to the mortar of the present invention to prevent the mortar from hardening, and an appropriate amount of modified microfoam is added, thereby improving the workability, freeze-thaw cycle resistance and durability of the mortar, and saving The amount of cement; the water and sand are preheated, and the mixing time is 0.5 to 1 times longer than that at normal temperature, which is conducive to the uniformity of the mortar. The water temperature is 40 to 70 ° C and will not cause false coagulation due to excessive temperature; construction Do a good job of insulating the masonry at the end of each day to ensure that the masonry will not suffer from low-temperature freezing and cracking.

附图说明Description of drawings

图1为本发明冬季砌体工程的施工方法。Fig. 1 is the construction method of winter masonry project of the present invention.

具体实施方式detailed description

下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.

如图1所示,一种冬季砌体工程的施工方法,包括以下步骤:As shown in Figure 1, a construction method for masonry works in winter includes the following steps:

S1、清除砌体材料表面的污物、冰雪等,剔除因浸水冻结的砖块;S1. Remove dirt, ice and snow on the surface of masonry materials, and remove bricks frozen due to water immersion;

S2、若石灰膏冻结,则融化石灰膏;S2, if the lime paste freezes, then melt the lime paste;

S3、调匀砂子使其不含有直径大于10mm的冻结块和冰块,保障砂浆质量;S3. Mix the sand thoroughly so that it does not contain frozen blocks and ice blocks with a diameter greater than 10mm, so as to ensure the quality of the mortar;

S4、预先加热砂子至20~35℃,加热水至40~70℃,环境温度不低于5℃拌制砂浆,可通过搅拌机搭棚架火炉保温,搅拌时间比常温情况增长0.5~1倍,砂场用帐篷覆盖,当气温较低时采用暖棚保温,防止砂子冻结,但砂不得在钢板上灼烧;S4. Pre-heat the sand to 20-35°C, heat the water to 40-70°C, and mix the mortar at an ambient temperature of not lower than 5°C. The mixer can be used to set up a scaffolding and a stove to keep it warm. The mixing time is 0.5-1 times longer than that at normal temperature. The sand field is covered with tents, and when the temperature is low, a greenhouse is used to keep the sand from freezing, but the sand must not burn on the steel plate;

S5、砌筑砌体,在每日收工前将垂直灰缝填满,上面不铺灰浆,用保温材料将砌体上表面加以覆盖,第二天砌筑时,应先将砌体表面的霜雪扫净,方可继续砌筑。S5. To build masonry, fill up the vertical mortar joints before closing the work every day, do not spread mortar on the top, and cover the upper surface of the masonry with thermal insulation materials. The snow can be swept away before the masonry can continue.

砂浆包括砂子、水、水泥、石灰膏和防冻剂,其中防冻剂在砂浆中的比例为6~7%,防冻剂采用检验合格并经试验室配合比试配符合要求的产品。砂浆还包括改性微沫剂,其在砂浆中的比例为0.1~0.3%,可以提高砂浆的和易性、抗冻融循环性和耐久性,并可节约水泥的用量。The mortar includes sand, water, cement, lime paste and antifreeze, wherein the proportion of antifreeze in the mortar is 6-7%. The mortar also includes a modified microfoam agent, whose proportion in the mortar is 0.1-0.3%, which can improve the workability, freeze-thaw cycle resistance and durability of the mortar, and can save the amount of cement.

砂浆用在多孔砖砌筑时的稠度在90~120mm,用在毛石砌体砌筑时稠度在45~60mm。The consistency of mortar is 90-120mm when it is used in porous brick masonry, and the consistency is 45-60mm when it is used in rubble masonry.

砂浆拌制后直接运输,不积存二次倒运,砂浆的储存时间不超过15min。The mortar is directly transported after mixing, without accumulation for secondary transportation, and the storage time of the mortar shall not exceed 15 minutes.

砂浆在经过搅拌、运输后,砌筑时温度在5℃以上。不使用已遭冻结的砂浆,不将热水掺入冻结砂浆内重新搅拌使用,也不在砌筑时向砂浆内掺水使用。在负温条件下,砌砖时不洒水湿润。After the mortar has been stirred and transported, the temperature of the masonry is above 5°C. Do not use frozen mortar, do not mix hot water into the frozen mortar for re-stirring, and do not add water to the mortar during masonry. Under the condition of negative temperature, do not spray water and wet when laying bricks.

Claims (7)

1.一种冬季砌体工程的施工方法,其特征在于,包括以下步骤:1. A construction method for masonry works in winter, characterized in that it may further comprise the steps: S1、清除砌体材料表面的污物,剔除因浸水冻结的砖块;S1. Remove the dirt on the surface of the masonry material and remove the bricks frozen due to water immersion; S2、若石灰膏冻结,则融化石灰膏;S2, if the lime paste freezes, then melt the lime paste; S3、调匀砂子使其不含有直径大于10mm的冻结块和冰块;S3, mix the sand thoroughly so that it does not contain frozen blocks and ice cubes with a diameter greater than 10mm; S4、预先加热砂子至20~35℃,加热水至40~70℃,环境温度不低于5℃拌制砂浆,搅拌时间比常温情况增长0.5~1倍;S4. Preheat the sand to 20-35°C, heat the water to 40-70°C, and mix the mortar at an ambient temperature not lower than 5°C. The mixing time is 0.5-1 times longer than that at normal temperature; S5、砌筑砌体,在每日收工前将垂直灰缝填满,上面不铺灰浆,用保温材料覆盖砌体上表面。S5. To build masonry, fill up the vertical mortar joints before the daily work ends, do not spread mortar on the top, and cover the upper surface of the masonry with thermal insulation materials. 2.根据权利要求1所述的一种冬季砌体工程的施工方法,其特征在于,所述砂浆包括砂子、水、水泥、石灰膏和防冻剂。2. The construction method of a kind of masonry project in winter according to claim 1, wherein the mortar comprises sand, water, cement, lime paste and antifreeze. 3.根据权利要求2所述的一种冬季砌体工程的施工方法,其特征在于,所述防冻剂在砂浆中的比例为6~7%。3. The construction method of a kind of winter masonry project according to claim 2, characterized in that, the ratio of the antifreeze agent in the mortar is 6-7%. 4.根据权利要求2所述的一种冬季砌体工程的施工方法,其特征在于,所述砂浆还包括改性微沫剂,其在砂浆中的比例为0.1~0.3%。4 . The construction method of a masonry project in winter according to claim 2 , wherein the mortar further comprises a modified microfoam agent, and its proportion in the mortar is 0.1-0.3%. 5.根据权利要求1所述的一种冬季砌体工程的施工方法,其特征在于,所述砂浆用在多孔砖砌筑时的稠度在90~120mm,用在毛石砌体砌筑时稠度在45~60mm。5. The construction method of a kind of masonry project in winter according to claim 1, wherein the mortar has a consistency of 90-120mm when used in porous brick masonry, and a consistency of 90mm when used in rubble masonry. In 45 ~ 60mm. 6.根据权利要求1所述的一种冬季砌体工程的施工方法,其特征在于,所述砂浆拌制后直接运输,不积存二次倒运,砂浆的储存时间不超过15min。6. The construction method of a kind of masonry project in winter according to claim 1, characterized in that, the mortar is directly transported after mixing without being stored for secondary transportation, and the storage time of the mortar is no more than 15 minutes. 7.根据权利要求1所述的一种冬季砌体工程的施工方法,其特征在于,所述砂浆在砌筑砌体时温度在5℃以上。7. The construction method of a masonry project in winter according to claim 1, characterized in that the temperature of the mortar is above 5°C when the masonry is being built.
CN201710711929.9A 2017-08-18 2017-08-18 A kind of construction method of winter masonry project Pending CN107675813A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710711929.9A CN107675813A (en) 2017-08-18 2017-08-18 A kind of construction method of winter masonry project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710711929.9A CN107675813A (en) 2017-08-18 2017-08-18 A kind of construction method of winter masonry project

Publications (1)

Publication Number Publication Date
CN107675813A true CN107675813A (en) 2018-02-09

Family

ID=61135384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710711929.9A Pending CN107675813A (en) 2017-08-18 2017-08-18 A kind of construction method of winter masonry project

Country Status (1)

Country Link
CN (1) CN107675813A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69601466D1 (en) * 1995-06-06 1999-03-11 Univ Dayton CONSTRUCTION MATERIALS CONTAINING PHASE CHANGING MATERIALS AND THEIR PRODUCTION METHOD
CN104196134A (en) * 2014-09-04 2014-12-10 中建四局第六建筑工程有限公司 Heat preservation system and construction method thereof
CN105625588A (en) * 2016-01-27 2016-06-01 中国十七冶集团有限公司 Construction method for heat preservation external wall of building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69601466D1 (en) * 1995-06-06 1999-03-11 Univ Dayton CONSTRUCTION MATERIALS CONTAINING PHASE CHANGING MATERIALS AND THEIR PRODUCTION METHOD
CN104196134A (en) * 2014-09-04 2014-12-10 中建四局第六建筑工程有限公司 Heat preservation system and construction method thereof
CN105625588A (en) * 2016-01-27 2016-06-01 中国十七冶集团有限公司 Construction method for heat preservation external wall of building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋建忠: "《浅析砌体工程冬季施工技术》", 《黑龙江科技信息》 *
雷艳梅: "《有关砌体工程冬季施工的几点探讨》", 《科技与企业》 *

Similar Documents

Publication Publication Date Title
CN108999405A (en) The construction method of severe cold area winter mass concrete
CN103570334B (en) Quick cold-patch repair method for asphalt pavement, and application thereof
CN103723968A (en) Concrete for volute casing pump structure of nuclear power plant PX pump room and pouring forming method of concrete
CN111075196A (en) Concrete pouring process
CN102080390B (en) Composite winter construction pile head waterproof construction process
CN101619656A (en) Permafrost tunnel supporting method of railway
CN112049445A (en) Seasonal construction and maintenance process for concrete
CN108609955B (en) T-beam concrete and its construction method
CN207633160U (en) It being capable of the anti-icing sidewalk ground tile of snow melt
CN104150854B (en) A corrosion-resistant and frost-resistant pole
CN106050274A (en) Anti-frost heaving structure of hard rock tunnel in cold region and construction method of anti-frost heaving structure
CN112227155A (en) Winter construction method for highway concrete
CN102400562B (en) Temperature control method for concrete silo sliding formwork in high-temperature environment
CN101392515B (en) A channel thermal insulation structure and its construction method
CN221798048U (en) A rapid repair pavement structure in negative temperature environment
CN107675813A (en) A kind of construction method of winter masonry project
CN101274827B (en) Preparation and pouring method of pearlite concrete
CN107881894B (en) Construction and maintenance methods of concrete expansion joints in severe cold areas
CN107892522B (en) A kind of anti-salt freeze self-repairing cement concrete and preparation method thereof
CN112321322A (en) A kind of interface agent for repairing frost-damaged concrete and its preparation and repairing method
CN111411785A (en) Concrete construction mold-entering temperature control system and temperature control method under high-temperature condition
CN113774957A (en) Open-cut cast-in-place tunnel main structure concrete anti-cracking construction method
CN205077740U (en) Oblique roof waterproof roof boarding
CN111319115A (en) Precast concrete sinking pipe cracking control method based on temperature control
CN116446908A (en) Concrete comprehensive winter construction method for tunnel engineering in extremely cold regions

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209