Prior art keywords
tube coupling
rainwater tube
pressure sensor
rainwater
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710841197.5A
Other languages
Chinese (zh)
Other versions
CN107675775B (en
Inventor
高维
米雪睿
王蕾
赵修祥
王光耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Kai Feng Municipal Engineering Co Ltd
Original Assignee
Jinan Kai Feng Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Kai Feng Municipal Engineering Co Ltd filed Critical Jinan Kai Feng Municipal Engineering Co Ltd
Priority to CN201710841197.5A priority Critical patent/CN107675775B/en
Publication of CN107675775A publication Critical patent/CN107675775A/en
Application granted granted Critical
Publication of CN107675775B publication Critical patent/CN107675775B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to a kind of constructing device and construction method for storm sewer construction, the constructing device has for being adjusted positioning to the lower rainwater tube coupling to groove in being constructed in storm sewer, so that the rainwater tube coupling of itself and leading portion aligns the adjustment platform of installation, bottom land of the adjustment working platform in construction groove, there are former and later two V-type bearings for being used for supporting rainwater tube coupling on adjustment platform, V-type bearing realizes vertical and lateral displacement under the power source of adjustment platform and transmission mechanism effect, so as to be adjusted positioning to the rainwater tube coupling supported, two support surface sides of V-type bearing have the movable rotating roller of support rainwater tube coupling.The present invention solves the problems such as storm sewer positioning hardly possible present in storm sewer construction, position inaccurate well, and drastically increases efficiency of construction and construction quality.

Description

A kind of constructing device and construction method for storm sewer construction
Technical field
The present invention relates to municipal pipeline field of engineering technology, more particularly to a kind of constructing device for storm sewer construction And construction method.
Background technology
At present in the construction of storm sewer, typically excavator combines artificial down tube, exists during down tube Pipeline location position inaccurate, it is necessary to which artificial the problems such as repeatedly adjusting, this aspect have impact on speed of application, on the other hand It is difficult to the requirement for meeting higher construction quality.
Therefore, the constructing device and construction method for storm sewer construction are studied, to guarantee quickly and accurately to Concrete storm sewer is transferred and adjusts positioning, realizes that the precisely installation of storm sewer is significant.
The content of the invention
For it is mentioned above the problem of, spy of the present invention provide it is a kind of for storm sewer construction constructing device and construction Method.
Technical scheme is as follows:
A kind of constructing device, for being adjusted positioning to the lower rainwater tube coupling to groove in being constructed in storm sewer, so that its Installation is aligned with the rainwater tube coupling of leading portion.The constructing device for adjustment platform, the adjustment working platform construction groove bottom land, Have on adjustment platform and be used to supporting former and later two V-type bearings of rainwater tube coupling, V-type bearing adjustment platform power source and Transmission mechanism effect is lower to realize vertical and lateral displacement, so as to be adjusted positioning to the rainwater tube coupling supported, V-type bearing Two support surface sides have the movable rotating roller of support rainwater tube coupling.
A kind of constructing device, for being visited in being constructed in storm sewer to the positional accuracy of adjacent rainwater tube coupling installation Survey.The constructing device is annular pressure sensor, and annular pressure sensor is fixed in the docking port of rainwater tube coupling rear end, annular pressure sensor Circle distribution has a pressure sensor of more than 3 on outer surface, the position of pressure sensor diametrically with it is right on rainwater tube coupling The position of joint diametrically is adapted to be applied with ensuring that pressure sensor can sense butt joint in the installation of rainwater tube coupling Power, annular pressure sensor at least also includes the control process unit being connected with each pressure sensor, and connection control process The wireless communication unit of unit, annular pressure sensor are connected by wireless communication unit with hand-held device data with by each pressure sensing The pressure data values that device measures are sent to hand-held device.
A kind of constructing device, for being fixed in being constructed in storm sewer to the rainwater tube coupling after location and installation.This is applied Frock is set to prefabricated bearing, and the prefabricated bearing is paired with the arcwall face fixed with the stopper slot on rainwater tube coupling, prefabricated bearing Use, the two prefabricated bearings used in pairs fix from the front and rear side of rainwater tube coupling to rainwater tube coupling respectively, prefabricated bearing Bottom be provided with a pair of fastening through-holes, the two prefabricated bearings used in pairs are the double end spiral shells by being arranged in the fastening through-hole What bar and the clamp nut at both ends were fixed.
A kind of construction method for storm sewer construction, constructing device used, which comprises at least, during it is constructed has described above Platform, annular pressure sensor and prefabricated bearing are adjusted, the construction method, which comprises at least, following construction procedure:
S1, by lifting appliance by rainwater the tube coupling quickly lower V-type bearing to adjustment platform;
S2, positioned to carry out vertical and horizontal adjustment to rainwater tube coupling by adjusting platform, make rainwater tube coupling under range estimation with The rainwater tube coupling centering to be docked;
S3, fix annular pressure sensor and annular rubber ring successively in the docking port of leading portion rainwater tube coupling;Then it is artificial to promote Rainwater tube coupling vertically moves, and the butt joint of rainwater tube coupling is stretched into the docking port of leading portion rainwater tube coupling, observes on hand-held device The data of each pressure sensor on the annular pressure sensor of display;When each pressure sensor data maximum difference within the specific limits When, then it can assert the accurate positioning of rainwater tube coupling, rainwater tube coupling can now be exited and press the annular on leading portion rainwater tube coupling Sensor and annular rubber ring unload, and promote rainwater tube coupling to be docked with leading portion rainwater tube coupling again afterwards;When each pressure sensor number According to maximum difference exceed above range when, then the position inaccurate of rainwater tube coupling can be assert, now according to each pressure sensor Data control the adjustment platform to be finely adjusted in corresponding orientation to rainwater tube coupling, it is to be adjusted it is good after, rainwater tube coupling is exited And unload the annular pressure sensor and annular rubber ring on leading portion rainwater tube coupling, promote rainwater tube coupling and leading portion rainwater again afterwards Tube coupling docks;
S4, cement mortar is smeared on the arc contact surface of prefabricated bearing, by the prefabricated bearing used in pairs the past rear side to rainwater Tube coupling is fixed, and prefabricated bearing is pre- to two by studs and fastening bolt again after being clamped at the stopper slot of rainwater tube coupling Bearing processed is fixed, and adjustment platform is removed into rainwater tube coupling bottom after the V-type bearing decline of finally control adjustment platform.
Beneficial effects of the present invention:The present invention solves the storm sewer positioning present in storm sewer construction well Difficulty, the problems such as position inaccurate, and drastically increase efficiency of construction and construction quality.
Brief description of the drawings
Below according to accompanying drawing, the present invention will be described:
Accompanying drawing 1 is the structural representation of rain pipe section in embodiment 1;
Accompanying drawing 2 is the structural representation that platform is adjusted in embodiment 1;
Accompanying drawing 3 is the positive structure schematic of rubber washer in embodiment 1;
Accompanying drawing 4 is the side structure schematic diagram of rubber washer in embodiment 1;
Accompanying drawing 5 is the positive structure schematic of annular pressure sensor in embodiment 1;
Accompanying drawing 6 is the side structure schematic diagram of annular pressure sensor in embodiment 1;
Accompanying drawing 7 is the basic framework figure of annular pressure sensor in embodiment 1;
Accompanying drawing 8 is the schematic diagram for detecting rainwater tube coupling positional accuracy in embodiment 1 by annular pressure sensor;
Accompanying drawing 9 is the structural representation of prefabricated bearing in embodiment 1;
Accompanying drawing 10 is the schematic diagram that the prefabricated bearing used in pairs in embodiment 1 fixes rainwater tube coupling;
Accompanying drawing 11 is the process chart of storm sewer construction method in embodiment 1;
1 rainwater tube coupling in figure, 1-1 butt joints, 1-2 docking ports, 1-3 stopper slots, 2 adjustment platforms, 2-1 V-type bearings, 2-2 turn Dynamic roller, 3 annular rubber rings, 4 annular pressure sensors, 4-1 pressure sensors, 5 prefabricated bearings, 5-1 arcwall faces, 5-2 fastening through-holes, 5- 3 double threaded screws, 5-4 clamp nuts, 6 lifting ropes, 7 hand-held devices.
Embodiment
With reference to specific embodiment, the present invention is further illustrated.
Embodiment 1
The embodiment has constructing device as shown in Figure 2, the constructing device be used for storm sewer construction in it is lower extremely The rainwater tube coupling 1 of groove(As shown in Figure 1)Positioning is adjusted, so that the rainwater tube coupling of itself and leading portion aligns installation.
The constructing device is adjustment platform 2, and adjustment working platform has on the bottom land of groove of constructing, adjustment platform to be used for Former and later two V-types bearing 2-1 of rainwater tube coupling is supported, V-type bearing is under the power source of adjustment platform and transmission mechanism effect Vertical and lateral displacement is realized, so as to be adjusted positioning to the rainwater tube coupling supported, two support surface sides of V-type bearing have Support the movable rotating roller 2-2 of rainwater tube coupling.
The embodiment has the constructing device as shown in Fig. 5,6,7,8, and the constructing device is used to construct in storm sewer In to adjacent rainwater tube coupling installation positional accuracy detect.
The constructing device is annular pressure sensor 4, and the annular pressure sensor is fixed in the docking port 1-2 of rainwater tube coupling rear end, Circle distribution has the pressure sensor 4-1 of more than 3, the position of pressure sensor diametrically on the outer surface of annular pressure sensor It is adapted with the positions of butt joint 1-1 diametrically on rainwater tube coupling to ensure that pressure sensor can be in the installation of rainwater tube coupling The power of butt joint application is sensed, annular pressure sensor at least also includes the control process unit being connected with each pressure sensor, And the wireless communication unit of connection control process unit, annular pressure sensor pass through wireless communication unit and the data of hand-held device 7 Connection is sent to hand-held device with the pressure data values for measuring each pressure sensor.
The embodiment has the constructing device as shown in Fig. 9,10, and the constructing device is used in storm sewer construction to fixed Rainwater tube coupling after the installation of position is fixed.
The constructing device is prefabricated bearing 5, and prefabricated bearing has the arcwall face fixed with the stopper slot 1-3 on rainwater tube coupling 5-1, prefabricated bearing use in pairs, and the prefabricated bearing of two used in pairs enters from the front and rear side of rainwater tube coupling to rainwater tube coupling respectively Row fixes, and the bottom of prefabricated bearing is provided with a pair of fastening through-hole 5-2, and the two prefabricated bearings used in pairs are by being arranged in fastening What the clamp nut 5-4 of double threaded screw 5-3 and both ends in through hole were fixed.
In the embodiment be used for storm sewer construction construction method as shown in Figure 11, its construct in constructing device used Including at least having adjustment platform, annular pressure sensor and prefabricated bearing described above, the construction method is comprised at least to have and applied as follows Work step is rapid:
S1, by lifting appliance with lifting rope 6 by rainwater the tube coupling quickly lower V-type bearing to adjustment platform;
S2, positioned to carry out vertical and horizontal adjustment to rainwater tube coupling by adjusting platform, make rainwater tube coupling under range estimation with The rainwater tube coupling centering to be docked;
S3, fix annular pressure sensor and annular rubber ring 3 successively in the docking port of leading portion rainwater tube coupling;Then it is artificial to promote Rainwater tube coupling vertically moves, and the butt joint of rainwater tube coupling is stretched into the docking port of leading portion rainwater tube coupling, observes on hand-held device The data of each pressure sensor on the annular pressure sensor of display;When each pressure sensor data maximum difference within the specific limits When, then it can assert the accurate positioning of rainwater tube coupling, rainwater tube coupling can now be exited and press the annular on leading portion rainwater tube coupling Sensor and annular rubber ring unload, and promote rainwater tube coupling to be docked with leading portion rainwater tube coupling again afterwards;When each pressure sensor number According to maximum difference exceed above range when, then the position inaccurate of rainwater tube coupling can be assert, now according to each pressure sensor Data control the adjustment platform to be finely adjusted in corresponding orientation to rainwater tube coupling, it is to be adjusted it is good after, rainwater tube coupling is exited And unload the annular pressure sensor and annular rubber ring on leading portion rainwater tube coupling, promote rainwater tube coupling and leading portion rainwater again afterwards Tube coupling docks;
S4, cement mortar is smeared on the arc contact surface of prefabricated bearing, by the prefabricated bearing used in pairs the past rear side to rainwater Tube coupling is fixed, and prefabricated bearing is pre- to two by studs and fastening bolt again after being clamped at the stopper slot of rainwater tube coupling Bearing processed is fixed, and adjustment platform is removed into rainwater tube coupling bottom after the V-type bearing decline of finally control adjustment platform.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this Among the right of invention.

Claims (4)

1. a kind of constructing device, in being constructed in storm sewer to the lower rainwater tube coupling to groove(1)Positioning is adjusted, with The rainwater tube coupling of itself and leading portion is aligned installation, be characterised by:It is adjustment platform(2), it is described adjustment working platform constructing The bottom land of groove, described adjust have former and later two V-type bearings for being used for supporting rainwater tube coupling on platform(2-1), the V-type branch Seat realizes vertical and lateral displacement under the power source of adjustment platform and transmission mechanism effect, so as to the rain pipe supported Section is adjusted positioning, and two support surface sides of the V-type bearing have the movable rotating roller of support rainwater tube coupling(2-2).
A kind of 2. constructing device, for being visited in being constructed in storm sewer to the positional accuracy of adjacent rainwater tube coupling installation Survey, be characterised by:It is annular pressure sensor(4), docking port of the annular pressure sensor fixing in rainwater tube coupling rear end(1-2) Interior, circle distribution has the pressure sensor of more than 3 on the outer surface of the annular pressure sensor(4-1), the pressure sensor Position diametrically and butt joint on rainwater tube coupling(1-1)Position diametrically is adapted to ensure that pressure sensor can The power of butt joint application is sensed in the installation of rainwater tube coupling, the annular pressure sensor at least also includes and each pressure sensor The control process unit of connection, and the wireless communication unit of connection control process unit, the annular pressure sensor passes through wireless Communication unit and hand-held device(7)Data connection is sent to hand-held device with the pressure data values for measuring each pressure sensor.
3. a kind of constructing device, for being fixed in being constructed in storm sewer to the rainwater tube coupling after location and installation, feature exists In:It is prefabricated bearing(5), the prefabricated bearing have and the stopper slot on rainwater tube coupling(1-3)The arcwall face of fixing(5- 1), the prefabricated bearing uses in pairs, and the prefabricated bearing of two used in pairs is respectively from the front and rear side of rainwater tube coupling to rain pipe Section is fixed, and the bottom of the prefabricated bearing is provided with a pair of fastening through-holes(5-2), the two prefabricated bearings used in pairs are to pass through The double threaded screw being arranged in the fastening through-hole(5-3)And the clamp nut at both ends(5-4)Fixed.
4. a kind of construction method for storm sewer construction, constructing device used is comprised at least just like claim during it is constructed Adjustment platform, as described in claim 2 annular pressure sensor and prefabricated branch as described in claim 3 described in 1 Seat, is characterised by:It, which is comprised at least, following construction procedure:
S1, pass through lifting appliance lifting rope(6)By on the quick lower V-type bearing to adjustment platform of rainwater tube coupling;
S2, positioned to carry out vertical and horizontal adjustment to rainwater tube coupling by adjusting platform, make rainwater tube coupling under range estimation with The rainwater tube coupling centering to be docked;
S3, fix annular pressure sensor and annular rubber ring successively in the docking port of leading portion rainwater tube coupling(3);Then manually push away Dynamic rainwater tube coupling vertically moves, and the butt joint of rainwater tube coupling is stretched into the docking port of leading portion rainwater tube coupling, observes hand-held device The data of each pressure sensor on the annular pressure sensor of upper display;When the maximum difference of each pressure sensor data is in certain limit When interior, then the accurate positioning of rainwater tube coupling can be assert, rainwater tube coupling can now be exited and by the annular on leading portion rainwater tube coupling Pressure sensor and annular rubber ring unload, and promote rainwater tube coupling to be docked with leading portion rainwater tube coupling again afterwards;When each pressure sensor When the maximum difference of data exceeds above range, then the position inaccurate of rainwater tube coupling can be assert, now according to each pressure sensing The data of device control the adjustment platform to be finely adjusted in corresponding orientation to rainwater tube coupling, it is to be adjusted it is good after, rainwater tube coupling is moved back Go out and unload the annular pressure sensor and annular rubber ring on leading portion rainwater tube coupling, promote rainwater tube coupling and leading portion rain again afterwards Water pipe section docks;
S4, cement mortar is smeared on the arc contact surface of prefabricated bearing, by the prefabricated bearing used in pairs the past rear side to rainwater Tube coupling is fixed, and prefabricated bearing is pre- to two by studs and fastening bolt again after being clamped at the stopper slot of rainwater tube coupling Bearing processed is fixed, and adjustment platform is removed into rainwater tube coupling bottom after the V-type bearing decline of finally control adjustment platform.
CN201710841197.5A 2017-09-18 2017-09-18 Construction device and construction method for rainwater pipeline construction Active CN107675775B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710841197.5A CN107675775B (en) 2017-09-18 2017-09-18 Construction device and construction method for rainwater pipeline construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710841197.5A CN107675775B (en) 2017-09-18 2017-09-18 Construction device and construction method for rainwater pipeline construction

Publications (2)

Publication Number Publication Date
CN107675775A true CN107675775A (en) 2018-02-09
CN107675775B CN107675775B (en) 2020-08-28

Family

ID=61137291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710841197.5A Active CN107675775B (en) 2017-09-18 2017-09-18 Construction device and construction method for rainwater pipeline construction

Country Status (1)

Country Link
CN (1) CN107675775B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532717A (en) * 2018-04-23 2018-09-14 哈尔滨共阳科技咨询有限公司 A kind of constructional engineering mud culvert pipe laying apparatus
CN113073723A (en) * 2021-04-12 2021-07-06 新乡市市政设施维护中心 Construction device for rainwater pipeline construction and implementation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201109014Y (en) * 2007-12-03 2008-09-03 青岛港(集团)有限公司 Conduit butt-joint rapid alignment device
CN202015913U (en) * 2010-08-23 2011-10-26 天津思为机器设备有限公司 Pipeline welding and centring device
KR20140086508A (en) * 2012-12-28 2014-07-08 주식회사 가나오엠 Supporting apparatus for drainage pipe
CN204986013U (en) * 2015-07-28 2016-01-20 天津泛亚科瑞成油田技术有限公司 Petroleum pipeline support
CN205352581U (en) * 2016-01-09 2016-06-29 长安大学 Bearing installation bias voltage detection device
CN106759786A (en) * 2017-01-17 2017-05-31 温州市宏泰市政园林建设有限公司 A kind of storm sewer structure and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201109014Y (en) * 2007-12-03 2008-09-03 青岛港(集团)有限公司 Conduit butt-joint rapid alignment device
CN202015913U (en) * 2010-08-23 2011-10-26 天津思为机器设备有限公司 Pipeline welding and centring device
KR20140086508A (en) * 2012-12-28 2014-07-08 주식회사 가나오엠 Supporting apparatus for drainage pipe
CN204986013U (en) * 2015-07-28 2016-01-20 天津泛亚科瑞成油田技术有限公司 Petroleum pipeline support
CN205352581U (en) * 2016-01-09 2016-06-29 长安大学 Bearing installation bias voltage detection device
CN106759786A (en) * 2017-01-17 2017-05-31 温州市宏泰市政园林建设有限公司 A kind of storm sewer structure and its construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532717A (en) * 2018-04-23 2018-09-14 哈尔滨共阳科技咨询有限公司 A kind of constructional engineering mud culvert pipe laying apparatus
CN113073723A (en) * 2021-04-12 2021-07-06 新乡市市政设施维护中心 Construction device for rainwater pipeline construction and implementation method thereof
CN113073723B (en) * 2021-04-12 2022-09-09 新乡市市政设施维护中心 Construction device for rainwater pipeline construction and implementation method thereof

Also Published As

Publication number Publication date
CN107675775B (en) 2020-08-28

Similar Documents

Publication Publication Date Title
CN107675775A (en) A kind of constructing device and construction method for storm sewer construction
CA2369366A1 (en) Diverless subsea hot tap system
CN109752142B (en) A people's air defense door gas tightness detection device for engineering scene
CN204252284U (en) Built-in fitting bracing means
US8790041B2 (en) Device for applying a push or pull action on tubes to be laid underground for overcoming water courses or obstacle of other type
CN206669221U (en) Submarine pipeline installs servo robot
CN214116902U (en) Municipal drainage pipe non-excavation is restoreed and is used pipeline inner wall expansion equipment
CN212109876U (en) Straightness detection device of municipal works drainage pipe
CN206920238U (en) A kind of amesdial method surveys rock and the experimental rig of concrete compression
CN219368858U (en) Hydrogeology water level observer
CN212377454U (en) Positioning and fixing device for small-diameter circular pipeline
CN207211785U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN212274891U (en) Oil gas pipeline wall thickness monitoring facilities
CN109185558A (en) The method that a kind of major diameter GRP tube road is installed under water
CN110686964B (en) Loess normal position detection pipeline drive robot
CN104354141A (en) Auxiliary device for installing large-sized pipeline and valve connection flange and application method of auxiliary device
CN205537458U (en) Detection scale is built by laying bricks or stones to inspection shaft
CN205560294U (en) Pipe detection device
CN209927457U (en) Roundness detector is used in bearing production
CN209762553U (en) Underground pipeline detection device
CN201720286U (en) Pressure steel pipe hydraulic circle regulating frame
CN112483724A (en) Angle-adjustable rolling support and construction method for laying pipeline
CN105382056A (en) Press device for correcting welding deformation of longitudinal joint of large-diameter steel pipe
CN111707525A (en) Method for forming mortar setting on wall brick detection surface
CN213337137U (en) Internal and external pressure inspection equipment for cement pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 7000 Han Yu Valley A2-4-2202 250000 in Shandong province Ji'nan City High-tech Zone by ten

Applicant after: Kaifeng wisdom (Shandong Province) Municipal Engineering Co.,Ltd.

Address before: No. 7000 Han Yu Valley A2-4-2202 250000 in Shandong province Ji'nan City High-tech Zone by ten

Applicant before: JINAN KAIFENG MUNICIPAL ENGINEERING Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction device and construction method for rainwater pipeline construction

Effective date of registration: 20210715

Granted publication date: 20200828

Pledgee: Jinan Rural Commercial Bank Co.,Ltd. Licheng sub branch

Pledgor: Kaifeng wisdom (Shandong Province) Municipal Engineering Co.,Ltd.

Registration number: Y2021370000088

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220507

Granted publication date: 20200828

Pledgee: Jinan Rural Commercial Bank Co.,Ltd. Licheng sub branch

Pledgor: Kaifeng wisdom (Shandong Province) Municipal Engineering Co.,Ltd.

Registration number: Y2021370000088

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A construction device and method for rainwater pipeline construction

Effective date of registration: 20220511

Granted publication date: 20200828

Pledgee: Jinan Rural Commercial Bank Co.,Ltd. Licheng sub branch

Pledgor: Kaifeng wisdom (Shandong Province) Municipal Engineering Co.,Ltd.

Registration number: Y2022980005324

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230512

Granted publication date: 20200828

Pledgee: Jinan Rural Commercial Bank Co.,Ltd. Licheng sub branch

Pledgor: Kaifeng wisdom (Shandong Province) Municipal Engineering Co.,Ltd.

Registration number: Y2022980005324

PC01 Cancellation of the registration of the contract for pledge of patent right