CN107672506A - A kind of carborne method of diesel locomotive - Google Patents

A kind of carborne method of diesel locomotive Download PDF

Info

Publication number
CN107672506A
CN107672506A CN201710848089.0A CN201710848089A CN107672506A CN 107672506 A CN107672506 A CN 107672506A CN 201710848089 A CN201710848089 A CN 201710848089A CN 107672506 A CN107672506 A CN 107672506A
Authority
CN
China
Prior art keywords
locomotive
diesel
fuel tank
bogie
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710848089.0A
Other languages
Chinese (zh)
Inventor
查全宽
李仓华
胡佩扬
谢来生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201710848089.0A priority Critical patent/CN107672506A/en
Publication of CN107672506A publication Critical patent/CN107672506A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P3/00Vehicles adapted to transport, to carry or to comprise special loads or objects
    • B60P3/06Vehicles adapted to transport, to carry or to comprise special loads or objects for carrying vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60PVEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS
    • B60P7/00Securing or covering of load on vehicles
    • B60P7/06Securing of load

Abstract

The invention discloses a kind of carborne method of diesel locomotive, include following steps successively:Car body is separated, diesel generator group is torn open and lifts, lifts body framework, fuel tank and bogie, Automobile Transportation, locomotive falls car, pilot installation, fuel tank installation, lifts power house ceiling lid, assembles diesel generator group and top cover lifts.Each part un-mate sequence of invention diesel locomotive is reasonable in design, and makes a record during disassembling and preserved with part, is easy to the complete and accuracy subsequently assembled;Transport automobile of the present invention carries out various stabilization and reinforcement operations, ensures position stability of each part of diesel locomotive in transport process;Each part assembling of inventive combustion engine car is positioned and installed according to the record data of early stage, ensure that overall locomotive performance is recovered.

Description

A kind of carborne method of diesel locomotive
Technical field
The present invention relates to the scheduling field of railway system's diesel locomotive, specifically a kind of carborne side of diesel locomotive Method.
Background technology
Limited by Chinese Railway parent company main track transport by track, the personal locomotive of engineering takes the mode of highway automotive to turn into The sole mode that locomotive is allocated between project ground.But diesel locomotive, because its volume is big, weight weight, handling site safety is difficult Degree is big, whole Transporting has the characteristics of overweight superelevation, it is necessary to take the method for disintegrating transportation to be transported through, and transhipment difficulty is big, extensive Complexity.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of carborne method of diesel locomotive, its transport it is efficiently low into Originally and it ensure that overall locomotive performance is recovered.
The technical scheme is that:
A kind of carborne method of diesel locomotive, includes following steps successively:Car body is separated, tears diesel generator group open simultaneously Lifting, lifting body framework, fuel tank and bogie, Automobile Transportation, locomotive fall car, pilot installation, fuel tank installation, lifted dynamic Power ceiling canopy lid, assemble diesel generator group and top cover lifting;
Described separation car body has specifically included following steps:
(1), forecarriage and trailing bogie are marked, and measure record forecarriage and fuel tank centre-to-centre spacing, rear steering The centre-to-centre spacing of frame and fuel tank;
(2), remove locomotive storage batteries and its line, then drain fuel oil, bavin machine oil, sand and cooling water;
(3), first successively remove locomotive traction motor big line, ventilation blower, side bearing protective cover, locomotive traction bar and car spring of installing The connecting pin and joint of clamp, then demolition machine in-car part, finally remove and start the big line of motor and front and rear pilot;
(4), will on locomotive fuel tank and rail level tie plate, then remove successively fuel tank locomotive connector for oil delivery pipe, oil returning pipe joint, Fuel tank installation bolt and fuel tank are revoked, and finally install locomotive lifting pin and hoisting rig locking pin;
Described tearing diesel generator group open and lift has specifically included following steps:First with steel wire rope three to have disintegrated Locomotive ceiling is hung down respectively, various connecting bolts and joint in locomotive power house is then removed, finally with crane by diesel engine Hung oneself out from locomotive, and pull down protective cover below main generator, then diesel engine handling to diesel engine is transported to the fixed branch of lorry On seat, and with steel wire rope banding fixed;
Described lifting body framework, fuel tank and bogie has specifically included following steps:Body framework handling is dragged to more wheels first On car storage rack special, and it is fixed;Then lifting fuel tank is transported on lorry to corresponding, and it is fixed;Trailing or leading bogie point Do not lift to corresponding transport lorry, and fixed with skate special tooling and cable wire with lorry body;
Described locomotive falls car and has specifically included following steps:Trailing or leading bogie is hung on rail first, according to former car size, Fuel tank is hung on the Special support of corresponding bogie, ensures trailing or leading bogie and fuel tank distance, then measure body framework The difference of height of eight side bearings, bogie side bearing difference of height is recorded, then ensures to be equipped with front and rear two bogie by car body stand Four side bearing uniform forces of each bogie after body framework, in horizontality;Finally carry out car body and fall rear corresponding assembly Connection;
Described assembling diesel generator group has specifically included following steps:Diesel generator group is slowly sling, moved to Above locomotive, decline slowly, main generator bearing ball rod should be in its centring sleeve, with hanging wire method preliminary survey diesel engine longitudinal direction Heart line, the skew of transverse center is measured with metallic tape, it is front and rear to open gear size, main generator bearing and plane clearance on bulb, weldering Longitudinal register technique backstop is connect, lays located lateral spiral, is ready to reposition, repeatedly above-mentioned operation, is confirmed Diesel generator group installation is good;After positioning confirmation is qualified, four fulcrum bearings are welded with the face of chassis boss three, finally connect bavin Oil machine and profit pipeline, wiring, connect the big line of main generator.
The connecting pin of demolition machine in-car part and joint specifically remove locomotive with turning to successively in described separation car body The connector of frame and wiring, the connecting pin of hand brake chain, the sub- joint of main reservoir pipe, connector for oil delivery pipe, oil returning pipe joint and Blow-off connection.
Described tears diesel generator group open and various connecting bolts and the joint tool in locomotive power house is removed in lifting Body is to remove the bolt that two booster chimneys are connected with exhaust-driven turbo-charger exhaust-gas turbo charger successively, and air cleaner canvas shroud clip is curved Head assembling and the connecting bolt of booster, the installation bolt of air filter and the fastening bolt of sealing strip, respiratory tract flexible pipe, universal drive shaft And the protective cover on power transmission shaft, power transmission shaft, universal drive shaft and diesel engine, the connecting bolt of main generator, power house cooling water system Each pipe joint, the fastening bolt of the adpting flange of each pipe, all kinds of pressure gauges, instrument and diesel engine, booster in cooling water system The pipe joint nut of connection.
After described diesel engine handling transports lorry to diesel engine, diesel engine rubber metal pad and pad in power house are protected in the original location Keep, not lose or obscure with its elsewhere, original position is reinstalled during assembling, and all kinds of pipe joints are tied up with plastic cloth, prevent foreign matter from entering Enter, the various parts pulled down, which are all sorted out to place, to be fixed, and prevents transport from losing, ceiling lid covers and fixes nothing with fastener again By mistake.
When described locomotive falls car, same four side bearings of bogie are in same plane franchise 1mm, and front and rear two bogie is high Low franchise 2mm, each side bearing have 2mm basic pad, and maximum cushioning amount is no more than 15mm, and performs record.
Described pilot installation comprises the concrete steps that:Pilot is sling with steel wire rope to assemble, focal point line centering is left Right symmetrical, then pilot is assembled with end lower skeleton and reclined during installation fastening, and local gap cannot be greater than 3mm, at bolt not Allow completely disengaged, the misaligned franchise of part of the straight line portion of circular arc portion and both sides is 6mm;Troubleshooting is checked after finally installing Device is adjustable, and underbeam should be in 85~130mm away from standard rail level height, and it is 20~30mm that rubber, which sweeps baffle to rail level distance,.
Described fuel tank installation is just installed in place using jack pair fuel tank, and installs total reservoir joint.
Fuel up, machine oil and soft water and corresponding sealing is done after the completion of described top cover lifting, finally checked, adjusted Examination, test run, reach locomotive operation conditions dictate.
Advantages of the present invention:
Each part un-mate sequence of inventive combustion engine car is reasonable in design, and makes a record during disassembling and preserved with part, is easy to The complete and accuracy subsequently assembled;Transport automobile of the present invention carries out various stabilization and reinforcement operations, ensures each part of diesel locomotive Position stability in transport process;The assembling of each part of inventive combustion engine car according to the record data of early stage carry out positioning and Installation, ensure that overall locomotive performance is recovered.
Embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation Example only part of the embodiment of the present invention, rather than whole embodiments.It is common based on the embodiment in the present invention, this area The every other embodiment that technical staff is obtained under the premise of creative work is not made, belong to the model that the present invention protects Enclose.
A kind of carborne method of diesel locomotive, includes following steps successively:Car body is separated, tears diesel generator open Group simultaneously lifts, lifting body framework, fuel tank and bogie, Automobile Transportation, and locomotive falls car, pilot installation, fuel tank installation, hangs Power house ceiling lid is filled, assembles diesel generator group, top cover lifting, fuel up, machine oil and soft water simultaneously do corresponding sealing, entered Row is checked, debugged, test run, reaches locomotive operation conditions dictate;
Separation car body has specifically included following steps:
(1), forecarriage and trailing bogie are marked, and measure record forecarriage and fuel tank centre-to-centre spacing, rear steering The centre-to-centre spacing of frame and fuel tank;
(2), remove locomotive storage batteries and its line, then drain fuel oil, bavin machine oil, sand and cooling water;
(3), first successively remove locomotive traction motor big line, ventilation blower, side bearing protective cover, locomotive traction bar and car spring of installing The connecting pin and joint of clamp, then demolition machine in-car part(Connector and the wiring of locomotive and bogie are removed successively, it is hand-made The connecting pin of motivation chain, the sub- joint of main reservoir pipe, connector for oil delivery pipe, oil returning pipe joint and blow-off connection), finally remove and open The dynamic big line of motor and front and rear pilot;
(4), will on locomotive fuel tank and rail level tie plate, then remove successively fuel tank locomotive connector for oil delivery pipe, oil returning pipe joint, Fuel tank installation bolt and fuel tank are revoked, and finally install locomotive lifting pin and hoisting rig locking pin;
Tear diesel generator group open and lift and specifically include following steps:First with steel wire rope the three locomotive tops disintegrated Canopy is hung down respectively, then removes various connecting bolts and joint in locomotive power house(Remove successively two booster chimneys with The bolt of exhaust-driven turbo-charger exhaust-gas turbo charger connection, air cleaner canvas shroud clip, elbow assembling and the connecting bolt of booster, air filter The installation bolt of device and the fastening bolt of sealing strip, respiratory tract flexible pipe, the protective cover on universal drive shaft and power transmission shaft, power transmission shaft, ten thousand To axle and diesel engine, the connecting bolt of main generator, each pipe joint of power house cooling water system, the company of each pipe in cooling water system The fastening bolt of acting flange, all kinds of pressure gauges, instrument and diesel engine, the pipe joint nut of booster connection), finally will with crane Diesel engine is hung oneself out from locomotive, and pulls down protective cover below main generator, then diesel engine handling to diesel engine is transported into lorry On hold-down support, and with steel wire rope banding fixed, and after diesel engine handling transports lorry to diesel engine, the diesel engine in power house Rubber metal pad and pad are kept in the original location, not lost or be obscured with its elsewhere, and original position reinstalls during assembling, all kinds of pipe joint plastics Cloth is tied up, and prevents foreign matter from entering, and the various parts pulled down, which are all sorted out to place, to be fixed, and prevents transport from losing, ceiling lid covers again Fixed well and with fastener errorless;
Lifting body framework, fuel tank and bogie have specifically included following steps:Body framework handling first is special to multiwheel trailer On storage rack, and it is fixed;Then lifting fuel tank is transported on lorry to corresponding, and it is fixed;Trailing or leading bogie lifts respectively To corresponding transport lorry, and fixed with skate special tooling and cable wire with lorry body;
Locomotive falls car and has specifically included following steps:Trailing or leading bogie is hung on rail first, according to former car size, by fuel oil Case is hung on the Special support of corresponding bogie, ensures trailing or leading bogie and fuel tank distance, then measures eight sides of body framework The difference of height held, bogie side bearing difference of height is recorded, then by car body stand on front and rear two bogie, guarantee is equipped with body framework Four side bearing uniform forces of each bogie afterwards, in horizontality, i.e., same four side bearings of bogie are in same plane Franchise 1mm, front and rear two bogies height franchise 2mm, each side bearing have 2mm basic pad, and maximum cushioning amount is no more than 15mm, and Perform record;Finally carry out the connection that car body falls rear corresponding assembly;
Pilot installation comprises the concrete steps that:Pilot is sling with steel wire rope to assemble, focal point line centering is symmetrical, so Pilot reclines with the assembling of end lower skeleton during installation fastening afterwards, and local gap cannot be greater than 3mm, not allow to take off completely at bolt Open, the misaligned franchise of part of the straight line portion of circular arc portion and both sides is 6mm;The adjustable underbeam of pilot is checked after finally installing Should be in 85~130mm away from standard rail level height, it is 20~30mm that rubber, which sweeps baffle to rail level distance,;
Fuel tank installation is just installed in place using jack pair fuel tank, and installs total reservoir joint;
Assembling diesel generator group has specifically included following steps:Diesel generator group is slowly sling, moved on locomotive Side, declines slowly, main generator bearing ball rod should in its centring sleeve, with hanging wire method preliminary survey diesel engine longitudinal centre line, It is front and rear to open gear size, main generator bearing and plane clearance on bulb, welding longitudinal direction with the skew of metallic tape measurement transverse center Positioning technique backstop, lays located lateral spiral, is ready to reposition, repeatedly above-mentioned operation, confirms diesel engine Generating set installation is good;After positioning confirmation is qualified, four fulcrum bearings are welded with the face of chassis boss three, finally connect diesel engine with Profit pipeline, wiring, connect the big line of main generator.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of carborne method of diesel locomotive, it is characterised in that:Include following steps successively:Car body is separated, tears bavin open Diesel engine generator simultaneously lifts, lifting body framework, fuel tank and bogie, Automobile Transportation, and locomotive falls car, pilot installation, combustion Fuel tank is installed, and lifts power house ceiling lid, assembles diesel generator group and top cover lifting;
Described separation car body has specifically included following steps:
(1), forecarriage and trailing bogie are marked, and measure record forecarriage and fuel tank centre-to-centre spacing, rear steering The centre-to-centre spacing of frame and fuel tank;
(2), remove locomotive storage batteries and its line, then drain fuel oil, bavin machine oil, sand and cooling water;
(3), first successively remove locomotive traction motor big line, ventilation blower, side bearing protective cover, locomotive traction bar and car spring of installing The connecting pin and joint of clamp, then demolition machine in-car part, finally remove and start the big line of motor and front and rear pilot;
(4), will on locomotive fuel tank and rail level tie plate, then remove successively fuel tank locomotive connector for oil delivery pipe, oil returning pipe joint, Fuel tank installation bolt and fuel tank are revoked, and finally install locomotive lifting pin and hoisting rig locking pin;
Described tearing diesel generator group open and lift has specifically included following steps:First with steel wire rope three to have disintegrated Locomotive ceiling is hung down respectively, various connecting bolts and joint in locomotive power house is then removed, finally with crane by diesel engine Hung oneself out from locomotive, and pull down protective cover below main generator, then diesel engine handling to diesel engine is transported to the fixed branch of lorry On seat, and with steel wire rope banding fixed;
Described lifting body framework, fuel tank and bogie has specifically included following steps:Body framework handling is dragged to more wheels first On car storage rack special, and it is fixed;Then lifting fuel tank is transported on lorry to corresponding, and it is fixed;Trailing or leading bogie point Do not lift to corresponding transport lorry, and fixed with skate special tooling and cable wire with lorry body;
Described locomotive falls car and has specifically included following steps:Trailing or leading bogie is hung on rail first, according to former car size, Fuel tank is hung on the Special support of corresponding bogie, ensures trailing or leading bogie and fuel tank distance, then measure body framework The difference of height of eight side bearings, bogie side bearing difference of height is recorded, then ensures to be equipped with front and rear two bogie by car body stand Four side bearing uniform forces of each bogie after body framework, in horizontality;Finally carry out car body and fall rear corresponding assembly Connection;
Described assembling diesel generator group has specifically included following steps:Diesel generator group is slowly sling, moved to Above locomotive, decline slowly, main generator bearing ball rod should be in its centring sleeve, with hanging wire method preliminary survey diesel engine longitudinal direction Heart line, the skew of transverse center is measured with metallic tape, it is front and rear to open gear size, main generator bearing and plane clearance on bulb, weldering Longitudinal register technique backstop is connect, lays located lateral spiral, is ready to reposition, repeatedly above-mentioned operation, is confirmed Diesel generator group installation is good;After positioning confirmation is qualified, four fulcrum bearings are welded with the face of chassis boss three, finally connect bavin Oil machine and profit pipeline, wiring, connect the big line of main generator.
A kind of 2. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described separation car body The connecting pin and joint of middle demolition machine in-car part specifically remove connector and the wiring of locomotive and bogie successively, hand braking The connecting pin of chain, the sub- joint of main reservoir pipe, connector for oil delivery pipe, oil returning pipe joint and blow-off connection.
A kind of 3. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described tears diesel engine open The various connecting bolts and joint removed in generating set and lifting in locomotive power house specifically remove two boosters successively The bolt that chimney is connected with exhaust-driven turbo-charger exhaust-gas turbo charger, air cleaner canvas shroud clip, elbow assembling and the connection spiral shell of booster Bolt, the installation bolt of air filter and the fastening bolt of sealing strip, respiratory tract flexible pipe, the protective cover on universal drive shaft and power transmission shaft, pass The connecting bolt of moving axis, universal drive shaft and diesel engine, main generator, each pipe joint of power house cooling water system, in cooling water system The fastening bolt of the adpting flange of each pipe, all kinds of pressure gauges, instrument and diesel engine, the pipe joint nut of booster connection.
A kind of 4. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described diesel engine is hung After transporting to diesel engine transport lorry, diesel engine rubber metal pad in power house and pad are kept in the original location, not lose or and other Place obscures, and original position is reinstalled during assembling, and all kinds of pipe joints are tied up with plastic cloth, prevent foreign matter from entering, and the various parts pulled down are whole Sort out to place and fix, prevent transport from losing, ceiling lid is covered and fixed with fastener errorless again.
A kind of 5. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described locomotive falls car When, same four side bearings of bogie are in same plane franchise 1mm, front and rear two bogies height franchise 2mm, and each side bearing has 2mm basic pad, maximum cushioning amount is no more than 15mm, and performs record.
A kind of 6. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described pilot peace Dress comprises the concrete steps that:Pilot is sling with steel wire rope to assemble, focal point line centering is symmetrical, then during installation fastening Pilot reclines with the assembling of end lower skeleton, and local gap cannot be greater than 3mm, not allow completely disengaged, circular arc portion at bolt The misaligned franchise of part with the straight line portion of both sides is 6mm;Check the adjustable underbeam of pilot away from standard rail level after finally installing Height should be in 85~130mm, and it is 20~30mm that rubber, which sweeps baffle to rail level distance,.
A kind of 7. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described fuel tank peace Dress is just installed in place using jack pair fuel tank, and installs total reservoir joint.
A kind of 8. carborne method of diesel locomotive according to claim 1, it is characterised in that:Described top cover lifting After the completion of fuel up, machine oil and soft water and do corresponding sealing, finally checked, debugged, test run, reaching locomotive operation state It is required that.
CN201710848089.0A 2017-09-19 2017-09-19 A kind of carborne method of diesel locomotive Pending CN107672506A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710848089.0A CN107672506A (en) 2017-09-19 2017-09-19 A kind of carborne method of diesel locomotive

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710848089.0A CN107672506A (en) 2017-09-19 2017-09-19 A kind of carborne method of diesel locomotive

Publications (1)

Publication Number Publication Date
CN107672506A true CN107672506A (en) 2018-02-09

Family

ID=61136830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710848089.0A Pending CN107672506A (en) 2017-09-19 2017-09-19 A kind of carborne method of diesel locomotive

Country Status (1)

Country Link
CN (1) CN107672506A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095024A (en) * 1993-02-04 1994-11-16 J·B·亨特公司 The apparatus and method of carrier in closed semi-trailer
DE19845523A1 (en) * 1998-10-02 2000-04-20 Wolfgang Rzehulka Transport device for heavy goods in ro-ro operation and working method for handling the transport device
US20030155748A1 (en) * 2001-12-17 2003-08-21 Claude Picard Modular trailer system
WO2003072423A1 (en) * 2002-02-28 2003-09-04 Extec Screens And Crushers Limited Tractor unit/trailer combination for suspended transport of equipment
CN102756763A (en) * 2012-08-02 2012-10-31 王同建 Large-scale transport vehicle parallel operation transporting system and method
CN203956835U (en) * 2014-07-14 2014-11-26 山西太钢不锈钢股份有限公司 Diesel engine of diesel locomotive injection pump dismounting apparatus for examination and repair
CN104973149A (en) * 2015-07-23 2015-10-14 赵永胜 Main vehicle and draw-bar trailer combination type transportation system and method
CN205989764U (en) * 2013-08-20 2017-03-01 斯莱普内尔芬兰公司 Transport heavy can transport machine transtainer

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1095024A (en) * 1993-02-04 1994-11-16 J·B·亨特公司 The apparatus and method of carrier in closed semi-trailer
DE19845523A1 (en) * 1998-10-02 2000-04-20 Wolfgang Rzehulka Transport device for heavy goods in ro-ro operation and working method for handling the transport device
US20030155748A1 (en) * 2001-12-17 2003-08-21 Claude Picard Modular trailer system
WO2003072423A1 (en) * 2002-02-28 2003-09-04 Extec Screens And Crushers Limited Tractor unit/trailer combination for suspended transport of equipment
CN102756763A (en) * 2012-08-02 2012-10-31 王同建 Large-scale transport vehicle parallel operation transporting system and method
CN205989764U (en) * 2013-08-20 2017-03-01 斯莱普内尔芬兰公司 Transport heavy can transport machine transtainer
CN203956835U (en) * 2014-07-14 2014-11-26 山西太钢不锈钢股份有限公司 Diesel engine of diesel locomotive injection pump dismounting apparatus for examination and repair
CN104973149A (en) * 2015-07-23 2015-10-14 赵永胜 Main vehicle and draw-bar trailer combination type transportation system and method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中铁一局集团公司神华甘泉铁路工程项目经理部: "机车解体组装运输方案,网址:http://www.docin.com/p-1744529165.html", 《豆丁文库》 *
宋书敏等: "东风8B型机车解体,网址:https://wenku.baidu.com/view/4d729eac482fb4daa58d4bb2.html", 《百度文库》 *
车仁雪: "青藏铁路安多至拉萨段大型铺架设备解体、运输、组装技术", 《铁道建筑技术》 *

Similar Documents

Publication Publication Date Title
CN102954871B (en) Motor train unit bogie assembling test flowing water repair method
CN106541959B (en) A kind of net rail detection vehicle bogie
CN204296454U (en) Rearmounted CNG gas-cylinder retaining assembly and this commercial car
CN103158874A (en) Substitution device for aircraft engine
CN202499142U (en) Wheel-track-type beam carrier
CN106448315A (en) Railway rescue simulation vehicle
CN107672506A (en) A kind of carborne method of diesel locomotive
CN106184281A (en) Synthesized environmental protection type urban rail inspection car
CN105857405B (en) A kind of hybrid power passenger car end construction
CN213008463U (en) Special chassis after-loading process trolley for full-load passenger car
CN210881690U (en) Locomotive pantograph boosting lifting device
KR101327084B1 (en) Bare chassis for vehicle
CN208291194U (en) A kind of Vehicle Engineering Measuring error platform
CN201769895U (en) Rear frame of underground service vehicle
CN206344809U (en) A kind of suspension monorail limiter
CN206436754U (en) A kind of vehicle impact test trailer wagon
CN205463527U (en) Trailing type motorcycle exhaust pump drainage system
CN201235823Y (en) Integrated apparatus for treating brake fault for train examination
CN202368593U (en) B-type metro train coupler traction rod
CN108442435A (en) Land leveller
CN201771652U (en) Air filter damping device of special purpose vehicle
CN211927033U (en) Pipeline fuelling vehicle flowmeter verification quick connecting device
CN202384926U (en) Motor suspension bracket reinforcing plate
CN211971102U (en) Derailing prevention device for tipper empty wagon line
CN209322331U (en) Electric four-wheel vehicle assembles Lift-on/Lift-off System

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023

Applicant after: CHINA RAILWAY NO.4 ENGINEERING GROUP Co.,Ltd.

Address before: 230023 technical center of China Railway four Bureau, No. 96 Wangjiang East Road, Anhui, 618, Hefei

Applicant before: CHINA RAILWAY NO.4 ENGINEERING GROUP Co.,Ltd.

CB02 Change of applicant information
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication