CN107658791A - 电力线缆布线理线装置 - Google Patents
电力线缆布线理线装置 Download PDFInfo
- Publication number
- CN107658791A CN107658791A CN201711106862.2A CN201711106862A CN107658791A CN 107658791 A CN107658791 A CN 107658791A CN 201711106862 A CN201711106862 A CN 201711106862A CN 107658791 A CN107658791 A CN 107658791A
- Authority
- CN
- China
- Prior art keywords
- winding head
- bobbin winding
- power cable
- electric power
- management device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
本发明涉及电力电缆布线技术领域,是一种电力线缆布线理线装置。包括安装板、上滑槽、下滑槽、上绕线头、下绕线头、上安装架、下安装架、上限位筒和下限位筒,在安装板上自上而下间隔固定安装有上滑槽、下滑槽、上安装架和下安装架,在上滑槽内自左至右间隔安装有至少三个上绕线头。本发明结构合理而紧凑,使用方便,使用时,将安装板固定安装好,将每根2M线缆梳理好,然后首先将第一根2M线缆缠绕到第一个上绕线头上,然后再从上限位筒穿出,第二根2M线缆缠绕到第一个下绕线头上,然后再从下限位筒穿出,就这样依次穿出,不仅很好地理顺了2M线缆,不会出现2M线缆相互缠绕的现象,有效提高了后期维护工作效率。
Description
技术领域
本发明涉及电力电缆布线技术领域,是一种电力线缆布线理线装置。
背景技术
在电缆施工和线缆布放过程中,由于设备越来越多,2M线缆在单元体后端布线出线长度不同,交叉穿越,造成布线混乱,布线施工时,通常用扎带完成多条2M线缆的绑扎,容易造成线缆之间相互缠绕,当需更换某条线缆时,需将所有扎带剪断,对线缆进行重新梳理并找到目标线缆后方可更换,这样就造成后期维护工作效率低的问题。
发明内容
本发明提供了一种电力线缆布线理线装置,克服了上述现有技术之不足,其能有效解决由于线缆布线混乱、后期维护工作效率低的问题。
本发明的技术方案是通过以下措施来实现的:一种电力线缆布线理线装置,包括安装板、上滑槽、下滑槽、上绕线头、下绕线头、上安装架、下安装架、上限位筒和下限位筒,在安装板上自上而下间隔固定安装有上滑槽、下滑槽、上安装架和下安装架,在上滑槽内自左至右间隔安装有至少三个上绕线头,在下滑槽内自左至右间隔安装有至少三个与上绕线头上下间隔错开的下绕线头,在上安装架上固定安装有与上绕线头上下一一对应的上限位筒,在下安装架上固定安装有与下绕线头上下一一对应的下限位筒。
下面是对上述发明技术方案的进一步优化或/和改进:
上述上滑槽和下滑槽均由一对上下对应并有间距的槽钢构成,上绕线头和下绕线头均为水平放置状的T形头,且上绕线头和下绕线头的小头呈左宽右窄的台阶状,上绕线头的小头的左部位于上滑槽内,下绕线头的小头的左部位于下滑槽内。
上述上绕线头和下绕线头的大头外侧均设有限位环台。
上述上绕线头通过螺钉固定安装在上滑槽内,下绕线头通过螺钉固定安装在下滑槽内。
上述上限位筒和下限位筒均为C形弹性筒。
上述安装板的四周设有安装通孔。
本发明结构合理而紧凑,使用方便,使用时,将安装板固定安装好,将每根2M线缆梳理好,然后首先将第一根2M线缆缠绕到第一个上绕线头上,然后再从上限位筒穿出,第二根2M线缆缠绕到第一个下绕线头上,然后再从下限位筒穿出,就这样依次穿出,不仅很好地理顺了2M线缆,不会出现2M线缆相互缠绕的现象,有效提高了后期维护工作效率。
附图说明
附图1为本发明最佳实施例的主视结构示意图。
附图2为附图1的左视结构示意图。
附图中的编码分别为:1为安装板,2为上滑槽,3为下滑槽,4为上绕线头,5为下绕线头,6为上安装架,7为下安装架,8为上限位筒,9为下限位筒,10为限位环台,11为螺钉,12为安装通孔。
具体实施方式
本发明不受下述实施例的限制,可根据本发明的技术方案与实际情况来确定具体的实施方式。
在本发明中,为了便于描述,各部件的相对位置关系的描述均是根据说明书附图2的布图方式来进行描述的,如:上、下、左、右等的位置关系是依据说明书附图2的布图方向来确定的。
下面结合实施例及附图对本发明作进一步描述:
如附图1、2所示,该电力线缆布线理线装置包括安装板1、上滑槽2、下滑槽3、上绕线头4、下绕线头5、上安装架6、下安装架7、上限位筒8和下限位筒9,在安装板1上自上而下间隔固定安装有上滑槽2、下滑槽3、上安装架6和下安装架7,在上滑槽2内自左至右间隔安装有至少三个上绕线头4,在下滑槽3内自左至右间隔安装有至少三个与上绕线头4上下间隔错开的下绕线头5,在上安装架6上固定安装有与上绕线头4上下一一对应的上限位筒8,在下安装架7上固定安装有与下绕线头5上下一一对应的下限位筒9。使用时,将安装板1固定安装好,将每根2M线缆梳理好,然后首先将第一根2M线缆缠绕到第一个上绕线头4上,然后再从上限位筒8穿出,第二根2M线缆缠绕到第一个下绕线头5上,然后再从下限位筒9穿出,就这样依次穿出,不仅很好地理顺了2M线缆,不会出现2M线缆相互缠绕的现象,有效提高了后期维护工作效率。
可根据实际需要,对上述电力线缆布线理线装置作进一步优化或/和改进:
如附图1、2所示,上滑槽2和下滑槽3均由一对上下对应并有间距的槽钢构成,上绕线头4和下绕线头5均为水平放置状的T形头,且上绕线头4和下绕线头5的小头呈左宽右窄的台阶状,上绕线头4的小头的左部位于上滑槽2内,下绕线头5的小头的左部位于下滑槽3内。这样,便于将上绕线头4和下绕线头5安装到上滑槽2和下滑槽3内。
如附图2所示,上绕线头4和下绕线头5的大头外侧均设有限位环台10。这样能起到很好的限位作用。
如附图2所示,上绕线头4通过螺钉11固定安装在上滑槽2内,下绕线头5通过螺钉11固定安装在下滑槽3内。这样,便与定位。
根据需要,上限位筒8和下限位筒9均为C形弹性筒。且C形弹性筒的开口应稍微小于2M线缆的直径,这样,便于在维修时取出和放入2M线缆。
为了便于安装,安装板1的四周设有安装通孔12。
以上技术特征构成了本发明的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要的技术特征,来满足不同情况的需求。
Claims (10)
1.一种电力线缆布线理线装置,其特征在于包括安装板、上滑槽、下滑槽、上绕线头、下绕线头、上安装架、下安装架、上限位筒和下限位筒,在安装板上自上而下间隔固定安装有上滑槽、下滑槽、上安装架和下安装架,在上滑槽内自左至右间隔安装有至少三个上绕线头,在下滑槽内自左至右间隔安装有至少三个与上绕线头上下间隔错开的下绕线头,在上安装架上固定安装有与上绕线头上下一一对应的上限位筒,在下安装架上固定安装有与下绕线头上下一一对应的下限位筒。
2.根据权利要求1所述的电力线缆布线理线装置,其特征在于上滑槽和下滑槽均由一对上下对应并有间距的槽钢构成,上绕线头和下绕线头均为水平放置状的T形头,且上绕线头和下绕线头的小头呈左宽右窄的台阶状,上绕线头的小头的左部位于上滑槽内,下绕线头的小头的左部位于下滑槽内。
3.根据权利要求2所述的电力线缆布线理线装置,其特征在于上绕线头和下绕线头的大头外侧均设有限位环台。
4.根据权利要求1或2或3所述的电力线缆布线理线装置,其特征在于上绕线头通过螺钉固定安装在上滑槽内,下绕线头通过螺钉固定安装在下滑槽内。
5.根据权利要求1或2或3所述的电力线缆布线理线装置,其特征在于上限位筒和下限位筒均为C形弹性筒。
6.根据权利要求4或所述的电力线缆布线理线装置,其特征在于上限位筒和下限位筒均为C形弹性筒。
7.根据权利要求1或2或3所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。
8.根据权利要求4所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。
9.根据权利要求5所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。
10.根据权利要求6所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711106862.2A CN107658791A (zh) | 2017-11-10 | 2017-11-10 | 电力线缆布线理线装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711106862.2A CN107658791A (zh) | 2017-11-10 | 2017-11-10 | 电力线缆布线理线装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107658791A true CN107658791A (zh) | 2018-02-02 |
Family
ID=61120046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711106862.2A Pending CN107658791A (zh) | 2017-11-10 | 2017-11-10 | 电力线缆布线理线装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107658791A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108767762A (zh) * | 2018-06-05 | 2018-11-06 | 浙江机电职业技术学院 | 一种通讯设备内部导线梳理排线结构 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204668863U (zh) * | 2015-05-29 | 2015-09-23 | 国家电网公司 | 2m单元体活动理线架 |
CN106300126A (zh) * | 2016-08-29 | 2017-01-04 | 莱芜钢铁集团有限公司 | 一种拆卸、安装电缆用辅助装置 |
CN206585289U (zh) * | 2017-02-24 | 2017-10-24 | 广州粤道电线电缆有限公司 | 一种方便使用的理线架 |
CN207426562U (zh) * | 2017-11-10 | 2018-05-29 | 国网新疆电力有限公司培训中心 | 电力线缆布线理线装置 |
-
2017
- 2017-11-10 CN CN201711106862.2A patent/CN107658791A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204668863U (zh) * | 2015-05-29 | 2015-09-23 | 国家电网公司 | 2m单元体活动理线架 |
CN106300126A (zh) * | 2016-08-29 | 2017-01-04 | 莱芜钢铁集团有限公司 | 一种拆卸、安装电缆用辅助装置 |
CN206585289U (zh) * | 2017-02-24 | 2017-10-24 | 广州粤道电线电缆有限公司 | 一种方便使用的理线架 |
CN207426562U (zh) * | 2017-11-10 | 2018-05-29 | 国网新疆电力有限公司培训中心 | 电力线缆布线理线装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108767762A (zh) * | 2018-06-05 | 2018-11-06 | 浙江机电职业技术学院 | 一种通讯设备内部导线梳理排线结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201868155U (zh) | 电缆铜丝屏蔽层均匀梳绕分布装置 | |
CN206665889U (zh) | 一种可调节的电缆卷线筒 | |
CN203466475U (zh) | 一种封闭式变台架 | |
EP2186099B1 (de) | Kabelbaumfertigungsfeld | |
CN107658791A (zh) | 电力线缆布线理线装置 | |
CN207426562U (zh) | 电力线缆布线理线装置 | |
CN204315305U (zh) | 一种绞线装置 | |
CN109375082B (zh) | 一种用于特高压现场试验中的分裂式扩径导线 | |
KR100908446B1 (ko) | 가공전선의 절연형 애자 고정식 완철 | |
CN211266264U (zh) | 一种电线布线架 | |
CN207124281U (zh) | 一种新型电梯天线装置 | |
EP3560051B1 (de) | Umspannstation, verfahren und vorrichtung für eine umspannstation | |
CN203982830U (zh) | 防积雪抗拉电缆 | |
CN203536902U (zh) | 输电线路防鸟针板 | |
CN206272196U (zh) | 一种具有监测功能的防振锤 | |
CN202094573U (zh) | 一种用于高海拔地区输电线路的防晕球 | |
CN208265532U (zh) | 绑线绕线机 | |
CN202601267U (zh) | 一种抗拉型电缆 | |
CN206620386U (zh) | 电控盒的抱攀固定结构 | |
CN205429652U (zh) | 一种吊杆型绝缘高压线缆耐张线夹 | |
CN205756861U (zh) | 全绝缘防鸟刺 | |
CN206040300U (zh) | 自承式架空网络线 | |
Rison et al. | Lightning air terminals-is shape important? | |
CN114137584A (zh) | 一种基于北斗数据地图的电子围栏及实时预警系统 | |
CN210667914U (zh) | 一种用于铜丝屏蔽机的可调式分线盘 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |