CN107657373A - 一种验证调度计划的方法 - Google Patents
一种验证调度计划的方法 Download PDFInfo
- Publication number
- CN107657373A CN107657373A CN201710869863.6A CN201710869863A CN107657373A CN 107657373 A CN107657373 A CN 107657373A CN 201710869863 A CN201710869863 A CN 201710869863A CN 107657373 A CN107657373 A CN 107657373A
- Authority
- CN
- China
- Prior art keywords
- operation plan
- power system
- node
- stable
- gross energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000004088 simulation Methods 0.000 claims abstract description 8
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 230000005611 electricity Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710869863.6A CN107657373B (zh) | 2017-09-23 | 2017-09-23 | 一种验证调度计划的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710869863.6A CN107657373B (zh) | 2017-09-23 | 2017-09-23 | 一种验证调度计划的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107657373A true CN107657373A (zh) | 2018-02-02 |
CN107657373B CN107657373B (zh) | 2021-04-06 |
Family
ID=61130962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710869863.6A Active CN107657373B (zh) | 2017-09-23 | 2017-09-23 | 一种验证调度计划的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107657373B (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102609882A (zh) * | 2012-01-13 | 2012-07-25 | 冶金自动化研究设计院 | 一种基于管网计算的蒸汽管网混合调度系统 |
US20140256266A1 (en) * | 2003-09-22 | 2014-09-11 | United Parcel Service Of America, Inc. | Symbiotic system for testing electromagnetic signal coverage in areas near transport routes |
CN105160451A (zh) * | 2015-07-09 | 2015-12-16 | 上海电力学院 | 一种含电动汽车的微电网多目标优化调度方法 |
-
2017
- 2017-09-23 CN CN201710869863.6A patent/CN107657373B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140256266A1 (en) * | 2003-09-22 | 2014-09-11 | United Parcel Service Of America, Inc. | Symbiotic system for testing electromagnetic signal coverage in areas near transport routes |
CN102609882A (zh) * | 2012-01-13 | 2012-07-25 | 冶金自动化研究设计院 | 一种基于管网计算的蒸汽管网混合调度系统 |
CN105160451A (zh) * | 2015-07-09 | 2015-12-16 | 上海电力学院 | 一种含电动汽车的微电网多目标优化调度方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107657373B (zh) | 2021-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102593829B (zh) | 计及关键支路的输电断面确定方法与装置 | |
CN108736500B (zh) | 区域电网富裕电力直流外送系统的优化切机方法和装置 | |
CN103259267A (zh) | 一种用于风电场集群的分模式电压控制方法 | |
CN105135409B (zh) | 基于一次调频动作幅值的超临界机组锅炉主控控制方法 | |
CN104578084B (zh) | 一种动态无功补偿装置与avc相结合的控制系统 | |
CN103390893B (zh) | 一种水电站avc控制方法 | |
CN105811452A (zh) | 配电网分布式光伏极限渗透率分析方法及装置 | |
CN107134977B (zh) | 一种户用光储一体机测试方法 | |
CN104218618B (zh) | 一种主从控制模式的微电网稳定运行的调节控制方法 | |
CN104868471A (zh) | 一种省级电网静态安全辅助决策方法 | |
CN102855533B (zh) | 基于负荷分担算法的配电网检修计划输出方法及装置 | |
CN107508290A (zh) | 一种基于大数据的电网调度方法 | |
CN106877383A (zh) | 一种变速风电机组低电压穿越能力仿真模型调整方法 | |
CN103401271B (zh) | 一种确定省级电网接纳分布式电源能力的方法及装置 | |
CN107181321A (zh) | 一种基于电网拓扑结构实现快速拉荷的方法 | |
CN103996325A (zh) | 一种培训系统中多级调度一体化模式下的教案制作方法 | |
CN107657373A (zh) | 一种验证调度计划的方法 | |
CN105375511A (zh) | 一种一次调频转速不等率函数的设置方法 | |
CN104701816A (zh) | 凸极机低励限制与失磁保护的配合整定方法及装置 | |
CN101951017A (zh) | 防止电动机意外停机的工频自动切换装置 | |
CN109802449A (zh) | 基于有功功率缺口的agc机组动态调配方法及装置 | |
Tsany et al. | Power system stability improvement using Battery Energy Storage System (BESS) in isolated grid | |
CN204012921U (zh) | 一种双向控制智能监控配电系统 | |
Zhang et al. | Security-based load shedding strategy considering the load frequency dependency in island distribution system | |
CN109713681A (zh) | 一种离线验证动态无功补偿装置控制策略的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Dunnan Inventor after: Ying Zhiwei Inventor after: Yu Tao Inventor after: Ka Ping Inventor after: Li Xiurong Inventor before: Li Xiurong |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210317 Address after: 102206 No. 2 Nong Road, Huilongguan, Beijing, Changping District Applicant after: NORTH CHINA ELECTRIC POWER University Applicant after: SHANGHAI ELECTRIC POWER TRANSACTION CENTER Co.,Ltd. Address before: 251900 Shandong province Binzhou County Wudi County Central Avenue 109 State Grid Shandong power company Wudi county power supply company Applicant before: Li Xiurong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |