CN109802449A - 基于有功功率缺口的agc机组动态调配方法及装置 - Google Patents
基于有功功率缺口的agc机组动态调配方法及装置 Download PDFInfo
- Publication number
- CN109802449A CN109802449A CN201910190260.2A CN201910190260A CN109802449A CN 109802449 A CN109802449 A CN 109802449A CN 201910190260 A CN201910190260 A CN 201910190260A CN 109802449 A CN109802449 A CN 109802449A
- Authority
- CN
- China
- Prior art keywords
- power
- unit
- active power
- rate
- agc unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种基于区域电网有功功率缺口的AGC机组动态调配方法及装置,包括监测区域电网是否发生故障,实时计算网内整体有功功率缺额数值、整体有功功率变化速率和应急有功功率变化速率,如果应急有功功率变化速率高于或低于网内现有的整体有功功率变化速率,则根据速率缺口对AGC机组进行新增或退出调配。本发明根据电网实时有功功率变化速率对AGC机组进行调配,确保了电网区域控制偏差在规定时间内的平均值以及过零等指标,控制电网波动较小期间的AGC机组数量,降低了电网系统的频率波动,避免了机组产生无效动作,实现了网源协调发展。
Description
技术领域
本发明涉及网源协调控制技术领域,尤其涉及一种基于区域电网有功功率缺口的AGC机组动态调配方法。
背景技术
在特高压电网和大区电网互联的新形势下,各级电网联系日渐紧密,电网和机组之间协调配合的要求也越来越高。同时,我国新能源装机及发电量快速提升,新能源装机(风电、光伏、核电)占比从2016年年底不足16%提升至2017年9月底的18.5%以上。截止到2017年9月,新能源总装机容量达到275GW,新增火电装机容量占比仅有33%,远低于在存量中的占比64%,新能源装机占比达到58%,其中仅光伏新增装机就占到45%。同时,区域间互联的日益紧密,电力系统将面临区域间大量的电力转移和潮流的大范围波动。为了电网的安全稳定运行,作为目前电网调频调峰的主力,大型火电机组都要求投入自动发电控制(AGC)功能。大型火电机组经常处于宽负荷区间运行,范围一般在50%-100%额定负荷,并且要求机组具备快速、准确、稳定的响应负荷变化需求。
电网AGC性能在每个AGC数据采集周期被调用,用于评估AGC的控制行为,评估标准主要为NERC(National Electrical Research Council,北美电力系统可靠性协会)行为准则。电网AGC性能可以计算和统计运行区域性能指标、机组性能指标,还可以计算频率、交换功率、ACE(区域控制偏差)等在不同的门槛值(例如频差0.1HZ和0.2HZ)及不同条件(如AGC是否投入等)下的合格率。ACE产生后,根据一定机理分配到各AGC机组上共同动作以消除偏差,达到电网频率的稳定,如图1所示。
目前,国内AGC控制性能评价主要采用的是NERC推行的两套标准:A1、A2标准和CPS1、CPS2标准,如华北等区域电网采用的是A1、A2标准,华东等区域电网采用的是CPS1、CPS2标准。NERC早在1973年就正式采用A1、A2标准来评价电网正常情况下的控制性能,其内容是:A1:控制区域的ACE在10min内必须至少过零一次;A2:控制区域的ACE 10min内的平均值必须控制在规定的范围Ld内。NERC要求各控制区域达到A1、A2标准的控制合格率在90%以上。这样通过执行A1、A2标准,使各控制区域的ACE始终接近于零,从而保证用电负荷与发电、计划交换和实际交换之间的平衡。
NERC于1996年推出了CPS1、CPS2控制性能评价标准,于1998年开始正式实施,取代了原来的A1、A2标准。其内容如下:
CPS1要求
式中:
AVGperiod[]为对括号中的值求平均值;ACEAVE-min为1分钟ACE的平均值,单位MW,要求每2s采样一次,然后30个值取平均;ΔFAVE-min为一分钟频率偏差的平均值,单位Hz,要求1s采样一次,然后60个值取平均;Bi为控制区域的偏差系数,单位MW/0.1Hz,取正号;ε1为互联电网对全年1分钟频率平均偏差的均方根的控制目标值,单位为Hz。
与A2相似,要求ACE每10min的平均值必须控制在规定的范围L10内。
国内各区域电网均按照国家的“两个细则”制定了相应的标准和实时细则,比如《华北区域发电厂并网运行管理实施细则》规定,图2中的有功功率变化速率A1值一般设为1.5%Pe(Pe为机组额定功率)或2%Pe,机组以同样的速率进行有功功率的增长或下降。在电网实际运行中,由于每日投入AGC方式运行的机组速率和台数是固定的,即整个电网每天的有功功率变化速率是固定的,这极易造成机组在日内某时间段内机组总体功率调节变化能力不足或多余,不能保证电网区域控制偏差在某段时间内的平均值控制在规定的范围内,若ACE过大则需要在送端电网切除大量运行机组,受端电网切除一定量负荷,否则将会发生连锁反应、导致系统失稳。
发明内容
为了解决上述问题,本发明提出了一种基于区域电网有功功率缺口的AGC机组动态调配方法,能根据电网功率缺口动态调整AGC运行机组数量,确保电网安稳运行。
具体地,本发明的一种基于区域电网有功功率缺口的AGC机组动态调配方法,包括:
监测区域电网是否发生故障,造成有功功率产生波动;
如果是,计算网内实时整体有功功率缺额数值、实时整体有功功率变化速率,和应急有功功率变化速率;
如果所述应急有功功率变化速率高于或低于网内实时整体有功功率变化速率,则根据速率缺口对AGC机组进行新增或退出调配。
进一步地,网内整体有功功率缺额数值ΔP为:
ΔP=P事故缺额-P切负荷-P一次调频,
P事故缺额表示某时刻有功功率缺额数值为事故造成的有功功率缺额,P切负荷表示应急切除负荷的功率量,P一次调频表示一次调频补偿的功率量。
进一步地,P切负荷可以为0,即网内事故缺额数值P事故缺额在一定范围内可以不进行切负荷操作,该范围值由电网管理部门提供,大小与电网规模相关。
进一步地,
其中,Pi为第i台AGC机组的额定有功功率,fN为电网额定频率50Hz,f为电网实时频率,δ%为转速不等率,取值范围为4%-5%。
进一步地,网内实时整体有功功率变化速率R为:
其中,Ri为第i台AGC机组的有功功率变化速率,该值根据区域发电厂并网运行管理实施细则的规定执行,取机组额定有功功率的1%-2%。
进一步地,计算电网所需的应急有功功率变化速率的方法为:
电网规定控制区域的整体有功功率缺额在时间T内必须至少过零一次,并且网内实时整体有功功率缺额数值ΔP在时间T内的平均值必须控制在规定的范围Ld内;考虑到电网调节的迟延和惯性,必须使网内实时整体有功功率缺额数值ΔP在时间内过零,故电网所需的应急有功功率变化速率R′为:
进一步地,
若R-R′<-ΔR,则需对当前AGC机组进行新增调配;
若R-R′>+ΔR,则需对当前AGC机组进行退出配置;
若-ΔR≤R-R′≤ΔR,则保持现有AGC机组运行;
其中ΔR为有功功率变化速率死区值,
进一步地,
增加或退出AGC机组的数量按照计算求得,Rn+1…Rn+k为新增或退出的第1-k台AGC机组的有功功率变化速率,新增顺序按照月度AGC机组综合性能指标和机组可调容量比例的加权指标Si由高到低进行选取,去除已投入AGC机组和未运行机组;退出AGC机组的选择与新增AGC机组的选择相反,按加权指标由低到高选取。
进一步地,Si=αNi+βKi,Si为机组加权后排名,Ni为月度AGC机组综合性能指标,Ki为机组可调容量比例,α、β为加权系数,按照优先考虑性能指标,兼顾机组可调空间的原则,系数分别设为0.6和0.4。
进一步地,机组可调容量比例
其中Pmax,i为机组i的调节容量上限,Pmin,i为机组i的调节容量下限,PB,i为机组i当前的基本功率。
本发明还提出一种基于区域电网有功功率缺口的AGC机组动态调配装置,包括:
故障监测模块:监测区域电网内是否发生故障,造成有功功率产生波动;
计算模块,与故障监测模块相连,当区域电网内发生故障时,计算网内实时整体有功功率缺额数值ΔP、实时整体有功功率变化速率R,和应急有功功率变化速率R′;
判断模块,与计算模块相连,对网内实时整体有功功率变化速率R和应急有功功率变化速率R′进行求差运算,判断是否对当前AGC机组进行新增或退出调配;
机组调配模块,与判断模块相连,计算求得增加或退出AGC机组的数量,并确定新增或退出的机组名称。
进一步地,
计算模块中,计算网内整体有功功率缺额数值ΔP的方法为:
ΔP=P事故缺额-P切负荷-P一次调频,
其中P事故缺额表示某时刻有功功率缺额数值为事故造成的有功功率缺额,P切负荷表示应急切除负荷的功率量,P一次调频表示一次调频补偿的功率量。
进一步地,其中P切负荷可以为0,即网内事故缺额数值P事故缺额在一定范围内可以不进行切负荷操作,该值由电网管理部门提供,大小与电网规模相关。
进一步地,
其中,Pi为第i台AGC机组的额定有功功率,fN为电网额定频率50Hz,f为电网实时频率,δ%为转速不等率,取值范围为4%-5%。
进一步地,
计算模块中,网内实时整体有功功率变化速率R的计算方法为:
其中,Ri为第i台AGC机组的有功功率变化速率,该值根据区域发电厂并网运行管理实施细则的规定执行,取机组额定有功功率的1%-2%。
进一步地,
计算模块中,电网规定控制区域的整体有功功率缺额在时间T内必须至少过零一次,并且网内实时整体有功功率缺额数值ΔP在时间T内的平均值必须控制在规定的范围Ld内;考虑到电网调节的迟延和惯性,必须使网内实时整体有功功率缺额数值ΔP在时间内过零,故电网所需的应急有功功率变化速率R′为:
进一步地,
判断模块中,判断是否对当前AGC机组进行新增或退出调配包括:
若R-R′<-ΔR,则需对当前AGC机组进行新增调配;
若R-R′>+ΔR,则需对当前AGC机组进行退出配置;
若-ΔR≤R-R′≤ΔR,则保持现有AGC机组运行;
其中ΔR为有功功率变化速率死区值,
进一步地,
机组调配模块中,
增加或退出AGC机组的数量按照计算求得,Rn+1…Rn+k为新增或退出的第1-k台AGC机组的有功功率变化率,新增顺序按照月度AGC机组综合性能指标和机组可调容量比例的加权指标Si由高到低进行选取,去除已投入AGC机组和未运行机组;退出AGC机组的选择与新增AGC机组的选择相反,按加权指标由低到高选取。
进一步地,
Si=αNi+βKi,Si为机组加权后排名,Ni为月度AGC机组综合性能指标,Ki为机组可调容量比例,α、β为加权系数,按照优先考虑性能指标,兼顾机组可调空间的原则,系数分别设为0.6和0.4。
进一步地,
机组可调容量比例
其中Pmax,i为机组i的调节容量上限,Pmin,i为机组i的调节容量下限,PB,i为机组i当前的基本功率。
与现有技术相比,本发明的有益效果是:
(1)在运机组整体功率变化速率快慢直接影响电网在故障下恢复频率稳定的快慢,本发明根据电网实时有功功率变化速率对AGC机组进行调配,确保了电网区域控制偏差在规定时间内的平均值以及过零等指标,降低了电网系统的频率波动,避免故障事故的扩大化。
(2)本发明通过动态调配AGC机组数量,可降低在电网波动较小期间的AGC机组数量,避免机组产生无效动作,实现了网源协调发展。
附图说明
图1为网源AGC协同调配控制示意图;
图2为常规火电机组AGC控制示意图;
图3为本发明一种基于区域电网有功功率缺口的AGC机组动态调配方法的流程示意图;
图4为本发明的一种基于区域电网有功功率缺口的AGC机组动态调配装置的结构示意图。
具体实施方式
为了使本技术领域的人员更好地理解本申请中的技术方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。
为了更好地理解本申请,下面结合附图来详细解释本申请的实施方式。
图3为本申请实施例所提供的一种基于区域电网有功功率缺口的AGC机组动态调配方法的流程示意图。由图3可知,本实施例中的方法包括如下过程:
(1)监测区域电网内是否发生故障,造成有功功率产生波动;若是,则进行步骤(2);
(2)计算网内实时整体有功功率缺额数值和网内实时整体有功功率变化速率、应急有功功率变化速率,其中,
计算网内实时整体有功功率缺额数值的方法为:
ΔP=P事故缺额-P切负荷-P一次调频,
即某时刻有功功率缺额数值为事故造成的有功功率缺额P事故缺额扣除应急切除负荷的功率量P切负荷和一次调频补偿的功率量P一次调频;P切负荷可以为0,即网内事故缺额数值P事故缺额在一定范围内可以不进行切负荷操作,该值由电网管理部门提供,大小与电网规模相关;
当电网发生功率缺额时,前10-20s内一次调频瞬间补偿一定功率,随之AGC进行有功功率偏差消除,按照GB/T 30370等规程标准要求以及实际运行经验,此时一次调频功率实际能够产生的补偿量约为标准值的75%,故
其中,Pi为第i台AGC机组的额定有功功率,fN为电网额定频率50Hz,f为电网实时频率,δ%为转速不等率,取值范围为4%-5%;
计算网内实时整体有功功率变化速率的方法为:
其中,Ri为第i台AGC机组的有功功率变化速率,该值根据区域发电厂并网运行管理实施细则的规定执行,一般为机组额定有功功率的1%-2%;
计算电网所需的应急有功功率变化速率的方法为:电网规定控制区域的整体有功功率缺额在Tmin内必须至少过零一次,并且网内整体有功功率缺额在时间Tmin内的平均值必须控制在规定的范围Ld内,考虑到电网调节的迟延和惯性,必须使网内整体有功功率缺额在时间内过零,故应急有功功率变化速率
(3)对网内实时整体有功功率变化速率R和应急有功功率变化速率R′进行求差运算:
若R-R′<-ΔR,则需对当前AGC机组进行新增调配;
若R-R′>+ΔR,则需对当前AGC机组进行退出配置;
若-ΔR≤R-R′≤ΔR,则保持现有AGC机组运行;
其中,ΔR为有功功率变化速率死区值,增加或退出AGC机组的数量按照计算求得,其中R″为增加或退出的AGC机组的有功功率变化率总和,Rn+1…Rn+k为新增或退出的第1-k台AGC机组的有功功率变化率,新增顺序按照月度AGC机组综合性能指标和机组可调容量比例的加权指标Si由高到低进行选取,去除已投入AGC机组和未运行机组;退出AGC机组的选择与新增AGC机组的选择相反,按加权指标由低到高选取;
Si=αNi+βKi,Si为机组加权后排名,Ni为月度AGC机组综合性能指标,Ki为机组可调容量比例;α、β为加权系数,按照优先考虑性能指标,兼顾机组可调空间的原则,系数分别设为0.6和0.4;机组可调容量比例Pmax,i为机组i的调节容量上限,Pmin,i为机组i的调节容量下限,PB,i为机组i当前的基本功率。
本发明还提出一种基于区域电网有功功率缺口的AGC机组动态调配装置,如图4所示,所述装置包括:
故障监测模块:监测区域电网内是否发生故障,造成有功功率产生波动;
计算模块,与故障监测模块相连,当区域电网内发生故障时,计算网内实时整体有功功率缺额数值ΔP、实时整体有功功率变化速率R,和应急有功功率变化速率R′;
判断模块,与计算模块相连,对网内实时整体有功功率变化速率R和应急有功功率变化速率R′进行求差运算,判断是否对当前AGC机组进行新增或退出调配;
若R-R′<-ΔR,则需对当前AGC机组进行新增调配;
若R-R′>+ΔR,则需对当前AGC机组进行退出配置;
若-ΔR≤R-R′≤ΔR,则保持现有AGC机组运行;
其中ΔR为有功功率变化速率死区值,
机组调配模块,与判断模块相连,计算求得增加或退出AGC机组的数量,并确定新增或退出的机组名称。
增加或退出AGC机组的数量按照计算求得,Rn+1…Rn+k为新增或退出的第1-k台AGC机组的有功功率变化率,新增顺序按照月度AGC机组综合性能指标和机组可调容量比例的加权指标Si由高到低进行选取,去除已投入AGC机组和未运行机组;退出AGC机组的选择与新增AGC机组的选择相反,按加权指标由低到高选取。
下面以华北区域山东电网为例,给出本发明所提出的方法在实际电网中的应用实例。
网内以300MW级正压直吹式机组为主,正常运行时每天约100余台机组投运,整体有功功率约为48000MW,其中投入AGC方式运行的火电机组约20台;该电网规定事故造成有功功率波动在10000MW范围内时不进行切负荷操作,控制区域的整体有功功率缺额在10min内必须至少过零一次,另规定网内整体有功功率缺额在时间10min内的平均值必须控制在规定的范围120MW以内;转速不等率δ%规定取5%。
按照《华北区域发电厂并网运行管理实施细则》规定:一般的直吹式制粉系统的汽包炉的火电机组为机组额定有功功率的1.5%,一般的带中间储仓式制粉系统的火电机组为机组额定有功功率的2%。按照GB/T30370《火力发电机组一次调频试验及性能验收导则》、Q/GDW 669《火力发电机组一次调频试验导则》等相关技术标准要求,目前常规的数字电液型调节控制系统的火电机组死区控制在±0.033Hz内;燃煤机组发电负荷调整量达到目标负荷变化幅度75%的时间应不大于15s,达到目标负荷变化幅度90%的时间不大于30s。
某日,20台AGC机组中300MW级机组为16台,其中储式机组4台,直吹式机组12台;600MW级机组为4台,均为直吹式机组,则此时整体有功功率变化速率为
若此时电网发生特高压直流故障,如银东直流单极闭锁损失功率约1900MW,电网频率跌落至49.9Hz,则此时电网调度的监控人员不进行切负荷操作;以一台300MW机组为例,按照标准经过15s后,该机组的一次调频功率补偿量需达到
全网100余台机组48000MW整体有功功率近似计算,求得
则电网所需的应急有功功率变化速率
因为R-R′=114-188=-74<-24,触发R-R′<-ΔR,需对当前AGC机组进行新增调配,R″=|R-R′|=74MW/min。
表1和表2分别为加权指标Si计算表和排序表,去除已投入AGC机组和未运行机组后,按照月度AGC机组综合性能指标和机组可调容量比例的进行加权处理。
表1加权指标Si计算表
机组名称 | 功率变化速率 | 综合性能指标N | 可调容量比例K | 加权指标S |
DZ电厂#4 | 5.25 | 2.78 | 0.45 | 1.848 |
LC电厂#3 | 4.5 | 2.77 | 0.67 | 1.930 |
HD电厂#6 | 10 | 2.75 | 0.42 | 1.818 |
DZ电厂#5 | 5.25 | 2.72 | 0.48 | 1.824 |
HD电厂#5 | 10 | 2.70 | 0.43 | 1.792 |
JX电厂#1 | 6 | 2.68 | 0.72 | 1.896 |
LC电厂#4 | 4.5 | 2.67 | 0.65 | 1.862 |
WH电厂#6 | 10 | 2.66 | 0.51 | 1.800 |
XD电厂#1 | 5 | 2.66 | 0.66 | 1.860 |
BZ电厂#2 | 5.25 | 2.65 | 0.55 | 1.810 |
WH电厂#4 | 5.25 | 2.65 | 0.53 | 1.802 |
WF电厂#3 | 10 | 2.65 | 0.54 | 1.806 |
XD电厂#2 | 5 | 2.64 | 0.49 | 1.780 |
JX电厂#2 | 6 | 2.64 | 0.68 | 1.856 |
LB电厂#1 | 5 | 2.64 | 0.57 | 1.812 |
YH电厂#4 | 4.5 | 2.63 | 0.55 | 1.798 |
HZ电厂#5 | 4.5 | 2.63 | 0.49 | 1.774 |
LC电厂#2 | 4.5 | 2.61 | 0.62 | 1.814 |
SH电厂#3 | 4.5 | 2.60 | 0.57 | 1.788 |
TZ电厂#4 | 5 | 2.60 | 0.55 | 1.780 |
... | ... | ... | ... | ... |
表2加权指标Si排序表
排序 | 机组名称 | 功率变化速率 | 加权指标S |
1 | LC电厂#3 | 4.5 | 1.930 |
2 | JX电厂#1 | 6 | 1.896 |
3 | LC电厂#4 | 4.5 | 1.862 |
4 | XD电厂#1 | 5 | 1.86 |
5 | JX电厂#2 | 6 | 1.856 |
6 | DZ电厂#4 | 5.25 | 1.848 |
7 | DZ电厂#5 | 5.25 | 1.824 |
8 | HD电厂#6 | 10 | 1.818 |
9 | LC电厂#2 | 4.5 | 1.814 |
10 | LB电厂#1 | 5 | 1.812 |
11 | BZ电厂#2 | 5.25 | 1.810 |
12 | WF电厂#3 | 10 | 1.806 |
13 | WH电厂#4 | 5.25 | 1.802 |
14 | WH电厂#6 | 10 | 1.800 |
15 | YH电厂#4 | 4.5 | 1.798 |
16 | HD电厂#5 | 10 | 1.792 |
17 | SH电厂#3 | 4.5 | 1.788 |
18 | XD电厂#2 | 5 | 1.780 |
19 | TZ电厂#4 | 5 | 1.780 |
20 | HZ电厂#5 | 4.5 | 1.774 |
... | ... | ... | ... |
按指标由高到低顺序选取,变化速率累加和需约为R″=|R-R′|=74MW/min,顺序选取前13台机组投入AGC,变化速率共计76.5MW/min。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。
Claims (20)
1.一种基于区域电网有功功率缺口的AGC机组动态调配方法,其特征在于,包括:
监测区域电网是否发生故障,造成有功功率产生波动;
如果是,计算网内实时整体有功功率缺额数值、实时整体有功功率变化速率和应急有功功率变化速率;
如果所述应急有功功率变化速率高于或低于所述实时整体有功功率变化速率,则根据速率缺口对AGC机组进行新增或退出调配。
2.如权利要求1所述的方法,其特征在于,所述网内实时整体有功功率缺额数值ΔP为:
ΔP=P事故缺额-P切负荷-P一次调频,
P事故缺额表示某时刻有功功率缺额数值为事故造成的有功功率缺额,P切负荷表示应急切除负荷的功率量,P一次调频表示一次调频补偿的功率量。
3.如权利要求2所述的方法,其特征在于,其中P切负荷可以为0,即网内事故缺额数值P事故缺额在一定范围内可以不进行切负荷操作,该范围值由电网管理部门提供,大小与电网规模相关。
4.如权利要求2或3所述的方法,其特征在于,
其中,Pi为第i台AGC机组的额定有功功率,fN为电网额定频率50Hz,f为电网实时频率;δ%为转速不等率,取值范围为4%-5%。
5.如权利要求4所述的方法,其特征在于,所述实时整体有功功率变化速率R为:
其中,Ri为第i台AGC机组的有功功率变化速率,该值根据区域发电厂并网运行管理实施细则的规定执行,取机组额定有功功率的1%-2%。
6.如权利要求5所述的方法,其特征在于,计算所述应急有功功率变化速率的方法为:
电网规定控制区域的整体有功功率缺额在时间T内必须至少过零一次,并且网内实时整体有功功率缺额数值ΔP在时间T内的平均值必须控制在规定的范围Ld内;考虑到电网调节的迟延和惯性,必须使网内实时整体有功功率缺额数值ΔP在时间内过零,故所述应急有功功率变化速率R′为:
7.如权利要求6所述的方法,其特征在于,
若R-R′<-ΔR,则需对当前AGC机组进行新增调配;
若R-R′>+ΔR,则需对当前AGC机组进行退出配置;
若-ΔR≤R-R′≤ΔR,则保持现有AGC机组运行;
其中ΔR为有功功率变化速率死区值,
8.如权利要求7所述的方法,其特征在于,
增加或退出AGC机组的数量按照计算求得,Rn+1…Rn+k为新增或退出的第1-k台AGC机组的有功功率变化速率,新增顺序按照月度AGC机组综合性能指标和机组可调容量比例的加权指标Si由高到低进行选取,去除已投入AGC机组和未运行机组;退出AGC机组的选择与新增AGC机组的选择相反,按加权指标Si由低到高选取。
9.如权利要求8所述的方法,其特征在于,Si=αNi+βKi,Si为机组加权后排名,Ni为月度AGC机组综合性能指标,Ki为机组可调容量比例,α、β为加权系数,按照优先考虑性能指标,兼顾机组可调空间的原则,系数分别设为0.6和0.4。
10.如权利要求9所述的方法,其特征在于,机组可调容量比例
其中Pmax,i为机组i的调节容量上限,Pmin,i为机组i的调节容量下限,PB,i为机组i当前的基本功率。
11.一种基于区域电网有功功率缺口的AGC机组动态调配装置,其特征在于,包括:
故障监测模块:监测区域电网内是否发生故障,造成有功功率产生波动;
计算模块,与故障监测模块相连,当区域电网内发生故障时,计算网内实时整体有功功率缺额数值ΔP、实时整体有功功率变化速率R,和应急有功功率变化速率R′;
判断模块,与计算模块相连,对网内实时整体有功功率变化速率R和应急有功功率变化速率R′进行求差运算,判断是否对当前AGC机组进行新增或退出调配;
机组调配模块,与判断模块相连,计算求得增加或退出AGC机组的数量,并确定新增或退出的机组名称。
12.如权利要求11所述的装置,其特征在于,
计算模块中,计算所述网内整体有功功率缺额数值ΔP的方法为:
ΔP=P事故缺额-P切负荷-P一次调频,
其中P事故缺额表示某时刻有功功率缺额数值为事故造成的有功功率缺额,P切负荷表示应急切除负荷的功率量,P一次调频表示一次调频补偿的功率量。
13.如权利要求12所述的装置,其特征在于,其中P切负荷可以为0,即网内事故缺额数值P事故缺额在一定范围内可以不进行切负荷操作,该范围值由电网管理部门提供,大小与电网规模相关。
14.如权利要求13所述的装置,其特征在于,
其中,Pi为第i台AGC机组的额定有功功率,fN为电网额定频率50Hz,f为电网实时频率;δ%为转速不等率,取值范围为4%-5%。
15.如权利要求14所述的装置,其特征在于,
计算模块中,所述实时整体有功功率变化速率R的计算方法为:
其中,Ri为第i台AGC机组的有功功率变化速率,该值根据区域发电厂并网运行管理实施细则的规定执行,取机组额定有功功率的1%-2%。
16.如权利要求15所述的装置,其特征在于,
计算模块中,电网规定控制区域的整体有功功率缺额在时间T内必须至少过零一次,并且网内实时整体有功功率缺额数值ΔP在时间T内的平均值必须控制在规定的范围Ld内;考虑到电网调节的迟延和惯性,必须使网内实时整体有功功率缺额数值ΔP在时间内过零,故所述应急有功功率变化速率R′为:
17.如权利要求16所述的装置,其特征在于,
判断模块中,判断是否对当前AGC机组进行新增或退出调配包括:
若R-R′<-ΔR,则需对当前AGC机组进行新增调配;
若R-R′>+ΔR,则需对当前AGC机组进行退出配置;
若-ΔR≤R-R′≤ΔR,则保持现有AGC机组运行;
其中ΔR为有功功率变化速率死区值,
18.如权利要求17所述的装置,其特征在于,
机组调配模块中,
增加或退出AGC机组的数量按照计算求得,Rn+1…Rn+k为新增或退出的第1-k台AGC机组的有功功率变化速率,新增顺序按照月度AGC机组综合性能指标和机组可调容量比例的加权指标Si由高到低进行选取,去除已投入AGC机组和未运行机组;退出AGC机组的选择与新增AGC机组的选择相反,按加权指标Si由低到高选取。
19.如权利要求18所述的装置,其特征在于,
Si=αNi+βKi,Si为机组加权后排名,Ni为月度AGC机组综合性能指标,Ki为机组可调容量比例,α、β为加权系数,按照优先考虑性能指标,兼顾机组可调空间的原则,系数分别设为0.6和0.4。
20.如权利要求19所述的装置,其特征在于,
机组可调容量比例
其中Pmax,i为机组i的调节容量上限,Pmin,i为机组i的调节容量下限,PB,i为机组i当前的基本功率。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910190260.2A CN109802449B (zh) | 2019-03-13 | 2019-03-13 | 基于有功功率缺口的agc机组动态调配方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910190260.2A CN109802449B (zh) | 2019-03-13 | 2019-03-13 | 基于有功功率缺口的agc机组动态调配方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109802449A true CN109802449A (zh) | 2019-05-24 |
CN109802449B CN109802449B (zh) | 2021-03-30 |
Family
ID=66563471
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910190260.2A Active CN109802449B (zh) | 2019-03-13 | 2019-03-13 | 基于有功功率缺口的agc机组动态调配方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109802449B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110417064A (zh) * | 2019-07-26 | 2019-11-05 | 国网山东省电力公司电力科学研究院 | 基于agc机组有功能力监控的调节速率动态调控方法及装置 |
CN110673569A (zh) * | 2019-10-25 | 2020-01-10 | 国网安徽省电力有限公司电力科学研究院 | 一种绿色能源与火力发电机组协同控制方法及装置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070038335A1 (en) * | 2005-07-22 | 2007-02-15 | Mcintyre Timothy J | Real Power Regulation for the Utility Power Grid Via Responsive Loads |
EP1959534A1 (en) * | 2007-02-13 | 2008-08-20 | General Electric Company | Utility grid, controller, and method for controlling the power generation in a utility grid |
CN103901875A (zh) * | 2014-03-06 | 2014-07-02 | 国家电网公司 | 发电机组agc试验中负荷变化实际升降速率的方法 |
CN106549422A (zh) * | 2016-12-07 | 2017-03-29 | 中国南方电网有限责任公司 | 一种基于频率变化率的agc紧急控制方法及系统 |
CN107294138A (zh) * | 2017-03-15 | 2017-10-24 | 贵州电网有限责任公司电力科学研究院 | 一种agc变负荷速率实时计算和自动适配方法 |
-
2019
- 2019-03-13 CN CN201910190260.2A patent/CN109802449B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070038335A1 (en) * | 2005-07-22 | 2007-02-15 | Mcintyre Timothy J | Real Power Regulation for the Utility Power Grid Via Responsive Loads |
EP1959534A1 (en) * | 2007-02-13 | 2008-08-20 | General Electric Company | Utility grid, controller, and method for controlling the power generation in a utility grid |
CN103901875A (zh) * | 2014-03-06 | 2014-07-02 | 国家电网公司 | 发电机组agc试验中负荷变化实际升降速率的方法 |
CN106549422A (zh) * | 2016-12-07 | 2017-03-29 | 中国南方电网有限责任公司 | 一种基于频率变化率的agc紧急控制方法及系统 |
CN107294138A (zh) * | 2017-03-15 | 2017-10-24 | 贵州电网有限责任公司电力科学研究院 | 一种agc变负荷速率实时计算和自动适配方法 |
Non-Patent Citations (1)
Title |
---|
林静怀等: ""扰动控制性能评价标准在福建电网的应用"", 《电网技术》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110417064A (zh) * | 2019-07-26 | 2019-11-05 | 国网山东省电力公司电力科学研究院 | 基于agc机组有功能力监控的调节速率动态调控方法及装置 |
CN110673569A (zh) * | 2019-10-25 | 2020-01-10 | 国网安徽省电力有限公司电力科学研究院 | 一种绿色能源与火力发电机组协同控制方法及装置 |
CN110673569B (zh) * | 2019-10-25 | 2022-09-23 | 国网安徽省电力有限公司电力科学研究院 | 一种绿色能源与火力发电机组协同控制方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109802449B (zh) | 2021-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102882229B (zh) | 风电场动态电压自动控制系统 | |
CN104052159B (zh) | 一种用于风光储微网系统的能量管理控制器 | |
CN107959306B (zh) | 一种微电网监控系统 | |
CN108736500B (zh) | 区域电网富裕电力直流外送系统的优化切机方法和装置 | |
CN102427244A (zh) | 大规模光伏风电信息接入系统 | |
CN102948030A (zh) | 可再生能量发电管理 | |
CN205829190U (zh) | 一种发输电联合动态增容系统 | |
CN103078326B (zh) | 一种提高电网频率安全稳定性的优化方法 | |
US20240055859A1 (en) | Source-grid-load-storage networked collaborative frequency control method | |
CN208723557U (zh) | 基于电网频差的一次调频优化控制系统 | |
CN105939021A (zh) | 一种计及风机低电压穿越能力的电网频率控制方法 | |
CN115224746A (zh) | 一种海上风电的多场景集群协调控制方法、装置及系统 | |
CN113949075A (zh) | 一种新能源网源协调调频、惯量支撑在线监测分析系统及方法 | |
CN102035217A (zh) | 主动防止风电场内机组同时低压脱扣的控制方法 | |
CN109802449A (zh) | 基于有功功率缺口的agc机组动态调配方法及装置 | |
Tan et al. | Multi-area automatic generation control scheme considering frequency quality in Southwest China grid: Challenges and solutions | |
Aziz et al. | Issues and mitigations of wind energy penetrated network: Australian network case study | |
CN102255337A (zh) | 一种电网接纳风电场能力的计算方法 | |
CN105717793A (zh) | 一种确保一次调频动作方向的优化控制方法及系统 | |
CN111313466A (zh) | 一种基于风力优先调节的送端电网agc优化调控方法及系统 | |
CN103532520B (zh) | 一种防御大规模风电机组连锁脱网的无功补偿装置控制方法 | |
CN107359646A (zh) | 一种计及远方调度计划和就地频率响应的风电场参与一次调频方法 | |
CN208401559U (zh) | 基于电网基准频率偏差的网源一次调频调控系统 | |
Hua et al. | Research and Application of Rapid Frequency Response Technology for New Energy Power Station | |
CN110417064A (zh) | 基于agc机组有功能力监控的调节速率动态调控方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |