CN107654232A - The moat ditch collection ore deposit mining methods of inclined orebody - Google Patents

The moat ditch collection ore deposit mining methods of inclined orebody Download PDF

Info

Publication number
CN107654232A
CN107654232A CN201711126583.2A CN201711126583A CN107654232A CN 107654232 A CN107654232 A CN 107654232A CN 201711126583 A CN201711126583 A CN 201711126583A CN 107654232 A CN107654232 A CN 107654232A
Authority
CN
China
Prior art keywords
moat ditch
ore
moat
ditch
collection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711126583.2A
Other languages
Chinese (zh)
Other versions
CN107654232B (en
Inventor
赖伟
刘婉莹
柳小胜
肖木恩
杨宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Institute of Mining Research Co Ltd
Original Assignee
Changsha Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Institute of Mining Research Co Ltd filed Critical Changsha Institute of Mining Research Co Ltd
Priority to CN201711126583.2A priority Critical patent/CN107654232B/en
Publication of CN107654232A publication Critical patent/CN107654232A/en
Application granted granted Critical
Publication of CN107654232B publication Critical patent/CN107654232B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of moat ditch collection ore deposit mining methods of inclined orebody, the dead zone formed after mining sets moat ditch to construct area;The moat ditch that moat ditch constructs area is constructed, and is specially:The upper disk surface in area and the rotation angle position of base surface are constructed in moat ditch, is constructed for guiding broken ore to move downward and/or protect the moat ditch of ore body upper disk surface domatic;Moat ditch is domatic when constructing in the reserved collection drive of base surface, moat ditch is formed by domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall, for the broken ore of moat ditch top back production to be gathered in into collection drive;Back production moat ditch top ore body, on collection drive and/or collection drive side carries out ore removal.The method is advantageous to improve ore recovery ratio, ore removal efficiency, production capacity, back production security and overall economic efficiency.Thin thick orebody mining to more than inclined moderately stable, and moat ditch formula ore removal polycrystalline substance are constructed.

Description

The moat ditch collection ore deposit mining methods of inclined orebody
Technical field
The present invention relates to mining technical field, especially, is related to adopting for a kind of inclined orebody moat ditch retaining wall and ore removal Ore deposit method.
Background technology
Ore body most of be inclined orebody, but when the slanting angle of ore body is small, first, armor rock and slicing and filling body folder on ore body Broken ore between angle, due to the limitation in space, recovery difficult is very big, causes greatly to adopt lower loss, such case is general Improved with the reduction of angle.Second, the exposure span of disk is big on ore body, and upper armor rock inbreak causes ore dilution, back production peace Full property cannot ensure, carry out supporting using anchor pole, anchor cable etc. more, support engineering amount is big, and efficiency is low.3rd, after ore body avalanche, Due to blast action, spew over is on whole filling bed, and high-grade fine ore cleaning difficulty is big, and its loss causes ore dilution; Ore collection efficiency is extremely low, and in stope direct cost, the cost of stope haulage accounts for 10%~25%, even more greatly, individually Mine reaches 50%, is only second to ore deposit cost, cost is higher when efficiency is low.4th, the above is adopted to exemplified by horizontal cut and fill stoping With the plant equipment ore removal such as scraper, in order to meet the plant equipment service requirement such as scraper, slicing and filling bottom is using low strong The obturation filling of degree, its surface carry out top dressing filling using the filling slurry of high intensity again, and part mine even uses coagulation Soil carries out top dressing, and the filling cost of top dressing is high.5th, polycrystalline substance ore deposit amount accounts for the 15~20% of nugget ore deposit amount, even more greatly, And bottom excavation rate is high, the Mining technology condition of recovery is poor, generally 30%~60%, mining loss ratio is big, causes resource unrestrained Take.
The content of the invention
The invention provides a kind of moat ditch collection ore deposit mining methods of inclined orebody, to solve existing inclined orebody mining side Method, mining difficulty is big, and mining loss ratio is high, the technology that broken ore collection efficiency is low, mining cost is high and polycrystalline substance is constructed Problem.
The present invention provides a kind of moat ditch collection ore deposit mining methods of inclined orebody, and the dead zone formed after mining sets moat ditch structure Build area;The moat ditch that moat ditch constructs area is constructed, and is specially:The upper disk surface in area and the rotation angle position of base surface are constructed in moat ditch, is constructed Moat ditch for guiding broken ore to move downward and/or protect ore body upper disk surface is domatic;Moat ditch is domatic when constructing in base surface Reserved collection drive, moat ditch is formed by domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall, for by moat ditch The broken ore of top back production is gathered on collection drive;Back production moat ditch top ore body, on collection drive and/or collection drive side is entered Row ore removal.
Further, nugget is arranged along orebody trend, nugget length >=30m, nugget height >=20m, and the width of nugget is The horizontal breadth of ore body.
Further, moat ditch is constructed, and is used:Directly construct moat ditch method, local top dressing constructs moat ditch method or comprehensive top dressing Construct moat ditch method.
Further, moat ditch method is directly constructed, is specially:As goaf height >=2m after back production, the ore deposit in goaf It is domatic that moat ditch is constructed between stone bottom surface and upper disk surface, and in the reserved collection drive in ore bottom surface, it is domatic, reserved by the moat ditch constructed Collect the domatic three of drive, ore body lower wall and form moat ditch.
Further, local top dressing constructs moat ditch method, is specially:Short transverse in dead zone to be filled is classified as bottom Filling area and top moat ditch construct area, carry out the filling of bottom filling area first;Then on top, moat ditch constructs the upper disk surface in area The rotation angle position for the base surface to be formed is filled with bottom, it is domatic to construct moat ditch, and collection drive is reserved when constructing;Finally according to collection drive Intensity requirement, only to collection drive surface top dressing;By domatic, the reserved collection drive of the moat ditch constructed, the domatic three's structure of ore body lower wall Into moat ditch.
Further, comprehensive top dressing constructs moat ditch method, is specially:Short transverse in dead zone to be filled is classified as bottom Filling area, top dressing area and top moat ditch construct area, carry out the filling of bottom filling area first;Then according to collection drive intensity requirement Carry out top dressing area's filling;Finally on top, moat ditch constructs the upper disk surface and the rotation angle position of the filling base surface of top dressing formation in area, It is domatic to construct moat ditch, collection drive is reserved when constructing;By domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall Form moat ditch.
Further, by back production and ore removal way, slicing is taken to be layered ore removal stoping scheme, when taking slicing It is divided into >=2 segmentations when being layered ore removal stoping scheme, in nugget height, subdivided layering in segmentation, slicing, is layered out Ore deposit, after the completion of each slicing ore removal, carry out slicing and filling and construct moat ditch, the moat ditch mode of constructing takes local top dressing structure Build method or comprehensive top dressing constructs moat ditch;Or take substoping to be segmented ore removal scheme, it is segmented ore removal side when taking substoping During case, >=2 segmentations are divided into nugget height, substoping, ore removal is segmented, after the completion of each substoping ore removal, enters Row sublevel fill stoping simultaneously constructs moat ditch, and the moat ditch mode of constructing is taken and directly constructs moat ditch method, local top dressing constructs moat ditch method or comprehensive Top dressing constructs moat ditch method;Or substoping stage ore removal or stage recovery phase ore removal scheme are taken, when taking substoping When stage ore removal or stage recovery phase ore removal scheme, including it is layered or is segmented or stage back production, stage ore removal, only in stope Foot constructs moat ditch, and moat ditch, which is constructed to take, directly constructs moat ditch method, after the completion of stope mining, carry out Filling mine-out area processing or Dead zone does not fill.
Further, after the most next layering of nugget or substoping and ore removal, directly it is layered or sublevel fill stoping, no Moat ditch is constructed, to improve the globality of obturation, is easy to the back production of bottom ore body.
Further, the domatic construction technology of moat ditch, it is specially:Pocket type is taken to fill, primary filling is constructed or layer stack Filling is constructed;The final slope angle of moat ditch >=ore natural repose angle.
Further, ore removal, it is specially:Top broken ore is converged on collection drive by moat ditch;Ore removal equipment is optional With scraper and/or other equipment with Ji Kuang and carrying function;Scraper is from collection drive one end to other end order ore removal Or the ore removal route side ore removal being connected from middle part to both ends ore removal or driving with collection drive;Scraper is by outside ore handling to arteries and veins Mine chute or direct entrucking transport out of stope.
The invention has the advantages that:
The moat ditch collection ore deposit mining methods of inclined orebody of the present invention, the moat ditch constructed is domatic, collection drive and lower wall country rock face are total to With moat ditch collection ore deposit system is formed, after the top ore body back production of moat ditch, broken ore is concentrated in moat ditch, and scraper is in moat ditch Ji Kuang Shovel dress is carried out on road, ore concentration degree is high, and the scraper efficiency high of scraper, cleaning work amount is few, is advantageous to improve ore recuperation Rate and ore removal efficiency.Moat ditch construct can effectively support armor rock, significantly reduce upper disk exposed area;The remittance ore deposit of moat ditch Effect, can avoid worker's operation under upper armor rock exposure;The raising of ore removal efficiency, be advantageous to shorten barnyard after explosion Open-assembly time, improve back production security.Need to only high intensity consolidated fill, Neng Gou great be carried out to the scraper runway of moat ditch bottom Width reduces high intensity obturation accounting, effectively reduces filling cost;Ore concentration degree is high, and shovel dress efficiency high, scraper is in moat Shovel dress in front in ditch, the equipment losses such as tire are reduced, scraper machine operation adjustment number is few, effectively reduces Cost of mining production and mining Integrated cost.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to figure, the present invention is further detailed explanation.
Brief description of the drawings
The accompanying drawing for forming the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate to be used to explain the present invention, do not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the step flow chart element of the inclined orebody horizontal slice Trench ore-drawing method of mining by the way of filling of the preferred embodiment of the present invention Figure;
Fig. 2 is the layering part top dressing scheme slicing and filling schematic diagram of the preferred embodiment of the present invention;
Fig. 3 is that the layering part top dressing scheme moat ditch of the preferred embodiment of the present invention constructs schematic diagram;
Fig. 4 is the layering part top dressing scheme slicing and filling top dressing schematic diagram of the preferred embodiment of the present invention;
Fig. 5 is the layering part top dressing scheme slicing ore removal schematic diagram of the preferred embodiment of the present invention;
Fig. 6 is that the layering part top dressing scheme moat ditch of the preferred embodiment of the present invention constructs thin portion structural representation;
Fig. 7 is the comprehensive top dressing scheme slicing and filling schematic diagram of layering of the preferred embodiment of the present invention;
Fig. 8 is that the comprehensive top dressing scheme moat ditch of layering of the preferred embodiment of the present invention constructs schematic diagram;
Fig. 9 is the comprehensive top dressing scheme slicing and filling top dressing schematic diagram of layering of the preferred embodiment of the present invention;
Figure 10 is the comprehensive top dressing scheme slicing ore removal schematic diagram of layering of the preferred embodiment of the present invention;
Figure 11 is that the comprehensive top dressing scheme moat ditch of layering of the preferred embodiment of the present invention constructs thin portion structural representation.
Marginal data:
1st, moat ditch structures;2nd, obturation;3rd, ore body upper disk surface;4th, broken ore;5th, stage nugget;6th, avalanche country rock; 7th, Slice stoping connecting taxiway;8th, it is segmented tunnel;9th, top dressing high intensity obturation;10th, filling counterfort;11st, moat ditch is domatic;12nd, ore deposit Body lower wall is domatic;13rd, drive is collected.
Embodiment
Embodiments of the invention are described in detail below in conjunction with accompanying drawing, but the present invention can be limited by following and The multitude of different ways of covering is implemented.
Fig. 1 is the step FB(flow block) of the moat ditch collection ore deposit mining methods of the inclined orebody of the preferred embodiment of the present invention;Fig. 2 is The layering part top dressing scheme slicing and filling schematic diagram of the preferred embodiment of the present invention;Fig. 3 is the layering of the preferred embodiment of the present invention Local top dressing scheme moat ditch constructs schematic diagram;Fig. 4 is that the layering part top dressing scheme slicing and filling of the preferred embodiment of the present invention pours Face schematic diagram;Fig. 5 is the layering part top dressing scheme slicing ore removal schematic diagram of the preferred embodiment of the present invention;Fig. 6 is this hair The layering part top dressing scheme moat ditch of bright preferred embodiment constructs thin portion structural representation;Fig. 7 is the preferred embodiment of the present invention It is layered comprehensive top dressing scheme slicing and filling schematic diagram;Fig. 8 is the comprehensive top dressing scheme moat ditch structure of layering of the preferred embodiment of the present invention Build schematic diagram;Fig. 9 is the comprehensive top dressing scheme slicing and filling top dressing schematic diagram of layering of the preferred embodiment of the present invention;Figure 10 is this hair The comprehensive top dressing scheme slicing ore removal schematic diagram of layering of bright preferred embodiment;Figure 11 is the layering of the preferred embodiment of the present invention Comprehensive top dressing scheme moat ditch constructs thin portion structural representation.
Embodiment one:
As shown in figure 1, the moat ditch collection ore deposit mining methods of the inclined orebody of the present embodiment, comprise the following steps:A, along ore body Vertical direction divides the stage, move towards division nugget along the stage, highly divides segmentation along nugget, subdivided layering in segmentation;B, adopt Quasi- cutting engineering construction;C, back production and ore removal are successively carried out from the bottom to top;D, slicing and filling and moat ditch are constructed;E, repeat step c With step d, start next stratified operation;F, mining is completed.This method is applied to more than inclined moderately stable thin arriving Middle thick orebody mining.The moat ditch collection ore deposit mining methods of inclined orebody of the present invention, the moat ditch constructed is domatic 11, collection drive 13 and ore deposit Body lower wall domatic 12 is collectively forming moat ditch collection ore deposit system, and after the top ore body back production of moat ditch, broken ore 4 is concentrated in moat ditch, Scraper carries out shovel dress on moat ditch collection drive, and ore concentration degree is high, and the scraper efficiency high of scraper, cleaning work amount is few, has Beneficial to raising ore recovery ratio and ore removal efficiency.Moat ditch construct can effectively support armor rock, and it is sudden and violent significantly to reduce upper disk Show up product;The remittance ore deposit effect of moat ditch, can avoid worker's operation under upper armor rock exposure;The raising of ore removal efficiency, favorably The open-assembly time of barnyard after explosion is shortened, improve back production security.The scraper runway of moat ditch bottom need to only be carried out high Intensity consolidated fill, high intensity obturation accounting can be greatly reduced, effectively reduce filling cost;Ore concentration degree is high, shovel Efficiency high is filled, scraper shovel dress in front in moat ditch, reduces the equipment losses such as tire, scraper machine operation adjustment number is few, effectively Reduction Cost of mining production and mining integrated cost.
As Figure 1-Figure 11, in the present embodiment, step a is specially:Nugget length is divided into 50m~70m, nugget height For 40m~50m, the width of nugget is the horizontal breadth of ore body.Multiple segmentations, segmentation height are being divided into nugget short transverse Spend for 10m~20m.
As Figure 1-Figure 11, in the present embodiment, the quasi- cutting of adopting in step b is specially:It is punctual to adopt, and is dug in ore body lower wall Enter Zigzag type ramp, according to scraper performance, Zigzag type ramp it is in easy flights in 22%.In order to the operation of scraper And operation.Between stage nugget 5 one point is tunneled every 10m~20m height away from ore body lower wall border horizontal range 30m~35m Section gallery, then from slice drift along the length center line of stage nugget 5 to nugget under to driving Slice stoping connecting taxiway 7, Slice stoping Connecting taxiway 7 it is in easy flights in 22%.In order to which equipment is run.People's row ventilation fill pass is tunneled in ore body.People's row is divulged information A diameter of 1m~the 2m of fill pass.The gallery that undercuts is tunneled in ore body interior edge orebody trend.After the completion of adopting quasi- engineering, undercut gallery certainly Start, first disclose the horizontal complete thick of ore body with brushing of caunching, form the pulling end space of stope.
As Figure 1-Figure 11, in the present embodiment, in step c, after the first floor slicing and ore removal of the first segmentation, in ore deposit Rotation angle position between body upper disk surface 3 and pulling end space base surface is constructed for guiding broken ore 4 to move downward and protecting ore deposit The moat ditch domatic 11 of body upper disk surface 3.By being constructed and corner portion in the rotation angle position of ore body upper disk surface 3 and pulling end space base surface The moat ditch structures 1 of non-colinear position.The outside wall surface of moat ditch structures 1 is close to ore body upper disk surface 3 and pulling end space base surface, moat respectively The exposed face of ditch structures 1 is inclined moat ditch domatic 11.The cross sectional shape approximation of moat ditch structures 1 is triangular in shape, forms triangle The stable support structure of shape, its buried orebody upper disk surface 3 are formed to ore body with reducing the exposed area of ore body upper disk surface 3 The supporting construction of upper disk surface 3.When moat ditch is constructed, collection drive 13 is reserved in the base surface of pulling end space.By moat ditch it is domatic 11, undercut The reserved collection drive 13 of the base surface in space, domatic 12 three of ore body lower wall form moat ditch, for collapsing next slicing Fall ore 4 to be gathered on scraper road in order to ore removal.The moat ditch constructed is domatic 11, collection drive 13 and ore body lower wall domatic 12 are common With moat ditch collection ore deposit system is formed, after the top orebody mining of moat ditch, broken ore 4 is concentrated in moat ditch, and scraper is in moat ditch Carry out shovel dress, ore concentration degree is high, and the scraper efficiency high of scraper, cleaning work amount is few, be advantageous to improve ore recovery ratio and Ore removal efficiency.Moat ditch construct can effectively support armor rock, significantly reduce upper disk exposed area.The remittance ore deposit of moat ditch is made With worker's operation under upper armor rock exposure can be avoided.The raising of ore removal efficiency, be advantageous to shorten explosion after barnyard it is sudden and violent Reveal the time, improve back production security.Need to only high intensity consolidated fill be carried out to the scraper runway of moat ditch bottom, can be significantly High intensity obturation accounting is reduced, effectively reduces filling cost.Ore concentration degree is high, and scraper efficiency high, scraper is in moat ditch Interior front shovel dress, the equipment losses such as tire are reduced, scraper adjustment number is few, can effectively reduce Cost of mining production and mining integrates Cost.
As shown in Fig. 1, Fig. 5 and Figure 10, in the present embodiment, the slicing in step c, it is specially:Adopt quasi- cutting engineering After the completion of, you can start slicing.Layer height is 2m~5m.Slicing is opened from one end of stope to other end order Adopt.Sexual behavior mode is consolidated depending on stope fall ore deposit rock drilling mode during back production.Alternatively, beared down on one ore falling mode using lateral aperture, lateral aperture chisel Rock once falls that ore deposit amount is small, but is easily controlled the security of top plate.Alternatively, caunched ore falling mode using upright opening, upright opening Caunch ore deposit, once fall that ore deposit amount is big, but the stability of top plate whard to control.Rock drilling pattern uses quincunx pattern Or rectangle pattern, array pitch is 0.8m~1m, explosive specific charge 0.25kg/t~0.5kg/t between blasthole.Returned from stope one end Adopt to the other end and accuse slicing and terminate, then using rebasing technology of caunching, using the padded Zigzag type ramp of avalanche country rock 6 Ramp connection road.On the one hand filling counterfort 10 is used as, on the other hand as the Slice stoping connecting taxiway 7 for entering next layering. Slicing from bottom to top successively, always on adopt the foundation of stage nugget 5.
As shown in Fig. 1, Fig. 5 and Figure 10, in the present embodiment, the ore removal in step c, it is specially:The first floor water of first segmentation Divide layer equally, ore removal uses scraper and/or other auxiliary equipments, and scraper enters stope by layered-liaison tunnel, will converged at Collect mine chute outside ore handling to the arteries and veins on drive, the arteries and veins loading drift that wears long transports stope, and the bulk during ore removal is concentrated In working face, it is carried to again in drop shaft after secondary blasting is broken.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 6, Fig. 7, Fig. 8, Fig. 9 and Figure 11, in the present embodiment, the layering in step d Filling and moat ditch are constructed, and are specially:Caunch the padded bottom plate of Slice stoping connecting taxiway 7, arrives the outlet level of Slice stoping connecting taxiway 7 Lower leaf height, then starts slicing and filling and moat ditch is constructed.Slicing and filling, by lift height, when adopting one using one and filling.Layering Packed height is 2m~5m.Slicing and filling and moat ditch are constructed to be constructed moat ditch using the local top dressing filling of layering or be layered and poured comprehensively Moat ditch is constructed in face filling.
As shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4 and Fig. 6, in the present embodiment, it is layered the filling of local top dressing and constructs moat ditch and be specially: Slicing and filling, to bottom 1.5m~4.5m of each slicing and filling, filled using low-intensity filling slurry, it is ensured that 5 days interior energy ends Solidifying upper people, and the exposure of adjacent stope back production side is not caving.Moat ditch is constructed, and moat ditch is constructed using pocket type filling method, takes layering Stack construction technology, moat ditch slope angle is according to the determination of ore natural repose angle, moat ditch slope angle >=45 °.Moat ditch constructs the bodily form Cheng Hou, the width for collecting drive meet the minimum widith requirement of scraper operation.Collect drive top dressing, carry out pouring surface layer in collection drive and fill Fill out and form top dressing high intensity obturation 9, to meet scraper service requirement, surface thickness >=0.5m is poured on top, it is desirable to obturation 2 Intensity can meet rock drilling operation in 10 days, be more than 1.5MPa during ore removal.After the completion of moat ditch is constructed, you can start subsequent cycle and make Industry.The moat ditch constructed is domatic 11, collection drive 13 and ore body lower wall domatic 12 are collectively forming moat ditch collection ore deposit system, the top ore deposit of moat ditch After body back production, broken ore 4 is concentrated in moat ditch, and scraper carries out shovel dress on moat ditch collection drive, and ore concentration degree is high, scraper The scraper efficiency high of machine, cleaning work amount is few, is advantageous to improve ore recovery ratio and ore removal efficiency.Moat ditch construct can be effective Armor rock in support, significantly reduce upper disk exposed area;The remittance ore deposit effect of moat ditch, can avoid worker from being exposed in upper armor rock Operation under face;The raising of ore removal efficiency, be advantageous to the open-assembly time of barnyard after shortening explosion, improve back production security.Only need pair The scraper runway of moat ditch bottom carries out high intensity consolidated fill, high intensity obturation accounting can be greatly reduced, effectively Reduce filling cost;Ore concentration degree is high, shovel dress efficiency high, scraper shovel dress in front in moat ditch, reduces the equipment such as tire damage Consumption, scraping process adjustment number is few, effectively reduces Cost of mining production and mining integrated cost.Alternatively, moat ditch can also use The materials such as cement mortar, concrete, sand-mix construction form, formed design structure and preferably it is domatic, to improve Ji Kuang Effect.Alternatively, moat ditch can also use the obsolete materials such as slag, cinder, building castoff, discarded support to build composition by laying bricks or stones, with The utilization rate of waste material is improved, avoids waste material from being polluted caused by accumulating, waste material is re-used, and reaches energy-conservation The purpose of environmental protection.
As shown in Fig. 1, Fig. 7, Fig. 8, Fig. 9 and Figure 11, in the present embodiment, being layered the filling of comprehensive top dressing, to construct moat ditch specific For:Slicing and filling, to each slicing and filling bottom 1.5m~4.5m, filled using low-intensity filling slurry, it is ensured that 5 days interior energy ends Solidifying upper people, and the exposure of adjacent stope back production side is not caving.Top dressing is layered, carries out pouring surface layer filling composition top dressing high intensity filling Body 9, to meet scraper service requirement, surface thickness >=0.5m is poured on top, it is desirable to which the intensity in 10 days of obturation 2 can meet work People's rock drilling operation, it is more than 1.5MPa during ore removal.Moat ditch is constructed, and moat ditch is constructed using pocket type filling method, takes layer stack formula structure Building technology, moat ditch slope angle is according to the determination of ore natural repose angle, moat ditch slope angle >=45 °.After moat ditch construct is formed, Ji Kuang The width in road meets the minimum widith requirement of scraper operation.After the completion of moat ditch is constructed, you can start subsequent cycle operation.Construct Moat ditch is domatic 11, collection drive 13 and ore body lower wall domatic 12 are collectively forming moat ditch collection ore deposit system, the top ore body back production of moat ditch Afterwards, broken ore 4 is concentrated in moat ditch, and scraper carries out shovel dress on moat ditch collection drive, and ore concentration degree is high, the shovel of scraper Efficiency high is transported, cleaning work amount is few, is advantageous to improve ore recovery ratio and ore removal efficiency.Moat ditch construct can be supported effectively Armor rock, significantly reduce upper disk exposed area;The remittance ore deposit effect of moat ditch, can avoid worker from making under upper armor rock exposure Industry;The raising of ore removal efficiency, be advantageous to the open-assembly time of barnyard after shortening explosion, improve back production security.Only need to be to moat bottom of trench The scraper runway in portion carries out high intensity consolidated fill, and high intensity obturation accounting can be greatly reduced, effectively reduce and fill Fill into this;Ore concentration degree is high, shovel dress efficiency high, scraper shovel dress in front in moat ditch, reduces the equipment losses such as tire, scraper Operation adjustment number is few, effectively reduces Cost of mining production and mining integrated cost.
As Figure 1-Figure 11, in the present embodiment, divulge information and enter segmentation tunnel 8 through Zigzag type ramp, then joined by segmentation Network road enters stope, enters the return aircourse of nugget of upper stage 5 behind cleaning face through filling returnairshaft.
Embodiment two:
In the present embodiment, moat ditch only is constructed in the foot of stope, is gathered in after the top ore body avalanche of moat ditch in moat ditch. Back production is expanded from the cutting tunnel that undercuts adopts to upper lower burrs, and back production certain altitude reaches the requirement for height for constructing moat ditch then up, and one As back production height >=2m, then construct moat ditch.Moat ditch is constructed using pocket type filling method, takes layer stack formula construction technology, moat Ditch slope angle >=ore natural repose angle.Domatic 11, the reserved collection drive 13 of moat ditch, domatic 12 three of ore body lower wall form moat Ditch;After the completion of moat ditch is constructed, you can start subsequent job.
During implementation, there is provided a kind of moat ditch collection ore deposit mining methods of inclined orebody, the safe and efficient of inclined orebody can be realized Exploitation, is comprised the following steps that:
1st, nugget inscape
The stage is divided along ore body vertical direction, moves towards to divide nugget along the stage, nugget height 50m, nugget length is 60m, It is further subdivided into 3 segmentations in short transverse, height of lift is 15m or so, the horizontal breadth of a width of ore body of nugget.
2nd, quasi- cutting is adopted
Adopting cut journey mainly includes:Ramp, slice drift, layering connection road, mine chute, ventilation shaft is filled, undercut lane Road.
It is punctual to adopt, and Zigzag type ramp is tunneled in ore body lower wall, in easy flights in 22% according to scraper performance, the stage Between every 15m height left and right tunnel a slice drift away from ore body lower wall border horizontal range about 30~35m, then from slice drift It is in easy flights in 22% to driving Slice stoping connecting taxiway 7 under to nugget, and people's row ventilation fill pass is tunneled in ore body, The a diameter of 1.6m of ventilation filling well.Level drive undercuts gallery in ore body, and undercut gallery section 3.1m × 2.8m.Adopt quasi- work After the completion of journey, since the gallery that undercuts, the full thickness of level of ore body is first disclosed with brushing of caunching, forms the pulling end space of stope.
3rd, back production
After the completion of adopting cut journey, you can start slicing, layer height 2.5m, one end of slicing to stope is to another One end order mining.Stope steadiness is regarded during back production, rock drilling is carried out using YT-28 rigs, can be beared down on one or hang down using lateral aperture Straight hole caunches ore deposit two ways, and wherein lateral aperture rock drilling once falls that ore deposit amount is small, but is easily controlled the security of top plate, vertically Hole is caunched ore deposit, once falls that ore deposit amount is big, but the stability of top plate whard to control, so should be on the firm Sexual behavior mode according to rock State two methods, pattern uses quincunx or rectangle pattern, and array pitch is 0.8~1m between blasthole, explosive specific charge 0.25~0.3kg/t.Slicing is accused from the back production of stope one end to the other end to terminate, it is then padded using rebasing technology of caunching Ramp joins road, on the one hand as filling counterfort 10, on the other hand as the Slice stoping connecting taxiway 7 for entering next layering.According to Secondary slicing from bottom to top, always on adopt stage foundation.
4th, ore removal
Ore removal equipment choosing scraper.Ore body lower wall is domatic 12, collection drive 13 and moat ditch domatic 11 are collectively forming moat ditch, moat After the ore body back production on ditch top, the ore of avalanche is gathered on collection drive through moat ditch, as shown in figure 4, scraper is from the one of moat ditch Hold to other end order ore removal, for scraper by mine chute outside ore handling to arteries and veins, the arteries and veins loading drift that wears long transports stope.Ore removal During bulk concentrate on working face, be carried to again in drop shaft after secondary blasting is broken.
5th, divulge information
It is fresh it is distinguished and admirable enter segmentation tunnel 8 through ramp, then stope is entered by segmentation connecting taxiway, through filling behind cleaning face Returnairshaft is filled out into return aircourse of upper stage.
6th, slicing and filling and moat ditch are constructed
Caunch the padded bottom plate of Slice stoping connecting taxiway 7 first, makes the outlet of Slice stoping connecting taxiway 7 horizontal high to lower leaf Degree, then starts slicing and filling and moat ditch is constructed.Slicing and filling, by lift height, when " 1, which adopts 1, fills ", slicing and filling height 2.5m。
Scheme one:It is layered local top dressing filling
(1) slicing and filling, as shown in figure 1, to each slicing and filling bottom 2m, filled using low-intensity filling slurry, 3d People in energy final set, the exposure of adjacent stope back production side are not caving.
(2) moat ditch is constructed, as shown in Figure 2.Moat ditch is constructed using pocket type filling method, takes layer stack formula construction technology, Moat ditch slope angle determines according to ore natural repose angle, general >=45 °;After moat ditch construct is formed, the width for collecting drive is necessary Meet the minimum widith requirement of scraper operation.
(3) drive top dressing is collected, as shown in figure 3, carrying out pouring surface layer filling composition top dressing high intensity obturation 9, to meet to shovel Surface thickness >=0.5m is poured on fortune machine service requirement, top, it is desirable to and intensity of the obturation 2 in 7 days can meet worker's rock drilling operation, It is more than 1.5MPa during ore removal.
After the completion of moat ditch is constructed, you can start subsequent cycle operation.
Scheme (two):It is layered comprehensive top dressing filling
(1) slicing and filling, as shown in fig. 6, to each slicing and filling bottom 2m, filled using low-intensity filling slurry, 3d People in energy final set, the exposure of adjacent stope back production side are not caving.
(2) top dressing is layered, as shown in fig. 7, carrying out pouring surface layer filling composition top dressing high intensity obturation 9, to meet scraper Surface thickness >=0.5m is poured on machine service requirement, top, it is desirable to which the intensity in 7 days of obturation 2 can meet worker's rock drilling operation, ore removal When be more than 1.5MPa.
(3) moat ditch is constructed, as shown in Figure 8.Moat ditch is constructed using pocket type filling method, takes layer stack formula construction technology, Moat ditch slope angle determines according to ore natural repose angle, general >=45 °;After moat ditch construct is formed, the width for collecting drive is necessary Meet the minimum widith requirement of scraper operation.
After the completion of moat ditch is constructed, you can start subsequent cycle operation.
Specifically there is following beneficial effect:
(1) ore recovery ratio and ore removal efficiency are improved.The moat ditch constructed is domatic 11, collection drive 13 and ore body lower wall domatic 12 Moat ditch collection ore deposit system is collectively forming, after ore body avalanche, broken ore 4 is concentrated in moat ditch, and scraper carries out shovel dress in moat ditch, Ore concentration degree is high, and the scraper efficiency high of scraper, cleaning work amount is few, and ore loss ratio is low.
(2) back production security is improved.Moat ditch construct can effectively support armor rock, significantly reduce upper disk exposure Product;The remittance ore deposit effect of moat ditch, can avoid worker's operation under upper armor rock exposure;The raising of ore removal efficiency, be advantageous to contract The open-assembly time of barnyard after short explosion.
(3) mining cost is reduced.High intensity consolidated fill only is carried out to the scraper runway of moat ditch bottom, can be significantly High intensity obturation accounting is reduced, effectively reduces filling cost;Ore concentration degree is high, and scraper efficiency high, scraper is in moat Shovel dress in front in ditch, the equipment losses such as tire are reduced, scraper adjustment number is few, effectively reduces Cost of mining production.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

  1. A kind of 1. moat ditch collection ore deposit mining methods of inclined orebody, it is characterised in that
    The dead zone formed after mining sets moat ditch to construct area;
    The moat ditch that moat ditch constructs area is constructed, and is specially:The upper disk surface in area and the rotation angle position of base surface are constructed in moat ditch, constructs use Move downward and/or protect the moat ditch of ore body upper disk surface domatic in guiding broken ore;It is pre- in base surface when constructing that moat ditch is domatic Collection drive is stayed, moat ditch is formed by domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall, for by moat ditch The broken ore of portion's back production is gathered on collection drive;
    Back production moat ditch top ore body, on collection drive and/or collection drive side carries out ore removal.
  2. 2. the moat ditch collection ore deposit mining methods of inclined orebody according to claim 1, it is characterised in that
    Stage, level interval >=10m are divided in ore body vertical direction;
    Move towards to arrange nugget, nugget length >=20m along the stage, the width of nugget is the horizontal breadth of ore body.
  3. 3. the moat ditch collection ore deposit mining methods of inclined orebody according to claim 1, it is characterised in that
    Moat ditch is constructed, and is used:
    Directly construct moat ditch method, local top dressing constructs moat ditch method or comprehensive top dressing constructs moat ditch method.
  4. 4. the moat ditch collection ore deposit mining methods of inclined orebody according to claim 3, it is characterised in that
    Moat ditch method directly is constructed, is specially:
    As goaf height >=2m after back production, it is domatic to construct moat ditch between the ore bottom surface in goaf and upper disk surface, and The reserved collection drive in ore bottom surface,
    Moat ditch is formed by domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall.
  5. 5. the moat ditch collection ore deposit mining methods of inclined orebody according to claim 3, it is characterised in that
    Local top dressing constructs moat ditch method, is specially:
    Short transverse in dead zone to be filled is classified as bottom filling area and top moat ditch constructs area,
    The filling of bottom filling area is carried out first;
    Then on top, moat ditch constructs the upper disk surface in area and bottom fills the rotation angle position for the base surface to be formed, and constructs moat ditch slope Face, collection drive is reserved when constructing;
    Finally according to collection drive intensity requirement, only to collection drive surface top dressing;
    Moat ditch is formed by domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall.
  6. 6. the moat ditch collection ore deposit mining methods of inclined orebody according to claim 3, it is characterised in that
    Comprehensive top dressing constructs moat ditch method, is specially:
    Short transverse in dead zone to be filled is classified as bottom filling area, top dressing area and top moat ditch and constructs area,
    The filling of bottom filling area is carried out first;
    Then top dressing area's filling is carried out according to collection drive intensity requirement;
    Finally on top, moat ditch constructs the upper disk surface and the rotation angle position of the filling base surface of top dressing formation in area, constructs moat ditch slope Face, collection drive is reserved when constructing;
    Moat ditch is formed by domatic, the reserved collection drive of the moat ditch constructed, the domatic three of ore body lower wall.
  7. 7. the moat ditch collection ore deposit mining methods of the inclined orebody according to any one of claim 3 to 6, it is characterised in that
    By back production and ore removal way,
    Slicing is taken to be layered ore removal stoping scheme, when taking slicing to be layered ore removal stoping scheme, in nugget height It is divided into >=2 segmentations, subdivided layering in segmentation, slicing, is layered ore removal, after the completion of each slicing ore removal, Carry out slicing and filling and construct moat ditch, the moat ditch mode of constructing takes local top dressing method for constructing or comprehensive top dressing to construct moat ditch;Or
    Take substoping to be segmented ore removal scheme, when taking substoping to be segmented ore removal scheme, >=2 are divided into nugget height Individual segmentation, substoping, ore removal is segmented, after the completion of each substoping ore removal, carries out sublevel fill stoping and construct moat ditch, moat ditch The mode of constructing is taken and directly constructs moat ditch method, local top dressing constructs moat ditch method or comprehensive top dressing constructs moat ditch method;Or
    Substoping stage ore removal or stage recovery phase ore removal scheme are taken, is returned when taking substoping stage ore removal or stage When adopting stage ore removal scheme, including it is layered or is segmented or stage back production, stage ore removal, only constructs moat ditch in the foot of stope, Moat ditch, which is constructed to take, directly constructs moat ditch method, after the completion of stope mining, carries out Filling mine-out area processing or dead zone does not fill.
  8. 8. the moat ditch collection ore deposit mining methods of inclined orebody according to claim 7, it is characterised in that
    After the most next layering of nugget or substoping and ore removal, directly it is layered or sublevel fill stoping, moat ditch is not constructed, to carry The globality of high obturation, it is easy to the back production of bottom ore body.
  9. 9. the moat ditch collection ore deposit mining methods of inclined orebody according to any one of claim 1 to 6, it is characterised in that
    The domatic construction technology of moat ditch, it is specially:
    Pocket type is taken to fill, primary filling is constructed or layer stack filling is constructed;Final slope angle >=the ore of moat ditch is rested in peace naturally Angle.
  10. 10. the moat ditch collection ore deposit mining methods of inclined orebody according to any one of claim 1 to 6, it is characterised in that
    Ore removal, it is specially:
    Top broken ore is converged on collection drive by moat ditch;Ore removal equipment can be selected scraper and/or other have Ji Kuang And the equipment for carrying function;
    What scraper was connected from collection drive one end to other end order ore removal or from middle part to both ends ore removal or driving with collection drive Ore removal route side ore removal;
    Mine chute outside ore handling to arteries and veins or direct entrucking are transported out of stope by scraper.
CN201711126583.2A 2017-11-15 2017-11-15 The moat ditch collection mine mining methods of inclined orebody Active CN107654232B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711126583.2A CN107654232B (en) 2017-11-15 2017-11-15 The moat ditch collection mine mining methods of inclined orebody

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711126583.2A CN107654232B (en) 2017-11-15 2017-11-15 The moat ditch collection mine mining methods of inclined orebody

Publications (2)

Publication Number Publication Date
CN107654232A true CN107654232A (en) 2018-02-02
CN107654232B CN107654232B (en) 2019-08-06

Family

ID=61121312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711126583.2A Active CN107654232B (en) 2017-11-15 2017-11-15 The moat ditch collection mine mining methods of inclined orebody

Country Status (1)

Country Link
CN (1) CN107654232B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110966005A (en) * 2019-11-22 2020-04-07 西北矿冶研究院 Novel medium-length hole ore-breaking stage chamber method
CN113216963A (en) * 2021-05-18 2021-08-06 中钢集团马鞍山矿山研究总院股份有限公司 Stoping method for gallery ore in transition mining by caving method to filling method
RU2757883C1 (en) * 2021-04-14 2021-10-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for underground mining of steeply dipping thick ore bodies

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4072352A (en) * 1974-08-20 1978-02-07 Erik Ingvar Janelid Method for mining of rock or ore according to the block caving principle in massive formations
CN103244121A (en) * 2013-04-24 2013-08-14 中南大学 Track and trackless coupled bottom ore removal system
CN105019902A (en) * 2015-05-12 2015-11-04 中冶北方(大连)工程技术有限公司 Intra-vein inclined drift overhand cut-and-filling mining method
CN106121648A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN106761842A (en) * 2017-03-17 2017-05-31 新疆大学 A kind of method of underground mining bottom moat ditch inner lining structure reclaiming of residual ore

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4072352A (en) * 1974-08-20 1978-02-07 Erik Ingvar Janelid Method for mining of rock or ore according to the block caving principle in massive formations
CN103244121A (en) * 2013-04-24 2013-08-14 中南大学 Track and trackless coupled bottom ore removal system
CN105019902A (en) * 2015-05-12 2015-11-04 中冶北方(大连)工程技术有限公司 Intra-vein inclined drift overhand cut-and-filling mining method
CN106121648A (en) * 2016-08-04 2016-11-16 西北矿冶研究院 Sublevel open stoping chassis route ore drawing subsequent filling mining method
CN106761842A (en) * 2017-03-17 2017-05-31 新疆大学 A kind of method of underground mining bottom moat ditch inner lining structure reclaiming of residual ore

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110966005A (en) * 2019-11-22 2020-04-07 西北矿冶研究院 Novel medium-length hole ore-breaking stage chamber method
RU2757883C1 (en) * 2021-04-14 2021-10-22 Федеральное государственное бюджетное учреждение науки Институт горного дела Уральского отделения Российской академии наук (ИГД УрО РАН) Method for underground mining of steeply dipping thick ore bodies
CN113216963A (en) * 2021-05-18 2021-08-06 中钢集团马鞍山矿山研究总院股份有限公司 Stoping method for gallery ore in transition mining by caving method to filling method
CN113216963B (en) * 2021-05-18 2022-05-27 中钢集团马鞍山矿山研究总院股份有限公司 Stoping method for gallery ore in transition mining by caving method to filling method

Also Published As

Publication number Publication date
CN107654232B (en) 2019-08-06

Similar Documents

Publication Publication Date Title
CN104747190B (en) Thin ore-body mechanized highly-layering continuous mining method
CN108561135B (en) A kind of mechanization stoping method of the suitable unstable middle thickness orebody of low-angle dip country rock
CN101818643B (en) Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN102562065B (en) Sublevel open-stop and delayed filling mining method
CN106223958B (en) The slant middle thick orebody subregion rock drilling stage falls ore deposit afterwards filling collaboration mining codes
CN101858217B (en) House pillar changeable panel upward demix filling mining method
CN102168579A (en) Rib-pillar-free continuous sublevel filling method for mining preparation in medium-thickness slope crushed ore body vein
CN105587318A (en) Filling mining method for continuous backstoping of gently inclined parallel medium thick ore body group
CN103615285B (en) A kind of stope route arrangement and method being beneficial to Tight filling
CN108843382A (en) Downward subsequent filling method suitable for unstable medium-thickness ore body of gently inclined surrounding rock
CN108194088A (en) A kind of soft top coal layer cuts top release gob-side entry retaining method without explosion
CN102953733A (en) Central outside-vein house pillar type combined crosscut two-end inside-vein continuous segment filling mining method
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN103032070A (en) Boundary-controlled room column type sublevel open stoping subsequent stage filling mining method
CN105909247A (en) Non-pillar sublevel mining cemented filling mining method
CN109184694A (en) A kind of pre- anchor sublevel drilling stage open stope afterwards filling mining method of upper disk
CN107829742A (en) Caving-filling-open stope-caving mining method
CN103075156A (en) Chessboard chamber pre-protection top upward middle-length hole ore-breaking segmented filling mining method
CN105649631A (en) Efficient mechanical mining method for gently-inclined thin ore bodies
CN102383820B (en) Coal mine underground airbridge construction method
CN107654232B (en) The moat ditch collection mine mining methods of inclined orebody
CN107939403A (en) To cemented filling mining technique under a kind of square crossing rectangle route type panel
CN111042817B (en) Partition cemented prop wall-cutting filling mining method
CN109538210A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN106761743A (en) Continuous slitting pocket type filling room-and-pillar method dead zone stooping pillaring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant