CN107653832A - 基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法 - Google Patents
基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法 Download PDFInfo
- Publication number
- CN107653832A CN107653832A CN201710991140.3A CN201710991140A CN107653832A CN 107653832 A CN107653832 A CN 107653832A CN 201710991140 A CN201710991140 A CN 201710991140A CN 107653832 A CN107653832 A CN 107653832A
- Authority
- CN
- China
- Prior art keywords
- ancient
- flood
- alluvial
- river
- mountain pass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V9/00—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
- G01V9/007—Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00 by detecting gases or particles representative of underground layers at or near the surface
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/40—Protecting water resources
- Y02A20/402—River restoration
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Sensing (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Geophysics (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
Abstract
本发明涉及古洪水水文学研究领域。一种基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,在预重建古洪水序列的河流出山口冲洪积扇上沿水流方向布置几个纵剖面,按照一定的间隔布置地质勘探钻孔进行地质勘探,根据获得的地质勘探资料绘制各剖面的岩层结构剖面图;根据岩层结构剖面图,在各剖面的最前缘选定一个包含各岩层的点位;在选定的点位上布置钻孔进行地质勘探,获取岩性,分析每一岩层的最大岩石颗粒;建立水动力学模型,模拟将上述最大岩石颗粒从冲洪积扇扇顶冲到上述位置所需最大流量;据此推算各岩层所对应年代河流出山口的最大流量;采用同位素测年技术,测定上述各点位各岩层所形成的年代;根据上述推算的洪峰流量及年代,建立古洪水序列。
Description
技术领域
本发明涉及古洪水水文学研究领域,尤其是涉及一种古洪水序列重建的方法。
背景技术
在大型水利水电工程等高危工程建设中,需要计算诸如百年、千年甚至万年标准的洪水,而目前已有的实测洪水记录一般只有几十年,即使加上历史调查洪水也远远不能满足这种要求。当实测洪水记录和历史洪水记录不能满足要求时,将造成洪水频率分析与设计洪水计算产生很大的不确定性,直接影响计算结果的可靠性。而通过古洪水重建,可以将河流洪水记录延长到百年、千年、乃至万年尺度,可大大延伸洪水信息的时间跨度。加入古洪水资料后的设计洪水结果与无古洪水资料的设计洪水结果相比,在参数区域协调平衡规律上更符合区域特性,结果更合理,能有效提高设计洪水的可靠性。目前,古洪水重建主要采用平流沉积物,但是作为洪水指示物的平流沉积物及其尖灭点在野外并不容易找到,另一方面该方法难以建立古洪水序列。因此,研究简单可行的古洪水资料重建的方法,具有极高的理论和实际价值。
发明内容
本发明提出了一种基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法。采用本方法能够根据河流出山口所形成的冲洪积扇的岩层结构,建立河流古洪水序列资料。
本发明所采用的技术方案:
一种基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,实现过程如下:
1)在预重建古洪水序列的河流出山口冲洪积扇上布置几个沿水流方向的纵剖面;
2)在所述纵剖面上按照一定的间隔布置地质勘探钻孔位置;
3)在所述地质勘探钻孔位置上进行地质勘探,根据获得的地质勘探资料绘制各剖面的岩层结构剖面图;
4)根据上述岩层结构剖面图,在各剖面的最前缘选定一个包含各岩层的点位;在选定的上述各点位上布置钻孔,进行地质勘探,获取岩性,分析每一岩层的最大岩石颗粒;
5)建立水动力学模型,模拟将上述最大岩石颗粒从冲洪积扇扇顶冲到上述位置所需最大流量;
6)根据上述各剖面上的最大流量,推算各岩层所对应年代河流出山口的最大流量,即洪峰流量;
7)采用同位素测年技术,测定上述各点位上各岩层所形成的年代;根据上述推算的洪峰流量及年代,建立古洪水序列。
本发明的有益效果:
1、本发明基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,包括地质勘探、水动力学模拟、地质测年等主要环节。本方法可以重建得到各时期的古洪水,从而可以建立古洪水序列。作为本发明古洪水指示物的出山口冲洪积扇在野外容易寻找到;根据岩层结构,用水动力学模型模拟,容易得到最大洪峰流量。
2、本发明基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,能够为水利水电工程、防洪工程以及流域规划提供更长系列的洪水资料,对工程建设具有重大的实际意义;能够进一步推动古洪水研究方法的进步。
附图说明
图1所示为本发明实施例地质勘探钻孔位置布置平面图;
图2所示为本发明实施例纵剖面图及钻孔位置布置图;
图中:1-河流出山口冲洪积扇、2-扇顶、3-扇缘、4-纵剖面布置线、5钻孔布置位置、6、包含各岩层的钻孔。
具体实施方式
下面通过具体实施方式,对本发明的技术方案做进一步的详细描述。应当注意的是,本发明公开的实施例只是示例性的,不应以本文的实施例作为本发明权利范围的限定。
本领域技术人员应当理解,发明实施例中描述的技术特征或者技术特征的组合不应当被认为是孤立的,它们可以被相互组合从而达到更好的技术效果。
如图1-图2所示,本发明基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,根据出山口冲洪积扇岩层对洪水过程的记录,重建古洪水序列,包括:
(1)如图1所示,在预重建古洪水序列的河流出山口冲洪积扇上布置几个纵剖面;
(2)在所述纵剖面上按照一定的间隔布置地质勘探钻孔位置;
(3)所述钻孔间隔不大于10米;
(4)在所述地质勘探钻孔位置上进行地质勘探;
(5)如图2所示,根据上述地质勘探资料,绘制各剖面的岩层结构剖面图;
(6)根据上述岩层结构剖面图,在各剖面的最前缘选定一个包含各岩层的点位;
(7)在上述各点位上布置钻孔,进行地质勘探,获取岩性,分析每一岩层的最大岩石颗粒;
(8)建立水动力学模型,模拟将上述最大岩石颗粒从冲洪积扇顶冲到上述位置所需最大流量;
(9)根据上述各剖面上的最大流量,推算各岩层所对应年代河流出山口的最大流量,即洪峰流量;
(10)采用同位素测年技术,测定上述各点位上各岩层所形成的年代;
(11)根据上述推算的洪峰流量及年代,建立古洪水序列。
本发明基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,可以重建得到各时期的古洪水,从而可以建立古洪水序列;能够为水利水电工程、防洪工程以及流域规划提供更长系列的洪水资料,对工程建设具有重大的实际意义。
Claims (2)
1.一种基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,实现过程如下:
1)在预重建古洪水序列的河流出山口冲洪积扇上布置几个沿水流方向的纵剖面;
2)在所述纵剖面上按照一定的间隔布置地质勘探钻孔位置;
3)在所述地质勘探钻孔位置上进行地质勘探,根据获得的地质勘探资料绘制各剖面的岩层结构剖面图;
4)根据上述岩层结构剖面图,在各剖面的最前缘选定一个包含各岩层的点位;在选定的上述各点位上布置钻孔,进行地质勘探,获取岩性,分析每一岩层的最大岩石颗粒;
5)建立水动力学模型,模拟将上述最大岩石颗粒从冲洪积扇扇顶冲到上述位置所需最大流量;
6)根据上述各剖面上的最大流量,推算各岩层所对应年代河流出山口的最大流量,即洪峰流量;
7)采用同位素测年技术,测定上述各点位各岩层所形成的年代;根据上述推算的洪峰流量及年代,建立古洪水序列。
2.根据权利要求1所述的基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法,其特征在于:步骤2)中,在所述纵剖面上按照一定的间隔布置地质勘探钻孔位置,所述地质勘探钻孔间隔不大于10米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710991140.3A CN107653832B (zh) | 2017-10-23 | 2017-10-23 | 基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710991140.3A CN107653832B (zh) | 2017-10-23 | 2017-10-23 | 基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107653832A true CN107653832A (zh) | 2018-02-02 |
CN107653832B CN107653832B (zh) | 2019-08-02 |
Family
ID=61118823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710991140.3A Active CN107653832B (zh) | 2017-10-23 | 2017-10-23 | 基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107653832B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110082837A (zh) * | 2019-06-03 | 2019-08-02 | 长安大学 | 一种探寻碳同位素存在的方法 |
CN113255124A (zh) * | 2021-05-17 | 2021-08-13 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种基于沉积-地貌证据链的古堰塞事件的重建方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103966972A (zh) * | 2014-04-29 | 2014-08-06 | 河海大学 | 一种安全利用洪水资源的量化分析方法 |
CN104727264B (zh) * | 2015-04-07 | 2016-06-08 | 武汉大学 | 一种基于Copula函数的坝址洪水还原方法 |
-
2017
- 2017-10-23 CN CN201710991140.3A patent/CN107653832B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103966972A (zh) * | 2014-04-29 | 2014-08-06 | 河海大学 | 一种安全利用洪水资源的量化分析方法 |
CN104727264B (zh) * | 2015-04-07 | 2016-06-08 | 武汉大学 | 一种基于Copula函数的坝址洪水还原方法 |
Non-Patent Citations (2)
Title |
---|
刘宏: "雪隆囊古堰塞坝溃决洪水演进数值模拟研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
黄春长等: "黄河永和关段全新世古洪水研究", 《地理学报》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110082837A (zh) * | 2019-06-03 | 2019-08-02 | 长安大学 | 一种探寻碳同位素存在的方法 |
CN113255124A (zh) * | 2021-05-17 | 2021-08-13 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种基于沉积-地貌证据链的古堰塞事件的重建方法 |
Also Published As
Publication number | Publication date |
---|---|
CN107653832B (zh) | 2019-08-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103226732B (zh) | 一种基于gms的矿区不同开采中段的地下水渗流场预测方法 | |
CN103403768B (zh) | 有关地下岩层的模型的方法和系统 | |
CN104809277A (zh) | 一种超低渗致密储层水平井地质建模方法 | |
CN106156432A (zh) | 基于三维地质信息的隧洞变形评估及支护设计方法和系统 | |
Jolie et al. | The development of a 3D structural–geological model as part of the geothermal exploration strategy—a case study from the Brady’s geothermal system, Nevada, USA | |
Battistelli et al. | Reservoir engineering assessment of Dubti geothermal field, northern Tendaho rift, Ethiopia | |
Di Celma et al. | Stratigraphic organization and predictability of mixed coarse‐grained and fine‐grained successions in an upper slope Pleistocene turbidite system of the Peri‐Adriatic basin | |
CN107653832A (zh) | 基于河流出山口冲洪积扇岩层结构的古洪水序列重建方法 | |
CN112523744A (zh) | 一种薄差层水平井井位设计及实时跟踪导向方法 | |
CN110851991B (zh) | 一种地下水流数值模拟方法 | |
Peijs-van Hilten et al. | Heterogeneity modeling and geopseudo upscaling applied to waterflood performance prediction of an incised valley reservoir: Countess YY Pool, southern Alberta, Canada | |
Watters et al. | A sleeping giant awakened; further development of the Seria Field, Brunei Darussalam, after almost 70 years of production | |
Zene et al. | Volumetric estimation and OOIP calculation of the Ronier4 block of Ronier oilfield in the Bongor basin, Chad | |
Hagby | Modelling medium-depth CO2 injection at the Svelvik CO2 field laboratory in Norway | |
O’Dell et al. | Uncertainty management in a major CO2 EOR project | |
Chapin et al. | Integrated static and dynamic modeling of the Pinedale tight gas field, Wyoming | |
Zulkipli et al. | The Guiding Principle of Well Placement to Maximise Hydrocarbon Recovery through Enhanced Reservoir Characterisation and Prolific Seismic-Driven Approaches | |
Thakur | Can integrated reservoir management and technology enhance performance of water and gas floods? | |
Kumar et al. | Groundwater resources management through flow modeling in lower part of Bhagirathi—Jalangi interfluve, Nadia, West Bengal | |
Adaeze et al. | Facies Modelling and Petrophysical Properties of X-Field, Onshore, Niger Delta, Nigeria | |
Al-Khalifa et al. | Overcoming the challenges of building 3D stochastic reservoir models using conceptual geological models—a case study | |
Garner et al. | The Quest for innovative technology solutions for in-situ development of challenging oil sands reservoirs in Alberta | |
Weijermans et al. | Integrated Reservoir Characterization and Simulation to Optimize Recovery from a Mature Carboniferous North Sea Gas Field with Water Influx | |
Meeks et al. | Maximizing gas recovery from tight gas reservoirs in Trawick field | |
Carpenter | Integrating Enhanced Oil Recovery and Carbon Capture and Storage: Farnsworth Field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |