CN107651590A - A kind of ocean platform replacing torch heads construction method of installation - Google Patents

A kind of ocean platform replacing torch heads construction method of installation Download PDF

Info

Publication number
CN107651590A
CN107651590A CN201711127055.9A CN201711127055A CN107651590A CN 107651590 A CN107651590 A CN 107651590A CN 201711127055 A CN201711127055 A CN 201711127055A CN 107651590 A CN107651590 A CN 107651590A
Authority
CN
China
Prior art keywords
flare
flare tip
ocean platform
coaster
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711127055.9A
Other languages
Chinese (zh)
Other versions
CN107651590B (en
Inventor
马振伦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Jinbin Hongyi Construction Engineering Co.,Ltd.
Original Assignee
Tianjin Development Zone Sanbo Technology Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Development Zone Sanbo Technology Service Co Ltd filed Critical Tianjin Development Zone Sanbo Technology Service Co Ltd
Priority to CN201711127055.9A priority Critical patent/CN107651590B/en
Publication of CN107651590A publication Critical patent/CN107651590A/en
Application granted granted Critical
Publication of CN107651590B publication Critical patent/CN107651590B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D1/00Rope, cable, or chain winding mechanisms; Capstans
    • B66D1/28Other constructional details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

The invention discloses a kind of ocean platform replacing torch heads construction method of installation, belongs to oceanographic equipment maintenance technology field, convenient transportation when there are replacing torch heads, it is safe the advantages of, its technical scheme following steps, include successively:Site inspection confirmation, early-stage preparations, scaffold building, coaster are built, cleaning, pilot fire are removed in the dismounting of old flare tip, the lifting of old flare tip, old flare tip handling, new flare tip handling, the installation of new flare tip, scene.

Description

A kind of ocean platform replacing torch heads construction method of installation
Technical field
The present invention relates to oceanographic equipment maintenance technology field, more particularly to a kind of ocean platform replacing torch heads installation Method.
Background technology
At present, the torch that the ocean engineering facility such as offshore oil fixed platform or FPSO such as FPSO uses More than 30 meters, the torch arm lengths of end item are even more than 100 meters long arm lengths.
The lifting mode of domestic conventional flare tip installation, maintenance or replacing is typically carried out using large ocean crane barge ship Lifting, for the flare boom of superelevation, hanging height and can not meeting requirement for above-mentioned crane barge ship, in this case, only use Flare tip is installed or changed to helicopter mode.
Following weak point be present in the installation of foregoing two kinds of routines and substitute mode:
1st, lifting operation, not only costly, length duty cycle are carried out using large ocean crane barge ship, and weather and sea situation are to peace It is larger to fill work influence, for the flare boom of superelevation, crane barge ship hangs height and can not met.
2nd, using helicopter, the security risk of installation process is larger, the stability of equipment interconnection after helicopter suspends High to security risk caused by workmen on flare boom operating platform and difficulty is big, its cost of use is very high, weather condition pair Hoisting process influences also very big, it is therefore desirable to which the replacing for developing torch combustion head on a kind of large torch arm suitable for superelevation is hung Assembling device.
Notification number is that CN203889884U Chinese patent discloses ocean platform replacing torch heads hanging apparatus, and it is by more Individual modular unit is assembled forming and be connected with base by connection component and can be around the pin for being fixed on base by fastener Axle, which does horizontal direction, lies prone and faces upward the main mast-up of derricking motion;It is made up of and and base fastener assembling multiple modular units It is being flexibly connected and can surround and be fixed on the bearing pin of base and do horizontal direction and lie prone and face upward the first support frame of derricking motion;By multiple moulds Module unit assembles forming and be movably connected with the base and can do horizontal direction around the bearing pin for being fixed on base by fastener Lie prone and face upward the second support frame of derricking motion;The first Lifting slings for lifting flare tip is connected and is used for main mast-up;With second The second Lifting slings for being used to change ocean platform replacing torch heads hanging apparatus angle of support frame connection;It is arranged on main lifting The first suspension rigging between frame and the first support frame;The second suspension line being arranged between the first support frame and the second support frame Tool;The support rigging affixed with base and flare boom deckhead for main mast-up, the first support frame, the second support frame.
After this installation hanging apparatus, torch can be directly lifted on flare platform, so as to be adapted to the feelings of long flare boom Condition, but when directly lifting, sea wind is still very big to the influence in hoisting process, easily cause what torch blown to rock, hit Hit on ocean platform, so as to the requirement of environment when installing replacing for lifting and the intensity requirement of hanging apparatus is compared It is high.
The content of the invention
It is an object of the invention to provide a kind of ocean platform replacing torch heads construction method of installation, it has replacing torch heads When convenient transportation, it is safe the advantages of.
The present invention above-mentioned technical purpose technical scheme is that:A kind of ocean platform flare tip is more Construction method of installation is changed, is comprised the following steps:
Step 1:Site inspection confirms:Field condition is reconnoitred, measures job site real data, and record;
Step 2:Early-stage preparations:Prepare construction tool and new flare tip, and be placed on ocean platform;
Step 3:Scaffold building:Lifting scaffold used for supporting is set up on flare platform;
Step 4:Coaster is built:The coaster slided along flare boom aisle guardrail length direction is built on the guardrail of flare boom aisle;
Step 5:Old flare tip dismounting:Disassemble old flare tip and be allowed to volume reduction convenience in transport;
Step 6:Old flare tip lifting:Old flare tip is sling using the suspension centre of scaffold building;
Step 7:Old flare tip handling:Hoist engine on scaffold is fixed with coaster, and old flare tip is moved to and slid onto, elevator Machine unwrapping wire, coaster is slided into flare boom aisle guardrail bottom;
Step 8:New flare tip handling:Old flare tip is removed from coaster, new flare tip is placed into and slid onto, hoist engine is received Line, coaster is slided into flare boom aisle guardrail top;
Step 9:New flare tip installation:New flare tip is fixed on flare platform;
Step 10:Remove cleaning in scene:Scaffold is dismantled, removed.
By using above-mentioned technical proposal, by the use of flare boom on the cunning slided as coaster of existing flare boom aisle guardrail Road, coaster are fixed on the scaffold for riding upon flare platform by hoist engine, and by the drawing of hoist engine, putting realizes coaster exists Sliding on the guardrail of flare boom aisle, so as to which the old flare tip of dismounting is slid onto on ocean platform by coaster, by new torch Head is moved on on flare platform by coaster, and after this method step, because the stability of coaster is good, torch is in mobile process In influenceed by extraneous factors such as sea winds small, effectively prevent torch and ocean platform from producing collision, when making replacing torch heads Convenient transportation, safety.
Further, when step 7 is with step 8 handling, the insurance being connected with coaster is set on flare boom every 5-6 rice Rope.
By using above-mentioned technical proposal, when coaster transports the moment maintain safety rope and can be connected with coaster, keep away Coaster directly quickly slips down on ocean platform and causes the personnel on ocean platform to produce damage with equipment after exempting from hoist engine failure Wound.
Further, there is safety rope the coaster both sides.
By using above-mentioned technical proposal, the safety rope that both sides are set can effectively ensure the balance of coaster both sides, keep away Exempt from coaster downslide after hoist engine produces failure to produce skew and cause torch to produce with coaster and separate and produce accident.
Further, step 3:Scaffold building:The also erecting scaffold on ocean platform, scaffold frame to flare boom Aisle guardrail bottom.
By using above-mentioned technical proposal, erecting scaffold on ocean platform, effectively play a part of protection, prevent fire Torch drops from ocean platform, and improves the protective of ocean platform, can impinge upon on scaffold, keep away after preventing coaster out of control Exempt to directly impinge on ocean platform.
Further, step 3:Scaffold building:It also is provided with being used to lift by crane torch on the scaffold on ocean platform The suspension centre of head.
By using above-mentioned technical proposal, installation suspension centre is easy to sling old flare tip or new flare tip, reduces people Lift the working strength of old flare tip or new flare tip.
Further, step 7:Old flare tip handling:By the suspension centre that is translated on ocean platform by old flare tip from Flare boom aisle guardrail bottom is moved on ocean platform.
By using above-mentioned technical proposal, suspension centre translation is easy to hang out old flare tip from coaster, carries people old Flare tip enhanced convenience.
Further, step 8:New flare tip handling:By the suspension centre that is translated on ocean platform by new flare tip from Ocean platform is moved on the guardrail bottom of flare boom aisle.
By using above-mentioned technical proposal, suspension centre translation is easy to new flare tip to hang on coaster, people is carried new torch Head enhanced convenience.
Further, step 11:Pilot fire:Fire trial is carried out to new flare tip with liquid gas storage tank.
By using above-mentioned technical proposal, fire trial is carried out to torch altar lamp which burns day and night and igniter with liquid gas storage tank, to protect Demonstrate,prove the reliability to come into operation.
Further, step 11:Pilot fire:Fire trial is unqualified to re-start step 9:New flare tip installation, directly It is qualified to fire trial.
By using above-mentioned technical proposal, pipeline installation is carried out again after unqualified and is repaired, to ensure what is come into operation Reliability.
In summary, the invention has the advantages that:
1st, influenceed in whole process by sea wind it is smaller, so as to which operation stability is high;
2nd, it is coaster slideway using existing flare boom aisle guardrail, is effectively reduced the cost built;
3rd, there is good safeguard measure, improve the security for changing flare tip.
Brief description of the drawings
Fig. 1 is the construction process figure of the present embodiment;
Fig. 2 is the flare boom structure chart of the present embodiment;
Fig. 3 is the torch shipping situation figure of the present embodiment.
In figure, 1, ocean platform;11st, scaffold;2nd, flare boom;3rd, guardrail;4th, flare platform;5th, flare tip;6th, coaster; 61st, safety rope;7th, hoist engine.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Existing platform flare tip 5 has damaged, and as flare tip 5 is run-down by igniter head side, torch burning is into irregular Flame, certain potential safety hazard is caused to production;Need to stop production, need to carry out more flare tip 5 and igniter head during stopping production Change.
Need to manufacture Special-purpose hanger rigging before stopping production and complete, and in torch ladder bottom pass the test, hoist engine 7 is laid solid Determine in place;The occasional passage at upper deck to flare boom 2 times 1/3rd is set up with pin hand;New flare tip 5 is hung onto Layer deck is at the occasional passage of torch cat ladder;Current Collector Sleave is placed, passed examination;By instrument and cable, electrogas welding, pin The equipment such as hand cradle 11 are ready to, and can use at any time.
A kind of ocean platform replacing torch heads construction method of installation, comprises the following steps:
Step 1:Site inspection confirms:After stopping production, field condition is reconnoitred, torch extinguishes after temperature drops to normal temperature at torch, people Field observation is carried out to the flare tip 5 of damage on flare boom 2 on member.
Job site real data is measured, and is recorded, such as:Each portion's size of torch is measured, determines the model of flare tip 5;According to The model of flare tip 5 and new flare tip 5 of measurement are contrasted;See whether new flare tip 5 is the same with old size, data.
Step 2:Early-stage preparations:Prepare construction tool, make the specific purpose tool for changing flare tip 5 and purchase new torch First 5, in the new handling of flare tip 5 to ocean platform 1.
Step 3:Scaffold building:Lifting scaffold used for supporting 11 is set up on flare platform 4, makes handling flare tip 5 Suspension bracket, wire rope hoist 7, two fixed blocks are fixed at the top of flare tip 5, the steel wire penetrating fixed pulley of hoist engine 7.
Also erecting scaffold 11 on ocean platform 1, the frame of scaffold 11 is to the bottom of 2 aisle guardrail of flare boom 3, positioned at ocean It also is provided with the suspension centre for lifting by crane flare tip 5 on scaffold 11 on platform 1, erecting scaffold 11 on ocean platform 1, effectively Play a part of protection, prevent torch from being dropped from ocean platform 1, and improve the protective of ocean platform 1, prevent coaster 6 Can be impinged upon on scaffold 11 after out of control, avoid directly impinging on ocean platform 1, installation suspension centre be easy to old flare tip 5 or The new flare tip 5 of person is sling, and reduces the working strength that people lift old flare tip 5 or new flare tip 5.
Step 4:Coaster is built:Build along the length direction of 2 aisle guardrail of flare boom 3 and slide on the aisle guardrail 3 of flare boom 2 Dynamic coaster 6.
Coaster 6 includes the rectangular frame that mutually head and the tail connection is managed by scaffold 11, the pin of fixed lateral on rectangular frame Hand cradle 11 is managed, and for supporting the torch being placed on coaster 6, is secured on rectangular frame and the pipe of horizontal scaffold 11 vertical Scaffold 11 is managed, and vertical scaffold 11 manages the head for blocking flare tip 5, for effective fixation of flare tip 5, rectangle frame Edge is provided with the scaffold 11 for being used to be stuck in the both sides of 2 aisle guardrail of flare boom 3 and managed at left and right sides of frame, for limiting coaster 6, prevents The skew of left and right is produced during coaster 6 moves on to.
In coaster 6 in use, the pipe support of scaffold 11 limits right position, rectangle frame to the both sides of 2 aisle guardrail of flare boom 3 Frame is ridden on the aisle guardrail 3 of flare boom 2, and the effect by hoist engine 7 is that coaster 6 is slided along the aisle guardrail 3 of flare boom 2 It is dynamic.
Step 5:Old flare tip dismounting:Disassemble old flare tip 5 and be allowed to volume reduction convenience in transport.
Step 6:Old flare tip lifting:Old flare tip 5 is sling using the suspension centre that scaffold 11 is set up.
Step 7:Old flare tip handling:Hoist engine 7 on scaffold 11 is fixed with coaster 6, every 5-6 on flare boom 2 Rice sets the safety rope 61 that is connected with coaster 6, and there is safety rope 61 both sides of coaster 6, when coaster 6 transports the moment maintain Safety rope 61 can be connected with coaster 6, and coaster 6 directly quickly slips down on ocean platform 1 and causes sea after avoiding the failure of hoist engine 7 Personnel on foreign platform 1 produce damage with equipment, and the safety rope 61 that both sides are set can effectively ensure the balance of the both sides of coaster 6 Property, avoid hoist engine 7 from producing coaster 6 after failure and glide and produce skew and cause the generation of torch and coaster 6 to separate and produce accident.
Old flare tip 5 is moved to and slid onto, the unwrapping wire of hoist engine 7, coaster 6 is slided into the bottom of 2 aisle guardrail of flare boom 3, then Old flare tip 5 is moved to by ocean platform 1 from the bottom of 2 aisle guardrail of flare boom 3 by the suspension centre translated on ocean platform 1 On.
Step 8:New flare tip handling:Suspension centre translation is easy to hang out old flare tip 5 from coaster 6, carries people old New flare tip 5 is moved to by the enhanced convenience of flare tip 5, then the suspension centre by being translated on ocean platform 1 from ocean platform 1 On the bottom of 2 aisle guardrail of flare boom 3, it is easy to new flare tip 5 to hang on coaster 6, people is carried new flare tip 5 more square Just.
The safety rope 61 being connected with coaster 6 is set on flare boom 2 every 5-6 rice, there is safety rope 61 both sides of coaster 6, The moment maintains safety rope 61 and can be connected with coaster 6 when coaster 6 transports, and coaster 6 is directly fast after avoiding the failure of hoist engine 7 Speed slips down on ocean platform 1 and causes the personnel on ocean platform 1 to produce damage, the energy of safety rope 61 that both sides are set with equipment The effective balance for ensureing the both sides of coaster 6, avoid hoist engine 7 from producing coaster 6 after failure and glide and produce skew and cause torch Produced with coaster 6 and separate and produce accident.
The take-up of hoist engine 7, coaster 6 is slided into the top of 2 aisle guardrail of flare boom 3.
Step 9:New flare tip installation:New flare tip 5 is fixed on flare platform 4.
Step 10:Remove cleaning in scene:Scaffold 11 is dismantled, removed.
Step 11:Pilot fire:Fire trial is carried out to new flare tip 5 with liquid gas storage tank, torch grown with liquid gas storage tank Bright lamp and igniter carry out fire trial, to ensure the reliability to come into operation.
Fire trial is unqualified to re-start step 9:New flare tip installation, until fire trial is qualified, it is unqualified laggard Row pipeline installation and reparation again, to ensure the reliability to come into operation.
This method step utilizes the slideway that the existing aisle guardrail 3 of flare boom 2 slides as coaster 6 on flare boom 2, coaster 6 are fixed on the scaffold 11 for riding upon flare platform 4 by hoist engine 7, and by the drawing of hoist engine 7, putting realizes coaster 6 exists Sliding on the aisle guardrail 3 of flare boom 2, will be new so as to which the old flare tip 5 of dismounting is slid onto on ocean platform 1 by coaster 6 Flare tip 5 is moved on on flare platform 4 by coaster 6, and after this method step, because the stability of coaster 6 is good, torch is moving Influenceed by extraneous factors such as sea winds small in dynamic process, effectively prevent torch from producing collision with ocean platform 1, make torch Convenient transportation, safety during first 5 replacing.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (9)

1. a kind of ocean platform replacing torch heads construction method of installation, it is characterized in that:Comprise the following steps:
Step 1:Site inspection confirms:Field condition is reconnoitred, measures job site real data, and record;
Step 2:Early-stage preparations:Prepare construction tool and new flare tip (5), and be placed on ocean platform (1);
Step 3:Scaffold building:Lifting scaffold used for supporting (11) is set up on flare platform (4);
Step 4:Coaster is built:Built on flare boom (2) aisle guardrail (3) along flare boom (2) aisle guardrail (3) length side To the coaster (6) of slip;
Step 5:Old flare tip dismounting:Disassemble old flare tip (5) and be allowed to volume reduction convenience in transport;
Step 6:Old flare tip lifting:Old flare tip (5) is sling using the suspension centre that scaffold (11) is set up;
Step 7:Old flare tip handling:Hoist engine (7) on scaffold (11) is fixed with coaster (6), and old flare tip (5) is moved Move and slide onto, hoist engine (7) unwrapping wire, coaster (6) is slided into flare boom (2) aisle guardrail (3) bottom;
Step 8:New flare tip handling:Old flare tip (5) is removed from coaster (6), new flare tip (5) is placed into cunning On, hoist engine (7) take-up, coaster (6) is slided into flare boom (2) aisle guardrail (3) top;
Step 9:New flare tip installation:New flare tip (5) is fixed on flare platform (4);
Step 10:Remove cleaning in scene:By scaffold (11) dismounting, remove.
2. a kind of ocean platform replacing torch heads construction method of installation according to claim 1, it is characterized in that:Step 7 with During step 8 handling, the safety rope being connected with coaster (6) is set on flare boom (2) every 5-6 rice(61).
3. a kind of ocean platform replacing torch heads construction method of installation according to claim 2, it is characterized in that:The coaster (6) there is safety rope both sides(61).
4. a kind of ocean platform replacing torch heads construction method of installation according to claim 1, it is characterized in that:Step 3: Scaffold building:Also erecting scaffold (11) on ocean platform (1), scaffold (11) frame to flare boom (2) aisle guardrail (3) Bottom.
5. a kind of ocean platform replacing torch heads construction method of installation according to claim 4, it is characterized in that:Step 3: Scaffold building:It also is provided with being used for the suspension centre for lifting by crane flare tip (5) on the scaffold (11) on ocean platform (1).
6. a kind of ocean platform replacing torch heads construction method of installation according to claim 5, it is characterized in that:Step 7: Old flare tip handling:By the suspension centre that is translated on ocean platform (1) by old flare tip (5) from flare boom (2) aisle guardrail (3) bottom is moved on ocean platform (1).
7. a kind of ocean platform replacing torch heads construction method of installation according to claim 6, it is characterized in that:Step 8: New flare tip handling:New flare tip (5) is moved to from ocean platform (1) by the suspension centre translated on ocean platform (1) On flare boom (2) aisle guardrail (3) bottom.
8. a kind of ocean platform replacing torch heads construction method of installation according to claim 1, it is characterized in that:Step 10 One:Pilot fire:Fire trial is carried out to new flare tip (5) with liquid gas storage tank.
9. a kind of ocean platform replacing torch heads construction method of installation according to claim 8, it is characterized in that:Step 10 One:Pilot fire:Fire trial is unqualified to re-start step 9:New flare tip installation, until fire trial is qualified.
CN201711127055.9A 2017-11-15 2017-11-15 A kind of ocean platform replacing torch heads construction method of installation Active CN107651590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711127055.9A CN107651590B (en) 2017-11-15 2017-11-15 A kind of ocean platform replacing torch heads construction method of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711127055.9A CN107651590B (en) 2017-11-15 2017-11-15 A kind of ocean platform replacing torch heads construction method of installation

Publications (2)

Publication Number Publication Date
CN107651590A true CN107651590A (en) 2018-02-02
CN107651590B CN107651590B (en) 2019-06-21

Family

ID=61121665

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711127055.9A Active CN107651590B (en) 2017-11-15 2017-11-15 A kind of ocean platform replacing torch heads construction method of installation

Country Status (1)

Country Link
CN (1) CN107651590B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2537964A1 (en) * 1982-12-15 1984-06-22 Verlinde Sa Unit formed by the drum of a hoist and its driving reduction gear, means for mounting in the framework of an assembly, and the assembly thus obtained.
CN200996605Y (en) * 2006-12-04 2007-12-26 中国船舶重工集团公司第七一一研究所 Self-unloading binding overhead torch and its loading-unloading system
CN201614230U (en) * 2010-01-15 2010-10-27 中国石化集团第十建设公司 Hoisting device for replacing torch heads
CN203889884U (en) * 2014-05-22 2014-10-22 天津开发区埃尼科技发展有限公司 Replacing and lifting device for torch head of ocean platform
CN105155418A (en) * 2015-08-16 2015-12-16 腾达建设集团股份有限公司 Construction method for bridge horizontal movement
CN105366576A (en) * 2015-09-25 2016-03-02 贵州新建业工程有限责任公司 Underground monorail crane
CN205476377U (en) * 2016-02-03 2016-08-17 江阴市建筑设计研究院有限公司 Skin construction scaffold convenient to installation
CN205892595U (en) * 2016-07-26 2017-01-18 中国葛洲坝集团电力有限责任公司 Hill slope rail transporting system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2537964A1 (en) * 1982-12-15 1984-06-22 Verlinde Sa Unit formed by the drum of a hoist and its driving reduction gear, means for mounting in the framework of an assembly, and the assembly thus obtained.
CN200996605Y (en) * 2006-12-04 2007-12-26 中国船舶重工集团公司第七一一研究所 Self-unloading binding overhead torch and its loading-unloading system
CN201614230U (en) * 2010-01-15 2010-10-27 中国石化集团第十建设公司 Hoisting device for replacing torch heads
CN203889884U (en) * 2014-05-22 2014-10-22 天津开发区埃尼科技发展有限公司 Replacing and lifting device for torch head of ocean platform
CN105155418A (en) * 2015-08-16 2015-12-16 腾达建设集团股份有限公司 Construction method for bridge horizontal movement
CN105366576A (en) * 2015-09-25 2016-03-02 贵州新建业工程有限责任公司 Underground monorail crane
CN205476377U (en) * 2016-02-03 2016-08-17 江阴市建筑设计研究院有限公司 Skin construction scaffold convenient to installation
CN205892595U (en) * 2016-07-26 2017-01-18 中国葛洲坝集团电力有限责任公司 Hill slope rail transporting system

Also Published As

Publication number Publication date
CN107651590B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN103342318B (en) Lifting device for steel truss inspection trolley working platform and installation method thereof
CN106193618B (en) A kind of aerial steel structure truss construction of Long span
CN100519396C (en) Gin pole integrated dismounting method for tower crane
CN110634344A (en) Hoisting operation experience device of large-scale shipbuilding factory
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
WO2013102460A1 (en) Suspension system for wind turbines
CN107651590A (en) A kind of ocean platform replacing torch heads construction method of installation
Liu et al. Safety control of hydraulic self-climbing formwork in south tower construction of Taizhou Bridge
CN104279525B (en) A kind of reversible aft anchor lamp socket
CN110820555A (en) Bridge maintenance vehicle and method for avoiding bridge pier by maintenance platform
CN111119493A (en) Construction method for integrally and synchronously lifting light steel keel
CN103422432A (en) Overhaul system of stayed cable of sing-cable-plane cable-stayed bridge and application thereof
CN110886214B (en) Mounting and dismounting method of maintenance platform for bridge maintenance vehicle
CN210209147U (en) Wind power tower cylinder door frame welding platform
CN110077963B (en) Installation method of large tank
CN103452043B (en) Maintenance system of cable-stayed bridge solid pylon and application of maintenance system
CN208306917U (en) Hydraulic control reversible head mast
CN205663226U (en) Super high -rise building thing top steel construction symmetry is hung and is drawn device
CN207175168U (en) Maintenance cage for vertical shaft
CN207175398U (en) Portable high-altitude lift work stage apparatus
CN206280720U (en) A kind of derrick low level installation and removal falling proof device
CN203393640U (en) Ship for detecting bridges in offshore low pier area
CN106320525B (en) Light shaft ceiling large span round steel tubular truss rotation-sliding construction method
CN205637829U (en) New bow cap rail device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240617

Address after: 300450 Tianjin Binhai New Area Tianjin Pilot Free Trade Zone (Central Business District) Hengfu Building North Tower 1-1-2404

Patentee after: Tianjin Jinbin Hongyi Construction Engineering Co.,Ltd.

Country or region after: China

Address before: 300457 Haiying Apartment-1511, No. 8 Huanghai Road, Economic and Technological Development Zone, Binhai New Area, Tianjin

Patentee before: TIANJIN DEVELOPMENT ZONE SANGBO TECHNICAL SERVICE CO.,LTD.

Country or region before: China