CN107651490A - A kind of electric cable rotary lift receives winding apparatus - Google Patents

A kind of electric cable rotary lift receives winding apparatus Download PDF

Info

Publication number
CN107651490A
CN107651490A CN201711021818.1A CN201711021818A CN107651490A CN 107651490 A CN107651490 A CN 107651490A CN 201711021818 A CN201711021818 A CN 201711021818A CN 107651490 A CN107651490 A CN 107651490A
Authority
CN
China
Prior art keywords
bull stick
around
cable
receipts
right sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711021818.1A
Other languages
Chinese (zh)
Inventor
乐甜桃
秦子淋
贺琛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711021818.1A priority Critical patent/CN107651490A/en
Publication of CN107651490A publication Critical patent/CN107651490A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/28Traversing devices; Package-shaping arrangements
    • B65H54/2803Traversing devices; Package-shaping arrangements with a traversely moving package
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/10Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers for making packages of specified shapes or on specified types of bobbins, tubes, cores, or formers
    • B65H54/20Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers for making packages of specified shapes or on specified types of bobbins, tubes, cores, or formers forming multiple packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/02Winding and traversing material on to reels, bobbins, tubes, or like package cores or formers
    • B65H54/40Arrangements for rotating packages
    • B65H54/44Arrangements for rotating packages in which the package, core, or former is engaged with, or secured to, a driven member rotatable about the axis of the package
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H54/00Winding, coiling, or depositing filamentary material
    • B65H54/70Other constructional features of yarn-winding machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Textile Engineering (AREA)
  • Manipulator (AREA)

Abstract

The present invention relates to a kind of cable to receive winding apparatus, more particularly to a kind of electric cable rotary lift receives winding apparatus.The technical problem to be solved in the present invention is to provide a kind of receipts can be made to be moved in the vertical direction around the object of cable, and receive and receive winding apparatus around uniform electric cable rotary lift.In order to solve the above-mentioned technical problem, the invention provides such a electric cable rotary lift to receive winding apparatus, includes mounting seat etc.;Elevating mechanism is connected with mounting seat, receipts are connected with elevating mechanism around mechanism.Moved in the vertical direction invention achieves object of the receipts around cable can be made, and receive around uniform effect, by being provided with elevating mechanism and receiving around mechanism, simple rotary motion can so be passed through, cable is can be realized as uniformly to receive around and being provided with bow and guide pad, can so ensure the horizontal feed of cable, facilitate the receipts of cable around and horizontal cable can be received more around uniform.

Description

A kind of electric cable rotary lift receives winding apparatus
Technical field
The present invention relates to a kind of cable to receive winding apparatus, more particularly to a kind of electric cable rotary lift receives winding apparatus.
Background technology
Typically by several or similar rope that several groups of wires (every group at least two) are twisted cable, every group of wire Between mutually insulated, and be often twisted into around a center, whole outside is surrounded by the coating of high-insulation.Cable has interior logical Electricity, the feature of external insulation.
Present cable receiving during is wrapped in cable on the object of one rotation, and winds cable Object can not move in the vertical direction, so cause cable to be received around only being received on a horizontal level of the object around causing The cable distribution on the object top, bottom and centre position is extremely uneven.
Therefore need badly research and development it is a kind of receipts can be made to be moved in the vertical direction around the object of cable, and receive around uniform electricity Cable rotary lifting-type receives winding apparatus, to overcome the object for winding cable in the prior art to move in the vertical direction, causes The shortcomings that cable distribution on the object top, bottom and centre position is extremely uneven.
The content of the invention
(1) technical problems to be solved
The present invention causes the object to overcome the object for winding cable in the prior art to move in the vertical direction The shortcomings that cable distribution on top, bottom and centre position is extremely uneven, the technical problem to be solved in the present invention is to provide one kind Receipts can be made to be moved in the vertical direction around the object of cable, and receive and receive winding apparatus around uniform electric cable rotary lift.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a electric cable rotary lift to receive winding apparatus, including There are mounting seat, elevating mechanism and receipts to be connected with elevating mechanism in mechanism, mounting seat, receipts are connected with elevating mechanism around mechanism.
Preferably, elevating mechanism include reducing motor, the first helical gear, guide rail, guide pin bushing, connecting rod, rolling bearing pedestal, First bull stick and the second helical gear, mounting seat crown center are connected with reducing motor, and the output shaft rear end of reducing motor is connected with First helical gear, the mounting seat top left and right sides are respectively connected with guide rail, and slidingtype is connected with guide pin bushing on guide rail, and the left and right sides is led Connecting rod is connected between set, rolling bearing pedestal is connected among connecting rod, the first bull stick is installed on rolling bearing pedestal, first The rear end of bull stick is connected with the second helical gear, and the second helical gear is located at the first helical gear surface, the second helical gear and first Helical gear engages.
Preferably, receive around mechanism include L-shaped installing plate, endless glide, sliding block, receipts around bucket, the first thrust metal and Second bull stick, the guide pin bushing outer wall of the left and right sides are respectively connected with L-shaped installing plate, and L-shaped installing plate inner top is connected with endless glide, ring Slidingtype is connected with sliding block on shape slide rail, and slider bottom is connected with receipts and is provided with first around bucket, the crown center of L-shaped installing plate and pushes away Power bearing block, the second bull stick is provided with the first thrust metal, and the bottom of the second bull stick is connected with receiving around bucket crown center.
Preferably, also include bow and guide pad, bow, the top of bow are respectively connected with left and right sides of mounting seat End is connected with guide pad, pilot hole is provided among guide pad, guide pad is positioned at receipts around the outside of bucket.
Preferably, lifter plate, the second thrust metal, belt pulley, flat belt and the 3rd bull stick, the left and right sides are also included Sliding block on be connected with lifter plate, the left and right sides and centre of lifter plate are respectively connected with the second thrust metal, the left and right sides It is connected at the top of second thrust metal and the second bull stick, the 3rd bull stick is installed on the second middle thrust metal, left side the The top of two bull sticks, the bottom of the bull stick of right side second and the 3rd bull stick up and down two be respectively connected with belt pulley, second turn of left side The belt pulley on the top of the belt pulley on the top of bar and the 3rd bull stick is located at same horizontal line, the skin of the bottom of the bull stick of right side second The belt pulley of the bottom of belt wheel and the 3rd bull stick is located at same horizontal line, by flat between the belt pulley in same horizontal line Belt transmission, the lifter plate top left and right sides are provided with through hole, and guide rail passes through through hole.
Preferably, also include first bevel gear and second bevel gear, be connected with first bevel gear on the first bull stick, first For bevel gear between rolling bearing pedestal and the second helical gear, the bottom of the 3rd bull stick is connected with second bevel gear, the second cone tooth Wheel engages with first bevel gear.
Preferably, also include spill spin block, handle, pin and external screw thread, receive and be provided with external screw thread around bucket bottom outer wall, receive around The mode that bottom of the barrel is connected through a screw thread is connected with spill spin block, and spill spin block crown center is provided with thread groove, thread groove and external screw thread Coordinate, two wall bottoms of spill spin block or so are respectively connected with handle, and the left and right sides is respectively connected with pin at the top of spill spin block.
Operation principle:When needing to be collected cable, staff will need the one end for winding cable preliminary first The receipts of the left and right sides are wrapped in mechanism, elevating mechanism is then turned on and drives whole receive to be moved up and down around mechanism, pass through simultaneously Rotate to receive and cable is received around mechanism around can so pass through simple rotary motion, it becomes possible to realize that cable is uniformly received Around.
Because elevating mechanism includes reducing motor, the first helical gear, guide rail, guide pin bushing, connecting rod, rolling bearing pedestal, One bull stick and the second helical gear, mounting seat crown center are connected with reducing motor, and the output shaft rear end of reducing motor is connected with One helical gear, the mounting seat top left and right sides are respectively connected with guide rail, and slidingtype is connected with guide pin bushing, the guide pin bushing of the left and right sides on guide rail Between be connected with connecting rod, rolling bearing pedestal is connected among connecting rod, the first bull stick is installed on rolling bearing pedestal, first turn The rear end of bar is connected with the second helical gear, and the second helical gear is located at the first helical gear surface, the second helical gear and first oblique Gear engages.When need to carry out cable receive around when, staff controls reducing motor to rotate, and the first helical gear rotates, due to the One helical gear and the second helical gear are intermeshed, and the second helical gear also concomitant rotation, this makes it possible to realize guide pin bushing on guide rail Up and down motion, so as to drive receive constantly moved up and down around mechanism, this makes it possible to rotate receive around mechanism while, make electricity Cable is uniformly wrapped in receipts in mechanism, and this makes it possible to realize the uniform receipts of cable around and easy to use.
Include L-shaped installing plate, endless glide, sliding block, receipts around bucket, the first thrust metal and second around mechanism because receiving Bull stick, the guide pin bushing outer wall of the left and right sides are respectively connected with L-shaped installing plate, and L-shaped installing plate inner top is connected with endless glide, and annular is sliding Slidingtype is connected with sliding block on rail, and slider bottom is connected with receipts and is provided with the first thrust axis around bucket, the crown center of L-shaped installing plate Bearing, the second bull stick is provided with the first thrust metal, and the bottom of the second bull stick is connected with receiving around bucket crown center.When entering When row cable is received around work, staff by rotating the second bull stick and receiving around bucket, makes one end of cable tentatively be wrapped in first Receive on bucket, then guide pin bushing is moved up and down by opening reducing motor, so as to realize receive around up and down motion, while the people that works Member constantly rotates the second bull stick, and cable can just be wrapped in receipts around bucket on bucket by the receipts so rotated, and move up and down Receipts around bucket cable can be made to be evenly distributed in receipts around bucket surface, as long as the simple bull stick of rotation second of such staff is just Can realize cable be uniformly wrapped in receipts on bucket so that cable receive around ratio it is more uniform.
Because also including bow and guide pad, bow, the top of bow are respectively connected with left and right sides of mounting seat Guide pad is connected with, pilot hole is provided among guide pad, guide pad is positioned at receipts around the outside of bucket.When needing to receive around cable, work Make personnel and one end of cable is passed through into pilot hole first, and be wrapped in receipts on bucket, can so ensure the horizontal defeated of cable Send, facilitate the receipts of cable around and horizontal cable can be received more around uniform.
Because also including lifter plate, the second thrust metal, belt pulley, flat belt and the 3rd bull stick, the left and right sides It is connected with lifter plate on sliding block, the left and right sides and centre of lifter plate are respectively connected with the second thrust metal, and the of the left and right sides Two thrust metals are provided with the 3rd bull stick, left side second with being connected at the top of the second bull stick on the second middle thrust metal The top of bull stick, the bottom of the bull stick of right side second and the 3rd bull stick up and down two be respectively connected with belt pulley, the bull stick of left side second The belt pulley on top and the belt pulley on top of the 3rd bull stick be located at same horizontal line, the belt of the bottom of the bull stick of right side second Wheel and the belt pulley of the bottom of the 3rd bull stick are located at same horizontal line, pass through flat skin between the belt pulley in same horizontal line V belt translation, the lifter plate top left and right sides are provided with through hole, and guide rail passes through through hole.When need rotate receive around when, staff only Need to rotate the 3rd bull stick, the 3rd bull stick drives middle pulley rotation, under the gearing of flat belt, the left and right sides Belt pulley also concomitant rotation, so as to realize the second bar rotation of the left and right sides, receive around bucket also concomitant rotation, such a work The cable that personnel can be realized as the left and right sides is received around work, is operated without two staff, is so greatly reduced The consumption of labour, and using more convenient.
Because also including first bevel gear and second bevel gear, first bevel gear, the first cone are connected with the first bull stick Gear is between rolling bearing pedestal and the second helical gear, and the bottom of the 3rd bull stick is connected with second bevel gear, second bevel gear Engaged with first bevel gear.While realizing that receipts move up and down around bucket, the first bull stick can be rotated constantly, first bevel gear Meeting concomitant rotation, the 3rd bull stick will rotate, and so as to realize the second bar rotation of the left and right sides, finally realize the left and right sides The rotation around bucket is received, so realizes the rotation received around bucket without manually, it is only necessary to control the rotation of reducing motor, it becomes possible to real The rotation and up and down motion around bucket are now received, greatly reduces the working strength of staff, cable is received around more convenient and practical.
Because also including spill spin block, handle, pin and external screw thread, receive and be provided with external screw thread around bucket bottom outer wall, receive around bucket The mode that bottom is connected through a screw thread is connected with spill spin block, and spill spin block crown center is provided with thread groove, and thread groove is matched somebody with somebody with external screw thread Close, two wall bottoms of spill spin block or so are respectively connected with handle, and the left and right sides is respectively connected with pin at the top of spill spin block.Needing to receive around electricity Before cable, spill spin block is screwed into receipts around bottom of the barrel by staff by handle first, can be had so during rotation Effect prevents cable from being dropped out from bottom during receiving, and prevents from hindering the receipts of cable around work, prevents cable from receiving around uneven, After receiving around completion, staff is again taken out spill spin block by handle, and such staff's can will receive the electricity wound Cable takes out from top to bottom from receipts on bucket.
(3) beneficial effect
Invention achieves object of the receipts around cable can be made to move in the vertical direction, and receive around uniform effect, By being provided with elevating mechanism and receiving around mechanism, it can so pass through simple rotary motion, it becomes possible to realize that cable is uniform Receive around, and be provided with bow and guide pad, can so ensure the horizontal feed of cable, facilitate the receipts of cable around, and Horizontal cable can be received more around uniform, be provided with lifter plate, the second thrust metal, belt pulley, flat belt and the 3rd bull stick, The cable that such a staff can be realized as the left and right sides is received around work, is operated without two staff, so The consumption of labour is greatly reduced, and uses and is more convenient, while is provided with first bevel gear and second bevel gear, is only needed Control the rotation of reducing motor, it becomes possible to realize the rotation and up and down motion received around bucket, greatly reduce the work of staff Make intensity, cable is received around more convenient and practicality, be additionally provided with spill spin block, handle, pin and external screw thread, the so mistake in rotation It can effectively prevent cable from being dropped out in receipts during from bottom in journey, the receipts for preventing from hindering cable prevent cable around work Receive around uneven.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Mark in accompanying drawing for:1- mounting seats, 2- elevating mechanisms, 201- reducing motors, the helical gears of 202- first, 203- are led Rail, 204- guide pin bushings, 205- connecting rods, 206- rolling bearing pedestals, the bull sticks of 207- first, the helical gears of 208- second, 3- are received around mechanism, 301-L shape installing plates, 302- endless glides, 303- sliding blocks, 304- are received around bucket, the thrust metals of 305- first, second turn of 306- Bar, 4- bows, 5- guide pads, 6- pilot holes, 7- lifter plates, the thrust metals of 8- second, 9- belt pulleys, 10- flat belts, 11- through holes, the bull sticks of 12- the 3rd, 13- first bevel gears, 14- second bevel gears, 15- spill spin blocks, 16- thread grooves, 17- handles, 18- pins, 19- external screw threads.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of electric cable rotary lift receives winding apparatus, as Figure 1-5, include mounting seat 1, elevating mechanism 2 and receive around Mechanism 3, elevating mechanism 2 is connected with mounting seat 1, receipts are connected with elevating mechanism 2 around mechanism 3.
Embodiment 2
A kind of electric cable rotary lift receives winding apparatus, as Figure 1-5, include mounting seat 1, elevating mechanism 2 and receive around Mechanism 3, elevating mechanism 2 is connected with mounting seat 1, receipts are connected with elevating mechanism 2 around mechanism 3.
Elevating mechanism 2 includes reducing motor 201, the first helical gear 202, guide rail 203, guide pin bushing 204, connecting rod 205, rolling Moving axis bearing 206, the first bull stick 207 and the second helical gear 208, the crown center of mounting seat 1 are connected with reducing motor 201, slow down The output shaft rear end of motor 201 is connected with the first helical gear 202, and the top of mounting seat 1 left and right sides is respectively connected with guide rail 203, led Slidingtype is connected with guide pin bushing 204 on rail 203, is connected with connecting rod 205 between the guide pin bushing 204 of the left and right sides, among connecting rod 205 Rolling bearing pedestal 206 is connected with, the first bull stick 207 is installed on rolling bearing pedestal 206, the rear end of the first bull stick 207 is connected with Second helical gear 208, the second helical gear 208 are located at the surface of the first helical gear 202, the second helical gear 208 and the first helical teeth The engagement of wheel 202.
Embodiment 3
A kind of electric cable rotary lift receives winding apparatus, as Figure 1-5, include mounting seat 1, elevating mechanism 2 and receive around Mechanism 3, elevating mechanism 2 is connected with mounting seat 1, receipts are connected with elevating mechanism 2 around mechanism 3.
Elevating mechanism 2 includes reducing motor 201, the first helical gear 202, guide rail 203, guide pin bushing 204, connecting rod 205, rolling Moving axis bearing 206, the first bull stick 207 and the second helical gear 208, the crown center of mounting seat 1 are connected with reducing motor 201, slow down The output shaft rear end of motor 201 is connected with the first helical gear 202, and the top of mounting seat 1 left and right sides is respectively connected with guide rail 203, led Slidingtype is connected with guide pin bushing 204 on rail 203, is connected with connecting rod 205 between the guide pin bushing 204 of the left and right sides, among connecting rod 205 Rolling bearing pedestal 206 is connected with, the first bull stick 207 is installed on rolling bearing pedestal 206, the rear end of the first bull stick 207 is connected with Second helical gear 208, the second helical gear 208 are located at the surface of the first helical gear 202, the second helical gear 208 and the first helical teeth The engagement of wheel 202.
Receive and include L-shaped installing plate 301, endless glide 302, sliding block 303, receipts around bucket 304, the first thrust axis around mechanism 3 The bull stick 306 of bearing 305 and second, the outer wall of guide pin bushing 204 of the left and right sides are respectively connected with L-shaped installing plate 301, in L-shaped installing plate 301 Top is connected with endless glide 302, and slidingtype is connected with sliding block 303 in endless glide 302, the bottom of sliding block 303 be connected with receipts around Bucket 304, the crown center of L-shaped installing plate 301 is provided with the first thrust metal 305, is provided with the first thrust metal 305 Second bull stick 306, the bottom of the second bull stick 306 are connected with receiving around the crown center of bucket 304.
Embodiment 4
A kind of electric cable rotary lift receives winding apparatus, as Figure 1-5, include mounting seat 1, elevating mechanism 2 and receive around Mechanism 3, elevating mechanism 2 is connected with mounting seat 1, receipts are connected with elevating mechanism 2 around mechanism 3.
Elevating mechanism 2 includes reducing motor 201, the first helical gear 202, guide rail 203, guide pin bushing 204, connecting rod 205, rolling Moving axis bearing 206, the first bull stick 207 and the second helical gear 208, the crown center of mounting seat 1 are connected with reducing motor 201, slow down The output shaft rear end of motor 201 is connected with the first helical gear 202, and the top of mounting seat 1 left and right sides is respectively connected with guide rail 203, led Slidingtype is connected with guide pin bushing 204 on rail 203, is connected with connecting rod 205 between the guide pin bushing 204 of the left and right sides, among connecting rod 205 Rolling bearing pedestal 206 is connected with, the first bull stick 207 is installed on rolling bearing pedestal 206, the rear end of the first bull stick 207 is connected with Second helical gear 208, the second helical gear 208 are located at the surface of the first helical gear 202, the second helical gear 208 and the first helical teeth The engagement of wheel 202.
Receive and include L-shaped installing plate 301, endless glide 302, sliding block 303, receipts around bucket 304, the first thrust axis around mechanism 3 The bull stick 306 of bearing 305 and second, the outer wall of guide pin bushing 204 of the left and right sides are respectively connected with L-shaped installing plate 301, in L-shaped installing plate 301 Top is connected with endless glide 302, and slidingtype is connected with sliding block 303 in endless glide 302, the bottom of sliding block 303 be connected with receipts around Bucket 304, the crown center of L-shaped installing plate 301 is provided with the first thrust metal 305, is provided with the first thrust metal 305 Second bull stick 306, the bottom of the second bull stick 306 are connected with receiving around the crown center of bucket 304.
Also include bow 4 and guide pad 5, the left and right sides of mounting seat 1 is respectively connected with bow 4, the top of bow 4 Guide pad 5 is connected with, pilot hole 6 is provided among guide pad 5, guide pad 5 is positioned at receipts around the outside of bucket 304.
Also include lifter plate 7, the second thrust metal 8, belt pulley 9, the bull stick 12 of flat belt 10 and the 3rd, the left and right sides Sliding block 303 on be connected with lifter plate 7, the left and right sides and centre of lifter plate 7 are respectively connected with the second thrust metal 8, left and right Second thrust metal 8 of both sides is connected with the top of the second bull stick 306, and the 3rd is provided with the second middle thrust metal 8 Bull stick 12, the top of the second bull stick of left side 306, the bottom of the second bull stick of right side 306 and the 3rd bull stick 12 up and down two connect Belt pulley 9 is connected to, the belt pulley 9 on the top of the second bull stick of left side 306 is with the belt pulley 9 on the top of the 3rd bull stick 12 positioned at same Horizontal line, the belt pulley 9 of the bottom of the bull stick 12 of belt pulley 9 and the 3rd of the bottom of the second bull stick of right side 306 are located at same level Line, it is driven by flat belt 10 between the belt pulley 9 in same horizontal line, the top of lifter plate 7 left and right sides is provided with logical Hole 11, guide rail 203 pass through through hole 11.
Also include first bevel gear 13 and second bevel gear 14, first bevel gear 13 is connected with the first bull stick 207, the One bevel gear 13 is located between the helical gear 208 of rolling bearing pedestal 206 and second, and the bottom of the 3rd bull stick 12 is connected with the second cone tooth Wheel 14, second bevel gear 14 engages with first bevel gear 13.
Also include spill spin block 15, handle 17, pin 18 and external screw thread 19, receive and be provided with external screw thread around the bottom outer wall of bucket 304 19, receive the mode being connected through a screw thread around the bottom of bucket 304 and be connected with spill spin block 15, the crown center of spill spin block 15 is provided with thread groove 16, thread groove 16 coordinates with external screw thread 19, and the wall bottom of spill spin block 15 or so two is respectively connected with handle 17, the top of spill spin block 15 left and right Both sides are respectively connected with pin 18.
Operation principle:When needing to be collected cable, staff will need the one end for winding cable preliminary first The receipts of the left and right sides are wrapped in mechanism 3, elevating mechanism 2 is then turned on and drives whole receive to be moved up and down around mechanism 3, lead to simultaneously Cross rotation and receive and cable is received around mechanism 3 around can so pass through simple rotary motion, it becomes possible to realize that cable is uniform Receive around.
Because elevating mechanism 2 includes reducing motor 201, the first helical gear 202, guide rail 203, guide pin bushing 204, connecting rod 205th, rolling bearing pedestal 206, the first bull stick 207 and the second helical gear 208, the crown center of mounting seat 1 are connected with reducing motor 201, the output shaft rear end of reducing motor 201 is connected with the first helical gear 202, and the top of mounting seat 1 left and right sides, which is respectively connected with, leads Rail 203, slidingtype is connected with guide pin bushing 204 on guide rail 203, and connecting rod 205 is connected between the guide pin bushing 204 of the left and right sides, connects Rolling bearing pedestal 206 is connected among bar 205, the first bull stick 207 is installed on rolling bearing pedestal 206, after the first bull stick 207 End is connected with the second helical gear 208, and the second helical gear 208 be located at the surface of the first helical gear 202, the second helical gear 208 and First helical gear 202 engages.When need carry out cable receive around when, staff control reducing motor 201 rotate, the first helical gear 202 rotate, because the first helical gear 202 and the second helical gear 208 are intermeshed, the second helical gear 208 also concomitant rotation, so Up and down motion of the guide pin bushing 204 on guide rail 203 is can be realized as, is constantly moved up and down around mechanism 3 so as to drive to receive, thus Cable can be made uniformly to be wrapped in receipts in mechanism 3, this makes it possible to realize cable while receipts are rotated around mechanism 3 Uniformly receive around and easy to use.
Pushed away because receiving and including L-shaped installing plate 301, endless glide 302, sliding block 303, receipts around mechanism 3 around bucket 304, first The bull stick 306 of power bearing block 305 and second, the outer wall of guide pin bushing 204 of the left and right sides are respectively connected with L-shaped installing plate 301, L-shaped installing plate 301 inner tops are connected with endless glide 302, and slidingtype is connected with sliding block 303 in endless glide 302, and the bottom of sliding block 303 is connected with Receipts are provided with the first thrust metal 305, pacified on the first thrust metal 305 around bucket 304, the crown center of L-shaped installing plate 301 Equipped with the second bull stick 306, the bottom of the second bull stick 306 is connected with receiving around the crown center of bucket 304.When cable to be carried out is received around work When, staff around bucket 304, makes one end of cable tentatively be wrapped in receipts around bucket 304 by rotating the second bull stick 306 and receiving first On, then guide pin bushing 204 is moved up and down by opening reducing motor 201, so as to realize receive around up and down motion, while the people that works Member constantly rotates the second bull stick 306, and cable can just be wrapped in receipts around bucket 304 on bucket 304 by the receipts so rotated, and The receipts of up and down motion can make cable be evenly distributed in receipts around the surface of bucket 304 around bucket 304, as long as such staff is simple Rotate the second bull stick 306 can be realized as cable be uniformly wrapped in receipts on bucket 304 so that cable receive around comparison it is equal It is even.
Because also including bow 4 and guide pad 5, the left and right sides of mounting seat 1 is respectively connected with bow 4, bow 4 Top is connected with guide pad 5, pilot hole 6 is provided among guide pad 5, guide pad 5 is positioned at receipts around the outside of bucket 304.When needing to receive During around cable, one end of cable is passed through pilot hole 6 by staff first, and is wrapped in receipts on bucket 304, can so be protected The horizontal feed of cable is demonstrate,proved, facilitates the receipts of cable around and horizontal cable can be received more around uniform.
Because also include lifter plate 7, the second thrust metal 8, belt pulley 9, the bull stick 12 of flat belt 10 and the 3rd, left and right Lifter plate 7 is connected with the sliding block 303 of both sides, the left and right sides and centre of lifter plate 7 are respectively connected with the second thrust metal 8, Second thrust metal 8 of the left and right sides is connected with the top of the second bull stick 306, is provided with the second middle thrust metal 8 3rd bull stick 12, the top of the second bull stick of left side 306, two up and down of the bottom of the second bull stick of right side 306 and the 3rd bull stick 12 Belt pulley 9 is respectively connected with, the belt pulley 9 and the belt pulley 9 on the top of the 3rd bull stick 12 on the top of the second bull stick of left side 306 are located at Same horizontal line, the belt pulley 9 of the bottom of the second bull stick of right side 306 is with the belt pulley 9 of the bottom of the 3rd bull stick 12 positioned at same Horizontal line, it is driven by flat belt 10 between the belt pulley 9 in same horizontal line, the top of lifter plate 7 left and right sides is opened There is through hole 11, guide rail 203 passes through through hole 11.When need rotate receive around when, staff only need rotate the 3rd bull stick 12, the 3rd Bull stick 12 drives the belt pulley 9 of centre to rotate, and under the gearing of flat belt 10, the belt pulley 9 of the left and right sides also turns therewith It is dynamic, so as to realize that the second bull stick 306 of the left and right sides rotates, receive around bucket 304 also concomitant rotation, such a staff is with regard to energy Enough cables for realizing the left and right sides are received around work, are operated without two staff, are so greatly reduced labour's Consumption, and using more convenient.
Because also including first bevel gear 13 and second bevel gear 14, first bevel gear is connected with the first bull stick 207 13, first bevel gear 13 is located between the helical gear 208 of rolling bearing pedestal 206 and second, and the bottom of the 3rd bull stick 12 is connected with Two bevel gears 14, second bevel gear 14 engage with first bevel gear 13.While realizing that receipts move up and down around bucket 304, first Bull stick 207 can be rotated constantly, first bevel gear 13 also can concomitant rotation, the 3rd bull stick 12 will rotate, so as to realize left and right Second bull stick 306 of both sides rotates, and rotation of the left and right sides receipts around bucket 304 is finally realized, so without manually being received to realize Around the rotation of bucket 304, it is only necessary to control the rotation of reducing motor 201, it becomes possible to realize rotation and the upper and lower fortune received around bucket 304 It is dynamic, the working strength of staff is greatly reduced, cable is received around more convenient and practical.
Because also including spill spin block 15, handle 17, pin 18 and external screw thread 19, receive around the bottom outer wall of bucket 304 provided with outer Screw thread 19, receive the mode being connected through a screw thread around the bottom of bucket 304 and be connected with spill spin block 15, the crown center of spill spin block 15 is provided with screw thread Groove 16, thread groove 16 coordinate with external screw thread 19, and the wall bottom of spill spin block 15 or so two is respectively connected with handle 17, the top left of spill spin block 15 Right both sides are respectively connected with pin 18.Needing to receive before cable, staff is first screwed in spill spin block 15 by handle 17 It to receiving around the bottom of bucket 304, can effectively prevent cable from being dropped out in receipts during from bottom so during rotation, prevent The receipts of cable are only hindered around work, prevent cable from receiving around uneven, after receiving around completion, staff passes through handle 17 again will Spill spin block 15 takes out, and such staff's can takes out the cable that receipts are wound from receipts from top to bottom on bucket 304.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of electric cable rotary lift receives winding apparatus, it is characterised in that include mounting seat (1), elevating mechanism (2) and receipts around Mechanism (3), elevating mechanism (2) is connected with mounting seat (1), receipts are connected with elevating mechanism (2) around mechanism (3).
2. a kind of electric cable rotary lift according to claim 1 receives winding apparatus, it is characterised in that elevating mechanism (2) wraps Reducing motor (201), the first helical gear (202), guide rail (203), guide pin bushing (204), connecting rod (205), rolling bearing pedestal are included (206), the first bull stick (207) and the second helical gear (208), mounting seat (1) crown center are connected with reducing motor (201), subtracted The output shaft rear end of speed motor (201) is connected with the first helical gear (202), and mounting seat (1) the top left and right sides, which is respectively connected with, leads Rail (203), slidingtype is connected with guide pin bushing (204) on guide rail (203), and connecting rod is connected between the guide pin bushing (204) of the left and right sides (205) rolling bearing pedestal (206), is connected among connecting rod (205), rolling bearing pedestal is provided with the first bull stick on (206) (207), the rear end of the first bull stick (207) is connected with the second helical gear (208), and the second helical gear (208) is located at the first helical gear (202) surface, the second helical gear (208) engage with the first helical gear (202).
3. a kind of electric cable rotary lift according to claim 2 receives winding apparatus, it is characterised in that receives and is wrapped around mechanism (3) Included L-shaped installing plate (301), endless glide (302), sliding block (303), receive around bucket (304), the first thrust metal (305) and Second bull stick (306), guide pin bushing (204) outer wall of the left and right sides are respectively connected with L-shaped installing plate (301), and L-shaped installing plate (301) is interior Top is connected with endless glide (302), and slidingtype is connected with sliding block (303) in endless glide (302), and sliding block (303) bottom connects It is connected to receipts and the first thrust metal (305), the first thrust axis is installed around bucket (304), the crown center of L-shaped installing plate (301) Second bull stick (306) is installed, the bottom of the second bull stick (306) is connected with receiving around bucket (304) crown center in bearing (305).
4. a kind of electric cable rotary lift according to claim 3 receives winding apparatus, it is characterised in that also includes bow (4) and guide pad (5), mounting seat (1) left and right sides are respectively connected with bow (4), and the top of bow (4) is connected with guide pad (5) pilot hole (6), is provided among guide pad (5), guide pad (5) is positioned at receipts around the outside of bucket (304).
5. a kind of electric cable rotary lift according to claim 4 receives winding apparatus, it is characterised in that also includes lifter plate (7), the second thrust metal (8), belt pulley (9), flat belt (10) and the 3rd bull stick (12), the sliding block (303) of the left and right sides On be connected with lifter plate (7), the left and right sides and centre of lifter plate (7) are respectively connected with the second thrust metal (8), the left and right sides The second thrust metal (8) and the second bull stick (306) at the top of be connected, the is provided with middle the second thrust metal (8) Three bull sticks (12), the top of the bull stick of left side second (306), the bottom of the bull stick of right side second (306) and the 3rd bull stick (12) it is upper Lower two are respectively connected with belt pulley (9), and the belt pulley (9) on the top of the bull stick of left side second (306) is upper with the 3rd bull stick (12) The belt pulley (9) in portion is located at same horizontal line, belt pulley (9) and the 3rd bull stick (12) of the bottom of the bull stick of right side second (306) The belt pulley (9) of bottom be located at same horizontal line, pass through flat belt (10) between the belt pulley (9) in same horizontal line Transmission, lifter plate (7) the top left and right sides are provided with through hole (11), and guide rail (203) passes through through hole (11).
6. a kind of electric cable rotary lift according to claim 5 receives winding apparatus, it is characterised in that also includes the first cone Gear (13) and second bevel gear (14), first bevel gear (13), first bevel gear (13) position are connected with the first bull stick (207) Between rolling bearing pedestal (206) and the second helical gear (208), the bottom of the 3rd bull stick (12) is connected with second bevel gear (14), second bevel gear (14) engages with first bevel gear (13).
7. a kind of electric cable rotary lift according to claim 6 receives winding apparatus, it is characterised in that also includes spill spin block (15), handle (17), pin (18) and external screw thread (19), receive and be provided with external screw thread (19) around bucket (304) bottom outer wall, receive around bucket (304) mode that bottom is connected through a screw thread is connected with spill spin block (15), and spill spin block (15) crown center is provided with thread groove (16), Thread groove (16) coordinates with external screw thread (19), and two wall bottoms of spill spin block (15) left and right are respectively connected with handle (17), spill spin block (15) Pin (18) is respectively connected with left and right sides of top.
CN201711021818.1A 2017-10-27 2017-10-27 A kind of electric cable rotary lift receives winding apparatus Withdrawn CN107651490A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711021818.1A CN107651490A (en) 2017-10-27 2017-10-27 A kind of electric cable rotary lift receives winding apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711021818.1A CN107651490A (en) 2017-10-27 2017-10-27 A kind of electric cable rotary lift receives winding apparatus

Publications (1)

Publication Number Publication Date
CN107651490A true CN107651490A (en) 2018-02-02

Family

ID=61095530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711021818.1A Withdrawn CN107651490A (en) 2017-10-27 2017-10-27 A kind of electric cable rotary lift receives winding apparatus

Country Status (1)

Country Link
CN (1) CN107651490A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108891994A (en) * 2018-07-24 2018-11-27 深圳市中科睿金贵材科技有限公司 One kind being used for gold and silver wire rod coil device
CN110835005A (en) * 2019-10-16 2020-02-25 徐飞 Bobbin movement device for winding machine based on intermittent movement principle
CN110902473A (en) * 2019-12-11 2020-03-24 湖州创塑新材科技有限公司 Full-automatic winding device for cloth textile line

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB967392A (en) * 1960-12-15 1964-08-19 Pierre Dillies Spinning machine for the production of cops
US6260781B1 (en) * 1998-12-16 2001-07-17 Lincoln Global, Inc. Method and apparatus for packing wire in a storage drum
CN202038766U (en) * 2011-03-31 2011-11-16 陈芳 Welding wire barrel packing machine
CN104003246A (en) * 2014-06-11 2014-08-27 无锡通用钢绳有限公司 Steel rope winding device with height-adjustable winding shaft
CN204057466U (en) * 2014-06-11 2014-12-31 无锡通用钢绳有限公司 A kind of steel cable wind of adjustable winding axle height
CN204111061U (en) * 2014-09-16 2015-01-21 浙江中德实业有限公司 For the lifting mode closed tube wheel construction of PPR coil pipe
CN205312761U (en) * 2015-12-03 2016-06-15 国家电网公司 Automatic power earth line winding device
CN205709160U (en) * 2016-04-01 2016-11-23 中国建筑第七工程局有限公司 A kind of novel cable rolling-up mechanism of band lowering or hoisting gear
CN205731965U (en) * 2016-05-05 2016-11-30 刘明杲 A kind of fast vibration sieve powder device
CN206288794U (en) * 2016-12-27 2017-06-30 国网山东省电力公司蓬莱市供电公司 Electric power cable retracting device
CN106995159A (en) * 2017-05-15 2017-08-01 湖州市澳蓝电力科技有限责任公司 A kind of cable laying traction winding device
CN206427854U (en) * 2016-11-30 2017-08-22 杨益 A kind of efficient wrap-up of heat-shrink tube
CN107150926A (en) * 2017-06-21 2017-09-12 何水明 A kind of power cable device
CN206544845U (en) * 2017-03-03 2017-10-10 湖南华升服饰股份有限公司 Lift take-up

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB967392A (en) * 1960-12-15 1964-08-19 Pierre Dillies Spinning machine for the production of cops
US6260781B1 (en) * 1998-12-16 2001-07-17 Lincoln Global, Inc. Method and apparatus for packing wire in a storage drum
CN202038766U (en) * 2011-03-31 2011-11-16 陈芳 Welding wire barrel packing machine
CN104003246A (en) * 2014-06-11 2014-08-27 无锡通用钢绳有限公司 Steel rope winding device with height-adjustable winding shaft
CN204057466U (en) * 2014-06-11 2014-12-31 无锡通用钢绳有限公司 A kind of steel cable wind of adjustable winding axle height
CN204111061U (en) * 2014-09-16 2015-01-21 浙江中德实业有限公司 For the lifting mode closed tube wheel construction of PPR coil pipe
CN205312761U (en) * 2015-12-03 2016-06-15 国家电网公司 Automatic power earth line winding device
CN205709160U (en) * 2016-04-01 2016-11-23 中国建筑第七工程局有限公司 A kind of novel cable rolling-up mechanism of band lowering or hoisting gear
CN205731965U (en) * 2016-05-05 2016-11-30 刘明杲 A kind of fast vibration sieve powder device
CN206427854U (en) * 2016-11-30 2017-08-22 杨益 A kind of efficient wrap-up of heat-shrink tube
CN206288794U (en) * 2016-12-27 2017-06-30 国网山东省电力公司蓬莱市供电公司 Electric power cable retracting device
CN206544845U (en) * 2017-03-03 2017-10-10 湖南华升服饰股份有限公司 Lift take-up
CN106995159A (en) * 2017-05-15 2017-08-01 湖州市澳蓝电力科技有限责任公司 A kind of cable laying traction winding device
CN107150926A (en) * 2017-06-21 2017-09-12 何水明 A kind of power cable device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108891994A (en) * 2018-07-24 2018-11-27 深圳市中科睿金贵材科技有限公司 One kind being used for gold and silver wire rod coil device
CN108891994B (en) * 2018-07-24 2020-04-07 深圳市中科睿金贵材科技有限公司 Be used for gold and silver wire rod winding device
CN110835005A (en) * 2019-10-16 2020-02-25 徐飞 Bobbin movement device for winding machine based on intermittent movement principle
CN110902473A (en) * 2019-12-11 2020-03-24 湖州创塑新材科技有限公司 Full-automatic winding device for cloth textile line

Similar Documents

Publication Publication Date Title
CN107651490A (en) A kind of electric cable rotary lift receives winding apparatus
CN112421490A (en) Transmission line double-conductor pulley
CN208521695U (en) A kind of cable stranding machine
CN111525460A (en) Power cable recovery unit that skins
CN107651626A (en) A kind of worker repairs natural gas line auxiliary equipment
CN109036723A (en) A kind of cable strand device
CN107821123A (en) A kind of hose fed travelling sprinkler machine with automatic fixing function based on Internet of Things
CN112193937A (en) Cable processing is with coiling equipment of restrainting
CN209297830U (en) The high-speed cable stranding-up machine of function admirable
CN208607971U (en) A kind of untwisting machine
CN107840191A (en) A kind of silica gel high-voltage line uniformly receives winding apparatus with lift
CN206947034U (en) The cable-former for being easy to cable to guide
CN216336318U (en) Reel device for hoisting equipment
CN205998783U (en) A kind of ship cable winding stand
CN108483295A (en) A kind of automatic rope guide of hoist
CN213111940U (en) Door profile line frame
CN202090827U (en) Electric drilling rig
CN208400622U (en) Disc type stranding machine and its nothing, which are drawn, takes disk winch host
CN212893453U (en) Frequency conversion dual drive electric rotary lifting hook
CN210827143U (en) Bridge turning system based on double power mechanisms
CN209210263U (en) A kind of rope-arranging mechanism for hoist engine
CN109896432B (en) Bridge crane equipment
CN208150703U (en) A kind of power supply for construction cable take-up
CN209338008U (en) A kind of integrated electric winch
CN113264446A (en) Fire-fighting pipeline hoisting device for fire engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180202

WW01 Invention patent application withdrawn after publication