CN107642366A - 城市地下盾构机双向出土技术 - Google Patents

城市地下盾构机双向出土技术 Download PDF

Info

Publication number
CN107642366A
CN107642366A CN201610568766.9A CN201610568766A CN107642366A CN 107642366 A CN107642366 A CN 107642366A CN 201610568766 A CN201610568766 A CN 201610568766A CN 107642366 A CN107642366 A CN 107642366A
Authority
CN
China
Prior art keywords
shield machine
concrete
technology
unearthed
way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610568766.9A
Other languages
English (en)
Inventor
朱连吉
孟立彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Renqiu Yongji Construction and Installation Engineering Co Ltd
Original Assignee
Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Renqiu Yongji Construction and Installation Engineering Co Ltd filed Critical Renqiu Yongji Construction and Installation Engineering Co Ltd
Priority to CN201610568766.9A priority Critical patent/CN107642366A/zh
Publication of CN107642366A publication Critical patent/CN107642366A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

城市地下盾构机双向出土技术,其特征在于:螺旋输送机进土口分布在刀头两侧在中间合并。本发明具有以下优点:施工速度快,免于运输管片,降低运输成本,对环境影响小,管道一次成型强度高,推进速度快。

Description

城市地下盾构机双向出土技术
技术领域
本发明涉及一种隧道挖掘技术,属于市政建设领域。
背景技术
综合管廊(日本称“共同沟”、台湾称“共同管道”),就是地下城市管道综合走廊。即在城市地下建造一个隧道空间,将电力、通讯,燃气、供热、给排水等各种工程管线集于一体,设有专门的检修口、吊装口和监测系统,实施统一规划、统一设计、统一建设和管理,是保障城市运行的重要基础设施和“生命线”。
我国城市化密集度的发展是扭曲的,按照传统的规划理念已经很难满足现状发展要求,与居住相配套的市政管线,如中水、排水、雨水、自来水、电力、通信、燃气、热力如果各走各自的路由,对于检修及增容都是一个挑战,往往花费是成倍的增长,加之容量富余量受限于地方规划指数影响,做城市大管廊的趋势势在必行。
在国外地下综合管廊的本体工程施工一般有明挖现浇法、明挖预制拼装法、盾构、顶管等。而从国内已建的地下综合管廊工程来看,多以明挖现浇法为主,该施工工法成本较低,然而其对环境影响较大。
发明内容
本发明的目的在于克服现有技术的不足,设计城市地下盾构机双向出土技术。
本发明涉及城市地下盾构机双向出土技术,该技术由简易盾构机、滑模套筒浇筑系统,混凝土泵站等设备实施。简易盾构机分为盾构机刀头、盾构机盾体、主驱动系统、螺旋输送机、皮带输送机、液压固定装置、液压推进装置等构成。该设备运行时,盾构机刀头在前方挖掘土石,挖掘的土石通过分布在刀头的两台螺旋输送机和皮带输送机输送到隧道外,螺旋输送机进土口分布在刀头两侧在中间合并,主驱动装置通过液压系统拖拽滑模套筒浇筑系统前进,液压固定装置为固定在盾体上的装置为液压推进装置提供驱动力和起到固定作用,盾体为整个盾构机提供工作环境,支撑土石区。
滑模套筒浇筑系统由混凝土泵送管,现浇混凝土内壁套筒、现浇混凝土外壁套筒、混凝土浇筑管、混凝土泵车、混凝土隔板组成,该系统运行时,由前方简易盾构机挖掘出工作环境,由混凝土泵送管将混凝土泵车内混凝土泵送至混凝土浇筑管,混凝土浇筑管将混凝土浇筑于现浇混凝土内壁套筒和现浇混凝土外壁套筒之间,混凝土采用速凝混凝土,使其快速达到工作强度,并使用混凝土隔板对混凝土进行阻隔,混凝土隔板位于现浇混凝土套筒内壁与套筒外壁之间,混凝土浇筑管通过混凝土隔板探入两套筒之间,当混凝土浇筑完成并达到指定强度后,由液压推进装置通过挤压混凝土隔板使盾构机前进,然后通过主驱动装置上的液压构件拖拽滑模套筒系统前进并进行下一步浇筑作业。
本发明具有以下优点:施工速度快,免于运输管片,降低运输成本,对环境影响小,管道一次成型强度高,推进速度快。
附图说明
附图1为设备侧面图,附图2是螺旋输送机示意图。
附图标记:1是盾构机盾体,2是刀头,3是螺旋输送机,4是主驱动系统,5是现浇混凝土外壁套筒,6是混凝土浇筑管,7是现浇混凝土内壁套筒,8是混凝土泵送管,9是混凝土泵车,10是液压固定装置,11是混凝土隔板,12是液压推进装置。
具体实施方式
以下将结合附图对本发明进行详细描述。但本发明的实施方式并不限于此。
参照附图1,该设备运行时,盾构机刀头2在前方挖掘土石,挖掘的土石通过螺旋输送机3和皮带输送机输送到隧道外,主驱动装置4通过液压系统驱使盾构机前进并拖拽滑模套筒浇筑系统前进,液压固定装置10为液压推进装置12提供驱动力和起到固定作用,盾体1为整个盾构机提供工作环境,支撑土石区。
该系统运行时,由前方简易盾构机挖掘出工作环境,由混凝土泵送管8将混凝土泵车9内混凝土泵送至混凝土浇筑管6,混凝土浇筑管6将混凝土浇筑于现浇混凝土内壁套筒7和现浇混凝土外壁套筒5之间,混凝土采用速凝混凝土,使其快速达到工作强度,并使用混凝土隔板11对混凝土进行阻隔,当混凝土浇筑完成并达到指定强度后,由液压推进装置12通过挤压混凝土隔板11使盾构机前进,然后通过主驱动装置4上的液压构件拖拽滑模套筒系统前进并进行下一步浇筑作业。。
本发明不局限于上述实施方式,任何人在本发明的启示下都可以得出其他各种形式的产品。凡依本发明申请专利范围所做的均等变化与修饰,皆应属于本发明的涵盖范围。

Claims (1)

1.城市地下盾构机双向出土技术,其特征在于:螺旋输送机进土口分布在刀头两侧在中间合并。
CN201610568766.9A 2016-07-20 2016-07-20 城市地下盾构机双向出土技术 Pending CN107642366A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610568766.9A CN107642366A (zh) 2016-07-20 2016-07-20 城市地下盾构机双向出土技术

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610568766.9A CN107642366A (zh) 2016-07-20 2016-07-20 城市地下盾构机双向出土技术

Publications (1)

Publication Number Publication Date
CN107642366A true CN107642366A (zh) 2018-01-30

Family

ID=61108326

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610568766.9A Pending CN107642366A (zh) 2016-07-20 2016-07-20 城市地下盾构机双向出土技术

Country Status (1)

Country Link
CN (1) CN107642366A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1546840A (zh) * 2003-12-04 2004-11-17 上海隧道工程股份有限公司 偏心多轴多刀盘式掘进机
CN201705360U (zh) * 2010-04-13 2011-01-12 唐兆连 一种盾构机
CN202202868U (zh) * 2011-09-05 2012-04-25 天津第六市政公路工程有限公司 土压平衡顶管泥水出土装置
CN203476341U (zh) * 2013-08-05 2014-03-12 中铁十二局集团第二工程有限公司 一种盾构机
CN204703907U (zh) * 2015-05-19 2015-10-14 重庆睿安特盾构技术有限公司 一种新型盾构机

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1546840A (zh) * 2003-12-04 2004-11-17 上海隧道工程股份有限公司 偏心多轴多刀盘式掘进机
CN201705360U (zh) * 2010-04-13 2011-01-12 唐兆连 一种盾构机
CN202202868U (zh) * 2011-09-05 2012-04-25 天津第六市政公路工程有限公司 土压平衡顶管泥水出土装置
CN203476341U (zh) * 2013-08-05 2014-03-12 中铁十二局集团第二工程有限公司 一种盾构机
CN204703907U (zh) * 2015-05-19 2015-10-14 重庆睿安特盾构技术有限公司 一种新型盾构机

Similar Documents

Publication Publication Date Title
CN104695971B (zh) 一种环形顶管施工方法
AU2014407470B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN105297807B (zh) 一种具有自动回填功能的综合管沟明挖掘进机
CN103277108A (zh) 泥水盾构水下到达施工工法
CN104712339A (zh) 一种环形顶管机
CN107131001A (zh) 一种兼输水和交通功能的高速铁路隧道
CN107460882A (zh) 一种深基坑封闭止水的支护排桩施工方法
CN103643961A (zh) 无端头加固盾构接收结构及接收方法
CN106593470A (zh) 高渗透性富水砂层盾构端头加固体系及其施工方法
CN105401593A (zh) 一种装配式方形地下管廊
CN102287207B (zh) 一种有关小断面隧洞严重塌方的拼装顶进法
CN104790964A (zh) 一种盾构机在洞口偏离情况下出洞的施工方法
CN105065040B (zh) 一种顶板预制的地下空间暗挖构筑方法
CN203669876U (zh) 无端头加固盾构接收结构
CN104790381B (zh) 基于uea微膨胀剂的内衬墙混凝土浇注逆作方法
CN208058113U (zh) 一种施工顶管的修正施工系统
CN210370655U (zh) 一种顶管机
CN101538832A (zh) 大型箱体二维顶进控制施工方法
CN104929655B (zh) 一种降低地铁盾构隧道洞门施工风险的方法
CN107642366A (zh) 城市地下盾构机双向出土技术
CN107142957B (zh) 一种城市综合管廊步履式循环施工系统及其方法
CN101141054A (zh) 一种防止非开挖水平钻孔后地面沉降的压密注浆方法
CN107642363A (zh) 城市地下盾构机与自动滑模联动技术
CN109119943A (zh) 电缆在顶管两端的敷设方式优化方法
CN107642369A (zh) 城市地下盾构机混凝土的密实技术

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180130

WD01 Invention patent application deemed withdrawn after publication