CN107634275A - Battery management method, charging cabinet and battery management system - Google Patents
Battery management method, charging cabinet and battery management system Download PDFInfo
- Publication number
- CN107634275A CN107634275A CN201710832805.6A CN201710832805A CN107634275A CN 107634275 A CN107634275 A CN 107634275A CN 201710832805 A CN201710832805 A CN 201710832805A CN 107634275 A CN107634275 A CN 107634275A
- Authority
- CN
- China
- Prior art keywords
- battery
- mark
- charging
- curve
- cycle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Abstract
Disclose a kind of battery management method, charging cabinet and battery management system, pre-provisioning request is met by the charging curve or discharge curve that detect battery to record the cycle-index of battery, and when the maximum electricity decay by detecting battery reaches drop threshold, control battery prohibits the use of, and judge whether the cycle-index of battery reaches quality guarantee threshold value, and then make quality guarantee mark or retired mark.The disclosure can accurately detect the state of recovery battery, effectively cascade utilization recovery battery.
Description
Technical field
The present invention relates to field of battery management, and in particular to a kind of battery management method, charging cabinet and battery management system.
Background technology
In use for some time, capacity or the power characteristic decline of battery are obvious, it is impossible to give for the battery of electric car
Electric car brings the power of abundance, it is necessary to retired from power in the market.But there is event in the existing retired battery of usually working as of battery
Barrier can not either use completely or manufacturer's periodic detection can be just recovered.After battery recycling, due to the limitation of testing conditions, nothing
Method accurately detects the state of recovery battery, it is impossible to which the battery of recovery is accurately classified.Therefore, carried out again to battery
During secondary utilization, effectively cascade utilization is difficult to realize, causes the waste of energy.
The content of the invention
In view of this, the disclosure provides a kind of battery management method, charging cabinet and battery management system, can accurately examine
The recovery state of battery is measured, effectively utilizes recovery battery.
First aspect, there is provided a kind of battery management method, including:
Battery records discharge curve in discharge process;
Charging cabinet receives the mark and discharge curve of battery when being connected to the battery for needing to charge;
The mark and discharge curve of battery are sent to server;
Charging cabinet records the mark and charging curve of battery in charging process;
Charging cabinet sends the mark and charging curve of battery to the server after the charging terminates;
Server is when the discharge curve or the charging curve meet pre-provisioning request, by the cycle-index of the battery
Increase is once;
When the maximum electricity decay of charging cabinet detection battery reaches drop threshold, battery is forbidden to be continuing with concurrent power transmission pond
Mark and disabling notice.
Preferably, methods described also includes:
The cycle-index of server battery according to corresponding to obtaining the battery identification;
When the cycle-index of the battery is less than quality guarantee threshold value, quality guarantee is set to mark for the battery.
Preferably, methods described also includes:
When the maximum electricity for detecting battery is decayed and is not up to drop threshold, battery is continuing with.
Preferably, methods described also includes:
When the cycle-index for being sent the battery for disabling notice exceedes quality guarantee threshold value, retired mark is set for the battery
Know.
Preferably, the quality guarantee threshold value is counted to calculate according to the maximum cycle of all batteries of record and obtained.
Second aspect, there is provided a kind of charging cabinet, including:
Multiple battery compartments, each battery compartment are provided with connecting interface, are adapted to battery and are charged and communicated;
Memory, for storing computer program instructions;
Controller, it is connected by the connecting interface with battery, the controller is adapted for carrying out the memory storage
Computer program instructions are to realize following steps:
Receive the mark and discharge curve of battery;
Send the mark and discharge curve of battery;
In charging process, the mark and charging curve of battery are recorded;
After charging terminates, the mark and charging curve of the battery are sent;
When the maximum electricity decay of detection battery reaches drop threshold, battery is forbidden to be continuing with the mark in concurrent power transmission pond
Notified with disabling.
Preferably, the controller is further adapted for performing following steps:
When the maximum electricity for detecting battery is decayed and is not up to drop threshold, battery is continuing with.
The third aspect, there is provided a kind of battery management system, including:
Battery, it is suitable for electric car and power is provided;
Charging cabinet, multiple battery compartments are provided with, suitable for being charged to the battery, and are being put into the battery that need to charge
When, there is provided the battery of replacing;And
Server, communicated to connect with the charging cabinet;
Wherein, the battery is configured as recording discharge curve in discharge process, and the charging cabinet is configured as even
When being connected to the battery for needing to charge, the mark of battery and the mark and discharge curve in the concurrent power transmission pond of discharge curve are received, is being filled
The mark and charging curve and after charging terminates of battery are recorded in electric process, sends the mark and charging curve of battery, is detected
When the maximum electricity decay of battery reaches drop threshold, battery is forbidden to be continuing with the mark and disabling notice in concurrent power transmission pond,
The server is configured as when the discharge curve or the charging curve meet pre-provisioning request, by the circulation of the battery
Once, the cycle-index of battery, small in the cycle-index of the battery according to corresponding to obtaining the battery identification for number increase
When quality guarantee threshold value, quality guarantee is set to mark for the battery.
Preferably, the charging cabinet, which is additionally configured to decay in the maximum electricity for detecting battery, is not up to drop threshold
When, battery is continuing with.
Preferably, the server is configured as exceeding quality guarantee threshold value in the cycle-index for being sent the battery for disabling notice
When, for the battery, retired mark is set.
Pre-provisioning request is met by the charging curve or discharge curve that detect battery to record the cycle-index of battery, and
And by detect the maximum electricity of battery decay reach drop threshold when, control battery prohibits the use of, and judges the circulation of battery
Whether number reaches quality guarantee threshold value, and then makes quality guarantee mark or retired mark.The disclosure can accurately detect recovery
The state of battery, effectively cascade utilization recovery battery.
Brief description of the drawings
By the description to the embodiment of the present invention referring to the drawings, above-mentioned and other purpose of the invention, feature and
Advantage will be apparent from, in the accompanying drawings:
Fig. 1 is the battery management system schematic diagram of the embodiment of the present invention;
Fig. 2 is the circuit diagram of the charging cabinet of the embodiment of the present invention;
Fig. 3 is the flow chart of the battery management method of the embodiment of the present invention;
Fig. 4 is the flow chart of the charging cabinet control method of the embodiment of the present invention;
Fig. 5 is the flow chart of the server control method of the embodiment of the present invention.
Embodiment
Below based on embodiment, present invention is described, but the present invention is not restricted to these embodiments.Under
It is detailed to describe some specific detail sections in the literary detailed description to the present invention.Do not have for a person skilled in the art
The description of these detail sections can also understand the present invention completely.In order to avoid obscuring the essence of the present invention, known method, mistake
The not narration in detail of journey, flow, element and circuit.
In addition, it should be understood by one skilled in the art that provided herein accompanying drawing be provided to explanation purpose, and
What accompanying drawing was not necessarily drawn to scale.
Unless the context clearly requires otherwise, otherwise entire disclosure is similar with the " comprising " in claims, "comprising" etc.
Word should be construed to the implication included rather than exclusive or exhaustive implication;That is, it is containing for " including but is not limited to "
Justice.
In the description of the invention, it is to be understood that term " first ", " second " etc. are only used for describing purpose, without
It is understood that to indicate or implying relative importance.In addition, in the description of the invention, unless otherwise indicated, the implication of " multiple "
It is two or more.
Unless otherwise clearly defined and limited, the term such as term " installation ", " connected ", " connection ", " fixation " should be done extensively
Reason and good sense solution, for example, it may be fixedly connected or be detachably connected, or integrally;Can mechanically connect, can also
It is electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can be two element internals connection or
The interaction relationship of two elements, limited unless otherwise clear and definite.For the ordinary skill in the art, Ke Yigen
Understand the concrete meaning of above-mentioned term in the present invention according to concrete condition.
As skilled in the art will be aware of, various aspects of the disclosure may be implemented as system, method or meter
Calculation machine program product.Therefore, various aspects of the disclosure can take following form:Complete hardware embodiment, complete software
Embodiment (including firmware, resident software, microcode etc.) or herein generally can referred to as " circuit ", " module " or
The embodiment that software aspects are combined with hardware aspect of " system ".In addition, the aspect of the present invention can take following shape
Formula:The computer program product realized in one or more computer-readable mediums, computer-readable medium have thereon
The computer readable program code of realization.
Any combination of one or more computer-readable mediums can be utilized.Computer-readable medium can be computer
Readable signal medium or computer-readable recording medium.Computer-readable recording medium can be such as (but not limited to) electronics,
Magnetic, optical, electromagnetism, infrared or semiconductor system, device, or foregoing any appropriate combination.Meter
The more specifically example (exhaustive to enumerate) of calculation machine readable storage medium storing program for executing will include the following:With one or more electric wire
Electrical connection, portable computer diskette, hard disk, random access memory (RAM), read-only storage (ROM), erasable compile
Journey read-only storage (EPROM or flash memory), optical fiber, portable optic disk read-only storage (CD-ROM), light storage device,
Magnetic memory apparatus or foregoing any appropriate combination.In the context of the disclosure, computer-readable recording medium can be
It can include or store the program used by instruction execution system, device or combined command execution system, equipment or dress
Put any tangible medium of the program used.
Computer-readable signal media can include the data-signal propagated, and the data-signal of the propagation has wherein
Such as the computer readable program code of the part realization in a base band or as carrier wave.The signal of such propagation can use
Any form in diversified forms, include but is not limited to:Electromagnetism, optical or its any appropriate combination.It is computer-readable
Signal media can be following any computer-readable medium:It is not computer-readable recording medium, and can be to by instructing
The program that execution system, device use or combined command execution system, device use is communicated, propagated
Or transmission.
Including but not limited to wireless, wired, fiber optic cables, RF etc. or foregoing can be used any appropriately combined any
Suitable medium transmits the program code realized on a computer-readable medium.
Computer program code for performing for the operation of each side of the present invention can be with one or more programming languages
Any combination of speech is write, and the programming language includes:The programming language of object-oriented such as Java, Smalltalk, C++ etc.;
And conventional process programming language such as " C " programming language or similar programming language.Program code can be used as independent software package
Fully on the user computer, partly perform on the user computer;Partly exist on the user computer and partly
Performed on remote computer;Or fully perform on remote computer or server.In the latter case, can be by far
Journey computer by any type of network connection including LAN (LAN) or wide area network (WAN) to subscriber computer, or
It can be attached with outer computer (such as internet by using ISP).
The above-mentioned flow chart legend according to the method for the embodiment of the present disclosure, equipment (system) and computer program product and/
Or block diagram describes various aspects of the disclosure.It will be appreciated that each block and flow of flow chart legend and/or block diagram
The combination of block in figure legend and/or block diagram can be realized by computer program instructions.These computer program instructions can be with
The processor of all-purpose computer, special-purpose computer or other programmable data processing devices is provided to, to produce machine so that
(via the computing device of computer or other programmable data processing devices) instruction create for implementation process figure and/or
The device for the function/action specified in block diagram or block.
These computer program instructions can also be stored in can instruct computer, other programmable data processing devices
Or in the computer-readable medium that runs in a specific way of other devices so that the instruction production stored in computer-readable medium
It is raw to include realizing the product of the instruction for the function/action specified in flow chart and/or block diagram or block.
Computer program instructions can also be loaded on computer, other programmable data processing devices or other devices
On, so as to perform a series of operable steps on computer, other programmable devices or other devices to produce computer reality
Existing process so that the instruction performed on computer or other programmable devices is provided for realizing in flow chart and/or frame
The process for the function/action specified in segment or block.
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
The cascade utilization of battery refers to that its capacity or power are special after battery is using a period of time or circulation certain number
Property decline it is more obvious, can not meet specific requirement, it is necessary to retired from power market;By retired battery by screening, matching somebody with somebody
To, in groups or into system be applied to other fields so that sufficiently utilize retired battery the surplus value, realize filling for energy
Divide and utilize.But testing conditions are constrained to, retired battery status is different, can not accurately grasp surplus in retired battery
Complementary energy, it is impossible to which effectively cascade utilization is carried out to battery.Therefore, a kind of battery management system of the disclosed invention, Ke Yizhun
The state of retired battery really is detected, realizes the cascade utilization of battery, saves energy.
Specifically, the battery management system of the disclosure is as shown in figure 1, battery management system includes battery 1, the and of charging cabinet 2
Server 3.Battery 1 is suitable for electric car as the power set of battery management system and provides power.In whole battery management system
Circulation has substantial amounts of battery 1 in system, and the inside of each battery 1 is provided with mark, and the charging cabinet 2 that can be connected is read.
After battery 1 is connected to electric car, in the discharge process of battery 1, battery 1 records the discharge curve in whole discharge process.
After battery 1 is connected to charging cabinet 2, in the charging process of battery 1, charging cabinet 2 records the charging curve of battery 1.Meanwhile battery
After 1 is fully charged, charging cabinet 2 detects the attenuation of battery 1, when the decay of the electricity of battery 1 meets drop threshold, no longer tells automatically
Go out battery to change for user, while prompt operation maintenance personnel to reclaim battery 1 by server 3, reused after maintenance, or
It is retired into the other cascade utilization of next stage the battery of requirement is not reached after maintenance still, until reaching Rejection standard, then
Into flow is disassembled, the cascade utilization of battery is finally realized.
Fig. 2 is the circuit diagram of the charging cabinet of the embodiment of the present invention, as shown in Fig. 2 charging cabinet 2 is provided with multiple batteries
Storehouse 21, memory 22 and controller 23.Each battery compartment 21 is respectively arranged with connecting interface, suitable for being connected with battery 1 and being
The battery 1 connected is charged.Memory 22 is used to store computer program instructions.Controller 23 passes through the connecting interface
It is connected with battery 1, the computer program instructions for performing the memory storage of memory 22 communicate with battery 1 and server 3.
Specifically, the battery management method of battery management system is as shown in figure 3, battery management method includes two parts.Its
In, Part I is that battery 1 is connected with electric car, and when providing power for electric car, battery 1 records the discharge curve of battery;And
When battery 1 is connected with charging cabinet 2, battery 1 and discharge curve are sent to charging cabinet 2.Part II is charging cabinet 2 for electricity
When pond 1 is charged, charging cabinet 2 records the charging curve of battery 1, and is sent to server 3;Meanwhile after battery 1 is fully charged, fill
Electric cabinet 2 detects the maximum electricity attenuation degree of battery 1.The Part I and Part II are respectively independent control process,
Do not carry out simultaneously.The battery management method includes:
S301, battery record discharge curve in discharge process.
Battery 1 is connected on electric car, and when electric car is run, battery 1 discharges, and battery 1 records to be produced in discharge process
Discharge curve.
S302, charging cabinet receive the mark and discharge curve of battery when being connected to the battery for needing to charge.
After battery compartment 21 is connected with the battery 1 for needing to be charged, battery 1 is triggered, battery 1 is according to computer-controlled program
The mark of battery 1 and discharge curve are sent to charging cabinet 2 by the connecting interface of battery compartment 21.Charging cabinet 2 passes through controller
23 receive the mark and discharge curve of battery 1, and are temporarily stored in memory 22.
S303, mark and discharge curve to server transmission battery.
Controller 23 in charging cabinet 2 sends the mark of the battery 1 of interim storage in memory 22 and discharge curve
To server 3.The mark and charging curve of the storage battery 1 of server 3.
S304, charging cabinet record the mark and charging curve of battery in charging process.
After battery compartment 21 is connected with the battery 1 for needing to be charged, battery 1 is charged.In the charging process of battery 1,
Charging cabinet 2 records the mark and charging curve of battery 1 by battery compartment 21.
S305, charging cabinet send the mark and charging curve of battery to the server after the charging terminates.
After the battery 1 is fully charged in charging cabinet 2, charging cabinet 2 completes the charging curve of record battery 1.Charging cabinet 2
The mark of battery 1 and charging curve are sent to by server 3 according to the control command of controller 23.The storage battery 1 of server 3
Mark and charging curve.By recording the discharge curve and charging curve of battery 1, the whole service week of battery 1 can be obtained
The discharge and recharge data of phase, the performance of battery can be analyzed as big data.
S306, judge whether discharge curve meets pre-provisioning request.
The program that server 3 is set by inside judges whether discharge curve meets predetermined requirement.If met, hold
Row S307 steps.In an optional embodiment, server 3 can also be by judging whether charging curve meets predetermined want
Ask and then perform S307 steps.The pre-provisioning request can accurately react discharge process or whether charging process is normal.
S307, battery cycle-index increase once.
When the discharge curve for the battery 1 that server 3 receives meets predetermined requirement, the cycle-index increase by one of battery 1
It is secondary, and be stored in server 3.
Whether S308, charging cabinet detection battery maximum electricity decay reach drop threshold.
After battery 1 is fully charged, whether the maximum electricity decay that charging cabinet 2 detects battery 1 reaches drop threshold.It is described to decline
Subtract threshold value can be it is being manually set with battery specified electric quantity into certain ratio, can also be determined according to substantial amounts of experiment
Drop threshold.When the maximum electricity decay of battery 1 reaches drop threshold, S309 steps are performed.When the maximum electricity of battery 1 declines
When subtracting not up to drop threshold, S310 steps are performed.Preferably, declining for the maximum electricity of battery 1 is detected by charging cabinet 2
Subtract, can highly precisely ensure that attenuation degree of the battery when reaching retired is essentially identical, ensure the validity of cascade utilization.
S309, battery is forbidden to be continuing with, the mark and disabling notice in concurrent power transmission pond.
When the maximum electricity decay of the battery 1 of detection reaches drop threshold, the battery compartment where corresponding battery 1 is controlled
21 close, and forbid battery to continue as user's use.The mark of battery 1 and disabling notice are sent to server 3 simultaneously.Server
3 can control the battery compartment 21 to close according to the mark and disabling notice of battery 1, no longer provide the user replacing service.Dimension
The disabling notice and the mark of battery 1 that shield personnel receive according to server 3, timely take the disabling battery in charging cabinet 2 away.
S310, battery is allowed to be continuing with.
When the maximum electricity decay of the battery 1 of detection is not up to drop threshold, the battery where corresponding battery 1 is controlled
Storehouse 21, when receiving the request of user's replacing battery, opening provides the user battery.
Whether S311, the cycle-index of server detection battery reach quality guarantee threshold value.
Server notifies according to the battery mark and disabling that receive, obtains following for battery corresponding to the battery identification
Ring number.The cycle-index of the battery 1 is detected, whether the cycle-index for detecting the battery 1 reaches quality guarantee threshold value.
The cycle-index of the battery 1 reaches quality guarantee threshold value, performs S312 steps.The cycle-index of the battery 1 is not up to quality guarantee threshold
Value, perform S313 steps.The quality guarantee threshold value is counted to calculate according to the maximum cycle of all batteries of record and obtained, can be with
It is the average cycle index of battery or the * n% of average cycle index obtained.In one alternatively embodiment, quality guarantee threshold value
It can also be default cycle-index.
S312, the battery set retired mark.
When the cycle-index of the battery 1 reaches quality guarantee threshold value, retired mark is set for the battery.Attendant's root
According to the retired mark of the battery of acquisition, the battery is taken away, carries out the utilization of next step.Retired battery is still latent
The huge surplus value is hidden, its capacity and power still can meet the needs of a variety of energy storage occasions, such as electric power system, communication base
Stand, data center, the application such as wind light generation energy storage.Capacity and residual life detection are carried out for lossless unpack, is tied by detecting
Fruit is screened, matched, in groups or into system, carries out secondary use, plays the surplus value.For the electricity being worth without energy storage
Pond, carry out housing and disassemble, raw material refine.
S313, the battery set quality guarantee to mark.
When the cycle-index of the battery 1 is not up to quality guarantee threshold value, quality guarantee is set to mark for the battery.Attendant
Marked according to the quality guarantee of the battery of acquisition, after the battery is taken away, quality guarantee processing is carried out to the battery.Cycle-index
It is important Judging index, is the foundation with battery producer quality guarantee.Cycle-index is that time of qualified capacity whether can be released with battery
Based on number is reached.The capacity of the battery of required quality guarantee does not reach requirement still after maintenance, battery is forced retired
Into cascade utilization downstream.
In the present embodiment, battery management system by charging cabinet 2 and server 3 for the battery 1 in all operations
Data be managed, so as to obtain the use data of all batteries exactly, electricity for being aged to predetermined extent
Pond prompting carry out demolition and replacement, and realizes the cascade utilization of battery.
Specifically, cabinet control method is charged as shown in figure 4, methods described includes:
S401, the mark and discharge curve for receiving battery.
After the battery compartment 21 in charging cabinet 2 is connected with battery 1, charging cabinet 2 receive battery 1 send battery mark and
Discharge curve, and stored by memory 22.
S402, the mark and discharge curve for sending battery.
The mark of the battery 1 of the memory storage of memory 22 and discharge curve are sent to server 3 by charging cabinet 2.
S403, in charging process, record the mark and charging curve of battery.
When battery 1 is connected to battery compartment 21, and after starting to charge up, charging cabinet 2 records the mark and charging curve of battery.
After S404, charging terminate, the mark and charging curve of the battery are sent.
After the charging of battery 1 terminates, the mark of the battery of record and charging curve are sent to server 3 by charging cabinet 2.
Whether S405, detection battery maximum electricity decay reach drop threshold.
After the charging of battery 1 terminates, whether the maximum electricity attenuation degree that charging cabinet 2 detects battery reaches drop threshold.
When the maximum electricity decay of battery 1 reaches drop threshold, S406 steps are performed.When the maximum electricity decay of battery 1 is not up to
During drop threshold, S407 steps are performed.Preferably, the decay of the maximum electricity of battery 1 is detected by charging cabinet 2, can be with non-
Often accurately ensure that attenuation degree of the battery when reaching retired is essentially identical, ensures the validity of cascade utilization.
S406, forbid battery to be continuing with the mark in concurrent power transmission pond and disable notice.
When the maximum electricity decay of the battery 1 of detection reaches drop threshold, the battery compartment where corresponding battery 1 is controlled
21 close, and forbid battery to continue as user's use.The mark of battery 1 and disabling notice are sent to server 3 simultaneously.
S407, battery is allowed to be continuing with.
Specifically, server control method is as shown in figure 5, methods described includes:
S501, the mark and discharge curve for receiving battery.
Server 3 receives the mark and discharge curve of the battery 1 that charging cabinet 2 is sent, and stores.
S502, the mark and charging curve for receiving battery.
Server 3 receives the mark and charging curve of the battery 1 that charging cabinet 2 is sent, and stores.
S503, judge whether discharge curve or charging curve meet pre-provisioning request.
Server 3 judges whether detect discharge curve or charging curve meets pre-provisioning request.The pre-provisioning request can be with
Detect discharge process or whether charging process is normal.Preferably, pre-provisioning request is to be charge and discharge time or discharge and recharge curvature etc.
Parameter.Discharge curve or charging curve meet pre-provisioning request, perform S504 steps.
S504, battery cycle-index increase once.
When the discharge curve or charging curve of battery 1 meet pre-provisioning request, the cycle-index increase of corresponding battery 1
Once, the cycle-index renewal storage of the corresponding battery of the memory storage of server 3.
S505, the mark for receiving battery and disabling notice.
When charging cabinet 2 detects battery to disable battery, server 3 receives the mark of the disabling battery and disabled logical
Know.
S506, judge whether the cycle-index of battery reaches quality guarantee threshold value.
Server 3 receives the correspondence for obtaining the memory storage of server 3 after disabling notifies according to the mark of the disabling battery
Cycle-index, and judge whether the cycle-index of battery reaches quality guarantee threshold value.If the cycle-index of the disabling battery reaches
To quality guarantee threshold value, S507 steps are performed.If the cycle-index of the disabling battery is not up to quality guarantee threshold value, S508 steps are performed
Suddenly.
S507, retired mark is set.
The disabling battery is directly carried out cascade utilization by attendant according to retired mark, realizes effective profit of battery
With.
S508, quality guarantee is set to mark.
Attendant marks to take out and return to battery producer the disabling battery according to quality guarantee carries out quality guarantee.
The state of retired battery can accurately be detected by the battery management method of the disclosure, and then can be effectively
Realize the cascade utilization of battery.Specifically, by entering to the cascade utilization of 48V20Ah (9 and 14 126 batteries of string) lithium battery group
Row performance analysis, it can be deduced that the economic benefit that the cascade utilization of battery is brought.48V20Ah (9 and 14 126 batteries of string) lithium electricity
Pond group refers to that lithium battery group is made up of 126 batteries, and the rated voltage of formation is 48V, rated capacity 20Ah.Lithium battery group
Composing method is first that one group of battery 9 is in parallel, forms 14 batteries groups, then this 14 batteries group is connected.(9 simultaneously by 48V20Ah
14 126 batteries of string) the cascade utilization performance analysis of lithium battery group is shown in Table 1:
The 48V20Ah of table 1 (9 and 14 126 batteries of string) lithium battery group cascade utilization performance analysis
By table 1, can obtain, when the capacity of lithium battery group is 15-20Ah in 75-100% section, lithium battery group
Suitable for take-away or delivery industry, its cycle-index is 800, and according to 5 yuan of expenses standards once, its income is 4000 yuan.
When the capacity of lithium battery group is 10-15Ah in 50-75% section, lithium battery group is applied to common electric car field, and it is followed
Ring number is 500, and according to 2 yuan of expenses standards once, its income is 1000 yuan.When the capacity of lithium battery group is below 50%
When section is below 10Ah, lithium battery group is applied to consumer electronics or disassembles smelting industry, and its cycle-index is 126, according to
2.5 yuan of expenses standards once, its income are 315 yuan.Lithium battery group is subtracted to produce, reequip and disassemble in whole cascade utilization
Cost, the total revenue of the lithium battery group is 3468 yuan, and its earning rate is 150%.In addition, when lithium battery group can not
In use, the recovery of parts can also be carried out.Therefore, battery effectively cascade utilization, not only reduce environment pollution and
The waste of energy, direct economic benefit can also be brought.
Pre-provisioning request is met by the charging curve or discharge curve that detect battery to record the cycle-index of battery, and
And by detect the maximum electricity of battery decay reach drop threshold when, control battery prohibits the use of, and judges the circulation of battery
Whether number reaches quality guarantee threshold value, and then makes quality guarantee mark or retired mark.The disclosure can accurately detect recovery
The state of battery, effectively cascade utilization recovery battery.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for those skilled in the art
For, the present invention can have various changes and change.All any modifications made within spirit and principles of the present invention, it is equal
Replace, improve etc., it should be included in the scope of the protection.
Claims (10)
1. a kind of battery management method, including:
Battery records discharge curve in discharge process;
Charging cabinet receives the mark and discharge curve of battery when being connected to the battery for needing to charge;
The mark and discharge curve of battery are sent to server;
Charging cabinet records the mark and charging curve of battery in charging process;
Charging cabinet sends the mark and charging curve of battery to the server after the charging terminates;
Server is when the discharge curve or the charging curve meet pre-provisioning request, by the cycle-index increase of the battery
Once;
When the maximum electricity decay of charging cabinet detection battery reaches drop threshold, battery is forbidden to be continuing with the mark in concurrent power transmission pond
Know and disabling notifies.
2. battery management method according to claim 1, it is characterised in that methods described also includes:
The cycle-index of server battery according to corresponding to obtaining the battery identification;
When the cycle-index of the battery is less than quality guarantee threshold value, quality guarantee is set to mark for the battery.
3. battery management method according to claim 1, it is characterised in that methods described also includes:
When the maximum electricity for detecting battery is decayed and is not up to drop threshold, battery is continuing with.
4. battery management method according to claim 2, it is characterised in that methods described also includes:
When the cycle-index for being sent the battery for disabling notice exceedes quality guarantee threshold value, retired mark is set for the battery.
5. battery management method according to claim 4, it is characterised in that the quality guarantee threshold value is according to all electricity of record
The maximum cycle statistics in pond, which calculates, to be obtained.
6. a kind of charging cabinet, including:
Multiple battery compartments, each battery compartment are provided with connecting interface, are adapted to battery and are charged and communicated;
Memory, for storing computer program instructions;
Controller, it is connected by the connecting interface with battery, the controller is adapted for carrying out the calculating of the memory storage
Machine programmed instruction is to realize following steps:
Receive the mark and discharge curve of battery;
Send the mark and discharge curve of battery;
In charging process, the mark and charging curve of battery are recorded;
After charging terminates, the mark and charging curve of the battery are sent;
When the maximum electricity decay of detection battery reaches drop threshold, battery is forbidden to be continuing with the mark and taboo in concurrent power transmission pond
With notice.
7. charging cabinet according to claim 6, it is characterised in that the controller is further adapted for performing following steps:
When the maximum electricity for detecting battery is decayed and is not up to drop threshold, battery is continuing with.
8. a kind of battery management system, including:
Battery, it is suitable for electric car and power is provided;
Charging cabinet, multiple battery compartments are provided with, suitable for being charged to the battery, and when being put into the battery that need to be charged, carried
For the battery of replacing;And
Server, communicated to connect with the charging cabinet;
Wherein, the battery is configured as recording discharge curve in discharge process, and the charging cabinet is configured as being connected to
When needing the battery to charge, the mark of battery and the mark and discharge curve in the concurrent power transmission pond of discharge curve are received, was being charged
The mark and charging curve and after charging terminates of battery are recorded in journey, sends the mark and charging curve of battery, detects battery
Maximum electricity decay when reaching drop threshold, forbid battery to be continuing with the mark and disabling notice in concurrent power transmission pond, it is described
Server is configured as when the discharge curve or the charging curve meet pre-provisioning request, by the cycle-index of the battery
Once, the cycle-index of battery, is less than matter in the cycle-index of the battery according to corresponding to obtaining the battery identification for increase
When protecting threshold value, quality guarantee is set to mark for the battery.
9. battery management system according to claim 8, it is characterised in that the charging cabinet is additionally configured to detecting
When the maximum electricity decay of battery is not up to drop threshold, battery is continuing with.
10. battery management system according to claim 8, it is characterised in that the server is configured as being sent
When the cycle-index of the battery of disabling notice exceedes quality guarantee threshold value, retired mark is set for the battery.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710832805.6A CN107634275B (en) | 2017-09-15 | 2017-09-15 | Battery management method, charging cabinet and battery management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710832805.6A CN107634275B (en) | 2017-09-15 | 2017-09-15 | Battery management method, charging cabinet and battery management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107634275A true CN107634275A (en) | 2018-01-26 |
CN107634275B CN107634275B (en) | 2020-04-14 |
Family
ID=61102285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710832805.6A Active CN107634275B (en) | 2017-09-15 | 2017-09-15 | Battery management method, charging cabinet and battery management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107634275B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110048503A (en) * | 2019-05-13 | 2019-07-23 | 深圳市高德威技术有限公司 | The method of power supply and emergency power supply is provided by changing electric cabinet for the base station 5G |
CN110061537A (en) * | 2019-03-15 | 2019-07-26 | 深圳易马达科技有限公司 | Change electric cabinet and its charging and discharging lithium battery control circuit, charging and discharging lithium battery system |
WO2019184863A1 (en) * | 2018-03-30 | 2019-10-03 | 比亚迪股份有限公司 | Recycling system and method for power batteries in electric vehicles |
WO2019213964A1 (en) * | 2018-05-11 | 2019-11-14 | 深圳市大疆创新科技有限公司 | Charging cabinet, battery charging method, and charging system |
CN112185007A (en) * | 2020-09-07 | 2021-01-05 | 杭州协能科技股份有限公司 | Control method and control system for battery charging |
CN113119798A (en) * | 2019-12-31 | 2021-07-16 | 奥动新能源汽车科技有限公司 | Full life cycle management method and system for battery pack of quick-change electric vehicle |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1577952A (en) * | 2003-07-15 | 2005-02-09 | 松下电器产业株式会社 | Degradation judgment circuit for secondary battery |
CN101420036A (en) * | 2007-10-22 | 2009-04-29 | 深圳迈瑞生物医疗电子股份有限公司 | Power supply management device and method for battery |
CN101621130A (en) * | 2009-08-07 | 2010-01-06 | 北京新能瑞泰电子技术有限责任公司 | Storage battery management system and method as well as storage battery charging management system and method |
CN101800340A (en) * | 2009-02-05 | 2010-08-11 | 三洋电机株式会社 | The abnormality detection device of secondary cell and secondary cell device |
CN103969585A (en) * | 2013-01-31 | 2014-08-06 | 国际商业机器公司 | Method and device for assessing service conditions of batteries, relevant system and vehicle |
CN105676139A (en) * | 2016-01-22 | 2016-06-15 | 深圳市智锂能源科技有限公司 | Intelligent power battery managing tracing-back method and device |
CN106627243A (en) * | 2017-02-13 | 2017-05-10 | 国网安徽省电力公司培训中心 | Cloud computation based charging management system for electric vehicle |
-
2017
- 2017-09-15 CN CN201710832805.6A patent/CN107634275B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1577952A (en) * | 2003-07-15 | 2005-02-09 | 松下电器产业株式会社 | Degradation judgment circuit for secondary battery |
CN101420036A (en) * | 2007-10-22 | 2009-04-29 | 深圳迈瑞生物医疗电子股份有限公司 | Power supply management device and method for battery |
CN101800340A (en) * | 2009-02-05 | 2010-08-11 | 三洋电机株式会社 | The abnormality detection device of secondary cell and secondary cell device |
CN101621130A (en) * | 2009-08-07 | 2010-01-06 | 北京新能瑞泰电子技术有限责任公司 | Storage battery management system and method as well as storage battery charging management system and method |
CN103969585A (en) * | 2013-01-31 | 2014-08-06 | 国际商业机器公司 | Method and device for assessing service conditions of batteries, relevant system and vehicle |
CN105676139A (en) * | 2016-01-22 | 2016-06-15 | 深圳市智锂能源科技有限公司 | Intelligent power battery managing tracing-back method and device |
CN106627243A (en) * | 2017-02-13 | 2017-05-10 | 国网安徽省电力公司培训中心 | Cloud computation based charging management system for electric vehicle |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019184863A1 (en) * | 2018-03-30 | 2019-10-03 | 比亚迪股份有限公司 | Recycling system and method for power batteries in electric vehicles |
CN110323508A (en) * | 2018-03-30 | 2019-10-11 | 比亚迪股份有限公司 | The recovery system and method for power battery in electric car |
CN110323508B (en) * | 2018-03-30 | 2021-06-18 | 比亚迪股份有限公司 | Recovery system and method for power battery in electric automobile |
WO2019213964A1 (en) * | 2018-05-11 | 2019-11-14 | 深圳市大疆创新科技有限公司 | Charging cabinet, battery charging method, and charging system |
CN110061537A (en) * | 2019-03-15 | 2019-07-26 | 深圳易马达科技有限公司 | Change electric cabinet and its charging and discharging lithium battery control circuit, charging and discharging lithium battery system |
CN110048503A (en) * | 2019-05-13 | 2019-07-23 | 深圳市高德威技术有限公司 | The method of power supply and emergency power supply is provided by changing electric cabinet for the base station 5G |
CN113119798A (en) * | 2019-12-31 | 2021-07-16 | 奥动新能源汽车科技有限公司 | Full life cycle management method and system for battery pack of quick-change electric vehicle |
CN113119798B (en) * | 2019-12-31 | 2022-03-29 | 奥动新能源汽车科技有限公司 | Full life cycle management method and system for battery pack of quick-change electric vehicle |
CN112185007A (en) * | 2020-09-07 | 2021-01-05 | 杭州协能科技股份有限公司 | Control method and control system for battery charging |
CN112185007B (en) * | 2020-09-07 | 2023-04-28 | 杭州协能科技股份有限公司 | Battery charging control method and control system |
Also Published As
Publication number | Publication date |
---|---|
CN107634275B (en) | 2020-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107634275A (en) | Battery management method, charging cabinet and battery management system | |
CN104916339B (en) | Nuclear power plant emergency state diagnosis system and diagnosis method | |
US10699278B2 (en) | Battery pack monitoring and warranty tracking system | |
CN102005736B (en) | On-line monitoring method of state of relay protection equipment | |
CN110244256A (en) | A kind of intelligent electric energy meter fault recognition method, device and equipment | |
CN115330275B (en) | Echelon utilization method and device for retired battery | |
CN102419903B (en) | Semiautomatic meter reading device and meter reading method thereof | |
CN105044487B (en) | A kind of area's line loss exception audit system and method | |
CN103926490A (en) | Power transformer comprehensive diagnosis method with self-learning function | |
CN106324525B (en) | The detection method and device of battery | |
CN107045706A (en) | Intelligent substation secondary safety measure operation order automatic generation method | |
CN108053095A (en) | A kind of electrical energy power quality disturbance affair character extracting method and system | |
CN109542742A (en) | Database server hardware health evaluating method based on expert model | |
CN109389697A (en) | Recording method, equipment and the readable storage medium storing program for executing of underground inspection data inputting time | |
CN106781053B (en) | The token recognition methods of STS and system | |
CN116381541B (en) | Health assessment method and system for energy storage lithium battery system | |
CN107576845A (en) | A kind of taiwan area acquisition terminal and unit-area management system | |
CN107741543A (en) | A kind of distribution power automation terminal protects Model test Method | |
CN110855522A (en) | Electric energy meter communication quality detection method based on analytic hierarchy process | |
CN116256651A (en) | Battery thermal incapacitation early warning method, system and readable storage medium | |
CN106408449A (en) | Method and system for verifying monitoring information integrity of transformer station | |
CN107450030B (en) | Communication storage battery telemetry data processing method, device and system | |
CN205809687U (en) | A kind of intelligent processing system automatically assessing diagnosis for transformator | |
TW202111616A (en) | Battery health state prediction system and method thereof capable of being safely and quickly plugged between a test device and a battery to be tested | |
CN113869871B (en) | Method, device and equipment for checking power ticket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right |
Effective date of registration: 20220321 Granted publication date: 20200414 |
|
PP01 | Preservation of patent right |