CN107633138B - 基于实际出力特性的发电机频率模型建模方法 - Google Patents
基于实际出力特性的发电机频率模型建模方法 Download PDFInfo
- Publication number
- CN107633138B CN107633138B CN201710858812.3A CN201710858812A CN107633138B CN 107633138 B CN107633138 B CN 107633138B CN 201710858812 A CN201710858812 A CN 201710858812A CN 107633138 B CN107633138 B CN 107633138B
- Authority
- CN
- China
- Prior art keywords
- power
- frequency
- stage
- time
- generator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 230000009194 climbing Effects 0.000 claims abstract description 19
- 230000014509 gene expression Effects 0.000 claims abstract description 17
- 230000000630 rising effect Effects 0.000 claims abstract description 10
- 238000010586 diagram Methods 0.000 claims description 6
- 230000003247 decreasing effect Effects 0.000 claims description 2
- 238000004088 simulation Methods 0.000 abstract description 5
- 230000007547 defect Effects 0.000 abstract description 3
- 238000013152 interventional procedure Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种基于实际出力特性的发电机频率模型建模方法,包括步骤1,采集实测数据;步骤2,根据实测数据绘制曲线图;步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段;步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。本发明构建出基于实际出力特性的发电机频率模型,该分时段模型结构克服了现有模型结构过于简单或复杂、参数设置难以精准的不足,建立了兼顾仿真度与复杂度要求,且能准确反映频率大扰动的基于实际出力特性的发电机频率模型。
Description
技术领域
本发明涉及一种基于实际出力特性的发电机频率模型建模方法,属于发电机建模领域。
背景技术
随着我国特高压输电工程越来越多投入运行,电网的复杂程度大幅增加,给大电网运行控制带来了新的问题与挑战,其中频率控制与响应问题尤为突出。比如,2015年10月20日,宾金直流逆变站发生闭锁故障,损失直流功率约3800MW,造成华东电网的频率严重跌落,14s内下降了0.2447Hz。此时,火电机组是否能有效地参与调频控制,是电网频率稳定的重要保障。
目前常用的仿真模型要么过于简单,要么过于复杂且参数设置难以精准。比如PSASP仿真软件中,常用的是I型频率模型和IV型频率模型。I型频率模型没有考虑到发电机组内部热力系统的约束;IV型频率模型虽然考虑了主蒸汽压力约束,但为了仿真简化一般设置为1;其它类型在建模时考虑的影响因素与IV型类似。在频率较大跌落的情况下,现有的发电机频率模型不能正确反映发电机真实特性,且过于乐观。
发明内容
为了解决上述技术问题,本发明提供了一种基于实际出力特性的发电机频率模型建模方法。
为了达到上述目的,本发明所采用的技术方案是:
基于实际出力特性的发电机频率模型建模方法,包括以下步骤,
步骤1,采集实测数据;
步骤2,根据实测数据绘制曲线图;
曲线图包括频率曲线图和功率曲线图;频率曲线图以时间t为横坐标,以频率作为纵坐标,功率曲线图以时间t为横坐标,以功率作为纵坐标;
步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段;
步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。
在电网故障点安装PMU,通过PMU采集实测数据。
稳态阶段:时间范围为0<t≤T0,其中T0为初始扰动时间,在该阶段中,频率和功率均稳定;
上升阶段:时间范围为T0<t≤T1,其中T1为峰值功率对应的时间,在该阶段中,功率从初始功率上升至峰值功率,频率从初始频率下降,但未到峰谷频率;
滑坡阶段:时间范围为T1<t≤T2,其中T2为AGC介入时间,在该阶段中,功率从峰值功率下降,频率下降到峰谷频率后上升;
爬坡阶段:时间范围为t>T2,在该阶段中,功率上升一段时间后平稳,频率上升一端时间后平稳。
在爬坡阶段,时间范围为T2<t≤T3时,功率上升,频率上升,时间范围为t>T3时,功率和频率平稳,T3为爬坡阶段功率和频率平稳开始的时间。
稳态阶段的函数表达式为p(t)=P0,其中p(t)为t时刻的发电机功率,P0为发电机初始功率;
上升阶段的函数表达式为p(t)=A1(f(t)-f0)+P0,其中f(t)为t时刻的发电机频率,f0为发电机初始功率,A1表示实际调差系数的倒数;
滑坡阶段的函数表达式为p(t)=A2(f(t)-f0)+P(T1),其中P(T1)为T1时刻发电机功率,A2表示热力约束造成的滑坡系数;
本发明所达到的有益效果:本发明构建出基于实际出力特性的发电机频率模型,该分时段模型结构克服了现有模型结构过于简单或复杂、参数设置难以精准的不足,建立了兼顾仿真度与复杂度要求,且能准确反映频率大扰动的基于实际出力特性的发电机频率模型。
附图说明
图1为本发明的流程图;
图2为绘制的曲线图。
具体实施方式
下面结合附图对本发明作进一步描述。以下实施例仅用于更加清楚地说明本发明的技术方案,而不能以此来限制本发明的保护范围。
如图1所示,基于实际出力特性的发电机频率模型建模方法,包括以下步骤:
步骤1,在电网故障点安装PMU,通过PMU采集实测数据。
步骤2,根据实测数据绘制曲线图。
曲线图包括频率曲线图和功率曲线图;频率曲线图以时间t为横坐标,以频率作为纵坐标,功率曲线图以时间t为横坐标,以功率作为纵坐标;为了便于拟合比对,将其绘制在一个坐标系中,如图2所示。
步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段。
稳态阶段:时间范围为0<t≤T0,其中T0为初始扰动时间,在该阶段中,频率和功率均稳定。
上升阶段:时间范围为T0<t≤T1,其中T1为峰值功率对应的时间,在该阶段中,功率从初始功率上升至峰值功率,频率从初始频率下降,但未到峰谷频率。
滑坡阶段:当频率下降较大时,发电机实际有功出力受热力约束并不能无限增大,即功率上升到某一极限后下降,时间范围为T1<t≤T2,其中T2为AGC介入时间,在该阶段中,功率从峰值功率下降,频率下降到峰谷频率后上升。
爬坡阶段:时间范围为t>T2,在该阶段中,功率上升一段时间后平稳,频率上升一端时间后平稳;根据具体的是,在爬坡阶段,时间范围为T2<t≤T3时,功率上升,频率上升,时间范围为t>T3时,功率和频率平稳,T3为爬坡阶段功率和频率平稳开始的时间。
步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。
各阶段的函数表达式如下:
稳态阶段的函数表达式为p(t)=P0,其中p(t)为t时刻的发电机功率,P0为发电机初始功率。
上升阶段的函数表达式为p(t)=A1(f(t)-f0)+P0,其中f(t)为t时刻的发电机频率,f0为发电机初始功率,A1表示实际调差系数的倒数。
滑坡阶段的函数表达式为p(t)=A2(f(t)-f0)+P(T1),其中P(T1)为T1时刻发电机功率,A2表示热力约束造成的滑坡系数。
最后叠加的发电机频率模型为:
本上述方法构建出基于实际出力特性的发电机频率模型,该分时段模型结构克服了现有模型结构过于简单或复杂、参数设置难以精准的不足,建立了兼顾仿真度与复杂度要求,且能准确反映频率大扰动的基于实际出力特性的发电机频率模型。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。
Claims (3)
1.基于实际出力特性的发电机频率模型建模方法,其特征在于:包括以下步骤,
步骤1,采集实测数据;
步骤2,根据实测数据绘制曲线图;
曲线图包括频率曲线图和功率曲线图;频率曲线图以时间t为横坐标,以频率作为纵坐标,功率曲线图以时间t为横坐标,以功率作为纵坐标;
步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段;
稳态阶段:时间范围为0<t≤T0,其中T0为初始扰动时间,在该阶段中,频率和功率均稳定;
上升阶段:时间范围为T0<t≤T1,其中T1为峰值功率对应的时间,在该阶段中,功率从初始功率上升至峰值功率,频率从初始频率下降,但未到峰谷频率;
滑坡阶段:时间范围为T1<t≤T2,其中T2为AGC介入时间,在该阶段中,功率从峰值功率下降,频率下降到峰谷频率后上升;
爬坡阶段:时间范围为t>T2,在该阶段中,功率上升一段时间后平稳,频率上升一端时间后平稳;
在爬坡阶段,时间范围为T2<t≤T3时,功率上升,频率上升,时间范围为t>T3时,功率和频率平稳,T3为爬坡阶段功率和频率平稳开始的时间;
稳态阶段的函数表达式为p(t)=P0,其中p(t)为t时刻的发电机功率,P0为发电机初始功率;
上升阶段的函数表达式为p(t)=A1(f(t)-f0)+P0,其中f(t)为t时刻的发电机频率,f0为发电机初始功率,A1表示实际调差系数的倒数;
滑坡阶段的函数表达式为p(t)=A2(f(t)-f0)+P(T1),其中P(T1)为T1时刻发电机功率,A2表示热力约束造成的滑坡系数;
步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。
2.根据权利要求1所述的基于实际出力特性的发电机频率模型建模方法,其特征在于:在电网故障点安装PMU,通过PMU采集实测数据。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710858812.3A CN107633138B (zh) | 2017-09-21 | 2017-09-21 | 基于实际出力特性的发电机频率模型建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710858812.3A CN107633138B (zh) | 2017-09-21 | 2017-09-21 | 基于实际出力特性的发电机频率模型建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107633138A CN107633138A (zh) | 2018-01-26 |
CN107633138B true CN107633138B (zh) | 2021-01-29 |
Family
ID=61102215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710858812.3A Expired - Fee Related CN107633138B (zh) | 2017-09-21 | 2017-09-21 | 基于实际出力特性的发电机频率模型建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107633138B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112231182A (zh) * | 2020-12-15 | 2021-01-15 | 长沙树根互联技术有限公司 | 物联设备工况数据分析方法、装置和计算机设备 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544655A (zh) * | 2013-10-18 | 2014-01-29 | 国家电网公司 | 一种含微电网的区域配电网分层优化方法 |
CN103701120A (zh) * | 2013-12-23 | 2014-04-02 | 华北电力大学 | 一种含风电场的大电网可靠性的评估方法 |
CN103840476A (zh) * | 2014-03-04 | 2014-06-04 | 国家电网公司 | 一种基于单机等值模型的高周切机整定方法 |
CN106961115A (zh) * | 2017-05-10 | 2017-07-18 | 国网河南省电力公司 | 一种高压直流输电系统等效电流电压源建模方法及模型 |
CN107103147A (zh) * | 2017-05-09 | 2017-08-29 | 河海大学 | 一种面向功率特性的uhvdc简化仿真模型 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9508529B2 (en) * | 2014-10-23 | 2016-11-29 | Lam Research Corporation | System, method and apparatus for RF power compensation in a plasma processing system |
-
2017
- 2017-09-21 CN CN201710858812.3A patent/CN107633138B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544655A (zh) * | 2013-10-18 | 2014-01-29 | 国家电网公司 | 一种含微电网的区域配电网分层优化方法 |
CN103701120A (zh) * | 2013-12-23 | 2014-04-02 | 华北电力大学 | 一种含风电场的大电网可靠性的评估方法 |
CN103840476A (zh) * | 2014-03-04 | 2014-06-04 | 国家电网公司 | 一种基于单机等值模型的高周切机整定方法 |
CN107103147A (zh) * | 2017-05-09 | 2017-08-29 | 河海大学 | 一种面向功率特性的uhvdc简化仿真模型 |
CN106961115A (zh) * | 2017-05-10 | 2017-07-18 | 国网河南省电力公司 | 一种高压直流输电系统等效电流电压源建模方法及模型 |
Non-Patent Citations (1)
Title |
---|
需求响应参与电力系统调频机理及控制研究;包宇庆;《中国博士学位论文全文数据库 工程科技Ⅱ辑》;20170115(第1期);C042-28 * |
Also Published As
Publication number | Publication date |
---|---|
CN107633138A (zh) | 2018-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Guo et al. | Regulation quality for frequency response of turbine regulating system of isolated hydroelectric power plant with surge tank | |
CN102709908B (zh) | 大规模风电接入电网后的网损预测方法 | |
CN106202793B (zh) | 一种基于一次调频限制的电网频率稳定仿真方法 | |
CN112287540B (zh) | 一种风电场接入电网的电磁暂态联合仿真方法 | |
CN109038613A (zh) | 一种计及风电虚拟惯性/一次调频响应的自适应低频减载方法 | |
CN103020385A (zh) | 基于RTDS电网500kV主网建模仿真系统 | |
CN109728597B (zh) | 一种光伏逆变器低电压穿越特性拟合方法及系统 | |
CN108631359A (zh) | 风电场实时仿真建模系统和方法 | |
CN104731636A (zh) | 调度员训练模拟装置及其操作方法 | |
CN115085287B (zh) | 一种考虑调速器限幅环节频率稳定约束的建模方法 | |
CN110417031B (zh) | 一种自动发电控制系统频率偏差系数分段整定方法 | |
Fanglei et al. | Estimating maximum penetration level of renewable energy based on frequency stability constrains in power grid | |
CN107633138B (zh) | 基于实际出力特性的发电机频率模型建模方法 | |
Trevisan et al. | Analysis of low frequency interactions of DFIG wind turbine systems in series compensated grids | |
CN115800308A (zh) | 一种考虑调频死区的新能源一次调频系数修正方法及系统 | |
CN105703395A (zh) | 一种风电消纳能力分析方法 | |
CN109301845B (zh) | 基于主从式储能协调控制的特高压联络线有功波动平抑方法 | |
US11262713B2 (en) | Method for calculating control parameters of heating supply power of heating network | |
CN116488267B (zh) | 一种基于建模的风电场无功容量极限仿真计算方法及装置 | |
CN106874615A (zh) | 风电机组负荷调节效应系数测试方法及装置 | |
CN114243805B (zh) | 一种考虑调速器限幅的同步机系统频率响应解析计算方法 | |
CN102945299B (zh) | 使用受控电源等效发电机节点的emtdc仿真初始化方法 | |
CN108510164A (zh) | 一种电力系统内指定地区的外网等值模型在线生成方法 | |
Peng et al. | Continuous power flow for hybrid AC/DC microgrid considering uncertainty of intermittent DG output | |
Xie et al. | Power System Frequency Dynamic Simulation Analysis and Tool Development of PSS/E |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |