CN107633138A - 基于实际出力特性的发电机频率模型建模方法 - Google Patents
基于实际出力特性的发电机频率模型建模方法 Download PDFInfo
- Publication number
- CN107633138A CN107633138A CN201710858812.3A CN201710858812A CN107633138A CN 107633138 A CN107633138 A CN 107633138A CN 201710858812 A CN201710858812 A CN 201710858812A CN 107633138 A CN107633138 A CN 107633138A
- Authority
- CN
- China
- Prior art keywords
- power
- frequency
- generator
- stage
- producing characteristics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开了一种基于实际出力特性的发电机频率模型建模方法,包括步骤1,采集实测数据;步骤2,根据实测数据绘制曲线图;步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段;步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。本发明构建出基于实际出力特性的发电机频率模型,该分时段模型结构克服了现有模型结构过于简单或复杂、参数设置难以精准的不足,建立了兼顾仿真度与复杂度要求,且能准确反映频率大扰动的基于实际出力特性的发电机频率模型。
Description
技术领域
本发明涉及一种基于实际出力特性的发电机频率模型建模方法,属于发电机建模领域。
背景技术
随着我国特高压输电工程越来越多投入运行,电网的复杂程度大幅增加,给大电网运行控制带来了新的问题与挑战,其中频率控制与响应问题尤为突出。比如,2015年10月20日,宾金直流逆变站发生闭锁故障,损失直流功率约3800MW,造成华东电网的频率严重跌落,14s内下降了0.2447Hz。此时,火电机组是否能有效地参与调频控制,是电网频率稳定的重要保障。
目前常用的仿真模型要么过于简单,要么过于复杂且参数设置难以精准。比如PSASP仿真软件中,常用的是I型频率模型和IV型频率模型。I型频率模型没有考虑到发电机组内部热力系统的约束;IV型频率模型虽然考虑了主蒸汽压力约束,但为了仿真简化一般设置为1;其它类型在建模时考虑的影响因素与IV型类似。在频率较大跌落的情况下,现有的发电机频率模型不能正确反映发电机真实特性,且过于乐观。
发明内容
为了解决上述技术问题,本发明提供了一种基于实际出力特性的发电机频率模型建模方法。
为了达到上述目的,本发明所采用的技术方案是:
基于实际出力特性的发电机频率模型建模方法,包括以下步骤,
步骤1,采集实测数据;
步骤2,根据实测数据绘制曲线图;
曲线图包括频率曲线图和功率曲线图;频率曲线图以时间t为横坐标,以频率作为纵坐标,功率曲线图以时间t为横坐标,以功率作为纵坐标;
步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段;
步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。
在电网故障点安装PMU,通过PMU采集实测数据。
稳态阶段:时间范围为0<t≤T0,其中T0为初始扰动时间,在该阶段中,频率和功率均稳定;
上升阶段:时间范围为T0<t≤T1,其中T1为峰值功率对应的时间,在该阶段中,功率从初始功率上升至峰值功率,频率从初始频率下降,但未到峰谷频率;
滑坡阶段:时间范围为T1<t≤T2,其中T2为AGC介入时间,在该阶段中,功率从峰值功率下降,频率下降到峰谷频率后上升;
爬坡阶段:时间范围为t>T2,在该阶段中,功率上升一段时间后平稳,频率上升一端时间后平稳。
在爬坡阶段,时间范围为T2<t≤T3时,功率上升,频率上升,时间范围为t>T3时,功率和频率平稳,T3为爬坡阶段功率和频率平稳开始的时间。
稳态阶段的函数表达式为p(t)=P0,其中p(t)为t时刻的发电机功率,P0为发电机初始功率;
上升阶段的函数表达式为p(t)=A1(f(t)-f0)+P0,其中f(t)为t时刻的发电机频率,f0为发电机初始功率,A1表示实际调差系数的倒数;
滑坡阶段的函数表达式为p(t)=A2(f(t)-f0)+P(T1),其中P(T1)为T1时刻发电机功率,A2表示热力约束造成的滑坡系数;
爬坡阶段的函数表达式为其中P(T2)为T2时刻发电机功率,P(T3)为T3时刻发电机功率,A3表示AGC介入过程的爬坡系数。
发电机频率模型为,
本发明所达到的有益效果:本发明构建出基于实际出力特性的发电机频率模型,该分时段模型结构克服了现有模型结构过于简单或复杂、参数设置难以精准的不足,建立了兼顾仿真度与复杂度要求,且能准确反映频率大扰动的基于实际出力特性的发电机频率模型。
附图说明
图1为本发明的流程图;
图2为绘制的曲线图。
具体实施方式
下面结合附图对本发明作进一步描述。以下实施例仅用于更加清楚地说明本发明的技术方案,而不能以此来限制本发明的保护范围。
如图1所示,基于实际出力特性的发电机频率模型建模方法,包括以下步骤:
步骤1,在电网故障点安装PMU,通过PMU采集实测数据。
步骤2,根据实测数据绘制曲线图。
曲线图包括频率曲线图和功率曲线图;频率曲线图以时间t为横坐标,以频率作为纵坐标,功率曲线图以时间t为横坐标,以功率作为纵坐标;为了便于拟合比对,将其绘制在一个坐标系中,如图2所示。
步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段。
稳态阶段:时间范围为0<t≤T0,其中T0为初始扰动时间,在该阶段中,频率和功率均稳定。
上升阶段:时间范围为T0<t≤T1,其中T1为峰值功率对应的时间,在该阶段中,功率从初始功率上升至峰值功率,频率从初始频率下降,但未到峰谷频率。
滑坡阶段:当频率下降较大时,发电机实际有功出力受热力约束并不能无限增大,即功率上升到某一极限后下降,时间范围为T1<t≤T2,其中T2为AGC介入时间,在该阶段中,功率从峰值功率下降,频率下降到峰谷频率后上升。
爬坡阶段:时间范围为t>T2,在该阶段中,功率上升一段时间后平稳,频率上升一端时间后平稳;根据具体的是,在爬坡阶段,时间范围为T2<t≤T3时,功率上升,频率上升,时间范围为t>T3时,功率和频率平稳,T3为爬坡阶段功率和频率平稳开始的时间。
步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。
各阶段的函数表达式如下:
稳态阶段的函数表达式为p(t)=P0,其中p(t)为t时刻的发电机功率,P0为发电机初始功率。
上升阶段的函数表达式为p(t)=A1(f(t)-f0)+P0,其中f(t)为t时刻的发电机频率,f0为发电机初始功率,A1表示实际调差系数的倒数。
滑坡阶段的函数表达式为p(t)=A2(f(t)-f0)+P(T1),其中P(T1)为T1时刻发电机功率,A2表示热力约束造成的滑坡系数。
爬坡阶段的函数表达式为用于描述AGC的作用效果,其中P(T2)为T2时刻发电机功率,P(T3)为T3时刻发电机功率,A3表示AGC介入过程的爬坡系数。
最后叠加的发电机频率模型为:
其中,
本上述方法构建出基于实际出力特性的发电机频率模型,该分时段模型结构克服了现有模型结构过于简单或复杂、参数设置难以精准的不足,建立了兼顾仿真度与复杂度要求,且能准确反映频率大扰动的基于实际出力特性的发电机频率模型。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。
Claims (6)
1.基于实际出力特性的发电机频率模型建模方法,其特征在于:包括以下步骤,
步骤1,采集实测数据;
步骤2,根据实测数据绘制曲线图;
曲线图包括频率曲线图和功率曲线图;频率曲线图以时间t为横坐标,以频率作为纵坐标,功率曲线图以时间t为横坐标,以功率作为纵坐标;
步骤3,将发电机实际出力过程分为稳态阶段、上升阶段、滑坡阶段和爬坡阶段;
步骤4,在各阶段,根据功率与频率的关系构建函数表达式,最后叠加的分段函数即为发电机频率模型。
2.根据权利要求1所述的基于实际出力特性的发电机频率模型建模方法,其特征在于:在电网故障点安装PMU,通过PMU采集实测数据。
3.根据权利要求1所述的基于实际出力特性的发电机频率模型建模方法,其特征在于:稳态阶段:时间范围为0<t≤T0,其中T0为初始扰动时间,在该阶段中,频率和功率均稳定;
上升阶段:时间范围为T0<t≤T1,其中T1为峰值功率对应的时间,在该阶段中,功率从初始功率上升至峰值功率,频率从初始频率下降,但未到峰谷频率;
滑坡阶段:时间范围为T1<t≤T2,其中T2为AGC介入时间,在该阶段中,功率从峰值功率下降,频率下降到峰谷频率后上升;
爬坡阶段:时间范围为t>T2,在该阶段中,功率上升一段时间后平稳,频率上升一端时间后平稳。
4.根据权利要求3所述的基于实际出力特性的发电机频率模型建模方法,其特征在于:在爬坡阶段,时间范围为T2<t≤T3时,功率上升,频率上升,时间范围为t>T3时,功率和频率平稳,T3为爬坡阶段功率和频率平稳开始的时间。
5.根据权利要求4所述的基于实际出力特性的发电机频率模型建模方法,其特征在于:稳态阶段的函数表达式为p(t)=P0,其中p(t)为t时刻的发电机功率,P0为发电机初始功率;
上升阶段的函数表达式为p(t)=A1(f(t)-f0)+P0,其中f(t)为t时刻的发电机频率,f0为发电机初始功率,A1表示实际调差系数的倒数;
滑坡阶段的函数表达式为p(t)=A2(f(t)-f0)+P(T1),其中P(T1)为T1时刻发电机功率,A2表示热力约束造成的滑坡系数;
爬坡阶段的函数表达式为其中P(T2)为T2时刻发电机功率,P(T3)为T3时刻发电机功率,A3表示AGC介入过程的爬坡系数。
6.根据权利要求5所述的基于实际出力特性的发电机频率模型建模方法,其特征在于:发电机频率模型为,
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710858812.3A CN107633138B (zh) | 2017-09-21 | 2017-09-21 | 基于实际出力特性的发电机频率模型建模方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710858812.3A CN107633138B (zh) | 2017-09-21 | 2017-09-21 | 基于实际出力特性的发电机频率模型建模方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107633138A true CN107633138A (zh) | 2018-01-26 |
CN107633138B CN107633138B (zh) | 2021-01-29 |
Family
ID=61102215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710858812.3A Active CN107633138B (zh) | 2017-09-21 | 2017-09-21 | 基于实际出力特性的发电机频率模型建模方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107633138B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112231182A (zh) * | 2020-12-15 | 2021-01-15 | 长沙树根互联技术有限公司 | 物联设备工况数据分析方法、装置和计算机设备 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544655A (zh) * | 2013-10-18 | 2014-01-29 | 国家电网公司 | 一种含微电网的区域配电网分层优化方法 |
CN103701120A (zh) * | 2013-12-23 | 2014-04-02 | 华北电力大学 | 一种含风电场的大电网可靠性的评估方法 |
CN103840476A (zh) * | 2014-03-04 | 2014-06-04 | 国家电网公司 | 一种基于单机等值模型的高周切机整定方法 |
US20160118227A1 (en) * | 2014-10-23 | 2016-04-28 | Lam Research Corporation | System, Method and Apparatus for RF Power Compensation in a Plasma Processing System |
CN106961115A (zh) * | 2017-05-10 | 2017-07-18 | 国网河南省电力公司 | 一种高压直流输电系统等效电流电压源建模方法及模型 |
CN107103147A (zh) * | 2017-05-09 | 2017-08-29 | 河海大学 | 一种面向功率特性的uhvdc简化仿真模型 |
-
2017
- 2017-09-21 CN CN201710858812.3A patent/CN107633138B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544655A (zh) * | 2013-10-18 | 2014-01-29 | 国家电网公司 | 一种含微电网的区域配电网分层优化方法 |
CN103701120A (zh) * | 2013-12-23 | 2014-04-02 | 华北电力大学 | 一种含风电场的大电网可靠性的评估方法 |
CN103840476A (zh) * | 2014-03-04 | 2014-06-04 | 国家电网公司 | 一种基于单机等值模型的高周切机整定方法 |
US20160118227A1 (en) * | 2014-10-23 | 2016-04-28 | Lam Research Corporation | System, Method and Apparatus for RF Power Compensation in a Plasma Processing System |
CN107103147A (zh) * | 2017-05-09 | 2017-08-29 | 河海大学 | 一种面向功率特性的uhvdc简化仿真模型 |
CN106961115A (zh) * | 2017-05-10 | 2017-07-18 | 国网河南省电力公司 | 一种高压直流输电系统等效电流电压源建模方法及模型 |
Non-Patent Citations (1)
Title |
---|
包宇庆: "需求响应参与电力系统调频机理及控制研究", 《中国博士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112231182A (zh) * | 2020-12-15 | 2021-01-15 | 长沙树根互联技术有限公司 | 物联设备工况数据分析方法、装置和计算机设备 |
Also Published As
Publication number | Publication date |
---|---|
CN107633138B (zh) | 2021-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108964032A (zh) | 一种建立含风电的系统频率响应模型的方法 | |
CN102412575B (zh) | 送端电网高频切机安全自动装置配置方案的仿真评估方法 | |
CN103825279A (zh) | 基于鲁棒控制的微电网系统电压稳定控制方法 | |
CN105303267B (zh) | 一种考虑动态频率约束的含高渗透率光伏电源的孤立电网机组组合优化方法 | |
CN103762589A (zh) | 一种电网中新能源容量配比分层优化方法 | |
CN108877368A (zh) | 一种基于多场景应用的电网仿真培训方法 | |
CN104659810B (zh) | 一种用于不确定通信拓扑的微电网协同控制方法 | |
CN103020385A (zh) | 基于RTDS电网500kV主网建模仿真系统 | |
CN105429170A (zh) | 一种基于可调虚拟阻抗的微网逆变器下垂控制方法 | |
CN107968441A (zh) | 一种考虑风电和需求侧响应的电网频率态势在线预测方法 | |
CN104092248A (zh) | 一种风火打捆外送容量协调优化配置方法 | |
CN112287540B (zh) | 一种风电场接入电网的电磁暂态联合仿真方法 | |
CN108631359A (zh) | 风电场实时仿真建模系统和方法 | |
CN108123438A (zh) | 一种考虑风电和储能的电网频率态势在线预测方法 | |
CN115085287B (zh) | 一种考虑调速器限幅环节频率稳定约束的建模方法 | |
CN110417031B (zh) | 一种自动发电控制系统频率偏差系数分段整定方法 | |
CN102708259A (zh) | 一种基于频域法的发电机组励磁系统建模方法 | |
CN107633138A (zh) | 基于实际出力特性的发电机频率模型建模方法 | |
CN108879721A (zh) | 一种基于风电消纳的频率控制方法 | |
US11262713B2 (en) | Method for calculating control parameters of heating supply power of heating network | |
CN204086850U (zh) | 协调控制系统的阶跃设定值形成回路 | |
CN105279297B (zh) | 一种基于工程应用的pss/e电力系统等值方法 | |
CN104466958A (zh) | 电网电压故障下自适应分数阶锁相环的获取方法 | |
CN107453389A (zh) | 一种组串式光伏逆变器机电暂态模型建模方法 | |
CN111092427B (zh) | 电力系统并行恢复的路径优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |