CN107630458A - A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation - Google Patents
A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation Download PDFInfo
- Publication number
- CN107630458A CN107630458A CN201711012242.2A CN201711012242A CN107630458A CN 107630458 A CN107630458 A CN 107630458A CN 201711012242 A CN201711012242 A CN 201711012242A CN 107630458 A CN107630458 A CN 107630458A
- Authority
- CN
- China
- Prior art keywords
- protective plate
- pile foundation
- regulation
- filling concrete
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation, including bottom plate, governor motion is installed on bottom plate, the lower end of governor motion is provided with damping actuating unit, and the lower end of damping actuating unit is provided with cutting mechanism.The present invention can solve to need present in existing pile foundation filling concrete protective plate demolishing process manually to separate protective plate with the concrete solidified using electronic chisel, needed when being removed to the protective plate of higher position by existing ascending tool, the concrete particle splashed during manually being worked using electronic chisel easily hurts staff, protective plate, which is removed, by ascending tool potential safety hazard be present, manual demolition pile foundation filling concrete protective plate complex operation, labor intensity problem low with operating efficiency etc. greatly, the function that pile foundation filling concrete protective plate high efficiency is removed can be realized.
Description
Technical field
The present invention relates to construction processes equipment technical field, specifically a kind of coagulation of high-speed railway rail bridge pile foundation
Soil perfusion protective plate automatic disassembling machine.
Background technology
Pile foundation is by stake and is connected to the cushion cap of stake top and collectively constitutes.If pile body is all embedded in soil, cushion cap bottom surface and the soil body
Contact, then referred to as embedded footing on piles, low capped pile foundation;If pile body top is basseted and cushion cap bottom is located at more than ground, referred to as Vertical spots
Base.Building pile foundation is usually embedded footing on piles, low capped pile foundation plinth.It is widely used in the engineerings such as skyscraper, bridge, high ferro, this 2 years high ferro
Track bridge pile foundation is built the most extensively, and building pile foundation needs to drill to construction location, then by pile foundation reinforcing bar or steel
The steel reinforcement cage that pipe has been tied up is installed in existing mounting hole, and the position basseted needs to use protective plate to be protected, so
The concrete being stirred is irrigated afterwards, it is necessary to which protective plate is removed after concrete setting, due to protective plate and concrete setting
Together, it is necessary to be separated using chisel, relatively common pile foundation shape has circular configuration and square structure, square removing
Need manually to use electronic chisel in the pile foundation filling concrete protective plate demolishing process of structure by protective plate and the coagulation of solidification
Soil separation, needs by existing ascending tool when being removed to the protective plate of higher position, manually using electronic chisel work
The concrete particle splashed during work easily hurts staff, and it is hidden in the presence of safety to remove protective plate by ascending tool
Suffer from, manual demolition pile foundation filling concrete protective plate complex operation, labor intensity are big, and operating efficiency is low.
The content of the invention
In order to solve the above problems, the invention provides a kind of filling concrete protective plate of high-speed railway rail bridge pile foundation
Automatic disassembling machine, can solve to need manually to use electronic chisel present in existing pile foundation filling concrete protective plate demolishing process
Tool separates protective plate with the concrete of solidification, and needs are by existing work of ascending a height when being removed to the protective plate of higher position
Tool, the concrete particle splashed during manually being worked using electronic chisel easily hurts staff, by ascending tool
Remove protective plate and potential safety hazard be present, manual demolition pile foundation filling concrete protective plate complex operation, labor intensity greatly with work
The problems such as efficiency is low, it is possible to achieve the function that pile foundation filling concrete protective plate high efficiency is removed, mixed without manual demolition pile foundation
Solidifying soil perfusion protective plate, in the absence of potential safety hazard and with it is simple to operate, security is good, stability is high, labor intensity is small and work
The advantages that making efficiency high.
To achieve these goals, the present invention is realized using following technical scheme:A kind of high-speed railway rail bridge pile foundation
Filling concrete protective plate automatic disassembling machine, including bottom plate, governor motion, the lower end installation of governor motion are installed on bottom plate
There is damping actuating unit, the lower end of damping actuating unit is provided with cutting mechanism, and governor motion can advise according to the difference of pile foundation
The regulation that lattice are adapted to, damping actuating unit serve damping and the effect of power output during protective plate is removed,
Dig mechanism under the auxiliary of damping actuating unit can automatic disassembling pile foundation filling concrete protective plate, governor motion, damping
Actuating unit is used in conjunction with each other the technique completed pile foundation filling concrete protective plate high efficiency and removed with digging mechanism.
The damping actuating unit includes the movable supporting frame for being arranged on regulation expansion bracket lower end, and movable supporting frame is in U
Type structure, mobile motor is provided with by motor cabinet on the right-hand member inwall of movable supporting frame, the output shaft of mobile motor passes through connection
Axle device is connected with one end of leading screw, and the other end of leading screw is arranged on by bearing on the inwall of movable supporting frame left end, leading screw
Middle part is provided with movable block, and the upper end of movable block is provided with linear slider, and linear slider is arranged on movable supporting frame, movable block
Two spacing side chains of movement are symmetrically installed with the outer wall of rear and front end, the lower end of movable block is provided with damper, damper
Lower end is provided with mobile fixed plate, and the lower end of mobile fixed plate is provided with moving telescopic cylinder, and the top of moving telescopic cylinder leads to
Flange is crossed on power supporter, the U-shaped structure of power supporter, the lower end of power supporter is provided with moving hole, moves
Two back-moving springs are installed on the lower end inner wall of power support frame, two back-moving springs are symmetrically positioned in the front and rear sides of moving hole,
The top of two back-moving springs is arranged on power output frame, and the section of power output frame is I-shaped structure, and power output
The middle part of frame is located in moving hole, and the upper end of power output frame is provided with the contact block in arc-shaped mechanism, power supporter
Motor with dynamic output is provided with by motor cabinet on inwall, dynamic rotation roller is installed on the output shaft of motor with dynamic output, is moved
Three power output blocks are evenly arranged with along its circumferential direction on the outer wall of power rotating roller, the top of power output block is arc-shaped
Structure, and power output block is corresponding with contact block, mobile motor work drives leading screw to be rotated, and leading screw passes through screw-driven
Mode drives movable block to move, and movable block is moved to the operating position specified under the auxiliary of linear slider on leading screw, two
Mobile spacing side chain work is spacing to movable block progress, and damper serves the effect of damping during work, and movement is stretched
Contracting cylinder drives power supporter to move to suitable operating position according to actual conditions, and motor with dynamic output drives dynamic rotation
Roller is rotated, and dynamic rotation roller drives power output block synchronously to be rotated during rotation, and power output block is revolving
By changing with the contact position of contact block so as to drive power output frame to be moved downward during turning, power output frame
It can be rapidly performed by resetting in the presence of two back-moving springs, power output frame can while being pumped
To drive cutting mechanism to carry out fast and effectively cutting operation to the pile foundation filling concrete protective plate that needs are removed, without artificial
Operation, the concrete particle splashed during cutting will not hurt staff, improve the security of work, reduce work
Make the labor intensity of personnel, improve the efficiency of work.
As a preferred technical solution of the present invention, the height that the governor motion includes being symmetrically mounted on bottom plate is adjusted
Displacements of cylinders, the top of two height regulation cylinders is by the way that in flange installation and adjustment supporting plate, the front end for adjusting supporting plate is provided with
Telescopic chute, telescopic chute is interior to be provided with regulation expansion bracket by sliding matching mode, and regulation expansion bracket is of an L-shaped structure, regulation support
Regulation riser is installed on plate, adjusts and regulation telescopic cylinder is installed in the side wall of riser, the top for adjusting telescopic cylinder passes through
Flange is arranged on regulation expansion bracket, adjusts and two adjustable telescopic rods are symmetrically installed with the side wall of riser, and two regulations are flexible
The top of bar is arranged on regulation expansion bracket, and the height that two height regulation cylinders remove protective plate pile foundation as needed, which drives, to be adjusted
Supporting plate regulation is saved to adjust under the auxiliary of two adjustable telescopic rods to the work adapted to suitable height, regulation telescopic cylinder
Position, it is simple to operate without the ascending tool for manually being selected to adapt to according to need of work, without artificial operation of ascending a height, reduce
Work risk, and job security is high, improves the efficiency of work.
As a preferred technical solution of the present invention, the mechanism of digging includes being arranged on the knife of power output frame lower end
Has shield, tool guard is hollow-core construction, and the lower end of tool guard is hatch frame, and tool guard front and rear sides are symmetrical arranged
There are two lifting grooves, buffer spring is installed on the upper end inwall of tool guard, the lower end of buffer spring is arranged on Cutting tool installation manner
On plate, for Cutting tool installation manner plate in two lifting grooves, the lower end of power output frame is symmetrically arranged with two cutting telescopic cylinders, and two
The individual top for digging telescopic cylinder is arranged on Cutting tool installation manner plate, and the lower end of Cutting tool installation manner plate is provided with chisel, Cutting tool installation manner plate
Rear and front end be symmetrically installed with two cutter protective plates, the lower end of cutter protective plate is inward slant structure, and two cuttings are stretched
Chisel of the contracting cylinder on the auxiliary lower band cutter installing plate of buffer spring moves to suitable position, on Cutting tool installation manner plate
Two cutter protective plates can strut the space of chisel cutting during work, avoid chisel from being stuck at work, carry
The high stability of work, without manual operation, the labor intensity of staff is reduced, improves the efficiency of work.
As a preferred technical solution of the present invention, the spacing side chain of movement includes being arranged on movement by motor cabinet
Mobile limit electric machine on block outer wall, move and mobile spill spin block is installed on the output shaft of limit electric machine, outside mobile spill spin block
Be symmetrically installed with two running fix blocks on wall, running fix block is convex structure, on the upper end inwall of movable supporting frame from
One row is uniformly installed from left to right and moves stopper slot, the lower end of each shifting chute is to expand outwardly structure, and each mobile limit
Position groove forms by two opposite movement limiting frames, and mobile limit electric machine drives mobile spill spin block to enter according to real work situation
Row rotation regulation, mobile spill spin block drive running fix block to move in shifting chute during regulation, and two movements are spacing
Side chain works simultaneously to be fixed to movable block progress position, it is ensured that causes to move because vibration frequency is too fast during protective plate is removed
Motion block position changes, and improves the stability of work.
During work, the present invention is arranged on existing mobile device first, and staff will by existing mobile device
The present invention is moved to the operating position specified, and two governor motions are started working, and two height regulation cylinders are removed as needed
The height of protective plate pile foundation drives the regulation of regulation supporting plate to suitable height, and regulation telescopic cylinder is in two adjustable telescopic rods
The lower regulation of auxiliary is started working to the operating position adapted to, damping actuating unit, and mobile motor work drives leading screw to be rotated,
Leading screw drives movable block to move by screw-driven mode, and movable block is moved on leading screw specified under the auxiliary of linear slider
Operating position, the work of two movements spacing side chain carries out spacing to movable block, and damper serves during work to be subtracted
The effect of shake, moving telescopic cylinder drive power supporter to move to suitable operating position, power output according to actual conditions
Motor driven dynamic rotation roller is rotated, and dynamic rotation roller drives power output block synchronously to be revolved during rotation
Turn, power output block during rotation by change with the contact position of contact block so as to drive power output frame carry out to
Lower motion, power output frame can be rapidly performed by resetting in the presence of two back-moving springs, and power output frame is on carrying out
Cutting mechanism can be driven to carry out the pile foundation filling concrete protective plate that needs are removed while lower reciprocating motion fast and effective
Cutting operation, move dig mechanism on two dig telescopic cylinders on the auxiliary lower band cutter installing plate of buffer spring
Chisel moves to suitable position, and two cutter protective plates on Cutting tool installation manner plate can strut chisel during work and open
The space of chisel, chisel is avoided to be stuck at work so as to quickly fast and effectively be removed to protective plate, it is possible to achieve
The function that pile foundation filling concrete protective plate high efficiency is removed.
The beneficial effects of the invention are as follows:
1st, the present invention can solve to need manually to use present in existing pile foundation filling concrete protective plate demolishing process
Electronic chisel separates protective plate with the concrete solidified, is needed when being removed to the protective plate of higher position by existing
Ascending tool, manually use electronic chisel work during the concrete particle that splashes easily hurt staff, by stepping on
High instrument removes protective plate and potential safety hazard be present, and manual demolition pile foundation filling concrete protective plate complex operation, labor intensity are big
The problem such as low with operating efficiency, it is possible to achieve the function that pile foundation filling concrete protective plate high efficiency is removed, without manual demolition
Pile foundation filling concrete protective plate, in the absence of potential safety hazard and with it is simple to operate, security is good, stability is high, labor intensity
The advantages that small and operating efficiency is high;
2nd, the present invention devises governor motion, damping actuating unit with digging mechanism, and governor motion can be according to pile foundation
The regulation that different size is adapted to, damping actuating unit serve damping and power output during protective plate is removed
Effect, dig mechanism under the auxiliary of damping actuating unit can automatic disassembling pile foundation filling concrete protective plate, can avoid
The concrete splashed during protective plate is removed hurts staff, in the absence of potential safety hazard, without manually by stepping on
High instrument removes the protective plate of higher position, simple to operate, reduces the labor intensity of staff, improves the effect of work
Rate.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of the present invention;
Fig. 2 is Fig. 1 of the present invention I to partial enlarged drawing;
Fig. 3 is that the structure between movable supporting frame of the present invention, leading screw, movable block, linear slider and mobile spacing side chain is shown
It is intended to;
Embodiment
In order that the technical means, the inventive features, the objects and the advantages of the present invention are easy to understand, tie below
Conjunction is specifically illustrating, and the present invention is expanded on further.
As shown in Figure 1 to Figure 3, the filling concrete protective plate automatic disassembling machine of a kind of high-speed railway rail bridge pile foundation, bag
Bottom plate 1 is included, governor motion 31 is installed on bottom plate 1, the lower end of governor motion 31 is provided with damping actuating unit 32, damping power
The lower end of mechanism 32, which is provided with, digs mechanism 33, the regulation that governor motion 31 can be adapted to according to the different size of pile foundation,
Damping actuating unit 32 serves damping and the effect of power output during protective plate is removed, and digs mechanism 33 in damping
Under the auxiliary of actuating unit 32 can automatic disassembling pile foundation filling concrete protective plate, governor motion 31, damping actuating unit 32
The technique completed pile foundation filling concrete protective plate high efficiency and removed is used in conjunction with each other with digging mechanism 33.
The damping actuating unit 32 includes the movable supporting frame 321 for being arranged on regulation expansion bracket 313 lower end, mobile support
Frame 321 is in inverted U-shaped structure, and mobile motor 322, mobile electricity are provided with by motor cabinet on the right-hand member inwall of movable supporting frame 321
The output shaft of machine 322 is connected by shaft coupling with one end of leading screw 323, and the other end of leading screw 323 is arranged on movement by bearing
On the inwall of the left end of support frame 321, the middle part of leading screw 323 is provided with movable block 324, and the upper end of movable block 324 is provided with straight line
Sliding block 325, linear slider 325 are arranged on movable supporting frame 321, are symmetrically installed with the outer wall of the rear and front end of movable block 324
Two spacing side chains 5 of movement, the lower end of movable block 324 are provided with damper 326, and the lower end of damper 326 is provided with movement admittedly
Fixed board 327, the lower end of mobile fixed plate 327 are provided with moving telescopic cylinder 328, and the top of moving telescopic cylinder 328 passes through method
Orchid is arranged on power supporter 329, and 329 U-shaped structure of power supporter, the lower end of power supporter 329 is provided with movement
Hole, two back-moving springs 3210 are installed on the lower end inner wall of power supporter 329, two back-moving springs 3210 are symmetrically positioned in shifting
The front and rear sides in dynamic hole, the top of two back-moving springs 3210 are arranged on power output frame 3211, power output frame 3211
Section is I-shaped structure, and the middle part of power output frame 3211 is located in moving hole, the upper end installation of power output frame 3211
There is a contact block 3212 in arc-shaped mechanism, motor with dynamic output is provided with by motor cabinet on the inwall of power supporter 329
3213, dynamic rotation roller 3214 is installed, edge on the outer wall of dynamic rotation roller 3214 on the output shaft of motor with dynamic output 3213
Its circumferential direction is evenly arranged with three power output blocks 3215, and the top of power output block 3215 is convex structure, and dynamic
Power IOB 3215 is corresponding with contact block 3212, and the work of mobile motor 322 drives leading screw 323 to be rotated, and leading screw 323 passes through
Screw-driven mode drives movable block 324 to move, and movable block 324 is moved under the auxiliary of linear slider 325 on leading screw 323
The operating position specified, two spacing side chains 5 of movement, which work, carries out spacing, process of the damper 326 in work to movable block 324
In serve the effect of damping, moving telescopic cylinder 328 drives power supporter 329 to move to suitable work according to actual conditions
Make position, motor with dynamic output 3213 drives dynamic rotation roller 3214 to be rotated, process of the dynamic rotation roller 3214 in rotation
Middle drive power output block 3215 is synchronously rotated, power output block 3215 during rotation by with contact block 3212
Contact position change so as to drive power output frame 3211 to be moved downward, power output frame 3211 is in two back-moving springs
It can be rapidly performed by resetting in the presence of 3210, power output frame 3211 can drive while being pumped
Dig mechanism 33 and fast and effectively cutting operation is carried out to the pile foundation filling concrete protective plate that needs are removed, without artificial behaviour
Make, the concrete particle splashed during cutting will not hurt staff, improve the security of work, reduce work
The labor intensity of personnel, improve the efficiency of work.
The governor motion 31 includes the height regulation cylinder 311 being symmetrically mounted on bottom plate 1, two height regulation cylinders
By in flange installation and adjustment supporting plate 312, the front end of regulation supporting plate 312 is provided with telescopic chute on 311 top, in telescopic chute
Regulation expansion bracket 313 is provided with by sliding matching mode, regulation expansion bracket 313 is of an L-shaped structure, adjusts and pacify in supporting plate 312
Equipped with regulation riser 314, adjust and regulation telescopic cylinder 315 is installed in the side wall of riser 314, adjust the top of telescopic cylinder 315
End is arranged on regulation expansion bracket 313 by flange, is adjusted and is symmetrically installed with two adjustable telescopic rods in the side wall of riser 314
316, the top of two adjustable telescopic rods 316 is arranged on regulation expansion bracket 313, and two height regulation cylinders 311 are as needed
The height for removing protective plate pile foundation drives the regulation regulation of supporting plate 312 to arrive suitable height, and regulation telescopic cylinder 315 is in two tune
Regulation is to the operating position adapted under the auxiliary of section telescopic bar 316, without the work of ascending a height for manually being selected to adapt to according to need of work
Tool, it is simple to operate, without artificial operation of ascending a height, work risk is reduced, job security is high, improves the efficiency of work.
The mechanism 33 of digging includes being arranged on the tool guard 331 of the lower end of power output frame 3211, and tool guard 331 is
Hollow-core construction, and the lower end of tool guard 331 is hatch frame, the front and rear sides of tool guard 331 are symmetrically arranged with two liftings
Groove, buffer spring 332 is installed on the upper end inwall of tool guard 331, the lower end of buffer spring 332 is arranged on Cutting tool installation manner plate
On 333, in two lifting grooves, the lower end of power output frame 3211 is symmetrically arranged with two cuttings and stretched Cutting tool installation manner plate 333
Contracting cylinder 334, the top of two cutting telescopic cylinders 334 are arranged on Cutting tool installation manner plate 333, the lower end of Cutting tool installation manner plate 333
Chisel 335 is installed, the rear and front end of Cutting tool installation manner plate 333 is symmetrically installed with two cutter protective plates 336, cutter protective plate
336 lower end is inward slant structure, digs telescopic cylinder 334 for two and is installed in the auxiliary lower band cutter of buffer spring 332
Chisel 335 on plate 333 moves to suitable position, mistake of the two cutter protective plates 336 on Cutting tool installation manner plate 333 in work
The space of the cutting of chisel 335 can be strutted in journey, avoids chisel 335 from being stuck at work, improves the stability of work, nothing
Manual operation is needed, reduces the labor intensity of staff, improves the efficiency of work.
The spacing side chain 5 of movement includes the mobile limit electric machine 51 being arranged on by motor cabinet on the outer wall of movable block 324,
Mobile spill spin block 52 is installed on the output shaft of mobile limit electric machine 51, two are symmetrically installed with the outer wall of mobile spill spin block 52
Running fix block 53, running fix block 53 are convex structure, are uniformly pacified from left to right on the upper end inwall of movable supporting frame 321
Stopper slot 54 is moved equipped with a row, the lower end of each shifting chute 54 is to expand outwardly structure, and each mobile stopper slot 54 is equal
It is made up of two opposite movement limiting frames 55, mobile limit electric machine 51 drives mobile spill spin block 52 to enter according to real work situation
Row rotation regulation, mobile spill spin block 52 drive running fix block 53 to move in shifting chute 54 during regulation, two shiftings
Move the work simultaneously of spacing side chain 5 to fix the progress of movable block 324 position, it is ensured that because of vibration frequency during protective plate is removed
It is too fast to cause the position of movable block 324 to change, improve the stability of work.
During work, the present invention is arranged on existing mobile device first, and staff will by existing mobile device
The present invention is moved to the operating position specified, and two governor motions 31 are started working, and two height regulation cylinders 311 are as needed
The height for removing protective plate pile foundation drives the regulation regulation of supporting plate 312 to arrive suitable height, and regulation telescopic cylinder 315 is in two tune
Regulation is started working to the operating position adapted to, damping actuating unit 32 under the auxiliary of section telescopic bar 316, the work of mobile motor 322
Make to drive leading screw 323 to be rotated, leading screw 323 drives movable block 324 to move by screw-driven mode, and movable block 324 is straight
The operating position specified is moved under the auxiliary of line sliding block 325 on leading screw 323, two spacing side chains 5 of movement work to movement
Block 324 carries out spacing, and damper 326 serves the effect of damping during work, and moving telescopic cylinder 328 is according to reality
Situation drives power supporter 329 to move to suitable operating position, and motor with dynamic output 3213 drives dynamic rotation roller 3214
Rotated, dynamic rotation roller 3214 drives power output block 3215 synchronously to be rotated during rotation, power output
Block 3215 is during rotation by changing with the contact position of contact block 3212 so as to drive power output frame 3211 to carry out
Move downward, power output frame 3211 can be rapidly performed by resetting in the presence of two back-moving springs 3210, power output
The pile foundation filling concrete that frame 3211 can drive cutting mechanism 33 to remove needs while being pumped is prevented
Backplate carries out fast and effectively cutting operation, moves two dug in mechanism 33 and digs telescopic cylinder 334 in buffer spring 332
Chisel 335 on auxiliary lower band cutter installing plate 333 moves to suitable position, two cutters on Cutting tool installation manner plate 333
Protective plate 336 can be strutted during work chisel 335 cutting space, avoid chisel 335 be stuck at work from
And quickly protective plate is fast and effectively removed, realize the work(of pile foundation filling concrete protective plate high efficiency dismounting
Can, solving needs manually to use electronic chisel by protective plate present in existing pile foundation filling concrete protective plate demolishing process
Separated with the concrete of solidification, need by existing ascending tool when being removed to the protective plate of higher position, manually make
The concrete particle splashed during being worked with electronic chisel easily hurts staff, and protective plate is removed by ascending tool
Potential safety hazard, manual demolition pile foundation filling concrete protective plate complex operation, labor intensity difficulty low with operating efficiency etc. greatly be present
Topic, has reached purpose.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the description in above-described embodiment and specification simply illustrates the present invention
Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, and these change and changed
Enter all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent
Define.
Claims (6)
1. a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation, including bottom plate (1), its feature exist
In:Governor motion (31) is installed, the lower end of governor motion (31) is provided with damping actuating unit (32), damping on bottom plate (1)
The lower end of actuating unit (32), which is provided with, digs mechanism (33), and governor motion (31), damping actuating unit (32) are with digging mechanism
(33) it is used in conjunction with each other and completes the technique that pile foundation filling concrete protective plate high efficiency is removed;
The damping actuating unit (32) includes being arranged on the movable supporting frame (321) of regulation expansion bracket (313) lower end, mobile branch
Support (321) is in inverted U-shaped structure, and mobile motor is provided with by motor cabinet on the right-hand member inwall of movable supporting frame (321)
(322), the output shaft of mobile motor (322) is connected by shaft coupling with one end of leading screw (323), the other end of leading screw (323)
It is arranged on by bearing on the inwall of movable supporting frame (321) left end, movable block (324) is provided with the middle part of leading screw (323), is moved
The upper end of motion block (324) is provided with linear slider (325), and linear slider (325) is arranged on movable supporting frame (321), mobile
The spacing side chain (5) of two movements is symmetrically installed with the outer wall of block (324) rear and front end, the lower end of movable block (324) is provided with
Damper (326), the lower end of damper (326) are provided with mobile fixed plate (327), the lower end installation of mobile fixed plate (327)
There is moving telescopic cylinder (328), the top of moving telescopic cylinder (328) is arranged on power supporter (329) by flange, moved
Power support frame (329) U-shaped structure, the lower end of power supporter (329) are provided with moving hole, under power supporter (329)
Two back-moving springs (3210) are installed on the inwall of end, two back-moving springs (3210) are symmetrically positioned in the front and rear sides of moving hole,
The top of two back-moving springs (3210) is arranged on power output frame (3211), and the section of power output frame (3211) is I-shaped
Type structure, and the middle part of power output frame (3211) is located in moving hole, the upper end of power output frame (3211) is provided with circle
The contact block (3212) of arcuation mechanism, motor with dynamic output is provided with by motor cabinet on the inwall of power supporter (329)
(3213) dynamic rotation roller (3214), is installed on the output shaft of motor with dynamic output (3213), dynamic rotation roller (3214)
Three power output blocks (3215) are evenly arranged with along its circumferential direction on outer wall, the top of power output block (3215) is circular arc
Shape structure, and power output block (3215) is corresponding with contact block (3212).
2. a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation according to claim 1,
It is characterized in that:The governor motion (31) includes the height regulation cylinder (311) being symmetrically mounted on bottom plate (1), two height
The top of degree regulation cylinder (311) is by the way that in flange installation and adjustment supporting plate (312), the front end of regulation supporting plate (312) is set
There is telescopic chute, be provided with telescopic chute by sliding matching mode and adjust expansion bracket (313), adjust expansion bracket (313) L-shaped knot
Structure, adjust and regulation riser (314) is installed in supporting plate (312), regulation flexible gas is installed in the side wall of regulation riser (314)
Cylinder (315), the top of regulation telescopic cylinder (315) are arranged on regulation expansion bracket (313) by flange, adjust riser (314)
Side wall on be symmetrically installed with two adjustable telescopic rods (316), it is flexible that the tops of two adjustable telescopic rods (316) is arranged on regulation
On frame (313).
3. a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation according to claim 1,
It is characterized in that:The mechanism (33) of digging includes being arranged on the tool guard (331) of power output frame (3211) lower end, cutter
Shield (331) is hollow-core construction, and the lower end of tool guard (331) is hatch frame, and tool guard (331) front and rear sides are symmetrical
Two lifting grooves are provided with, buffer spring (332) is installed on the upper end inwall of tool guard (331), buffer spring (332)
Lower end is arranged on Cutting tool installation manner plate (333), and Cutting tool installation manner plate (333) is in two lifting grooves, power output frame (3211)
Lower end be symmetrically arranged with two dig telescopic cylinders (334), two dig telescopic cylinder (334) tops be arranged on cutter peace
In loading board (333), the lower end of Cutting tool installation manner plate (333) is provided with chisel (335).
4. a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation according to claim 3,
It is characterized in that:The rear and front end of the Cutting tool installation manner plate (333) is symmetrically installed with two cutter protective plates (336), preventing cutter tool
The lower end of backplate (336) is inward slant structure.
5. a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation according to claim 1,
It is characterized in that:The movement that the spacing side chain of movement (5) includes being arranged on movable block (324) outer wall by motor cabinet is spacing
Motor (51), move and mobile spill spin block (52) is installed on the output shaft of limit electric machine (51), the outer wall of mobile spill spin block (52)
On be symmetrically installed with two running fix blocks (53), running fix block (53) is convex structure, movable supporting frame (321) it is upper
A row is uniformly installed from left to right on the inwall of end and moves stopper slot (54).
6. a kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation according to claim 5,
It is characterized in that:The lower end of each shifting chute (54) is to expand outwardly structure, and each moves stopper slot (54) by opposite
Two movement limiting frames (55) composition.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711012242.2A CN107630458A (en) | 2017-10-26 | 2017-10-26 | A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711012242.2A CN107630458A (en) | 2017-10-26 | 2017-10-26 | A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107630458A true CN107630458A (en) | 2018-01-26 |
Family
ID=61105843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711012242.2A Withdrawn CN107630458A (en) | 2017-10-26 | 2017-10-26 | A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107630458A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108277994A (en) * | 2018-03-20 | 2018-07-13 | 中铁三局集团有限公司 | On across the high ferro safe guarding shed quick method for dismounting of operation line |
CN108423572A (en) * | 2018-03-28 | 2018-08-21 | 周兵经 | A kind of hydraulic engineering capture apparatus |
CN108612339A (en) * | 2018-06-13 | 2018-10-02 | 莫小雨 | A kind of frame-supporting column reinforcing bar intelligence prosthetic appliance and its building method for repairing and constructing |
-
2017
- 2017-10-26 CN CN201711012242.2A patent/CN107630458A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108277994A (en) * | 2018-03-20 | 2018-07-13 | 中铁三局集团有限公司 | On across the high ferro safe guarding shed quick method for dismounting of operation line |
CN108423572A (en) * | 2018-03-28 | 2018-08-21 | 周兵经 | A kind of hydraulic engineering capture apparatus |
CN108612339A (en) * | 2018-06-13 | 2018-10-02 | 莫小雨 | A kind of frame-supporting column reinforcing bar intelligence prosthetic appliance and its building method for repairing and constructing |
CN108612339B (en) * | 2018-06-13 | 2019-11-22 | 广东精艺建设集团有限公司 | A kind of frame-supporting column reinforcing bar intelligence prosthetic appliance and its building method for repairing and constructing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107675719A (en) | A kind of Pile Foundation of Highrise Building filling concrete protective plate automatic disassembling robot | |
CN107630458A (en) | A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation | |
CN108867647B (en) | Multifunctional steel pipe column verticality adjusting machine for pile and column integrated construction | |
CN115595978B (en) | Repairing method for side slope empty bag in rock and soil treatment process | |
CN104674856B (en) | Base Pit Excavation Simulation device when hypergravity | |
CN107653884A (en) | The boring steel pile casting of sand foundation bored concrete pile sets device and its construction method | |
CN209067099U (en) | A kind of road and bridge construction piling machine | |
CN109520771A (en) | A kind of Soil K+adsorption convenient for taking indigenous equipment | |
CN109056645A (en) | A kind of river course slope protection build device | |
CN107740406A (en) | Equipment is removed in a kind of mechanization of bridge pile foundation filling concrete protective plate | |
CN110374654B (en) | Hydraulic support device and method for processing coal mine roof fall by using same | |
CN209741839U (en) | A vibration pile driver for bridge construction | |
CN207608916U (en) | A kind of Pile Foundation of Highrise Building filling concrete protective plate automatic disassembling robot | |
CN207659977U (en) | A kind of filling concrete protective plate automatic disassembling machine of high-speed railway rail bridge pile foundation | |
CN207086287U (en) | A kind of bridge sand screening plant | |
CN107701096B (en) | Device and its construction method are grabbed in the boring punching of sand foundation bored concrete pile | |
CN207484467U (en) | Equipment is removed in a kind of mechanization of bridge pile foundation filling concrete protective plate | |
CN114961557A (en) | Be used for building engineering concrete pipe pile to draw a device | |
CN108867553A (en) | A kind of water conservancy river course slope protection is intelligent to build equipment and its slope protection process for constructing | |
CN203373746U (en) | Crawler-type vibration immersed tube piling machine | |
JP6684314B2 (en) | Bridge pier removal method | |
CN216276776U (en) | Beam frame for building construction | |
CN205172501U (en) | A sticking of tool processing apparatus punches a hole | |
CN206911717U (en) | A kind of road bridge construction material screening plant | |
JP4112921B2 (en) | Temporary gantry used for work between tracks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180126 |