CN107627528A - A kind of horizontal TPU foaming machines - Google Patents

A kind of horizontal TPU foaming machines Download PDF

Info

Publication number
CN107627528A
CN107627528A CN201711000251.XA CN201711000251A CN107627528A CN 107627528 A CN107627528 A CN 107627528A CN 201711000251 A CN201711000251 A CN 201711000251A CN 107627528 A CN107627528 A CN 107627528A
Authority
CN
China
Prior art keywords
mentioned
mounting plate
mold mounting
installation cavity
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711000251.XA
Other languages
Chinese (zh)
Inventor
许明琛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinjiang Licheng Machinery Technology Co Ltd
Original Assignee
Jinjiang Licheng Machinery Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinjiang Licheng Machinery Technology Co Ltd filed Critical Jinjiang Licheng Machinery Technology Co Ltd
Priority to CN201711000251.XA priority Critical patent/CN107627528A/en
Publication of CN107627528A publication Critical patent/CN107627528A/en
Pending legal-status Critical Current

Links

Landscapes

  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The present invention discloses a kind of horizontal TPU foaming machines, including frame, mould installion frame and the discharging carriage below mould installion frame, mould installion frame includes the first mold mounting plate and the second mold mounting plate of laterally opposed setting, first mold mounting plate is packed in frame, second mold mounting plate is arranged on the first mold mounting plate in a manner of transverse translation, translation driving device is installed in frame, the mounting surface of first mold mounting plate and the second mold mounting plate is concavely provided with installation cavity, the first end of discharging carriage is in the lower section of the first mold mounting plate, second end is stretched out outside frame;Frame be located at mould installion frame top be provided with flow to the first installation cavity and steam pipeline, cold water delivery pipe and vacuum conveyer tube in the second installation cavity.Compared with prior art, the advantages of whole mould installion frame is in horizontal type structure, greatly reduces the overall space of foaming machine, has overall volume small, takes up space small, and parts are few, simple structure, easy to maintain, and fault rate is low.

Description

A kind of horizontal TPU foaming machines
Technical field
The present invention relates to foaming machinery, more particularly to a kind of horizontal TPU foaming machines.
Background technology
TPU expanded materials be in fact by numerous resilient enough, very light in weight TPU foaming bead assemble together one Kind of novel high polymer material, this granular materials after expanding, 5-8 times of volumetric expansion, cell diameter only 30 microns it is micro- to 300 Rice or so, size and shape is as puffed rice, and 0.15-0.25 grams per cubic centimeter of density allows people, and almost imperceptible its is heavy Amount, so, " puffed rice " is referred to as by industry image, it overcomes, and TPU raw material weights are big, hardness is high, damping performance is poor etc. The shortcomings that aspect, while weight is lighter, gas permeability is stronger, environmentally friendly, wear-resisting, high-elastic, color inhibition, is internationally renowned brand sport footwear Insole material.With the extensive use of TPU expanded materials, market also has the TPU foaming machines of different structure, but, it is existing There are TPU foaming machines, its mould for being used to be molded is separately positioned on two disjunct mounting brackets, and is also needed on each mounting bracket Mould installion can be just set to answer existing TPU foaming machines generally existing overall structure in mounting bracket provided with a mounting seat and template The problem of miscellaneous, volume is big, takes up space big, not easy care, and cost of manufacture is high, and fault rate is high
In view of this, the present inventor furthers investigate to above mentioned problem, is produced then by this case.
The content of the invention
In view of this, it is an object of the invention to provide a kind of horizontal TPU foaming machines, to solve existing TPU foaming machines Have that complicated, volume is big, it is big to take up space, easy care, cost of manufacture be not high and the problem of fault rate is high.
In order to reach above-mentioned purpose, solution of the invention is:A kind of horizontal TPU foaming machines, including frame and mould Mounting bracket, mould installion frame are arranged in frame;Above-mentioned mould installion frame includes erectting the first mold mounting plate set and the Two molds installing plate, above-mentioned first mold mounting plate and above-mentioned second mold mounting plate are in laterally opposed interval setting, and above-mentioned the One mold mounting plate is fixedly mounted in above-mentioned frame, is installed with accumbency on above-mentioned first mold mounting plate, and to the second mould Has a mounting post of installing plate direction extension, above-mentioned second mold mounting plate is with to the side of the first mold mounting plate direction alternating translational Formula is arranged in above-mentioned mounting post, and the driven in translation dress of the second mold mounting plate alternating translational of control is provided with above-mentioned frame Put, the one side relative with the second mold mounting plate using the first mold mounting plate is mounting surface, the peace of above-mentioned first mold mounting plate Dress face is concavely provided with the first installation cavity of male model or the master mold installation for mould, the mounting surface of above-mentioned second mold mounting plate It is concavely provided with for the master mold of mould or with mould installation, and second installation cavity relative with the first installation cavity, above-mentioned frame On be provided with below the mould installion frame, and the discharging carriage with conveyer belt, at the first end of above-mentioned discharging carriage In the lower section of above-mentioned first mold mounting plate, the second end of above-mentioned discharging carriage extends to the second mold mounting plate direction, and Stretch out outside above-mentioned frame;Above-mentioned frame be located at mould installion frame top be provided with flow in the first installation cavity and the second installation cavity Steam pipeline, cold water delivery pipe and vacuum conveyer tube.
Using the moving direction of the second mold mounting plate as left and right directions, above-mentioned frame includes casing and the bar in casing Frame, above-mentioned casing are in the rectangular parallelepiped structure extended along frame left and right directions, and above-mentioned second mold mounting plate is in the first mould peace The left side of loading board, the left surface of above-mentioned casing, which offers, confesses the stretching hole that the second end of material carriage is stretched out.
Above-mentioned bridge is with the cross-bar body along the extension of bridge fore-and-aft direction and on the left of cross-bar body and prolongs in left-right direction The preceding body of rod and the rear body of rod stretched, above-mentioned first mold mounting plate are fixed to erect and are arranged in above-mentioned cross-bar body, the above-mentioned preceding body of rod and Place height of place of the body of rod on bridge highly less than above-mentioned cross-bar body on bridge after above-mentioned;The top surface of the above-mentioned preceding body of rod The directive slide track extended with the left and right directions being installed with respectively on the top surface of the rear body of rod along frame, above-mentioned second mould installion The sliding block being slidably mounted on directive slide track is correspondingly installed with the bottom surface front and rear sides of plate.
Above-mentioned mounting post is provided with four, wherein two mounting posts are at the front side of mould installion frame, and in right up and down Position is set, and another two mounting posts are at the rear side of mould installion frame, and is set in contraposition up and down, and above-mentioned mounting post has in a left side The first cylinder and the second cylinder that the right side is arranged side by side, the right-hand member end of above-mentioned first cylinder pass through above-mentioned first mold mounting plate, And the intrinsic mounting blocks of right-hand member end overcoat of above-mentioned first cylinder, above-mentioned mounting blocks locking is on the right side of above-mentioned first mold mounting plate On side, the right-hand member slip cap of above-mentioned second cylinder is outside the left end of above-mentioned first cylinder, the left end end of above-mentioned second cylinder Portion's activity is passed through outside above-mentioned second mold mounting plate, and is in the left end end of the mounting post of top and the mounting post being below Left end end be provided with the second mold mounting plate of limitation and the first mold mounting plate fit after the pretightening machine of micro-shifting to the left again Structure.
Above-mentioned pre-tightening mechanism includes upper clamping block, lower gripping block and the lifting air between upper clamping block and lower gripping block Cylinder, above-mentioned upper clamping block include upper and lower the first half fixture blocks being oppositely arranged and the second half fixture blocks, above-mentioned lower gripping block include it is upper, Under the 3rd half fixture block and the 4th half fixture block that are oppositely arranged, above-mentioned the first half fixture block, the second half fixture block, the 3rd half fixture blocks and the 4th Half fixture block is from top to bottom set gradually, and above-mentioned the first half bottom surfaces of fixture block and the bottom surface of the 3rd half fixture block are arranged with for peace The top of dress post is embedded in interior upper cavity, and above-mentioned the second half top surfaces of fixture block and the top surface of the 4th half fixture block are arranged with for peace The bottom of dress post is embedded in interior lower cavity, and above-mentioned the first half fixture block, which with above-mentioned 3rd half fixture block passes through the first vertical connecting rod, to be fixed and go here and there It is connected together, and the activity of above-mentioned first vertical connecting rod is through above-mentioned the second half fixture block, above-mentioned the second half fixture block and the above-mentioned 4th half folder Block is fixed by the second vertical connecting rod and is serially connected, and the activity of above-mentioned second vertical connecting rod passes through above-mentioned 3rd half fixture block, above-mentioned liter The cylinder body of sending down abnormally ascending cylinder is fixed and is erected on the top surface of above-mentioned 3rd half fixture block, the piston rod free end end court of above-mentioned lift cylinder Upper setting, and the piston rod free end end of above-mentioned lift cylinder is fixedly connected with above-mentioned the second half fixture block, above-mentioned lift cylinder Piston rod free end outside be arranged with the support block of support lift cylinder piston rod, above-mentioned support block is in above-mentioned the second half fixture block Lower section, and the locking of above-mentioned support block is on the left surface of above-mentioned second mold mounting plate.
Above-mentioned first installation cavity and the second installation cavity are provided with several, each first installation cavity and each second installation cavity one One contraposition is set, and each first installation cavity and each second installation cavity are arranged in arrays;And above-mentioned first mold mounting plate is located at Position between two first neighbouring installation cavitys between two first installation cavitys that left and right is adjacent is offered for this phase The first intercommunicating pore that two first adjacent installation cavitys are connected, above-mentioned second mold mounting plate is positioned at two second neighbouring installations Position between chamber between two second installation cavitys that left and right is adjacent offers to be connected for this two second adjacent installation cavity The second logical intercommunicating pore, the bottom surface of above-mentioned first mold mounting plate are located in each first installation cavity of matrix arrangement in most lower The position of each first installation cavity of row offers the first osculum being connected with the first installation cavity, above-mentioned second mould peace Open at the position that the bottom surface of loading board is located in each second installation cavity for most descending row in each second installation cavity of matrix arrangement Provided with the second osculum being connected with the second installation cavity, the right flank of above-mentioned first mold mounting plate is located at each first installation cavity Centre at offer the material hole being connected with the first installation cavity, the left surface of above-mentioned second mold mounting plate is positioned at each The medium access aperture being connected with the second installation cavity is offered at the centre of second installation cavity.
Above-mentioned second installation cavity internal lock Guan County is equipped with medium output board, and above-mentioned medium output board is in day font, above-mentioned medium Offer the day font passage to be matched with the shape of medium output board in output board, above-mentioned medium output board is towards above-mentioned first Several medium delivery outlets being connected with day font passage are offered in the one side of installation cavity, each medium delivery outlet surrounds a day word Type, and several side through hole being connected with day font passage are offered in the side wall of above-mentioned medium output board.
Above-mentioned translation driving device is flat-removing air cyclinder, and the cylinder body of above-mentioned flat-removing air cyclinder is fixed on above-mentioned bridge, and is in The lower section of above-mentioned mould installion frame, left and right directions extension of the above-mentioned flat-removing air cyclinder along above-mentioned bridge, the piston of above-mentioned flat-removing air cyclinder Bar free end end is locked together towards left setting, and with the bottom surface of above-mentioned second mold mounting plate.
Above-mentioned discharging carriage has support body, conveying roller and said conveyer belt, and above-mentioned support body is in what is extended in left-right direction Arrow rack, above-mentioned support body are positioned on above-mentioned bridge by above-mentioned stretching hole activity pull, and above-mentioned conveying roller is provided with two, and Set along the fore-and-aft direction traverse of support body, two conveying rollers correspond to be rotatably installed in the arranged on left and right sides of support body respectively, above-mentioned conveying Band is set around on two conveying rollers.
In being arranged side by side from front to back, above-mentioned steam conveys for above-mentioned steam pipeline, cold water delivery pipe and vacuum conveyer tube Pipe, cold water delivery pipe and vacuum conveyer tube are connected jointly by a connection transverse tube with above-mentioned first installation cavity and the second installation cavity It is logical, erect to have respectively on above-mentioned steam pipeline, above-mentioned cold water delivery pipe and above-mentioned vacuum conveyer tube and be connected with connecting transverse tube Vertical tube, the switching control pilot of control vertical tube on or off is separately installed with each vertical tube.
After adopting the above technical scheme, the present invention a kind of horizontal TPU foaming machines, only need to set the first mold mounting plate and Second mold mounting plate is the installation that the mould for foaming can be achieved, and makes the mounting structure of mould simple, and the One mold mounting plate and the second mold mounting plate are commonly mounted in a mounting post, make the overall volume of whole mould installion frame It is small, take up space small, parts are few, simple structure, easy to maintain, and fault rate is low, meanwhile, the first mold mounting plate and the second mould Has the laterally opposed setting of installing plate, it is in horizontal type structure to make mould, greatly reduces the overall space of foaming machine, and is easy to grasp Make.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the combination diagram of mould installion frame and discharging carriage in the present invention;
Fig. 3 is the stereogram of mould installion frame in the present invention;
Fig. 4 is another stereogram of mould installion frame in the present invention;
Fig. 5 is the stereogram of medium tablet in the present invention.
Embodiment
In order to which technical scheme is explained further, the present invention is explained in detail below by specific embodiment State.
A kind of horizontal TPU foaming machines of the present invention, as Figure 1-5, including frame 1 and mould installion frame, mould installion Frame is arranged in frame 1, first mold mounting plate 2 and second mold mounting plate 3 of the mould installion frame including erectting setting, and first The mold mounting plate 3 of mold mounting plate 2 and second is in laterally opposed interval setting, is pacified with the first mold mounting plate 2 and the second mould The transversely arranged direction of loading board 3 is left and right directions, and the first mold mounting plate 2 is in right side, and the second mold mounting plate 3 is in a left side Side;First mold mounting plate 2 is fixedly mounted in frame, is installed with accumbency on the first mold mounting plate 2, and to the second mould The mounting post 4 of the direction of installing plate 3 extension, the plate of the second mould installion 3 is in a manner of to the direction alternating translational of the first mold mounting plate 2 In mounting post 4, be provided with frame 1 control the alternating translational of the second mold mounting plate 3 translation driving device 5, first The left surface of mold mounting plate 2 is concavely provided with the first installation cavity 21 of male model or the master mold installation for mould, the second mould The right flank of installing plate 3 is concavely provided with for the master mold of mould or with mould installation, and with the first installation cavity 21 with respect to position Second installation cavity 31, it is provided with frame 1 below mould installion frame, and the discharging carriage 6 with conveyer belt, discharging are defeated It is in the list structure extended along the left and right directions of frame to send frame 6, and the right-hand member of discharging carriage 6 is in the first mold mounting plate 2 Lower section, it is preferred that the right-hand member end of discharging carriage 6 is in outside the lower right of the first mold mounting plate 2, and discharge carriage 6 Left end stretch out frame 1 left side outside;Pacify provided with the first installation cavity 21 and second is flow to the top that frame 1 is located at mould installion frame Steam pipeline 71, cold water delivery pipe 72 and the vacuum conveyer tube 73 behaveing affectedly in 31.
Preferably, the frame 1 includes casing 11 and the bridge 12 in casing 11, and casing 11 is in along frame left and right directions The rectangular parallelepiped structure of extension, the left surface of casing 11, which offers, confesses the stretching hole 111 that the left end of material carriage 6 stretches out, bridge 12 correspond at mould installion frame with the cross-bar body (not shown) along the extension of the fore-and-aft direction of bridge 12 and in cross-bar body Left side and the preceding body of rod (not shown) extended in left-right direction and rear body of rod (not shown), the first mold mounting plate 2 Fixed erect is arranged in cross-bar body, and the place of the preceding body of rod and the rear body of rod on bridge is highly less than institute of the cross-bar body on bridge In height;It is installed with along the guiding of the left and right directions extension of frame and slides respectively on the top surface of the top surface of the preceding body of rod and the rear body of rod Rail 13, the cunning being slidably mounted on two directive slide tracks 13 is correspondingly installed with the bottom surface front and rear sides of the second mold mounting plate 3 Block 32, being slidably installed for the second mold mounting plate 3 can be achieved using the cooperation of sliding block 32 and directive slide track 13.
Described mounting post 4 is provided with four, and mounting post 4 is in cylindrical structure, wherein two mounting posts 4 are in mould peace At the front side shelved, and being set in contraposition up and down, another two mounting posts are at the rear side of mould installion frame, and in contraposition up and down Set, i.e. four mounting posts are gone to upper and lower, left and right direction is set, and four mounting posts 4 surround square structure, the right-hand member of each mounting post 4 End passes through to the right the first mold mounting plate 2, and the intrinsic mounting blocks 41 of right-hand member end overcoat of mounting post 4, mounting blocks 41 are locked Gu on the right flank of the first mold mounting plate 2, the fixation of mounting post and the first mold mounting plate 2 is realized using this mounting blocks 41 Installation, activity is passed through outside the left side of the second mold mounting plate 3 to the left for the left end end of mounting post 4, it is preferred that the mounting post 4 has There are the first cylinder and the second cylinder being arranged side by side in left and right, the right-hand member end of the first cylinder passes through the first mold mounting plate 2, and Mounting blocks 41 are fixed in outside the right-hand member end of first cylinder, and the left end of the first cylinder has undergauge section, the right-hand member of the second cylinder For slip cap outside undergauge section, the left end of the second cylinder passes through the second mold mounting plate 3, and is fixed with the second mold mounting plate 3 Connection, so, the cooperation using the first cylinder and the second cylinder makes the slip of the second mold mounting plate 3 play guide effect, and The second mold mounting plate 3 of limitation and the first mould installion are provided between the left end end for two the second cylinders being oppositely arranged up and down The pre-tightening mechanism of micro-shifting to the left again after plate 2 fits.
This pre-tightening mechanism includes upper clamping block 81, lower gripping block 82 and between upper clamping block 81 and lower gripping block 82 Lift cylinder 83, upper clamping block 81 include upper and lower the first half fixture blocks 811 being oppositely arranged and the second half fixture blocks 812, lower gripping block 82 include upper and lower the 3rd half fixture block 821 and the 4th half fixture block 822 being oppositely arranged, the first half fixture blocks 811, the second half fixture blocks 812nd, the 3rd half fixture block 821 and the 4th half fixture block 822 are from top to bottom set gradually, the bottom surface and the 3rd of the first half fixture blocks 811 The top that the bottom surface of half fixture block 821 is arranged with for the second cylinder is embedded in interior upper cavity (not shown), this fovea superior Chamber matches with the second cylinder, less than the concave arc chamber of semicircle, the top surfaces of the second half fixture blocks 812 and the 4th half fixture block 822 The bottom that top surface is arranged with down for the second cylinder is embedded in interior lower cavity, and this lower cavity matches with the second cylinder, Less than the concave arc chamber of semicircle, the second cylinder can be clamped using cavity on this and lower cavity, the first half fixture blocks 811 and the 3rd half press from both sides Block 821 is fixed by the first vertical connecting rod 84 and is serially connected, and the activity of the first vertical connecting rod 84 is through the second half fixture blocks 812, and second Half fixture block 812 is fixed by the second vertical connecting rod 85 with the 4th half fixture block 822 and is serially connected, and the activity of the second vertical connecting rod 85 passes through 3rd half fixture block 821, the cylinder body of lift cylinder 83, which is fixed, to be erected on the top surface of the 3rd half fixture block 821, the work of lift cylinder 83 Stopper rod free end end is set upward, and the piston rod free end end of lift cylinder 83 is fixedly connected with the second half fixture blocks 812, It is arranged with the support block 86 of the support piston rod of lift cylinder 83 outside the piston rod free end of lift cylinder 83, support block 86 is in the The lower section of 2 half fixture block 812, and support block 86 locks on the left surface of the second mold mounting plate 4.When lift cylinder 83 stretches out, the 2 half fixture blocks 812 move up, and the 3rd half fixture block 821 moves down, and moving up for the second half fixture blocks 812 pulls the 4th half fixture block 823 to move up, the The fixture block 811 of pulling the first half that moves down of 3 half fixture blocks 821 moves down, the relative movement and the 3rd of the first half fixture blocks and the second half fixture blocks The relative movement of half fixture block and the 4th half fixture block makes upper half gripping block and lower gripping block utilize the cylinder pressure of lift cylinder all the time Clamp mounting post.
Described the first installation cavity 21 and the second installation cavity 31 is provided with several, each first installation cavity and each second peace Contraposition one by one of behaveing affectedly is set, and each first installation cavity and each second installation cavity are arranged in arrays, is preferably respectively provided with eight, and 8 the One installation cavity 21 is set in two rows, and often row has four the first installation cavitys 21;The first described mold mounting plate 2 is located at Position between upper and lower two first adjacent installation cavitys 21 between left and right two first adjacent installation cavitys 21 offers The first intercommunicating pore 211 being connected for this two first adjacent installation cavity, i.e., up and down between two first installation cavitys of contraposition setting With the first intercommunicating pore 211, there is the first intercommunicating pore 211, the second mould between two first installation cavitys that left and right is mutually disposed proximate to Position of the installing plate 3 between upper and lower two second adjacent installation cavitys 31 between left and right two second adjacent installation cavitys 31 Place offers the second intercommunicating pore 311 being connected for this two second adjacent installation cavity, i.e., aligns two second set up and down There is the second intercommunicating pore 311 between installation cavity, there is the second intercommunicating pore between two second installation cavitys that left and right is mutually disposed proximate to 311, the position that the bottom surface of the first mold mounting plate 2 is located at each first installation cavity 21 offers and the phase of the first installation cavity 21 First osculum 212 of connection, the position that the bottom surface of the second mold mounting plate 3 is located at each second installation cavity 31 offer The second osculum 312 being connected with the second installation cavity 31, material hole 213 is offered on the right flank of the first mold mounting plate 2 With medium access aperture 214, the left surface of the second mold mounting plate 3 be located at the centre of each second installation cavity 31 offer with The medium access aperture 313 that second installation cavity is connected.
Described translation driving device 5 is flat-removing air cyclinder, and the cylinder body of flat-removing air cyclinder is fixed on bridge 15, and is in mould The lower section of mounting bracket, left and right directions extension of the flat-removing air cyclinder along bridge, the piston rod free end end of flat-removing air cyclinder towards left setting, And be locked together with the bottom surface of the second mold mounting plate 3, flexible achievable second mold mounting plate 3 of flat-removing air cyclinder Alternating translational.
Described steam pipeline 71, cold water delivery pipe 72 and vacuum conveyer tube 73 is in be arranged side by side from front to back, steam Delivery pipe 71, cold water delivery pipe 72 and vacuum conveyer tube 73 are connected jointly by a connection transverse tube 74, and connection transverse tube 74 is in The top of steam pipeline 71, cold water delivery pipe 72 and vacuum conveyer tube 73, and be extended along the longitudinal direction, connect transverse tube 74 It is connected by each branched pipe with the medium access aperture of each first installation cavity and each second installation cavity cooperation, steam pipeline 71, Being erect respectively in cold water delivery pipe 72 and vacuum conveyer tube 73 has the vertical tube 75 being connected with connection transverse tube 74, divides on each vertical tube 75 The switching control pilot 76 of control vertical tube on or off is not installed.
A kind of horizontal TPU foaming machines of the present invention, the male model of mould is installed in each first installation cavity during application Or master mold, the master mold or male model of installation forming mould in each second installation cavity, the right side that mould installion frame is located in frame are set Row material injecting mechanism, the discharge end of row material injecting mechanism are connected with the material hole 213 of the first installation cavity.During work, flat-removing air cyclinder shrinks, and puts down The contraction for moving cylinder drives the second mold mounting plate 3 to be affixed to right translation, the second mold mounting plate 3 with the first mold mounting plate 2 Close and coordinate, be i.e. the male model of mould and master mold matched moulds, after matched moulds, row material injecting mechanism is through material hole 213 toward injecting in mould The switching control pilot 76 of foamed material, the correspondingly vertical tube 75 at steam pipeline 71, the steam input in steam pipeline 71 To the first installation cavity and the second installation cavity, mould is heated, and meets the temperature needed for foamed material, afterwards steam pipeline 71 stop sending hot gas, and the switching control pilot 76 of the vertical tube 75 at cold water delivery pipe 72 turns on, and the cold water in cold water delivery pipe 72 is defeated Enter to the first installation cavity and the second installation, mould is cooled, and meets the chilling temperature needed for foamed material, afterwards foamed Material shaping, the second mold mounting plate 3 is moved to the left after shaping, and moulded products are moved to left and deviate from the second mold mounting plate 3 Outside second mold mounting plate 3, the thimble of row material injecting mechanism is stretched into moulded products in the mould of the first installation cavity through material hole afterwards Eject outside the first mold mounting plate 2, the moulded products of ejection are just dropped down onto down on discharging carriage 6, are now discharged on carriage 6 Conveyer belt moulded products are transferred out outside frame 1.
The horizontal TPU foaming machines of the present invention, have the advantages that:
First, only the first mold mounting plate 2 need to be set and mould for foaming can be achieved in the second mold mounting plate 3 Installation, make the mounting structure of mould simple, small volume;
2nd, the first mold mounting plate 2 and the second mold mounting plate 3 are commonly mounted in a mounting post 4, pacify whole mould The overall volume shelved is small, takes up space small, and parts are few, simple structure, easy to maintain, and fault rate is low;
3rd, the first mold mounting plate and the laterally opposed setting of the second mold mounting plate, it is in horizontal type structure to make mould, greatly The big overall space for reducing foaming machine, and it is easily operated, and processing and fabricating cost is low;
4th, multiple products can be once molded, operating efficiency is high;
5th, using evacuated air pipe make mould installion frame after one step foaming is completed can first will be at evacuated air pipe 73 it is perpendicular The switching control pilot of pipe is opened, and the first installation cavity and the second installation cavity are carried out blowing vacuum, installs the first installation cavity and second It is in dry condition during chamber input steam, the first installation cavity and the second installation cavity is rapidly heated, significantly improves shaping effect Rate;
6th, the cold water that the osculum at the first installation cavity and the second installation cavity inputs cold water delivery pipe can be arranged through osculum Go out and collect and recycle again, the waste of water resource will not be caused;
Seven, the second mold mounting plate can be enable to be bonded all the time with the first mold mounting plate during using pre-tightening mechanism matched moulds, it is right First mold mounting plate has certain pressure force, makes the Forming Quality of mould preferable.
The foaming machine of the present invention, it is preferred that the discharging carriage 6 has support body, conveying roller and conveyer belt, and support body is in edge The arrow rack of left and right directions extension, support body are positioned on bridge by stretching out hole activity pull, and conveying roller is provided with two, and edge The fore-and-aft direction traverse of support body is set, and two conveying rollers correspond to be rotatably installed in the arranged on left and right sides of support body respectively, conveyer belt winding In on two conveying rollers;Such a discharging carriage 6 can transfer out moulded products outside frame, make the taking-up of moulded products more square Just, in addition, the pull of discharging carriage 6 sets the installation and maintenance for the carriage that can conveniently discharge, mould installion frame is had no effect on Safeguard.
The foaming machine of the present invention, it is preferred that the internal lock Guan County of the second installation cavity 31 is equipped with medium output board 8, and medium is defeated Ejecting plate 8 is in day font, offers the day font passage to be matched with the shape of medium output board 8 in medium output board 8, medium is defeated Ejecting plate 8 is towards several medium delivery outlets 81 being connected with day font passage are offered in the one side of the first installation cavity 21, respectively Medium delivery outlet 81 surrounds a day font, and offers what several were connected with day font passage in the side wall of medium output board 8 Side through hole 82;So, the medium of input is disperseed using the medium output board 8 of such a structure to be delivered to the four of the second installation cavity 31 At week, enable whole chamber heated fast, cooling or the drying of the second installation cavity 31, efficiency high.
Above-described embodiment and accompanying drawing and non-limiting product form of the invention and style, any art it is common The appropriate change or modification that technical staff is done to it, it all should be regarded as not departing from the patent category of the present invention.

Claims (10)

1. a kind of horizontal TPU foaming machines, including frame and mould installion frame, mould installion frame is arranged in frame;Its feature exists In:Above-mentioned mould installion frame includes erectting the first mold mounting plate and the second mold mounting plate set, above-mentioned first mould peace Loading board and above-mentioned second mold mounting plate are in laterally opposed interval setting, and above-mentioned first mold mounting plate is fixedly mounted on above-mentioned machine On frame, accumbency is installed with above-mentioned first mold mounting plate, and to the mounting post that the second mold mounting plate direction extends, it is above-mentioned Second mold mounting plate is arranged in above-mentioned mounting post in a manner of to the first mold mounting plate direction alternating translational, above-mentioned frame On be provided with control the second mold mounting plate alternating translational translation driving device, with the first mold mounting plate and the second mould peace The relative one side of loading board is mounting surface, and the mounting surface of above-mentioned first mold mounting plate is concavely provided with male model or mother for mould First installation cavity of mould installation, the mounting surface of above-mentioned second mold mounting plate are concavely provided with for the master mold of mould or pacified with mould Dress, and second installation cavity relative with the first installation cavity, it is provided with below mould installion frame in above-mentioned frame, and have The discharging carriage of conveyer belt, the first end of above-mentioned discharging carriage are in the lower section of above-mentioned first mold mounting plate, it is above-mentioned go out Second end of material carriage extends to the second mold mounting plate direction, and stretches out outside above-mentioned frame;Above-mentioned frame is located at mould peace The top shelved is provided with and flow to the first installation cavity and steam pipeline, cold water delivery pipe and vacuum handling in the second installation cavity Pipe.
A kind of 2. horizontal TPU foaming machines as claimed in claim 1, it is characterised in that:With the mobile side of the second mold mounting plate Include casing and the bridge in casing to for left and right directions, above-mentioned frame, above-mentioned casing is in along the extension of frame left and right directions Rectangular parallelepiped structure, above-mentioned second mold mounting plate are in the left side of the first mold mounting plate, and the left surface of above-mentioned casing offers Confess the stretching hole that the second end of material carriage is stretched out.
A kind of 3. horizontal TPU foaming machines as claimed in claim 2, it is characterised in that:Above-mentioned bridge has along bridge front and back Cross-bar body to extension and on the left of cross-bar body and the preceding body of rod extended in left-right direction and the rear body of rod, above-mentioned first mould Installing plate is fixed to erect and is arranged in above-mentioned cross-bar body, and the above-mentioned preceding body of rod and above-mentioned rear place of the body of rod on bridge are highly less than Place height of the above-mentioned cross-bar body on bridge;Edge is installed with respectively on the top surface of the above-mentioned preceding body of rod and the top surface of the rear body of rod The directive slide track of the left and right directions extension of frame, is correspondingly installed with the bottom surface front and rear sides of above-mentioned second mold mounting plate The sliding block being slidably mounted on directive slide track.
A kind of 4. horizontal TPU foaming machines as claimed in claim 2, it is characterised in that:Above-mentioned mounting post is provided with four, wherein Two mounting posts are at the front side of mould installion frame, and are set in contraposition up and down, and another two mounting posts are in mould installion frame Rear side at, and set in contraposition up and down, above-mentioned mounting post has in left and right the first cylinder and the second cylinder that are arranged side by side, on The right-hand member end for stating the first cylinder passes through above-mentioned first mold mounting plate, and the right-hand member end overcoat of above-mentioned first cylinder is inherently pacified Block is filled, on the right flank of above-mentioned first mold mounting plate, the right-hand member of above-mentioned second cylinder, which slides, to be arranged for above-mentioned mounting blocks locking In outside the left end of above-mentioned first cylinder, the left end end activity of above-mentioned second cylinder is passed through outside above-mentioned second mold mounting plate, and The left end end of mounting post in top and the left end end for the mounting post being below are provided with the second mould installion of limitation The pre-tightening mechanism of micro-shifting to the left again after plate and the first mold mounting plate fit.
A kind of 5. horizontal TPU foaming machines as claimed in claim 4, it is characterised in that:Above-mentioned pre-tightening mechanism include upper clamping block, Lower gripping block and the lift cylinder between upper clamping block and lower gripping block, above-mentioned upper clamping block include upper and lower be oppositely arranged The first half fixture blocks and the second half fixture blocks, above-mentioned lower gripping block include upper and lower the 3rd half fixture block being oppositely arranged and the 4th half folder Block, above-mentioned the first half fixture block, the second half fixture block, the 3rd half fixture block and the 4th half fixture blocks are from top to bottom set gradually, and above-mentioned first The top that the bottom surface of the bottom surface of half fixture block and the 3rd half fixture block is arranged with for mounting post is embedded in interior upper cavity, above-mentioned The bottom that the second half top surfaces of fixture block and the top surface of the 4th half fixture block are arranged with for mounting post is embedded in interior lower cavity, above-mentioned The first half fixture blocks are fixed by the first vertical connecting rod with above-mentioned 3rd half fixture block and are serially connected, and above-mentioned first vertical connecting rod activity is worn Cross above-mentioned the second half fixture block, above-mentioned the second half fixture block is fixed with above-mentioned 4th half fixture block by the second vertical connecting rod to be serially connected, And above-mentioned second vertical connecting rod activity passes through above-mentioned 3rd half fixture block, the cylinder body of above-mentioned lift cylinder, which is fixed, is erected at the above-mentioned 3rd half On the top surface of fixture block, the piston rod free end end of above-mentioned lift cylinder is set upward, and the piston rod of above-mentioned lift cylinder is certainly By holding end to be fixedly connected with above-mentioned the second half fixture block, the piston rod free end of above-mentioned lift cylinder is arranged with support lifting air outside The support block of cylinder piston rod, above-mentioned support block are in below above-mentioned the second half fixture block, and the locking of above-mentioned support block is above-mentioned second On the left surface of mold mounting plate.
A kind of 6. horizontal TPU foaming machines as claimed in claim 2, it is characterised in that:Above-mentioned first installation cavity and the second installation Chamber is provided with several, and each first installation cavity aligns setting, and each first installation cavity and Ge one by one with each second installation cavity Two installation cavitys are arranged in arrays;And above-mentioned first mold mounting plate is between two first neighbouring installation cavitys and left and right Position between two first adjacent installation cavitys offers the first connection being connected for this two first adjacent installation cavity Hole, above-mentioned second mold mounting plate two second installation cavitys adjacent with left and right between two second neighbouring installation cavitys it Between position offer the second intercommunicating pore being connected for this two second adjacent installation cavity, above-mentioned first mold mounting plate Bottom surface be located in each first installation cavity of matrix arrangement in most descending the position of each first installation cavity of row to offer The first osculum being connected with the first installation cavity, the bottom surface of above-mentioned second mold mounting plate are located at each the second of matrix arrangement Position in each second installation cavity for most descending row in installation cavity offers the second draining being connected with the second installation cavity Hole, the right flank of above-mentioned first mold mounting plate, which is located at the centre of each first installation cavity, to be offered and the first installation cavity phase The material hole of connection, the left surface of above-mentioned second mold mounting plate, which is located at the centre of each second installation cavity, to be offered and the The medium access aperture that two installation cavitys are connected.
A kind of 7. horizontal TPU foaming machines as claimed in claim 6, it is characterised in that:Above-mentioned second installation cavity internal lock Guan County dress There is medium output board, above-mentioned medium output board is in day font, and the shape with medium output board is offered in above-mentioned medium output board The day font passage to match, above-mentioned medium output board is towards offering several and day word in the one side of above-mentioned first installation cavity The medium delivery outlet that type passage is connected, each medium delivery outlet surrounds a day font, and is opened up in the side wall of above-mentioned medium output board There are several side through hole being connected with day font passage.
A kind of 8. horizontal TPU foaming machines as claimed in claim 2, it is characterised in that:Above-mentioned translation driving device is translation gas Cylinder, the cylinder body of above-mentioned flat-removing air cyclinder are fixed on above-mentioned bridge, and the lower section in above-mentioned mould installion frame, above-mentioned flat-removing air cyclinder Extend along the left and right directions of above-mentioned bridge, the piston rod free end end of above-mentioned flat-removing air cyclinder is towards left setting, and with above-mentioned second The bottom surface of mold mounting plate is locked together.
A kind of 9. horizontal TPU foaming machines as claimed in claim 2, it is characterised in that:Above-mentioned discharging carriage has support body, defeated Roller and said conveyer belt are sent, above-mentioned support body is in the arrow rack extended in left-right direction, and above-mentioned support body passes through the activity of above-mentioned stretching hole Pull is positioned on above-mentioned bridge, and above-mentioned conveying roller is provided with two, and is set along the fore-and-aft direction traverse of support body, two conveying rollers Correspond to and be rotatably installed in the arranged on left and right sides of support body respectively, said conveyer belt is set around on two conveying rollers.
A kind of 10. horizontal TPU foaming machines as claimed in claim 2, it is characterised in that:Above-mentioned steam pipeline, cold water conveying In being arranged side by side from front to back, above-mentioned steam pipeline, cold water delivery pipe and vacuum conveyer tube pass through one for pipe and vacuum conveyer tube Connection transverse tube is connected jointly with above-mentioned first installation cavity and the second installation cavity, above-mentioned steam pipeline, above-mentioned cold water delivery pipe There is the vertical tube being connected with connection transverse tube with being erect respectively on above-mentioned vacuum conveyer tube, control vertical tube is separately installed with each vertical tube The switching control pilot of on or off.
CN201711000251.XA 2017-10-24 2017-10-24 A kind of horizontal TPU foaming machines Pending CN107627528A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711000251.XA CN107627528A (en) 2017-10-24 2017-10-24 A kind of horizontal TPU foaming machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711000251.XA CN107627528A (en) 2017-10-24 2017-10-24 A kind of horizontal TPU foaming machines

Publications (1)

Publication Number Publication Date
CN107627528A true CN107627528A (en) 2018-01-26

Family

ID=61106023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711000251.XA Pending CN107627528A (en) 2017-10-24 2017-10-24 A kind of horizontal TPU foaming machines

Country Status (1)

Country Link
CN (1) CN107627528A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108943561A (en) * 2018-09-02 2018-12-07 台山市舒力床具机械有限公司 Automatic double mode sponge continuous foam maker and the sponge foaming method for using the foaming machine
CN110757714A (en) * 2019-11-05 2020-02-07 晋江立成祥机械科技有限公司 Mould adjusting mechanism of foaming machine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205705002U (en) * 2016-05-03 2016-11-23 天津市一越机械设备制造有限公司 A kind of hot-water heating pipe injection machine based on the horizontal process technology of high-efficiency and precision
CN107263794A (en) * 2017-07-31 2017-10-20 嘉善梦溪服饰辅料厂(普通合伙) A kind of horizontal automation injection moulding apparatus
CN207344953U (en) * 2017-10-24 2018-05-11 晋江立成祥机械科技有限公司 A kind of horizontal TPU foaming machines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205705002U (en) * 2016-05-03 2016-11-23 天津市一越机械设备制造有限公司 A kind of hot-water heating pipe injection machine based on the horizontal process technology of high-efficiency and precision
CN107263794A (en) * 2017-07-31 2017-10-20 嘉善梦溪服饰辅料厂(普通合伙) A kind of horizontal automation injection moulding apparatus
CN207344953U (en) * 2017-10-24 2018-05-11 晋江立成祥机械科技有限公司 A kind of horizontal TPU foaming machines

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108943561A (en) * 2018-09-02 2018-12-07 台山市舒力床具机械有限公司 Automatic double mode sponge continuous foam maker and the sponge foaming method for using the foaming machine
CN110757714A (en) * 2019-11-05 2020-02-07 晋江立成祥机械科技有限公司 Mould adjusting mechanism of foaming machine

Similar Documents

Publication Publication Date Title
WO2006029584A8 (en) Method and device for blow forming containers
CN106029331B (en) Equipped with the preform moulding unit for rotating movable core print
CN107627528A (en) A kind of horizontal TPU foaming machines
ITRM20130033A1 (en) INJECT-COMPRESSION APPARATUS FOR THE PRODUCTION OF THERMOPLASTIC CONTAINERS
CN209937587U (en) Injection molding machine
CN207028189U (en) 3D printer cooling device
CN206999592U (en) A kind of hollow plastic apparatus for blow moulding
CN109452335A (en) A kind of device and method producing a coarse cereals steamed bread of corn
CN207344953U (en) A kind of horizontal TPU foaming machines
US20230081398A1 (en) Molding systems and related methods
ITRM20130035A1 (en) ROTARY JOINT FOR A PLASTIC TRANSFER MADE FROM AN EXTRUDER TO MOLDS OF A PREFORMING ROTARY MOLDING MACHINE
CN110979885A (en) Stand-alone machine is carried with pasting in commodity circulation
CN104493104B (en) Double-station shell core machine
CN108015947A (en) From jet-propelled compression device
CN109352953A (en) A kind of multilayer blow moulding machine die head
CN104973407A (en) Automatic arranging and conveying system for glass containers
CN213830307U (en) Plastic uptake box mould
CN201198192Y (en) Stretch blow station structure of bottle blower
CN204399935U (en) Filling rear plastic infusion bottle vertical conveyor
CN109648830B (en) Production and processing technology of plastic bottle
CN215703463U (en) Full-degradable starch foaming forming machine
CN102962988A (en) Forming die for plastic hollow container extrusion-blowing machine
CN209208051U (en) A kind of novel plastic injection-blow molding machine stripper apparatus
CN206229679U (en) One kind insulation bead particles grading plant
CN206528029U (en) A kind of vertical plastic forming machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination