CN107627132A - A kind of frock clamp - Google Patents

A kind of frock clamp Download PDF

Info

Publication number
CN107627132A
CN107627132A CN201711040173.6A CN201711040173A CN107627132A CN 107627132 A CN107627132 A CN 107627132A CN 201711040173 A CN201711040173 A CN 201711040173A CN 107627132 A CN107627132 A CN 107627132A
Authority
CN
China
Prior art keywords
tower
arch bridge
bridge part
fixed
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711040173.6A
Other languages
Chinese (zh)
Inventor
钱梦铖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711040173.6A priority Critical patent/CN107627132A/en
Publication of CN107627132A publication Critical patent/CN107627132A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of frock clamp, is related to technology-specific field of fixtures.The frock clamp includes:Workbench, space is provided for the fixation of arch bridge part, processing;Fixed tower, it is distributed on workbench and along the length direction of arch bridge part;Claw, the flank of arch bridge part is gripped on fixed tower;Positioning Tower, on workbench, including alignment pin and the insertion of control alignment pin or the positioning cylinder for leaving open-work.This programme can be convenient that arch bridge part is processed further operating with fixed arch bridge.

Description

A kind of frock clamp
Technical field
The present invention relates to special fixture technical field, more particularly to a kind of frock clamp.
Background technology
As depicted in figs. 1 and 2, it is a kind of auto parts and components, because it is shaped as the arc that arches upward, so being called arch bridge part 1。
Arch bridge part 1 is made up of main bridge 11 and top plate, and main bridge 11 is sheet metal component, and its longitudinal section is " u "-shaped.The main top of bridge 11 Opening is closed by top plate and surrounds a cavity with main bridge 11.Extend the covering model of top plate in the both ends of the main length direction of bridge 11 Enclose, and form the open slot 115 of connection cavity.
Wherein, both ends of the top plate along the main width of bridge 11 extend to form flank 12, the flank 12 super direction of main bridge 11 bending And wing groove 13 is formed between main bridge 11.
The center that the main bottom of bridge 11 is located at its length direction is provided with middle position hole 111.
The both sides of middle position hole 111 are arranged with counterbore 112 and open-work 113, the wherein communication with cavity of counterbore 112, and open-work is through interior Chamber simultaneously passes through top plate.Counterbore 112 and the outside of open-work 113, i.e., along side of the both sides away from middle position hole 111 of the main length direction of bridge 11 To being arranged with two bottom outlets 116.The communication with cavity of bottom outlet 116.
The both sides of top plate length direction are respectively equipped with the stomidium 114 of communication with cavity.
Because arch bridge part 1 is in irregular shape, it is not fixed easily when being processed to arch bridge part 1.
The content of the invention
The technical problems to be solved by the invention are the shortcomings that overcoming prior art, there is provided a kind of frock clamp, Ke Yigu Determine arch bridge part, it is convenient that arch bridge part is processed further operating.
In order to solve the above technical problems, the present invention provides a kind of frock clamp, including,
Workbench, space is provided for the fixation of arch bridge part, processing;
Fixed tower, it is distributed on workbench and along the length direction of arch bridge part;
Claw, the flank of arch bridge part is gripped on fixed tower;
Positioning Tower, on workbench, including alignment pin and the insertion of control alignment pin or the positioning cylinder for leaving open-work.
Technique effect:It is arc at the top of arch bridge part, bottom is horizontal plane.Along some fixations of length direction point of arch bridge part Point, prevent that fix tower grips to arch bridge part.It is the shape for preventing chamber in clamping process because arch bridge part is sheet metal component Shape changes, so bite is arranged at the sheet part at flank and main bridge both ends.By fixed tower to whole arch bridge part Gripped so that arch bridge part positions in the horizontal plane, then by Positioning Tower, is positioned by alignment pin.Positioning Tower At least two, open-work, counterbore or the bottom outlet of corresponding main pars basilaris pontis.Wherein through-hole position must set Positioning Tower positioning, because open-work Through whole arch bridge part, it is more easy to position arch bridge part.So as to form the positioning of horizontal plane and two alignment pins.
The technical scheme that further limits of the present invention is:Fixed tower is three, and one is located in arch bridge part length direction Between, two other corresponding arch bridge part both ends, and the claw on the fixation tower at arch bridge part both ends grips the groove of open slot Bottom, bottom land are the part that main bridge stretches out top plate coverage.
A kind of preceding described frock clamp, a fixed tower, the claw for the fixation tower set up are set up between adjacent fixed tower Flank is gripped, and the face that claw contacts with flank is bonded to each other.
A kind of preceding described frock clamp, fixed tower includes the pedestal being detachably secured on workbench, installed in pedestal On claw, and the drive division that control card claw clip is held or opened.
A kind of preceding described frock clamp, fix between tower provided with tower is oriented to, being oriented to tower includes being located at leading on workbench To pedestal and two guiding tentacles of stretching guide base, the passage being caught in for arch bridge part is formed between two guiding tentacles.
A kind of preceding described frock clamp, two spacing being oriented between tentacles taper into along the direction that arch bridge part is caught in, And minimum widith is not less than the width of arch bridge part.
A kind of preceding described frock clamp, Positioning Tower include fixed positioning pedestal on the table, are fixed on positioning base Positioning cylinder on seat, the output end of positioning cylinder are removably fixed with alignment pin, alignment pin face open-work.
A kind of preceding described frock clamp, alignment pin is between main bridge and workbench, and towards an end section of open-work Direction of the area along insertion open-work tapers into.
The beneficial effects of the invention are as follows:
(1) it is of the invention;Arch bridge part is lifted by some fixed towers and gripped in the horizontal plane, then passes through at least two Positioning Tower positions to the hole of main pars basilaris pontis, realizes the positioning method of plane and two pitses.
(2) it is of the invention;When being gripped to arch bridge part, bite is distributed in flank and the open slot bottom of individual layer Portion, it is not easy to damage the die cavity that whole arch bridge part surrounds.
(3) it is of the invention:Guided by placement of some guiding towers to arch bridge part so that the installation of arch bridge part is more square Just, accurately.
Brief description of the drawings
Fig. 1 is the schematic diagram that background technology represents arch bridge part top structure;
Fig. 2 is the schematic diagram that background technology represents arch bridge part polycrystalline substance;
Fig. 3 is the schematic diagram of structure of the present invention;
Fig. 4 is that the present invention represents to be oriented to the schematic diagram of tower position;
Fig. 5 is the schematic diagram that the present invention represents fixed tower structure.
Wherein:1st, arch bridge part;11st, main bridge;111st, middle position hole;112nd, counterbore;113rd, open-work;114th, stomidium;115th, it is open Groove;116th, bottom outlet;12nd, flank;13rd, wing groove;2nd, workbench;3rd, fixed tower;31st, pedestal;32nd, claw;321st, upper clipping claw;322、 Lower claw;323rd, corpus unguis;33rd, drive division;331st, drive cylinder;332nd, linkage;34th, the first hinged place;35th, second is be hinged Place;4th, it is oriented to tower;41st, guide base;42nd, it is oriented to tentacle;5th, Positioning Tower;51st, positioning pedestal;52nd, alignment pin;53rd, gas is positioned Cylinder.
Embodiment
A kind of frock clamp that the present embodiment provides, structure is as shown in the figure.
With reference to Fig. 3 and Fig. 4, the frock clamp, including fixation, processing for arch bridge part 1 provide the workbench 2 in space, set In at least two set on workbench 2 and along the fixation tower 3 that is distributed of length direction of arch bridge part 1, the corresponding main each hole in the bottom of bridge 11 Individual Positioning Tower 5.
Wherein, fixed tower 3 is five, a centre for being located at the length direction of arch bridge part 1, two corresponding both ends of arch bridge part 1, And the claw 32 on the fixation tower 3 at the both ends of arch bridge part 1 grips the bottom land of open slot 115, bottom land is that main bridge 11 stretches out The part of top plate coverage.
Remaining two fixed towers 3 are the fixation tower 3 set up, and are fixed positioned at adjacent two between tower 3.Three positioned at centre The claw 32 of fixed tower 3 grips flank 12, and claw 32 is bonded to each other with the face that flank 12 contacts.
Fixed tower 3 includes the pedestal 31 being detachably secured on workbench, the claw 32 on pedestal 31, and control The drive division 33 that claw 32 is clamped or opened.
It is provided between fixed tower 3 and is oriented to tower 4, being oriented to tower 4 there are two, and each tower 4 that is oriented to includes leading on workbench 2 To pedestal 41 and two guiding tentacles 42 of stretching guide base 41, form what is be caught in for arch bridge part 1 between two guiding tentacles 42 Passage.
Spacing between same two guiding tentacles 42 being oriented on tower 4 tapers into along the direction that arch bridge part 1 is caught in, and most Small width is not less than the width of arch bridge part 1.
Wherein, Positioning Tower 5 includes the positioning pedestal 51 being fixed on workbench 2, the positioning being fixed in positioning pedestal 51 Cylinder 53, the output end of positioning cylinder 53 are removably fixed with alignment pin 52, the face open-work 113 of alignment pin 52.Positioning Tower 5 is at least There are two, the corresponding counterbore 112 of alignment pin 52 or bottom outlet 116 of another Positioning Tower 5.
Alignment pin 52 inserts open-work between main bridge 11 and workbench 2, and towards one end area of section edge of open-work 113 113 direction tapers into.
The top of arch bridge part 1 is arc, and bottom is horizontal plane.Along some fixing points of length direction point of arch bridge part 1, fixed tower 3 on these fixing points, and arch bridge part 1 is gripped.It is anti-in clamping process because arch bridge part 1 is sheet metal component Only the shape of chamber changes, so bite is arranged at the sheet part at flank 12 and the both ends of main bridge 11.
Whole arch bridge part 1 is gripped by fixed tower 3 so that arch bridge part 1 positions in the horizontal plane, then passes through Alignment pin 52 in Positioning Tower 5 is positioned.Positioning Tower 5 at least two, open-work 113, the counterbore 112 of the corresponding main bottom of bridge 11 Or bottom outlet 116.A Positioning Tower 5 must be wherein set at open-work 113 to be positioned, because open-work 113 runs through whole arch bridge part 1, be more easy to Arch bridge part 1 is positioned.So as to form the positioning of horizontal plane and two alignment pins 52.
As shown in figure 5, claw 32 includes upper clipping claw 321 and lower claw 322.Lower claw 322 is fixed on pedestal 31, upper card Pawl 321 is hinged on lower claw 322, and the two hinged place is the first hinged place 34.Upper clipping claw 321 extends the first hinged place 34 Part be hinged on the take-off lever of drive cylinder 331.Drive cylinder 331 is hinged on lower claw 322, and the two hinged place For the second hinged place 35.First hinged place 34 and the second hinged place 35 are located at same and indulged on vertical line.First hinged place 34, lower card Pawl 322, the hinged place 35 of drive cylinder 331 and second form linkage 332.
The take-off lever of drive cylinder 331 does flexible control upper clipping claw 321 when transporting and clamps or open.
The corresponding wing groove 13 of lower claw 322 is detachably provided with corpus unguis 323, and corpus unguis illustration wing groove is simultaneously bonded conflict in flank 12 Bottom.Corresponding two corpus unguis 323 of upper clipping claw 321 is detachably provided with two conflict blocks, and conflict block coordinates flank 12 with corpus unguis 323 Clamp.
When corpus unguis 323 and conflict block change installation site or change various sizes of corpus unguis 323, different size is adapted to Arch bridge part 1 gripped.
In addition to the implementation, the present invention can also have other embodiment;It is all to use equivalent substitution or equivalent transformation shape Into technical scheme, all fall within the protection domains of application claims.

Claims (8)

  1. A kind of 1. frock clamp, it is characterised in that:Including,
    Workbench (2), space is provided for the fixation of arch bridge part (1), processing;
    Fixed tower (3), it is distributed on the workbench (2) and along the length direction of the arch bridge part (1);
    Claw (32), the flank (12) of the arch bridge part (1) is gripped on the fixed tower (3);
    Positioning Tower (5), on the workbench (2), including alignment pin (52) and the insertion of the control alignment pin (52) or from Open the positioning cylinder (53) of open-work (113).
  2. A kind of 2. frock clamp according to claim 1, it is characterised in that:The fixed tower (3) is three, and one is located at The centre of arch bridge part (1) length direction, two other corresponding described arch bridge part (1) both ends, and it is located at the arch bridge part (1) Claw (32) on the fixation tower (3) at both ends grips the bottom land of open slot (115), and the bottom land is that main bridge (11) stretches out top The part of plate coverage.
  3. A kind of 3. frock clamp according to claim 2, it is characterised in that:One is set up between the adjacent fixed tower admittedly Determine tower (3), the claw (32) for the fixed tower (3) set up grips the flank (12), and the claw (32) and institute The face for stating flank (12) contact is bonded to each other.
  4. A kind of 4. frock clamp according to claim 1, it is characterised in that:The fixed tower (3) includes being detachably fixed Pedestal (31) on the workbench (2), the claw (32) on the pedestal (31), and the control claw (32) Clamping or the drive division (33) opened.
  5. A kind of 5. frock clamp according to claim 1, it is characterised in that:It is provided between the fixed tower (3) and is oriented to tower (4), the tower (4) that is oriented to includes the guide base (41) on the workbench (2) and stretches out the guide base (41) Two be oriented to tentacles (42), two described are oriented between tentacles (42) form the passage being caught in for the arch bridge part (1).
  6. A kind of 6. frock clamp according to claim 5, it is characterised in that:Two spacing being oriented between tentacle (42) The direction being caught in along the arch bridge part (1) tapers into, and minimum widith is not less than the width of the arch bridge part (1).
  7. A kind of 7. frock clamp according to claim 1, it is characterised in that:The Positioning Tower (5) is described including being fixed on Positioning pedestal (51) on workbench (2), the positioning cylinder (53) being fixed in the positioning pedestal (51), the positioning cylinder (53) output end is removably fixed with the alignment pin (52), alignment pin (52) the face open-work (113).
  8. A kind of 8. frock clamp according to claim 1, it is characterised in that:The alignment pin (52) is located at host bridge (11) between the workbench (2), and the open-work (113) is inserted towards one end area of section edge of the open-work (113) Direction taper into.
CN201711040173.6A 2017-10-30 2017-10-30 A kind of frock clamp Pending CN107627132A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711040173.6A CN107627132A (en) 2017-10-30 2017-10-30 A kind of frock clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711040173.6A CN107627132A (en) 2017-10-30 2017-10-30 A kind of frock clamp

Publications (1)

Publication Number Publication Date
CN107627132A true CN107627132A (en) 2018-01-26

Family

ID=61106986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711040173.6A Pending CN107627132A (en) 2017-10-30 2017-10-30 A kind of frock clamp

Country Status (1)

Country Link
CN (1) CN107627132A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103157751A (en) * 2011-12-09 2013-06-19 苏州工业园区高登威科技有限公司 Machine platform
CN204639517U (en) * 2015-06-02 2015-09-16 安徽江淮汽车股份有限公司 A kind of frock clamp
CN105345372A (en) * 2015-12-10 2016-02-24 安徽江淮汽车股份有限公司 Repairing welding platform
CN105479076A (en) * 2015-12-31 2016-04-13 重庆山朕科技发展有限公司 Automobile doorsill beam welding clamp
CN205437616U (en) * 2015-12-31 2016-08-10 重庆山朕科技发展有限公司 Crashproof roof beam welding jig before car
CN205703078U (en) * 2016-06-28 2016-11-23 安徽江淮汽车股份有限公司 Glass guide-rail positioning fixture
CN206140171U (en) * 2016-08-31 2017-05-03 重庆山朕科技发展有限公司 Car side wall threshold reinforcement anchor clamps
CN206200453U (en) * 2016-11-26 2017-05-31 安徽江淮汽车集团股份有限公司 It is a kind of from hold-down mechanism

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103157751A (en) * 2011-12-09 2013-06-19 苏州工业园区高登威科技有限公司 Machine platform
CN204639517U (en) * 2015-06-02 2015-09-16 安徽江淮汽车股份有限公司 A kind of frock clamp
CN105345372A (en) * 2015-12-10 2016-02-24 安徽江淮汽车股份有限公司 Repairing welding platform
CN105479076A (en) * 2015-12-31 2016-04-13 重庆山朕科技发展有限公司 Automobile doorsill beam welding clamp
CN205437616U (en) * 2015-12-31 2016-08-10 重庆山朕科技发展有限公司 Crashproof roof beam welding jig before car
CN205703078U (en) * 2016-06-28 2016-11-23 安徽江淮汽车股份有限公司 Glass guide-rail positioning fixture
CN206140171U (en) * 2016-08-31 2017-05-03 重庆山朕科技发展有限公司 Car side wall threshold reinforcement anchor clamps
CN206200453U (en) * 2016-11-26 2017-05-31 安徽江淮汽车集团股份有限公司 It is a kind of from hold-down mechanism

Similar Documents

Publication Publication Date Title
CN107877066A (en) A kind of weld jig
CN107627132A (en) A kind of frock clamp
CN203371207U (en) Structure for positioning support in welding of exhaust manifold
CN203648864U (en) Live eel sorter
CN203289036U (en) Housing structure of dense type bus duct
CN206677058U (en) Bend pipe positioning tool
CN207066728U (en) Panoramic sunroof of automobile wind load tests monitor station
CN205685297U (en) A kind of device for depositing drill bit
CN205435371U (en) Take lower capping structure of diffuser
EP4232605A4 (en) Methods and compositions for diagnosing and treating prostate cancer based on long noncoding rna overlapping the lck gene that regulates prostate cancer cell growth
CN206923059U (en) A kind of heating tool
CN206136553U (en) Vertical radiator for medical instruments convenient to adjust fan position
CN203563523U (en) Warm air supply and length extension device applied to henhouse
CN207435509U (en) Annealing drying device Fast Installation structure
CN107645148B (en) Adjustable JDG secondary structure reserved line box
CN108925127A (en) A kind of vacuum plate sucking device of adaptive PCB size
CN207171124U (en) A kind of tapping jig for electronic components production
CN206683061U (en) Fresh air purifier provided with detachable fan supporter
CN208942229U (en) A kind of surgical operation stretching apparatus
CN206302590U (en) Efficient electric heater
CN203905395U (en) Whole guide pipe
CN204875201U (en) Automatic ratio device of dyeing auxiliaries
CN210381554U (en) Sheet metal accessory for electronic device single cabinet body
CN205304691U (en) Photovoltaic module installs guide rail
CN107675877A (en) A kind of Combined bracket structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180126