CN1076234A - Prevent the method for frost crack of irrigation ditch with rigid facing - Google Patents
Prevent the method for frost crack of irrigation ditch with rigid facing Download PDFInfo
- Publication number
- CN1076234A CN1076234A CN 92101539 CN92101539A CN1076234A CN 1076234 A CN1076234 A CN 1076234A CN 92101539 CN92101539 CN 92101539 CN 92101539 A CN92101539 A CN 92101539A CN 1076234 A CN1076234 A CN 1076234A
- Authority
- CN
- China
- Prior art keywords
- pipe
- insulation
- rigid facing
- irrigation ditch
- frost crack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
A kind of method that prevents frost crack of irrigation ditch with rigid facing.It is that loose heat insulating materials such as swelling perlite powder are seated in the plastic flexible pipe, constitutes insulation tunic pipe.The film pipe is laid on below the rigid facing.To be prevented the purpose that canal frost heave destroys.This method good freezing protection effect, material is easy to get, only 9.35 yuan of every construction cost per square meters, and be convenient to construction.
Description
A kind of method that prevents frost crack of irrigation ditch with rigid facing.
Cold district, the frost heaving failure problem of rigid facing channel is very serious.At present, solve this difficult problem with following several method both at home and abroad: 1. adopt and increase the weight of and strengthen the rigid facing channel structure, change the section of channel.This method is difficult to the purpose that reaches freeze proof effectively.2. the moisture soil body under the rigidity mask is taked the insulation measure; As do not lay all good polystyrol plastic foam plate of waterproof and heat-insulating property at rigid facing.This method antifreezing effect is better, but it involves great expense, and every cubic metre of cost is at 385 yuan, so be difficult in practical engineering application.Some area proposes to lay the purpose that heat insulating materials such as lower hydrophobic pearlite warming plate of coefficient of thermal conductivity and waterproof thermal-insulated mineral wool board reach frost heaving resistant destruction under rigid facing in recent years, this method can reduce cost 1/3rd than polystyrol plastic foam plate, and its antifreezing effect is also more satisfactory.But because its water absorption rate higher (8%-10%), and to give first system " plate ", production technology is complicated, also difficult extensive use in actual engineering.
The objective of the invention is to: invent a kind ofly have good waterproof performance, good heat preservation performance, have certain elasticity and flexibility and material to be easy to get, price is low, technology is simple, be convenient to construct and insulation layer that can extensive use prevents the method for frost crack of irrigation ditch with rigid facing.
Main contents of the present invention: accompanying drawing is that channel drawing in side sectional elevation (1) is native canal bed, and (2) are insulation film pipe layer, and (3) are the levelling sand bed, and (4) are rigidity membrane layer, and (5) put insulation film pipe layer for canal.
The loose efficient heat insulating materials such as swelling perlite powder of filling (determined by the cross-sectional length of channel by the length of plastic flexible pipe in wall thickness is the plastic flexible pipe of 0.10-0.15mm; The diameter of plastic flexible pipe<be insulation layer thickness by soil insulation, antifreeze calculating are determined), the two ends that is full of the plastic flexible pipe of efficient heat insulating material such as swelling perlite powder stays one section empty film pipe, it is dead with corrosion-resistant rope bundle that it is turned back, and accomplishes to make heat insulating material and isolate from outer air in the pipe.Just made insulation tunic pipe.
As shown in drawings, in the native canal bed of fixing (1),, promptly on native canal bed (1), constituted an insulation layer perpendicular to the closely parallel insulation tunic pipe (2) that makes that is paved with of the direction of channel.On insulation tunic pipe, re-lay the wet mixing layer of sand (3) of one deck 2-3cm, as the levelling transition zone.Go up cast-in-place or pave various rigidity membrane layers (4) at levelling transition zone (3).When laying insulation tunic pipe, should backguy on the two lateral slopes of Tu Qu, the backguy position should be higher than the waterline of design maximum flow.Insulation tunic pipe two ends and backguy snap, and are higher than the waterline of design maximum flow with assurance insulation layer pipe end point-blank.In adjacent film pipe two ends, the canal dike on both sides is down laid 2/3rds the insulation film pipe that width is a maximum depth of frozen ground along channel direction.Volt soil thereon again, its volt soil thickness should greater than with equal 30cm.To avoid the insulation film tube-surface to damage in the construction as far as possible.
The thick degree of plastic flexible pipe diameter<promptly be incubated〉calculate by following formula:
H treasure=(H-(K snow h snow+k mixes h to be mixed+the husky h sand of k))/(k treasure)
In the formula: H-is the maximum frozen depth of local end insulation soil, can be checked in or be calculated with formula by local meteorological data.
K snow, K mud, K sand, K treasure are respectively snow, coagulation surface layer, sand bed coefficient.Can be by finding in " K value table when different soil adopt different heat insulating material ".
H snow, h mix, h is husky-be respectively the thickness of local average snow depth, concrete surface layer thickness, levelling sand.
The anti-freeze expansion destruction methods that the insulation film pipe insulation layer of this filling crushed crude pearlite is used for the rigid facing channel has applicability preferably; Because the heat insulating material in the insulation tunic pipe is with flexible pipe and isolate from outer air, and its coefficient of thermal conductivity very low (0.04-0.05w/m.k), so it has good protection against the tide, waterproof, heat insulation function.Simultaneously because the insulation film pipe of filling crushed crude pearlite has certain elasticity and flexibility, even the moisture soil body like this under the insulation layer may because of some reason take place to a certain degree freeze and produce a certain amount of frost-heaving deformation also can absorb by insulation tunic pipe.And crushed crude pearlite and plastic flexible pipe material are easy to get, need not any reprocessing equipment, buy and to use construction technology simple, price is low, and to compare the result as follows with polystyrol plastic foam plate heat preserving method and hydrophobic pearlite board heat preserving method: the thickness with the method insulation layer when maximum depth of frozen ground is 1.5 meters as calculated is 12.5cm, and the insulation layer cost of materials that (being the plastic flexible pipe diameter) is every square metre is 9.35 yuan.If with polystyrene board insulation layer method, when maximum depth of frozen ground was 1.5 meters, its insulation layer funds calculated and should be 9.37cm, and then every square metre heat insulating material expense is 36.07 yuan, is 3.86 times of this method.If with the method for hydrophobic pearlite board insulation, when maximum depth of frozen ground was 1.5 meters, its insulation layer thickness was 23.58cm as calculated, then every square meter of material expense is 20.75 yuan, is 2.22 times of this method, so its applicability is conspicuous.
Example: the maximum frozen depth H that the somewhere is not incubated soil is 1.4 meters, and snow depth is the 10-30 centimetre, 15cm averages) the concrete pavement thickness h that will cast mixes and is 12cm, the husky transition zone of levelling is 3cm, and checking in COEFFICIENT K snow is 1.60, and K sand is 0.95, it is 1.14 that K mixes, and K treasure is 9.60.Then its plastic flexible pipe diameter H treasure (i.e. insulation mixes layer thickness) is
H treasure=(H-(K snow h snow+k mixes h to be mixed+the husky h sand of k))/(k treasure)
The above-mentioned every data of substitution:
Try to achieve h treasure=10.05(cm)
The thickness that promptly needs filling crushed crude pearlite plastic flexible pipe insulation layer is that 10.05cm(is that the diameter of plastic flexible pipe should be 10.05 centimeters).For safety, result of calculation be multiply by the global factor of safety of 1.2-1.4, the diameter of then getting plastic flexible pipe is that 12-14cm gets final product.
Claims (3)
1, a kind of method that is used to prevent frost crack of irrigation ditch with rigid facing.It is characterized in that by the insulation layer that efficient heat insulating material, plastic flexible pipe, sands etc. such as expanded pearlite powder are formed said insulation layer is with efficient heat insulating materials such as swelling perlite powders, is filled in the plastic flexible pipe, constitutes insulation tunic pipe.
2, according to the said method that prevents frost crack of irrigation ditch with rigid facing of claim (1).It is characterized in that said insulation tunic pipe is closely parallel being paved with on the native canal bed of fixing perpendicular to channel direction.
3, according to claim 1, the 2 said methods that prevent frost crack of irrigation ditch with rigid facing.It is characterized in that said insulation tunic pipe when laying, the two ends of film pipe should be higher than the waterline of the big design discharge of channel amount, and the two ends of film pipe will be pricked dead with the corrosion-resistant rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92101539 CN1076234A (en) | 1992-03-12 | 1992-03-12 | Prevent the method for frost crack of irrigation ditch with rigid facing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 92101539 CN1076234A (en) | 1992-03-12 | 1992-03-12 | Prevent the method for frost crack of irrigation ditch with rigid facing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1076234A true CN1076234A (en) | 1993-09-15 |
Family
ID=4939176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 92101539 Pending CN1076234A (en) | 1992-03-12 | 1992-03-12 | Prevent the method for frost crack of irrigation ditch with rigid facing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1076234A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101392515B (en) * | 2008-11-11 | 2010-06-02 | 武汉理工大学 | Channel thermal insulation structure and construction method thereof |
CN105696526A (en) * | 2016-01-29 | 2016-06-22 | 西北农林科技大学 | Phase-change heat-accumulation seepage-prevention hollow plastic plate and construction method thereof |
CN106759123A (en) * | 2017-01-06 | 2017-05-31 | 石河子大学 | The method for eliminating the canal for water conveyance frost heaving failure effect that Frozen Area winter is run without ice sheet, high water level |
CN106884426A (en) * | 2017-04-17 | 2017-06-23 | 中水东北勘测设计研究有限责任公司 | A kind of large channel base soil heat-preserving anti-freezing method |
CN108166455A (en) * | 2017-12-21 | 2018-06-15 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of construction method and structure of High-cold regions excavation channel anti-freeze expansion |
CN109371914A (en) * | 2018-12-25 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | A kind of discharge channel structure convenient for later period reconstruction |
-
1992
- 1992-03-12 CN CN 92101539 patent/CN1076234A/en active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101392515B (en) * | 2008-11-11 | 2010-06-02 | 武汉理工大学 | Channel thermal insulation structure and construction method thereof |
CN105696526A (en) * | 2016-01-29 | 2016-06-22 | 西北农林科技大学 | Phase-change heat-accumulation seepage-prevention hollow plastic plate and construction method thereof |
CN106759123A (en) * | 2017-01-06 | 2017-05-31 | 石河子大学 | The method for eliminating the canal for water conveyance frost heaving failure effect that Frozen Area winter is run without ice sheet, high water level |
CN106759123B (en) * | 2017-01-06 | 2018-11-20 | 石河子大学 | The method for eliminating the canal for water conveyance frost heaving failure effect that Frozen Area winter runs without ice sheet, high water level |
CN106884426A (en) * | 2017-04-17 | 2017-06-23 | 中水东北勘测设计研究有限责任公司 | A kind of large channel base soil heat-preserving anti-freezing method |
CN108166455A (en) * | 2017-12-21 | 2018-06-15 | 水利部交通运输部国家能源局南京水利科学研究院 | A kind of construction method and structure of High-cold regions excavation channel anti-freeze expansion |
CN108166455B (en) * | 2017-12-21 | 2020-03-03 | 水利部交通运输部国家能源局南京水利科学研究院 | Construction method and structure for preventing frost heaving of excavation channel in high and cold area |
CN109371914A (en) * | 2018-12-25 | 2019-02-22 | 中国电建集团成都勘测设计研究院有限公司 | A kind of discharge channel structure convenient for later period reconstruction |
CN109371914B (en) * | 2018-12-25 | 2023-09-26 | 中国电建集团成都勘测设计研究院有限公司 | Drain channel structure convenient to later stage rebuild |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4464082A (en) | Chilled gas pipeline installation and method | |
CN108316081A (en) | A kind of temperature and humidity control system for frozen ground regions road structure | |
CN1076234A (en) | Prevent the method for frost crack of irrigation ditch with rigid facing | |
CN213740383U (en) | Roadbed structure suitable for frozen soil area | |
CN109339075A (en) | Landslide emergency control technology management method | |
CN201099920Y (en) | Heat preservation collecting well | |
CN110284385B (en) | Anti-freeze soil road | |
US6976809B1 (en) | Method of preventing frost heave stress concentrations in chilled buried pipelines | |
CN111101413A (en) | Device applied to salinized soil subgrade in seasonal frozen soil area and construction method | |
CN216515649U (en) | Expansive soil or freeze thawing frozen expansive soil slope protection structure | |
CN101424087B (en) | Insulation and collecting well | |
CN215718947U (en) | Intelligent active heat preservation and drainage system for highway tunnel | |
CN102587399B (en) | Salivary flow ice prevention and management structure in cold zone | |
CN210561950U (en) | Overflow structure for preventing lake burst in permafrost region | |
CN205776411U (en) | A kind of insulation safeguard structure of cold district side slope pipeline laying | |
CN212000424U (en) | Be applied to device of seasonal frozen soil district salt soil road bed | |
CN108166455A (en) | A kind of construction method and structure of High-cold regions excavation channel anti-freeze expansion | |
Penner | Experimental pavement structures insulated with a polyurethane and extruded polystyrene foam | |
Ivanov | Use of granulated foam glass ceramics in the bases of transport facilities in the Arctic | |
CN207761710U (en) | One kind being used for seasonal frost region tunnel portal section center pipe trench structure | |
Gandahl | The use of plastic foam insulation in roads | |
CN110295571A (en) | A kind of Permafrost Area prevents the flow structure that lake is burst | |
CN215715582U (en) | Full earthing top waterproof construction of large tracts of land danger article storage tank jar group | |
CN219197361U (en) | Cold region operation tunnel lining infiltration punishment structure | |
CN214939873U (en) | Protective structure for concrete face dam in severe cold area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C06 | Publication | ||
PB01 | Publication | ||
C01 | Deemed withdrawal of patent application (patent law 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |