CN107620300A CN201710839865.0A CN201710839865A CN107620300A CN 107620300 A CN107620300 A CN 107620300A CN 201710839865 A CN201710839865 A CN 201710839865A CN 107620300 A CN107620300 A CN 107620300A
Authority
CN
China
Prior art keywords
optic cable
measuring point
sensing optic
depth
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710839865.0A
Other languages
Chinese (zh)
Inventor
陈文华
王群敏
黄江华
王烨晟
张文成
郭剑锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201710839865.0A priority Critical patent/CN107620300A/en
Publication of CN107620300A publication Critical patent/CN107620300A/en
Pending legal-status Critical Current

Links

Landscapes

  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention provides a kind of Foundation Pit bottom resilience quantity monitoring method; it is before excavation of foundation pit; by set drilling, bury protection pipe, installation sensing optic cable, drilling in tamp bentonite, connection sensing optic cable and sensing optic cable strain (FBG) demodulator; form Foundation Pit bottom springback capacity monitoring device; test the strain value of the sensing optic cable of each depth measuring point in the range of drilling depth under foundation ditch bottom surface; in Excavation Process or after terminating, re-test several times under foundation ditch bottom surface in the range of drilling depth the sensing optic cable of each depth measuring point strain value;Draw εJ, i~hiRelation curve and Δ SJ, i~hiRelation curve, so as to obtain the springback capacity of each each measuring point of soil layer and its distribution under foundation ditch.The size of each soil layer springback capacity and distribution, accurately measure the strain variation of each measuring point, and calculate the springback capacity of each measuring point under energy automatic observation foundation ditch of the invention.The inventive method has the advantages that principle is simple, and Embedded installation is convenient, energy automatic observation, and observation data are accurate, has good economic benefit and social benefit.

Description

A kind of Foundation Pit bottom resilience quantity monitoring method
Technical field
The present invention relates to a kind of Foundation Pit bottom springback capacity monitoring device and method.Suitable for Geotechnical Engineering field.
Background technology
Elastic Deformation of Foundation Pit amount is the phase in coverage inside and outside foundation ditch caused by removal foundation ditch is conducted oneself with dignity after excavation of foundation pit For the springback capacity before excavation, also referred to as base bottom heave.Monitor the size of each soil layer springback capacity and distribution pair under foundation ditch Guiding construction and optimization design etc., which all have, to be of great significance.At present, Elastic Deformation of Foundation Pit amount typically using arrangement and is buried back The mode for playing mark is carried out, and resilience mark should be embedded to below foundation ditch bottom surface at 20-30cm, according to cutting depth and stratum soil property feelings Condition, boring method or prospect pit method can be used to bury.According to embedded and observation procedure, formula can be sent into by forced, drilling rod using auxiliary rod Or direct flush type mark.But resilience target is embedded to and observation is all pretty troublesome, and it can not accomplish that observation or automation are real-time Observation.Therefore, a kind of Elastic Deformation of Foundation Pit amount monitoring device for being easy to observation and energy automatic observation of research and design and side are needed badly Method.
The content of the invention
The technical problem to be solved in the present invention is:For above-mentioned problem, there is provided a kind of Foundation Pit bottom springback capacity is supervised Survey method, with the size of each soil layer springback capacity under energy automatic observation foundation ditch and distribution.Therefore, the present invention uses following technology Scheme:
A kind of Foundation Pit bottom resilience quantity monitoring method, it is characterised in that it comprises the following steps:
(1), before excavation of foundation pit, by set drilling, bury protection pipe, installation sensing optic cable, drilling in tamp bentonite, even Sensing optic cable and sensing optic cable strain (FBG) demodulator are connect, forms Foundation Pit bottom springback capacity monitoring device, the drilling depth and test Depth matches, the sensing optic cable one through to MTD, in the range of MTD each measuring point spacing distance be 20mm~ 500mm;
(2), before excavation of foundation pit, after waiting bentonite consolidation in drilling and being combined closely with surrounding soil, foundation ditch bottom surface is tested The strain value of the sensing optic cable of each depth measuring point in the range of lower drilling depth, and be designated as straining initial value ε0,i, i is measuring point sequence number;
(3), in Excavation Process or after terminating, re-test each depth in the range of drilling depth under foundation ditch bottom surface several times The strain value of the sensing optic cable of measuring point, and be designated as straining initial value εj,i, j is survey sequence number;
(4) the strain variation amount Δ ε of each depth measuring point, is calculatedj,iWith displacement variable Δ Sj,i, draw Δ εj,i~hiClose It is curve and Δ Sj,i~hiRelation curve, so as to obtain the springback capacity of each each measuring point of soil layer and its distribution under foundation ditch, hi is survey The depth of point.
Further, strain variation amount Δ εj,iCalculation formula be Δ εj,ij,i0,i, displacement variable Δ Sj,i's Calculation formula is
Further, the sensing optic cable is quasi-distributed fiber grating string or distributed sensing fiber;The sense light Cable strain (FBG) demodulator is fiber Bragg grating (FBG) demodulator or Brillouin's (FBG) demodulator (BOTDR/BOTDA).
The beneficial effects of the invention are as follows:The present invention, can automatic observation foundation ditch by Foundation Pit bottom springback capacity monitoring device The size of beneath each soil layer springback capacity and distribution, accurately measure the strain variation of each measuring point, and calculate the springback capacity of each measuring point. The inventive method has the advantages that principle is simple, and Embedded installation is convenient, energy automatic observation, and observation data are accurate, has good Economic benefit and social benefit.
Brief description of the drawings
Fig. 1 is springback capacity monitoring device schematic diagram in Foundation Pit bottom of the present invention.
Fig. 2 is strain variation amount~depth curve schematic diagram.
Fig. 3 is each measuring point displacement~depth profile curve synoptic diagram under foundation ditch bottom surface.
Embodiment
Exemplified by having supporting construction foundation ditch, specific implementation is as follows:
(1) in situ on face 5, the installation of sensing optic cable 1 drilling 3 is set to non-resilience rock-soil layer with rig.Drilling 3 diameters can Select 76mm~108mm.
(2) protection pipe 4 is installed in drilling orifice soil layer 7, protection pipe 4 is buried to the 10~20mm of foundation ditch face 8 times soil layer 9 In, the optional 108mm~130mm of the diameter of protection pipe 4.
(3) sensing optic cable 1 is placed in drilling 3, and is tamped drilling 3 with swelling soil ball 2.
(4) sensing optic cable 1 is connected with Fibre Optical Sensor strain (FBG) demodulator 10.Sensing optic cable 1 is quasi-distributed fiber grating string Or distributed sensing fiber;The sensing optic cable strain (FBG) demodulator 10 is fiber Bragg grating (FBG) demodulator or Brillouin's (FBG) demodulator (BOTDR/BOTDA)。
Etc. (5) after the swelling soil ball 2 in drilling 3 is consolidated and combined closely with surrounding soil, test under foundation ditch bottom surface drilling 3 The strain value of the sensing optic cable 1 of each depth measuring point in depth bounds, and be designated as straining initial value ε0,i, i is measuring point sequence number.
(6) in Excavation Process or after terminating, re-test drills under foundation ditch bottom surface each depth in 3 depth boundses several times The strain value of the sensing optic cable 1 of measuring point, and be designated as straining initial value εj,i, j is survey sequence number.
(7) each depth h is calculated respectively by formula (1) and formula (2)iThe strain variation amount Δ ε of measuring pointj,iWith displacement variable Δ Sj,i
Δεj,ij,i0,i (1)
(8) ε is drawnj,i~hiRelation curve (Fig. 2) and Δ Sj,i~hiRelation curve (Fig. 3).
The specific embodiment of the present invention is the foregoing is only, but the architectural feature of the present invention is not limited thereto, Ren Heben The technical staff in field in the field of the invention, all cover among protection scope of the present invention by the change or modification made.

Claims (3)

1. a kind of Foundation Pit bottom resilience quantity monitoring method, it is characterised in that it comprises the following steps:
(1), before excavation of foundation pit, by set drilling, bury protection pipe, installation sensing optic cable, drilling in tamp bentonite, connection pass Sensing optical cable and sensing optic cable strain (FBG) demodulator, form Foundation Pit bottom springback capacity monitoring device, the drilling depth and MTD Match, the sensing optic cable one through to MTD, in the range of MTD each measuring point spacing distance be 20mm~ 500mm;
(2), before excavation of foundation pit, after waiting bentonite consolidation in drilling and being combined closely with surrounding soil, test under foundation ditch bottom surface and bore The strain value of the sensing optic cable of each depth measuring point in the range of hole depth, and be designated as straining initial value ε0,i, i is measuring point sequence number;
(3), in Excavation Process or after terminating, re-test each depth measuring point in the range of drilling depth under foundation ditch bottom surface several times Sensing optic cable strain value, and be designated as straining initial value εj,i, j is survey sequence number;
(4) the strain variation amount Δ ε of each depth measuring point, is calculatedj,iWith displacement variable Δ Sj,i, draw Δ εj,i~hiRelation curve With Δ Sj,i~hiRelation curve, so as to obtain the springback capacity of each each measuring point of soil layer and its distribution under foundation ditch, hi is the depth of measuring point Degree.
A kind of 2. Foundation Pit bottom resilience quantity monitoring method according to claim 1, it is characterised in that strain variation amount Δ εj,iMeter Calculation formula is Δ εj,ij,i0,i, displacement variable Δ Sj,iCalculation formula be
A kind of 3. Foundation Pit bottom resilience quantity monitoring method according to claim 1, it is characterised in that:The sensing optic cable is Quasi-distributed fiber grating string or distributed sensing fiber;The sensing optic cable strain (FBG) demodulator is fiber Bragg grating (FBG) demodulator or cloth In deep (FBG) demodulator (BOTDR/BOTDA).
CN201710839865.0A 2017-09-18 2017-09-18 A kind of Foundation Pit bottom resilience quantity monitoring method Pending CN107620300A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710839865.0A CN107620300A (en) 2017-09-18 2017-09-18 A kind of Foundation Pit bottom resilience quantity monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710839865.0A CN107620300A (en) 2017-09-18 2017-09-18 A kind of Foundation Pit bottom resilience quantity monitoring method

Publications (1)

Publication Number Publication Date
CN107620300A true CN107620300A (en) 2018-01-23

Family

ID=61089954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710839865.0A Pending CN107620300A (en) 2017-09-18 2017-09-18 A kind of Foundation Pit bottom resilience quantity monitoring method

Country Status (1)

Country Link
CN (1) CN107620300A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101667327A (en) * 2008-09-03 2010-03-10 中国石油天然气股份有限公司 Pipeline landslide deep displacement monitoring and early warning method and system and construction method of system
CN103205957A (en) * 2013-03-19 2013-07-17 天津市市政工程设计研究院 Method of estimation on underlying tunnel and foundation rebound in excavation of foundation pit
CN104482855A (en) * 2014-11-19 2015-04-01 河海大学 Foundation pit slide surface position monitoring method based on FBG (fiber bragg grating)
CN104776840A (en) * 2015-04-17 2015-07-15 山东大学 Foundation ditch springback observation mark convenient for layered observation and observation method
CN105159267A (en) * 2015-09-28 2015-12-16 南阳中衡智能科技有限公司 Foam concrete quality remote real time monitoring authentication system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101667327A (en) * 2008-09-03 2010-03-10 中国石油天然气股份有限公司 Pipeline landslide deep displacement monitoring and early warning method and system and construction method of system
CN103205957A (en) * 2013-03-19 2013-07-17 天津市市政工程设计研究院 Method of estimation on underlying tunnel and foundation rebound in excavation of foundation pit
CN104482855A (en) * 2014-11-19 2015-04-01 河海大学 Foundation pit slide surface position monitoring method based on FBG (fiber bragg grating)
CN104776840A (en) * 2015-04-17 2015-07-15 山东大学 Foundation ditch springback observation mark convenient for layered observation and observation method
CN105159267A (en) * 2015-09-28 2015-12-16 南阳中衡智能科技有限公司 Foam concrete quality remote real time monitoring authentication system

Similar Documents

Publication Publication Date Title
CN105890537B (en) The technical solution and system of the distributing optical fiber sensing of induced joint deformation monitoring
Zhu et al. An optical fibre monitoring system for evaluating the performance of a soil nailed slope
CN102221332A (en) Fiber grating multi-point sensing device for unconsolidated strata as well as monitoring system and method
CN102607488B (en) Device and method for monitoring displacement deformation of sliding surface of landslip
WO2019233105A1 (en) Device and method for measuring flow rate, flow direction, and geological parameter of deep-well cross-hole groundwater
Reinsch et al. Thermal, mechanical and chemical influences on the performance of optical fibres for distributed temperature sensing in a hot geothermal well
Zhu et al. Combined Application of Optical Fibers and CRLD Bolts to Monitor Deformation of a Pit‐in‐Pit Foundation
CN112504336A (en) Landslide area pipeline deformation monitoring system
CN105115624B (en) A kind of floor undulation gushing water thermo parameters method formula method of testing
CN103276714B (en) Device and method for measuring soil body displacement in layering mode
CN106091967A (en) The optical fiber sensing monitoring technology of concrete gravity dam deformation and system
CN107643138A (en) Miniature steel-pipe pile body stress test device
Liu et al. Application of distributed optical fiber sensing technique in monitoring the ground deformation
Cao et al. Investigating the hydro-mechanical properties of calcareous sand foundations using distributed fiber optic sensing
CN109083639B (en) A method of laying vertical fiber and injection hole sealing in gun drilling
CN106643649B (en) Device and method for measuring deep settlement and pore water pressure of soil body
CN207215329U (en) Miniature steel-pipe pile body stress test device
CN205894050U (en) Novel static probing device
CN107703055A (en) Country rock relaxation monitoring device and its relaxation depth method of discrimination
CN109520471B (en) Optical fiber single-hole layered settlement monitoring device and monitoring method thereof
CN107620300A (en) A kind of Foundation Pit bottom resilience quantity monitoring method
CN207775858U (en) A kind of Foundation Pit bottom springback capacity monitoring device
CN213748552U (en) Landslide area pipeline deformation monitoring system
CN210441841U (en) Rock-soil body layered monitoring mark
CN207280927U (en) Country rock relaxation monitoring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180123