CN107618739A - A kind of building equipment - Google Patents

A kind of building equipment Download PDF

Info

Publication number
CN107618739A
CN107618739A CN201710931251.5A CN201710931251A CN107618739A CN 107618739 A CN107618739 A CN 107618739A CN 201710931251 A CN201710931251 A CN 201710931251A CN 107618739 A CN107618739 A CN 107618739A
Authority
CN
China
Prior art keywords
staving
arcuation
cavity
sheath body
bleed slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710931251.5A
Other languages
Chinese (zh)
Inventor
胡小君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710931251.5A priority Critical patent/CN107618739A/en
Publication of CN107618739A publication Critical patent/CN107618739A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Magnetic Bearings And Hydrostatic Bearings (AREA)

Abstract

The invention discloses a kind of building equipment, including main staving, the midpoint of the main staving is provided between storage, the side of the main staving is provided with the arcuation staving for being secured to installation, socle is installed with the outside of the arcuation staving bottom face, the socle bottom face gluing is provided with slipmat, the slipmat bottom face flushes with the main staving bottom face, the main staving is being internally provided with empty groove positioned at the arcuation staving, one first magnetic patch is placed in the bottom of the arcuation staving, and an ornaments plate is fixed at the top of first magnetic patch.The present invention is used as medium by the use of the air for being easy to take; with convenience; convenient work, in addition, the device internal part is low for required precision and part is easy to take; with manufacturing cost it is low the characteristics of; moreover, there is the device decompressor and speed to adjust and set device, the structural behaviour of the device can be effectively protected; service life is high, and practicality is stronger.

Description

A kind of building equipment
Technical field
The present invention relates to technical field of building construction, specially a kind of building equipment.
Background technology
, it is necessary to use many containers during housing construction, required material during depositing construction, at present, Building construction container used is usually that design structure is excessively single, when container volume is big highly high, the material of such bottom Just it is difficult to take out, therefore the equipment for needing in construction a kind of convenience to take out material.
The content of the invention
It is an object of the invention to provide a kind of building equipment, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides following technical scheme:
A kind of building equipment of the present invention, including main staving, the midpoint of the main staving are provided between storage, the main bucket The side of body is provided with the arcuation staving for being secured to installation, and socle is installed with the outside of the arcuation staving bottom face, The socle bottom face gluing is provided with slipmat, and the slipmat bottom face flushes with the main staving bottom face, the master Staving places one first magnetic patch, institute in the empty groove that is internally provided with positioned at the arcuation staving, the bottom of the arcuation staving State and an ornaments plate fixed at the top of the first magnetic patch, the main staving be provided with the top between the storage size relative to The less bung of board size is furnished, an arcuation magnetic patch, the top of the arcuation magnetic patch are placed in the bottom inside the arcuation staving An arcuation movable block is fixed, one first closure circle and the second closure circle are installed in the outside and inner side of the arcuation movable block respectively, Magnetic on the inside of the arcuation magnetic patch is set with the reversal of magnetism on the outside of first magnetic patch, the bottom of the arcuation staving side It is provided be secured to install first and enters tracheae, described first enters being internally provided with outside UNICOM and empty groove side for tracheae The first of bottom enters tracheal orifice, and the bottom of the arcuation staving opposite side is provided with the first of another side bottom of UNICOM's cavity groove and entered Air drain, the arcuation staving are secured to the decompressor of installation being provided with positioned at first position for entering air drain end, Be provided with the first air bleed slot of the side roof part of UNICOM's cavity groove one at the top of the arcuation staving side, the arcuation staving positioned at The position of the first air bleed slot end is provided with the speed tune for being secured to install and sets device.
As preferable technical scheme, the decompressor include the second sheath body, the second cavity, heavy chamber, second enter air drain, Second bleeder pipe, the second air bleed slot, the second movable block, the second air bleed slot, the second airtight core and the second plug.
As preferable technical scheme, the midpoint inside second sheath body is provided with the second cavity, second sheath body One end of second cavity is being provided with heavy chamber, second sheath body is being provided with second positioned at one end of the heavy chamber Enter air drain, and described second enters air drain and first and enter air drain UNICOM, one end of second sheath body is provided with outside UNICOM and the Second air bleed slot of two cavitys, the side of second sheath body be provided be secured to installation the second bleeder pipe, described second Bleeder pipe is internally provided with its outside and the second cavity second air bleed slot of UNICOM, the inside installation 1 of second cavity the Two movable blocks, and the closure circle of side installation one of second movable block, second movable block is positioned at the one of the heavy chamber Side is provided with second plug, and one second airtight core is installed in the inside of second air bleed slot.
As preferable technical scheme, the structure of second plug is identical with the structure of the heavy chamber.
As preferable technical scheme, the speed, which is adjusted, to be set device and includes the 3rd sheath body, the 3rd cavity, pointed heavy chamber, the Three enter air drain, the 3rd air bleed slot, pointed stifled core, cylinder, be spirally connected bar and cursor.
As preferable technical scheme, the midpoint inside the 3rd sheath body is provided with the 3rd cavity, the 3rd sheath body The side of 3rd cavity is being provided with the pointed heavy chamber, the 3rd sheath body is positioned at the one of the pointed heavy chamber Side is provided with the 3rd and enters air drain, and the described 3rd enters air drain and the first air bleed slot UNICOM, and described 3rd sheath body one end is provided with more Connected always by spiro connection structure at the midpoint at the end with the 3rd air bleed slot of the 3rd cavity, the 3rd sheath body outside individual UNICOM Go here and there the bar that is spirally connected at its midpoint, the bar that is spirally connected fixes a cursor positioned at outside one end, and the bar that is spirally connected is positioned at the described 3rd A cylinder is fixed in one end of cavity inside, and the cylinder is secured to installation being provided with positioned at one end of the pointed heavy chamber Pointed stifled core.
As preferable technical scheme, the spiro connection structure includes being arranged on the outer spiro connection structure being spirally connected on bar with setting Put and be threaded into bar and run through the interior spiro connection structure of part interior, and the outer spiro connection structure and the interior knot that is spirally connected in the 3rd sheath body Structure is engaged.
The beneficial effects of the invention are as follows:
The present invention has convenience, convenient work, in addition, the device internal part by the use of the air for being easy to take as medium For required precision, low and part is easy to take, have manufacturing cost it is low the characteristics of, moreover, the device have decompressor and Speed is adjusted and sets device, can effectively protect the structural behaviour of the device, and service life is high, and practicality is stronger.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the building equipment of the present invention;
Fig. 2 is the structural representation of decompressor in the present invention;
Fig. 3 is that medium velocity of the present invention adjusts the structural representation for setting device;
Fig. 4 is the upward view in Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Refer to Fig. 1-4, a kind of embodiment provided by the invention:A kind of building equipment, including main staving 1, it is described The midpoint of main staving 1 is provided with 3 between storage, and the side of the main staving 1 is provided with the arcuation staving 2 for being secured to installation, institute State and socle 20 is installed with the outside of the bottom face of arcuation staving 2, the bottom face gluing of socle 20 is provided with slipmat 21, institute State the bottom face of slipmat 21 to flush with the main bottom face of staving 1, the main staving 1 is positioned at the inside of the arcuation staving 2 Empty groove 4 is provided with, one first magnetic patch 5 is placed in the bottom of the arcuation staving 2, and a pendulum is fixed at the top of first magnetic patch 5 If plate 6, the main staving 1 is provided with size between the storage 3 top relative to the ornaments less bung of the size of plate 6 7, an arcuation magnetic patch 9 is placed in the bottom inside the arcuation staving 2, and an arcuation movable block is fixed at the top of the arcuation magnetic patch 9 8, one first closure circle 10 and the second closure circle 11, the arcuation magnetic are installed in the outside and inner side of the arcuation movable block 8 respectively The magnetic of the inner side of block 9 and the reversal of magnetism in the outside of the first magnetic patch 5 are set, and the bottom of the side of arcuation staving 2 is provided with It is secured to the first of installation and enters tracheae 12, described first enters being internally provided with outside UNICOM and the empty side of groove 4 for tracheae 12 The first of bottom enters tracheal orifice 13, and the bottom of the opposite side of arcuation staving 2 is provided with the of 4 another side bottom of UNICOM's cavity groove One enters air drain 14, and the arcuation staving 2 is provided with the position for entering the end of air drain 14 positioned at described first is secured to installation Decompressor 15, the first air bleed slot 16 of the side roof part of UNICOM's cavity groove 4 one, institute are provided with the top of the side of arcuation staving 2 State arcuation staving 2 be provided with positioned at the position of the end of the first air bleed slot 16 be secured to installation speed adjust set device 17, connected in use, entering tracheae 12 by first with the exhaust port of an air blower, then open air blower, into empty groove 4 Air is injected in portion, and arcuation movable block 8 can normally be moved up, in the presence of the magnetic patch 5 of arcuation magnetic patch 9 and first, will can be located at The material on ornaments plate 6 surface is moved up or moved down.
Wherein, the decompressor 15 include the second sheath body 151, the second cavity 152, heavy chamber 153, second enter air drain 154, Second bleeder pipe 155, the second air bleed slot 156, the second movable block 157, the second air bleed slot 158, the second airtight core 159 and second are stifled First 1510;
Wherein, the midpoint inside second sheath body 151 is provided with the second cavity 152, and second sheath body 151 is positioned at described One end of second cavity 152 is provided with heavy chamber 153, and second sheath body 151 is being provided with positioned at one end of the heavy chamber 153 Two enter air drain 154, and described second enters air drain 154 and first and enter the UNICOM of air drain 14, and one end of second sheath body 151 is provided with With the second air bleed slot 158 of the second cavity 152 outside UNICOM, the side of second sheath body 151, which is provided with, to be secured to install The second bleeder pipe 155, second bleeder pipe 155 is internally provided with UNICOM it outside and the second cavity 152 second put One second movable block 157, and the side peace of second movable block 157 are installed in air drain 156, the inside of second cavity 152 A closure circle is filled, second movable block 157 is being provided with second plug 1510, institute positioned at the side of the heavy chamber 153 The inside for stating the second air bleed slot 158 is installed by one second airtight core 159;
Wherein, the structure of second plug 1510 is identical with the structure of the heavy chamber 153;
Wherein, second cavity 152 pours fixed in the region between the airtight core 159 of the second plug 1510 and second Gas is measured, in use, the certain amount of air of preset air pressure is poured in the inside for first passing through aerating device to the second cavity 152, should Control can use as greatest limit pressure, and it is strong when being deformed in the presence of gas pressure that its numerical value should be less than part Degree, when when the air pressure of injection be more than the second cavity 152 inside air pressure when, the second movable block 157 is compressed, now air Discharged by the second air bleed slot 156, so as to effectively reduce the air pressure inside empty groove 4, prevent part distortion.
Wherein, the speed, which is adjusted to set device 17 and include the 3rd sheath body 171, the 3rd cavity 172, pointed heavy chamber the 173, the 3rd, enters Air drain 174, the 3rd air bleed slot 175, pointed stifled core 176, cylinder 177, be spirally connected bar 178 and cursor 179;
Wherein, the midpoint inside the 3rd sheath body 171 is provided with the 3rd cavity 172, and the 3rd sheath body 171 is positioned at described The side of 3rd cavity 172 is provided with the pointed heavy chamber 173, and the 3rd sheath body 171 is positioned at the pointed heavy chamber 173 Side is provided with the 3rd and enters air drain 174, and the described 3rd enters the UNICOM of 174 and first air bleed slot of air drain 16, the 3rd sheath body 171 One end is provided with the 3rd air bleed slot 175 with the 3rd cavity 172 outside multiple UNICOMs, and the 3rd sheath body 171 is in the end Point runs through the bar 178 that is spirally connected wherein put by spiro connection structure connection one, and the bar 178 that is spirally connected fixes one turn positioned at outside one end A cylinder 177 is fixed in swing arm 179, the described one end that bar 178 is located inside the 3rd cavity 172 that is spirally connected, and the cylinder 177 exists The pointed stifled core 176 for being secured to installation is provided with positioned at one end of the pointed heavy chamber 173;
Wherein, the spiro connection structure includes being arranged on the outer spiro connection structure being spirally connected on bar 178 and is arranged on described 3rd set Shell 171 runs through the interior spiro connection structure of part interior being threaded into bar 178, and the outer spiro connection structure matches with interior spiro connection structure Close, in use, by rotating the bar 178 that is spirally connected, change the gap between pointed heavy chamber 173 and pointed stifled core 176, so that arc The air on the top of shape movable block 8 plays a part of resistance, the speed of the movement of control arcuation movable block 8 in discharge.
Specifically used mode:In present invention work, in use, the exhaust port for first being entered the air blower of tracheae 12 and one connects Connect, then open air blower, inject air to the inside of empty groove 4, when the air pressure of injection is less than inside the second cavity 152 Air pressure when, arcuation movable block 8 can be moved up normally, in the presence of the magnetic patch 5 of arcuation magnetic patch 9 and first, can will be located at pendulum If the material on the surface of plate 6 is moved up or moved down, when the air pressure of injection is more than the air pressure inside the second cavity 152, decompression Device 15 in time can discharge pressure-air, prevent the generation of the part distortion phenomenon caused by pressure-air, meanwhile, In the course of the work, it can be adjusted by governing speed and set device 17, the gap arranged outside regulation air, so as to regulate and control on ornaments plate 6 The speed for rising or declining.
The beneficial effects of the invention are as follows:
The present invention has convenience, convenient work, in addition, the device internal part by the use of the air for being easy to take as medium For required precision, low and part is easy to take, have manufacturing cost it is low the characteristics of, moreover, the device have decompressor and Speed is adjusted and sets device, can effectively protect the structural behaviour of the device, and service life is high, and practicality is stronger.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.

Claims (7)

1. a kind of building equipment, including main staving, it is characterised in that:The midpoint of the main staving is provided between storage, institute The side for stating main staving is provided with the arcuation staving for being secured to installation, is installed with the outside of the arcuation staving bottom face Socle, the socle bottom face gluing are provided with slipmat, and the slipmat bottom face flushes with the main staving bottom face, institute State main staving and place one first magnetic in the empty groove that is internally provided with positioned at the arcuation staving, the bottom of the arcuation staving Block, an ornaments plate is fixed at the top of first magnetic patch, the main staving is provided with size at the top between the storage Relative to the ornaments less bung of board size, an arcuation magnetic patch, the arcuation magnetic patch are placed in the bottom inside the arcuation staving Top fix an arcuation movable block, one first closure circle and the second envelope are installed in the outside and inner side of the arcuation movable block respectively Stifled to enclose, the magnetic on the inside of the arcuation magnetic patch is set with the reversal of magnetism on the outside of first magnetic patch, the arcuation staving side Bottom be provided with and be secured to the first of installation and enter tracheae, described first enter tracheae be internally provided with outside UNICOM and cavity The first of the side bottom of groove one enters tracheal orifice, and the bottom of the arcuation staving opposite side is provided with another side bottom of UNICOM's cavity groove First enters air drain, and the arcuation staving is secured to the decompression of installation being provided with positioned at first position for entering air drain end Device, the first air bleed slot of the side roof part of UNICOM's cavity groove one, the arcuation staving are provided with the top of the arcuation staving side Be provided with positioned at the position of the first air bleed slot end be secured to installation speed adjust set device.
A kind of 2. building equipment according to claim 1, it is characterised in that:The decompressor includes second set Shell, the second cavity, heavy chamber, second enter air drain, the second bleeder pipe, the second air bleed slot, the second movable block, the second air bleed slot, second Airtight core and the second plug.
A kind of 3. building equipment according to claim 2, it is characterised in that:Midpoint inside second sheath body is set The second cavity is equipped with, second sheath body is being provided with heavy chamber positioned at one end of second cavity, and second sheath body is in place One end of the heavy chamber is provided with second and enters air drain, and described second enters air drain and first and enters air drain UNICOM, described second set One end of shell is provided with the second air bleed slot with the second cavity outside UNICOM, and the side of second sheath body, which is provided with, to be secured to Second bleeder pipe of installation, second bleeder pipe are internally provided with its outside and the second cavity second air bleed slot of UNICOM, One second movable block, and the closure circle of side installation one of second movable block are installed in the inside of second cavity, and described the Two movable blocks are being provided with second plug, the inside installation one second of second air bleed slot positioned at the side of the heavy chamber Airtight core.
A kind of 4. building equipment according to claim 3, it is characterised in that:The structure of second plug with it is described The structure of heavy chamber is identical.
A kind of 5. building equipment according to claim 1, it is characterised in that:The speed tune, which sets device, includes the 3rd Sheath body, the 3rd cavity, pointed heavy chamber, the 3rd enter air drain, the 3rd air bleed slot, pointed stifled core, cylinder, be spirally connected bar and cursor.
A kind of 6. building equipment according to claim 5, it is characterised in that:Midpoint inside 3rd sheath body is set It is equipped with the 3rd cavity, the 3rd sheath body is being provided with the pointed heavy chamber positioned at the side of the 3rd cavity, and the described 3rd Sheath body enters air drain being provided with the 3rd positioned at the side of the pointed heavy chamber, and the described 3rd enters air drain and the first air bleed slot joins Logical, described 3rd sheath body one end is provided with the 3rd air bleed slot with the 3rd cavity outside multiple UNICOMs, and the 3rd sheath body is at this The bar that is spirally connected wherein put is run through in the midpoint at end by spiro connection structure connection one, and the bar that is spirally connected fixes one turn positioned at outside one end A cylinder is fixed in swing arm, one end that the bar that is spirally connected is located at the 3rd cavity inside, and the cylinder is positioned at described pointed heavy One end of chamber is provided with the pointed stifled core for being secured to installation.
A kind of 7. building equipment according to claim 6, it is characterised in that:The spiro connection structure includes being arranged on institute State the outer spiro connection structure being spirally connected on bar and be arranged on the 3rd sheath body and be threaded into bar and run through the interior spiro connection structure of part interior, And the outer spiro connection structure is engaged with interior spiro connection structure.
CN201710931251.5A 2017-10-09 2017-10-09 A kind of building equipment Withdrawn CN107618739A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710931251.5A CN107618739A (en) 2017-10-09 2017-10-09 A kind of building equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710931251.5A CN107618739A (en) 2017-10-09 2017-10-09 A kind of building equipment

Publications (1)

Publication Number Publication Date
CN107618739A true CN107618739A (en) 2018-01-23

Family

ID=61091468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710931251.5A Withdrawn CN107618739A (en) 2017-10-09 2017-10-09 A kind of building equipment

Country Status (1)

Country Link
CN (1) CN107618739A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4626700A (en) * 1984-07-05 1986-12-02 Nippon Air Brake Co., Ltd. Hydraulic reservoir with fluid level detector
CN202728938U (en) * 2012-06-27 2013-02-13 北京红海科技开发有限公司 Container
CN203611111U (en) * 2013-12-17 2014-05-28 中信戴卡宁波轮毂制造有限公司 Front face polishing device of wheel
CN204211430U (en) * 2014-09-20 2015-03-18 谢国章 The building materials pallet that a kind of multiple-cylinder drives lifting mode building ground special
CN204338074U (en) * 2014-12-26 2015-05-20 山东省建筑科学研究院 Building water-proof paint mix and blend equipment
CN205269434U (en) * 2015-12-20 2016-06-01 陈海兴 Coating mixing tank for building
CN107364656A (en) * 2017-09-18 2017-11-21 连玲玲 A kind of raw material storage tanks for possessing feedstock transportation effect

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4626700A (en) * 1984-07-05 1986-12-02 Nippon Air Brake Co., Ltd. Hydraulic reservoir with fluid level detector
CN202728938U (en) * 2012-06-27 2013-02-13 北京红海科技开发有限公司 Container
CN203611111U (en) * 2013-12-17 2014-05-28 中信戴卡宁波轮毂制造有限公司 Front face polishing device of wheel
CN204211430U (en) * 2014-09-20 2015-03-18 谢国章 The building materials pallet that a kind of multiple-cylinder drives lifting mode building ground special
CN204338074U (en) * 2014-12-26 2015-05-20 山东省建筑科学研究院 Building water-proof paint mix and blend equipment
CN205269434U (en) * 2015-12-20 2016-06-01 陈海兴 Coating mixing tank for building
CN107364656A (en) * 2017-09-18 2017-11-21 连玲玲 A kind of raw material storage tanks for possessing feedstock transportation effect

Similar Documents

Publication Publication Date Title
CN107364656A (en) A kind of raw material storage tanks for possessing feedstock transportation effect
CN205335327U (en) Explosion -proof pressure relief device of power battery high low temperature test equipment
CN107618739A (en) A kind of building equipment
CN206553625U (en) A kind of broken sky of vacuum uses air flow device
CN108775431A (en) Balanced valve
CN203230882U (en) Air conditioner and stop valve therefor
CN108082680A (en) A kind of modified building equipment
CN204328099U (en) Railway freight-car gas charging valve
CN108100435A (en) A kind of novel house Architectural Equipment
CN205920835U (en) Lightning -proof insulator column type die mould
CN206387483U (en) A kind of pneumatic weighing device
CN108149598A (en) A kind of gas type road limiting device
CN107989766A (en) Pump head for plunger type metering pump and outlet valve with exhaust structure
CN107672917A (en) A kind of material storage device
CN204554045U (en) A kind of yielding support formula air valve door
CN203111923U (en) Pneumatic suspended ore drawing chute device
CN209275678U (en) A kind of device for discharging
CN209262661U (en) Carbon dioxide purification filling control device
CN208178363U (en) A kind of phenolic resin automatic adding device of precoated sand production
CN207450297U (en) Air supporting pulse automatic ration packing machine
CN207712730U (en) A kind of powder storage device preventing silo charging roof fall
CN206373323U (en) A kind of magnetic-type sand shooting mechanism
CN203919391U (en) A kind of pneumatic apparatus quick acting improves device and the mixing plant of proportioning accuracy
CN204372250U (en) Air pressure switch
CN207046820U (en) Buffer unit is quantitatively injected in a kind of chili oil production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180123