CN107618739A - A kind of building equipment - Google Patents
A kind of building equipment Download PDFInfo
- Publication number
- CN107618739A CN107618739A CN201710931251.5A CN201710931251A CN107618739A CN 107618739 A CN107618739 A CN 107618739A CN 201710931251 A CN201710931251 A CN 201710931251A CN 107618739 A CN107618739 A CN 107618739A
- Authority
- CN
- China
- Prior art keywords
- staving
- arcuation
- cavity
- sheath body
- bleed slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Magnetic Bearings And Hydrostatic Bearings (AREA)
Abstract
The invention discloses a kind of building equipment, including main staving, the midpoint of the main staving is provided between storage, the side of the main staving is provided with the arcuation staving for being secured to installation, socle is installed with the outside of the arcuation staving bottom face, the socle bottom face gluing is provided with slipmat, the slipmat bottom face flushes with the main staving bottom face, the main staving is being internally provided with empty groove positioned at the arcuation staving, one first magnetic patch is placed in the bottom of the arcuation staving, and an ornaments plate is fixed at the top of first magnetic patch.The present invention is used as medium by the use of the air for being easy to take; with convenience; convenient work, in addition, the device internal part is low for required precision and part is easy to take; with manufacturing cost it is low the characteristics of; moreover, there is the device decompressor and speed to adjust and set device, the structural behaviour of the device can be effectively protected; service life is high, and practicality is stronger.
Description
Technical field
The present invention relates to technical field of building construction, specially a kind of building equipment.
Background technology
, it is necessary to use many containers during housing construction, required material during depositing construction, at present,
Building construction container used is usually that design structure is excessively single, when container volume is big highly high, the material of such bottom
Just it is difficult to take out, therefore the equipment for needing in construction a kind of convenience to take out material.
The content of the invention
It is an object of the invention to provide a kind of building equipment, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides following technical scheme:
A kind of building equipment of the present invention, including main staving, the midpoint of the main staving are provided between storage, the main bucket
The side of body is provided with the arcuation staving for being secured to installation, and socle is installed with the outside of the arcuation staving bottom face,
The socle bottom face gluing is provided with slipmat, and the slipmat bottom face flushes with the main staving bottom face, the master
Staving places one first magnetic patch, institute in the empty groove that is internally provided with positioned at the arcuation staving, the bottom of the arcuation staving
State and an ornaments plate fixed at the top of the first magnetic patch, the main staving be provided with the top between the storage size relative to
The less bung of board size is furnished, an arcuation magnetic patch, the top of the arcuation magnetic patch are placed in the bottom inside the arcuation staving
An arcuation movable block is fixed, one first closure circle and the second closure circle are installed in the outside and inner side of the arcuation movable block respectively,
Magnetic on the inside of the arcuation magnetic patch is set with the reversal of magnetism on the outside of first magnetic patch, the bottom of the arcuation staving side
It is provided be secured to install first and enters tracheae, described first enters being internally provided with outside UNICOM and empty groove side for tracheae
The first of bottom enters tracheal orifice, and the bottom of the arcuation staving opposite side is provided with the first of another side bottom of UNICOM's cavity groove and entered
Air drain, the arcuation staving are secured to the decompressor of installation being provided with positioned at first position for entering air drain end,
Be provided with the first air bleed slot of the side roof part of UNICOM's cavity groove one at the top of the arcuation staving side, the arcuation staving positioned at
The position of the first air bleed slot end is provided with the speed tune for being secured to install and sets device.
As preferable technical scheme, the decompressor include the second sheath body, the second cavity, heavy chamber, second enter air drain,
Second bleeder pipe, the second air bleed slot, the second movable block, the second air bleed slot, the second airtight core and the second plug.
As preferable technical scheme, the midpoint inside second sheath body is provided with the second cavity, second sheath body
One end of second cavity is being provided with heavy chamber, second sheath body is being provided with second positioned at one end of the heavy chamber
Enter air drain, and described second enters air drain and first and enter air drain UNICOM, one end of second sheath body is provided with outside UNICOM and the
Second air bleed slot of two cavitys, the side of second sheath body be provided be secured to installation the second bleeder pipe, described second
Bleeder pipe is internally provided with its outside and the second cavity second air bleed slot of UNICOM, the inside installation 1 of second cavity the
Two movable blocks, and the closure circle of side installation one of second movable block, second movable block is positioned at the one of the heavy chamber
Side is provided with second plug, and one second airtight core is installed in the inside of second air bleed slot.
As preferable technical scheme, the structure of second plug is identical with the structure of the heavy chamber.
As preferable technical scheme, the speed, which is adjusted, to be set device and includes the 3rd sheath body, the 3rd cavity, pointed heavy chamber, the
Three enter air drain, the 3rd air bleed slot, pointed stifled core, cylinder, be spirally connected bar and cursor.
As preferable technical scheme, the midpoint inside the 3rd sheath body is provided with the 3rd cavity, the 3rd sheath body
The side of 3rd cavity is being provided with the pointed heavy chamber, the 3rd sheath body is positioned at the one of the pointed heavy chamber
Side is provided with the 3rd and enters air drain, and the described 3rd enters air drain and the first air bleed slot UNICOM, and described 3rd sheath body one end is provided with more
Connected always by spiro connection structure at the midpoint at the end with the 3rd air bleed slot of the 3rd cavity, the 3rd sheath body outside individual UNICOM
Go here and there the bar that is spirally connected at its midpoint, the bar that is spirally connected fixes a cursor positioned at outside one end, and the bar that is spirally connected is positioned at the described 3rd
A cylinder is fixed in one end of cavity inside, and the cylinder is secured to installation being provided with positioned at one end of the pointed heavy chamber
Pointed stifled core.
As preferable technical scheme, the spiro connection structure includes being arranged on the outer spiro connection structure being spirally connected on bar with setting
Put and be threaded into bar and run through the interior spiro connection structure of part interior, and the outer spiro connection structure and the interior knot that is spirally connected in the 3rd sheath body
Structure is engaged.
The beneficial effects of the invention are as follows:
The present invention has convenience, convenient work, in addition, the device internal part by the use of the air for being easy to take as medium
For required precision, low and part is easy to take, have manufacturing cost it is low the characteristics of, moreover, the device have decompressor and
Speed is adjusted and sets device, can effectively protect the structural behaviour of the device, and service life is high, and practicality is stronger.
Brief description of the drawings
Fig. 1 is the overall structure diagram of the building equipment of the present invention;
Fig. 2 is the structural representation of decompressor in the present invention;
Fig. 3 is that medium velocity of the present invention adjusts the structural representation for setting device;
Fig. 4 is the upward view in Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Refer to Fig. 1-4, a kind of embodiment provided by the invention:A kind of building equipment, including main staving 1, it is described
The midpoint of main staving 1 is provided with 3 between storage, and the side of the main staving 1 is provided with the arcuation staving 2 for being secured to installation, institute
State and socle 20 is installed with the outside of the bottom face of arcuation staving 2, the bottom face gluing of socle 20 is provided with slipmat 21, institute
State the bottom face of slipmat 21 to flush with the main bottom face of staving 1, the main staving 1 is positioned at the inside of the arcuation staving 2
Empty groove 4 is provided with, one first magnetic patch 5 is placed in the bottom of the arcuation staving 2, and a pendulum is fixed at the top of first magnetic patch 5
If plate 6, the main staving 1 is provided with size between the storage 3 top relative to the ornaments less bung of the size of plate 6
7, an arcuation magnetic patch 9 is placed in the bottom inside the arcuation staving 2, and an arcuation movable block is fixed at the top of the arcuation magnetic patch 9
8, one first closure circle 10 and the second closure circle 11, the arcuation magnetic are installed in the outside and inner side of the arcuation movable block 8 respectively
The magnetic of the inner side of block 9 and the reversal of magnetism in the outside of the first magnetic patch 5 are set, and the bottom of the side of arcuation staving 2 is provided with
It is secured to the first of installation and enters tracheae 12, described first enters being internally provided with outside UNICOM and the empty side of groove 4 for tracheae 12
The first of bottom enters tracheal orifice 13, and the bottom of the opposite side of arcuation staving 2 is provided with the of 4 another side bottom of UNICOM's cavity groove
One enters air drain 14, and the arcuation staving 2 is provided with the position for entering the end of air drain 14 positioned at described first is secured to installation
Decompressor 15, the first air bleed slot 16 of the side roof part of UNICOM's cavity groove 4 one, institute are provided with the top of the side of arcuation staving 2
State arcuation staving 2 be provided with positioned at the position of the end of the first air bleed slot 16 be secured to installation speed adjust set device
17, connected in use, entering tracheae 12 by first with the exhaust port of an air blower, then open air blower, into empty groove 4
Air is injected in portion, and arcuation movable block 8 can normally be moved up, in the presence of the magnetic patch 5 of arcuation magnetic patch 9 and first, will can be located at
The material on ornaments plate 6 surface is moved up or moved down.
Wherein, the decompressor 15 include the second sheath body 151, the second cavity 152, heavy chamber 153, second enter air drain 154,
Second bleeder pipe 155, the second air bleed slot 156, the second movable block 157, the second air bleed slot 158, the second airtight core 159 and second are stifled
First 1510;
Wherein, the midpoint inside second sheath body 151 is provided with the second cavity 152, and second sheath body 151 is positioned at described
One end of second cavity 152 is provided with heavy chamber 153, and second sheath body 151 is being provided with positioned at one end of the heavy chamber 153
Two enter air drain 154, and described second enters air drain 154 and first and enter the UNICOM of air drain 14, and one end of second sheath body 151 is provided with
With the second air bleed slot 158 of the second cavity 152 outside UNICOM, the side of second sheath body 151, which is provided with, to be secured to install
The second bleeder pipe 155, second bleeder pipe 155 is internally provided with UNICOM it outside and the second cavity 152 second put
One second movable block 157, and the side peace of second movable block 157 are installed in air drain 156, the inside of second cavity 152
A closure circle is filled, second movable block 157 is being provided with second plug 1510, institute positioned at the side of the heavy chamber 153
The inside for stating the second air bleed slot 158 is installed by one second airtight core 159;
Wherein, the structure of second plug 1510 is identical with the structure of the heavy chamber 153;
Wherein, second cavity 152 pours fixed in the region between the airtight core 159 of the second plug 1510 and second
Gas is measured, in use, the certain amount of air of preset air pressure is poured in the inside for first passing through aerating device to the second cavity 152, should
Control can use as greatest limit pressure, and it is strong when being deformed in the presence of gas pressure that its numerical value should be less than part
Degree, when when the air pressure of injection be more than the second cavity 152 inside air pressure when, the second movable block 157 is compressed, now air
Discharged by the second air bleed slot 156, so as to effectively reduce the air pressure inside empty groove 4, prevent part distortion.
Wherein, the speed, which is adjusted to set device 17 and include the 3rd sheath body 171, the 3rd cavity 172, pointed heavy chamber the 173, the 3rd, enters
Air drain 174, the 3rd air bleed slot 175, pointed stifled core 176, cylinder 177, be spirally connected bar 178 and cursor 179;
Wherein, the midpoint inside the 3rd sheath body 171 is provided with the 3rd cavity 172, and the 3rd sheath body 171 is positioned at described
The side of 3rd cavity 172 is provided with the pointed heavy chamber 173, and the 3rd sheath body 171 is positioned at the pointed heavy chamber 173
Side is provided with the 3rd and enters air drain 174, and the described 3rd enters the UNICOM of 174 and first air bleed slot of air drain 16, the 3rd sheath body 171
One end is provided with the 3rd air bleed slot 175 with the 3rd cavity 172 outside multiple UNICOMs, and the 3rd sheath body 171 is in the end
Point runs through the bar 178 that is spirally connected wherein put by spiro connection structure connection one, and the bar 178 that is spirally connected fixes one turn positioned at outside one end
A cylinder 177 is fixed in swing arm 179, the described one end that bar 178 is located inside the 3rd cavity 172 that is spirally connected, and the cylinder 177 exists
The pointed stifled core 176 for being secured to installation is provided with positioned at one end of the pointed heavy chamber 173;
Wherein, the spiro connection structure includes being arranged on the outer spiro connection structure being spirally connected on bar 178 and is arranged on described 3rd set
Shell 171 runs through the interior spiro connection structure of part interior being threaded into bar 178, and the outer spiro connection structure matches with interior spiro connection structure
Close, in use, by rotating the bar 178 that is spirally connected, change the gap between pointed heavy chamber 173 and pointed stifled core 176, so that arc
The air on the top of shape movable block 8 plays a part of resistance, the speed of the movement of control arcuation movable block 8 in discharge.
Specifically used mode:In present invention work, in use, the exhaust port for first being entered the air blower of tracheae 12 and one connects
Connect, then open air blower, inject air to the inside of empty groove 4, when the air pressure of injection is less than inside the second cavity 152
Air pressure when, arcuation movable block 8 can be moved up normally, in the presence of the magnetic patch 5 of arcuation magnetic patch 9 and first, can will be located at pendulum
If the material on the surface of plate 6 is moved up or moved down, when the air pressure of injection is more than the air pressure inside the second cavity 152, decompression
Device 15 in time can discharge pressure-air, prevent the generation of the part distortion phenomenon caused by pressure-air, meanwhile,
In the course of the work, it can be adjusted by governing speed and set device 17, the gap arranged outside regulation air, so as to regulate and control on ornaments plate 6
The speed for rising or declining.
The beneficial effects of the invention are as follows:
The present invention has convenience, convenient work, in addition, the device internal part by the use of the air for being easy to take as medium
For required precision, low and part is easy to take, have manufacturing cost it is low the characteristics of, moreover, the device have decompressor and
Speed is adjusted and sets device, can effectively protect the structural behaviour of the device, and service life is high, and practicality is stronger.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the involved claim of limitation.
Claims (7)
1. a kind of building equipment, including main staving, it is characterised in that:The midpoint of the main staving is provided between storage, institute
The side for stating main staving is provided with the arcuation staving for being secured to installation, is installed with the outside of the arcuation staving bottom face
Socle, the socle bottom face gluing are provided with slipmat, and the slipmat bottom face flushes with the main staving bottom face, institute
State main staving and place one first magnetic in the empty groove that is internally provided with positioned at the arcuation staving, the bottom of the arcuation staving
Block, an ornaments plate is fixed at the top of first magnetic patch, the main staving is provided with size at the top between the storage
Relative to the ornaments less bung of board size, an arcuation magnetic patch, the arcuation magnetic patch are placed in the bottom inside the arcuation staving
Top fix an arcuation movable block, one first closure circle and the second envelope are installed in the outside and inner side of the arcuation movable block respectively
Stifled to enclose, the magnetic on the inside of the arcuation magnetic patch is set with the reversal of magnetism on the outside of first magnetic patch, the arcuation staving side
Bottom be provided with and be secured to the first of installation and enter tracheae, described first enter tracheae be internally provided with outside UNICOM and cavity
The first of the side bottom of groove one enters tracheal orifice, and the bottom of the arcuation staving opposite side is provided with another side bottom of UNICOM's cavity groove
First enters air drain, and the arcuation staving is secured to the decompression of installation being provided with positioned at first position for entering air drain end
Device, the first air bleed slot of the side roof part of UNICOM's cavity groove one, the arcuation staving are provided with the top of the arcuation staving side
Be provided with positioned at the position of the first air bleed slot end be secured to installation speed adjust set device.
A kind of 2. building equipment according to claim 1, it is characterised in that:The decompressor includes second set
Shell, the second cavity, heavy chamber, second enter air drain, the second bleeder pipe, the second air bleed slot, the second movable block, the second air bleed slot, second
Airtight core and the second plug.
A kind of 3. building equipment according to claim 2, it is characterised in that:Midpoint inside second sheath body is set
The second cavity is equipped with, second sheath body is being provided with heavy chamber positioned at one end of second cavity, and second sheath body is in place
One end of the heavy chamber is provided with second and enters air drain, and described second enters air drain and first and enters air drain UNICOM, described second set
One end of shell is provided with the second air bleed slot with the second cavity outside UNICOM, and the side of second sheath body, which is provided with, to be secured to
Second bleeder pipe of installation, second bleeder pipe are internally provided with its outside and the second cavity second air bleed slot of UNICOM,
One second movable block, and the closure circle of side installation one of second movable block are installed in the inside of second cavity, and described the
Two movable blocks are being provided with second plug, the inside installation one second of second air bleed slot positioned at the side of the heavy chamber
Airtight core.
A kind of 4. building equipment according to claim 3, it is characterised in that:The structure of second plug with it is described
The structure of heavy chamber is identical.
A kind of 5. building equipment according to claim 1, it is characterised in that:The speed tune, which sets device, includes the 3rd
Sheath body, the 3rd cavity, pointed heavy chamber, the 3rd enter air drain, the 3rd air bleed slot, pointed stifled core, cylinder, be spirally connected bar and cursor.
A kind of 6. building equipment according to claim 5, it is characterised in that:Midpoint inside 3rd sheath body is set
It is equipped with the 3rd cavity, the 3rd sheath body is being provided with the pointed heavy chamber positioned at the side of the 3rd cavity, and the described 3rd
Sheath body enters air drain being provided with the 3rd positioned at the side of the pointed heavy chamber, and the described 3rd enters air drain and the first air bleed slot joins
Logical, described 3rd sheath body one end is provided with the 3rd air bleed slot with the 3rd cavity outside multiple UNICOMs, and the 3rd sheath body is at this
The bar that is spirally connected wherein put is run through in the midpoint at end by spiro connection structure connection one, and the bar that is spirally connected fixes one turn positioned at outside one end
A cylinder is fixed in swing arm, one end that the bar that is spirally connected is located at the 3rd cavity inside, and the cylinder is positioned at described pointed heavy
One end of chamber is provided with the pointed stifled core for being secured to installation.
A kind of 7. building equipment according to claim 6, it is characterised in that:The spiro connection structure includes being arranged on institute
State the outer spiro connection structure being spirally connected on bar and be arranged on the 3rd sheath body and be threaded into bar and run through the interior spiro connection structure of part interior,
And the outer spiro connection structure is engaged with interior spiro connection structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710931251.5A CN107618739A (en) | 2017-10-09 | 2017-10-09 | A kind of building equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710931251.5A CN107618739A (en) | 2017-10-09 | 2017-10-09 | A kind of building equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107618739A true CN107618739A (en) | 2018-01-23 |
Family
ID=61091468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710931251.5A Withdrawn CN107618739A (en) | 2017-10-09 | 2017-10-09 | A kind of building equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107618739A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4626700A (en) * | 1984-07-05 | 1986-12-02 | Nippon Air Brake Co., Ltd. | Hydraulic reservoir with fluid level detector |
CN202728938U (en) * | 2012-06-27 | 2013-02-13 | 北京红海科技开发有限公司 | Container |
CN203611111U (en) * | 2013-12-17 | 2014-05-28 | 中信戴卡宁波轮毂制造有限公司 | Front face polishing device of wheel |
CN204211430U (en) * | 2014-09-20 | 2015-03-18 | 谢国章 | The building materials pallet that a kind of multiple-cylinder drives lifting mode building ground special |
CN204338074U (en) * | 2014-12-26 | 2015-05-20 | 山东省建筑科学研究院 | Building water-proof paint mix and blend equipment |
CN205269434U (en) * | 2015-12-20 | 2016-06-01 | 陈海兴 | Coating mixing tank for building |
CN107364656A (en) * | 2017-09-18 | 2017-11-21 | 连玲玲 | A kind of raw material storage tanks for possessing feedstock transportation effect |
-
2017
- 2017-10-09 CN CN201710931251.5A patent/CN107618739A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4626700A (en) * | 1984-07-05 | 1986-12-02 | Nippon Air Brake Co., Ltd. | Hydraulic reservoir with fluid level detector |
CN202728938U (en) * | 2012-06-27 | 2013-02-13 | 北京红海科技开发有限公司 | Container |
CN203611111U (en) * | 2013-12-17 | 2014-05-28 | 中信戴卡宁波轮毂制造有限公司 | Front face polishing device of wheel |
CN204211430U (en) * | 2014-09-20 | 2015-03-18 | 谢国章 | The building materials pallet that a kind of multiple-cylinder drives lifting mode building ground special |
CN204338074U (en) * | 2014-12-26 | 2015-05-20 | 山东省建筑科学研究院 | Building water-proof paint mix and blend equipment |
CN205269434U (en) * | 2015-12-20 | 2016-06-01 | 陈海兴 | Coating mixing tank for building |
CN107364656A (en) * | 2017-09-18 | 2017-11-21 | 连玲玲 | A kind of raw material storage tanks for possessing feedstock transportation effect |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107364656A (en) | A kind of raw material storage tanks for possessing feedstock transportation effect | |
CN205335327U (en) | Explosion -proof pressure relief device of power battery high low temperature test equipment | |
CN107618739A (en) | A kind of building equipment | |
CN206553625U (en) | A kind of broken sky of vacuum uses air flow device | |
CN108775431A (en) | Balanced valve | |
CN203230882U (en) | Air conditioner and stop valve therefor | |
CN108082680A (en) | A kind of modified building equipment | |
CN204328099U (en) | Railway freight-car gas charging valve | |
CN108100435A (en) | A kind of novel house Architectural Equipment | |
CN205920835U (en) | Lightning -proof insulator column type die mould | |
CN206387483U (en) | A kind of pneumatic weighing device | |
CN108149598A (en) | A kind of gas type road limiting device | |
CN107989766A (en) | Pump head for plunger type metering pump and outlet valve with exhaust structure | |
CN107672917A (en) | A kind of material storage device | |
CN204554045U (en) | A kind of yielding support formula air valve door | |
CN203111923U (en) | Pneumatic suspended ore drawing chute device | |
CN209275678U (en) | A kind of device for discharging | |
CN209262661U (en) | Carbon dioxide purification filling control device | |
CN208178363U (en) | A kind of phenolic resin automatic adding device of precoated sand production | |
CN207450297U (en) | Air supporting pulse automatic ration packing machine | |
CN207712730U (en) | A kind of powder storage device preventing silo charging roof fall | |
CN206373323U (en) | A kind of magnetic-type sand shooting mechanism | |
CN203919391U (en) | A kind of pneumatic apparatus quick acting improves device and the mixing plant of proportioning accuracy | |
CN204372250U (en) | Air pressure switch | |
CN207046820U (en) | Buffer unit is quantitatively injected in a kind of chili oil production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180123 |