CN107618625A CN201710809048.0A CN201710809048A CN107618625A CN 107618625 A CN107618625 A CN 107618625A CN 201710809048 A CN201710809048 A CN 201710809048A CN 107618625 A CN107618625 A CN 107618625A
Authority
CN
China
Prior art keywords
ship
bridge
flat bed
slope
transport vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710809048.0A
Other languages
Chinese (zh)
Inventor
曾勇
周洪斌
徐佰林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Jinhai Group Co Ltd
Original Assignee
Hunan Jinhai Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Jinhai Group Co Ltd filed Critical Hunan Jinhai Group Co Ltd
Priority to CN201710809048.0A priority Critical patent/CN107618625A/en
Publication of CN107618625A publication Critical patent/CN107618625A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a kind of bridge roll-on transport ship, the ship is middle part band groove, the Ship Structure that outside is welded by outside plate, the fore sets the springboard of a movable landing, the bottom portion of groove sets inner bottom plating, groove side is provided with longitudinal bulkhead, and the ship upper surface is welded by main deck.The advantage of the invention is that:It is transported bridge using rolling dress mode and is segmented, with reference to the cargo ship that flat bed transport vehicle can be allowed to pass in and out, and the river levee grading pitch set, can be in the case of not by harbour large scale hoisting machinery, carry out large bridge segmentation shipment transport, whole economic efficiency is improved, is advantageous to the development of bridge construction cause.

Description

A kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship
Technical field
The present invention relates to a kind of marine equipment, specifically a kind of bridge roll-on transport ship and use the cargo ship The method for carrying out bridge transportation.
Background technology
For large-scale special harbour is equipped with across river, bridge spanning the sea, ultra-large type bridge manufacturing enterprise of China(About 1,000,000,000 throw Money), with common deck barging.
Into after 21st century, Chinese construction of road and bridge rapid development, bridge the more does the more wide, and span is increasing, state Family's support on policy steel structure bridge substitutes concrete-bridge, therefore steel structure bridge has welcome unprecedented opportunity to develop.
But large-scale steel structure bridge can not transport on highway(It is overweight, ultra-wide, overlength, superelevation), this segmentation nothing Transported on Fa highways, it is necessary to by sea defeated.
And river-spanning bridge typically uses erection by protrusion, or crane barge using suspension cable type, suspension cable type structure, installation method Method, these engineering methods do not set Temporary Piers in river, bridge location closure are directly lifted to from ship, it is also necessary to use Ship Transportation.Lifting is such as This big section is gone on board, and just there are so big harbour crane capacity, other bridge producers in domestic only several large bridge companies There is production capacity without transport capacity, large pier is the bottleneck for restricting the development of Chinese large-sized bridge.And the demand of bridge Distribution is in all parts of the country, and existing large bridge company is in a fixed position, and long-distance water transport will add cost of transportation.
The content of the invention
To solve the above problems, carried out it is an object of the invention to provide a kind of bridge roll-on transport ship and using the cargo ship The method of bridge transportation, it is transported bridge using rolling dress mode and is segmented, with reference to the cargo ship that flat bed transport vehicle can be allowed to pass in and out, and The river levee set, in the case of can not having to by the large scale hoisting machinery of harbour, large bridge segmentation shipment transport is carried out, is carried High whole economic efficiency.
The present invention to achieve the above object, is achieved through the following technical solutions:
A kind of bridge roll-on transport ship, the ship are middle part band groove, and the Ship Structure that outside is welded by outside plate is described Fore sets the springboard of a movable landing, and the bottom portion of groove sets inner bottom plating, and groove side is provided with longitudinal bulkhead, described Ship upper surface is welded by main deck.
Further, the fore of the ship respectively sets a bollard with Stern Post.
Further, the inner bottom plating is being provided with one 5 ° of slope, and the slope plane and river close to fore position Angle between dike transition slope is not more than 5 °, and slope length is about the 1/3 of captain.
Further, a kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship, it is special Sign is:Methods described comprises the following steps:
Step 1:River levee configures
A1, first paragraph slope is set at the top of river levee, its ruling grade is no more than 15 °;
A2, by riverain position excessive slope is set, the angle between excessive slope and first paragraph slope is no more than 5 °, and ramp length is about For 30m;
Step 2:Flat board vehicle-mounted running
B1, bridge is segmented with two or more flat bed transport vehicles transported by workshop, the bridge segmentation on flat bed transport vehicle It is padded with sleeper;
B2, flat bed transport vehicle reach ship inner bottom plating horizontal segment through the slope on first paragraph slope, excessive slope and ship;
Step 3:Ship carrying
C1, after flat bed transport vehicle comes to a complete stop, operation flat bed transport vehicle jacks some height;
After C2, flat bed transport vehicle are hydraulically locked in appropriate jacking state, several wood are arranged on bridge section underneath, main deck Pier;
C3, operation flat bed transport vehicle entire lowering so that sleeper departs from bridge segmentation, and bridge segmentation gravity is delivered to by plancon On the main deck of ship;
Minimum decline state is constant residing for C4, flat bed transport vehicle, removes sleeper, increases flat bed transport vehicle and bridge overlap span;
C5, flat bed transport vehicle is recalled, after flat bed transport vehicle disembarkation, the springboard on withdrawal ship;
C6, cargo ship drag riverbank away from the case of carrying with towboat.
The advantage of the invention is that:Its using rolling dress mode transport bridge be segmented, with reference to can allow flat bed transport vehicle pass in and out Cargo ship, and the river levee grading pitch set, it can be carried out large-scale in the case of not by harbour large scale hoisting machinery Bridge segmentation shipment transport, improves whole economic efficiency, is advantageous to the development of bridge construction cause.
Brief description of the drawings
Fig. 1 is the cargo ship structural representation of the present invention;
The cargo ship that Fig. 2 is the present invention stops river prompting intention;
Fig. 3 is the cargo ship sectional view of the present invention;
Fig. 4 is that cargo ship carries first paragraph slope schematic diagram with river;
Fig. 5 is cargo ship and the excessive slope schematic diagram of river levee;
Fig. 6 is flat bed transport vehicle schematic diagram on the slope of cargo ship;
Fig. 7 is flat bed transport vehicle normal level traveling schematic diagram;
Fig. 8 is that flat bed transport vehicle jacks view;
Fig. 9 is that pontic section underneath places plancon schematic diagram;
Figure 10 is that flat bed delivery height declines schematic diagram;
Figure 11 is that sleeper withdraws schematic diagram above flat bed transport vehicle;
Figure 12 is to recall flat bed transport vehicle schematic diagram;
Figure 13 is that springboard withdraws schematic diagram on cargo ship;
Figure 14 is that cargo ship integrally loads schematic diagram;
In figure:
1st, springboard;2nd, inner bottom plating;3rd, main deck;4th, bridge is segmented;5th, flat bed transport vehicle;6th, sleeper;7th, plancon;8th, riverbed;9、 Bollard;10th, outside plate;11st, excessive slope;12nd, longitudinal bulkhead.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is described in further detail.
As shown in Figure 1 to Figure 3, a kind of bridge roll-on transport ship, the ship are middle part band groove, and outside is welded by outside plate 10 The Ship Structure connect.The springboard 1 of one movable landing is on the bow set, interior bottom is transitioned into from riverbank for transporting equipment Plate 2.Inner bottom plating 2 is set in bottom portion of groove, groove side is provided with longitudinal bulkhead 12, and longitudinal bulkhead 12 passes in and out for flat bed transport vehicle 5 Conveniently set.In Fig. 2, ∠ C are that inner bottom plating 2 is setting the angle of slope and horizontal plane close to fore position, and size is 5 °, and Angle between the slope plane and river levee transition slope is not more than 5 °.Preferably, slope length is about the 1/3 of captain.
In addition, the fore in cargo ship respectively sets a bollard 9 with Stern Post, fixed for ship.And cargo ship Upper surface be welded by main deck 3, main deck 3 cover position high strength steel structural support should be set, in order to rear More preferably play a part of load-bearing during continuous carrying.
As shown in Figures 4 to 6, each view in being advanced for flat bed transport vehicle 5.∠ A are river levee first paragraph in Fig. 4 The inclination of ramp on slope, its ruling grade are no more than 15 °, and ∠ B are excessive angles between slope 11 and first paragraph slope on river levee in Fig. 5, Its maximum angle is no more than 5 °.
As shown in Fig. 7 to Figure 12,4 each views are segmented for the carrying bridge of flat bed transport vehicle 5.H0 is flat in Fig. 7 Height of the plate transport vehicle 5 in normal travel condition under body.H1 is that flat bed transport vehicle 5 jacks state under body in Fig. 8, Fig. 9 Highly.H2 is that flat bed transport vehicle 5 declines state rear height in Figure 10, Figure 11.The height of 5 each vehicle body of flat bed transport vehicle The magnitude relationship of degree is H1>H0>H2.
As shown in Figure 13, Figure 14, completion is integrally loaded for cargo ship, and withdraw the schematic diagram of springboard 1.
To sum up, a kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship, methods described are included Following steps:
Step 1:River levee configures
A1, first paragraph slope is set at the top of river levee, its ruling grade is no more than 15 °;
A2, by riverain position excessive slope 11 is set, the angle between excessive slope 11 and first paragraph slope is no more than 5 °, ramp length Degree is about 30m;
Step 2:Flat board vehicle-mounted running
B1, with two or more flat bed transport vehicles 5 bridge segmentation 4 is transported by workshop, the bridge on flat bed transport vehicle 5 point Section 4 is padded with sleeper 6, improves coefficient of friction;
B2, flat bed transport vehicle 5 reach the horizontal segment of ship inner bottom plating 2 through the slope on first paragraph slope, excessive slope 11 and ship;
Step 3:Ship carrying
C1, after flat bed transport vehicle 5 comes to a complete stop, operation flat bed transport vehicle 5 jack some height;
After C2, flat bed transport vehicle 5 are hydraulically locked in appropriate jacking state, below bridge segmentation 4, arranged on main deck 3 some Individual plancon 7;
C3, the operation entire lowering of flat bed transport vehicle 5 so that sleeper 6 departs from bridge segmentation 4, and bridge is segmented 4 gravity by plancon 7 It is delivered on the main deck 3 of ship;
Minimum decline state is constant residing for C4, flat bed transport vehicle 5, removes sleeper 6, increases between flat bed transport vehicle 5 and bridge segmentation 4 Gap;
C5, flat bed transport vehicle 5 is recalled, after flat bed transport vehicle 5 debarks, the springboard 1 on withdrawal ship;
C6, cargo ship drag riverbank away from the case of carrying with towboat.
It will be appreciated by those skilled in the art that hull keel steel construction is using existing used by the transport ship Technology, here is omitted for the connection of its internal structure.
Embodiment described above is only the preferred embodiments of the present invention, and the simultaneously exhaustion of the feasible implementation of non-invention.It is right For persons skilled in the art, on the premise of without departing substantially from the principle of the invention and spirit to any aobvious made by it and The change being clear to, it should all be contemplated as falling with the claims of the present invention.

Claims (4)

1. a kind of bridge roll-on transport ship, it is characterised in that the ship is middle part band groove, what outside was welded by outside plate Ship Structure, the fore set the springboard of a movable landing, and the bottom portion of groove sets inner bottom plating, and groove side is set There is longitudinal bulkhead, the ship upper surface is welded by main deck.
2. a kind of bridge roll-on transport ship according to claim 1, it is characterised in that the fore of the ship and stern position Put one bollard of each setting.
3. a kind of bridge roll-on transport ship according to claim 1, it is characterised in that the inner bottom plating is close to fore position Install and be equipped with one 5 ° of slope, and the angle between the slope plane and river levee transition slope is not more than 5 °, slope length is about ship Long 1/3.
4. a kind of bridge roll-on transport ship a kind of according to claim 1 and the side that bridge transportation is carried out using the cargo ship Method, it is characterised in that:Methods described comprises the following steps:
Step 1:River levee configures
A1, first paragraph slope is set at the top of river levee, its ruling grade is no more than 15 °;
A2, by riverain position excessive slope is set, the angle between excessive slope and first paragraph slope is no more than 5 °, and ramp length is about For 30m;
Step 2:Flat board vehicle-mounted running
B1, bridge is segmented with two or more flat bed transport vehicles transported by workshop, the bridge segmentation on flat bed transport vehicle It is padded with sleeper;
B2, flat bed transport vehicle reach ship inner bottom plating horizontal segment through the slope on first paragraph slope, excessive slope and ship;
Step 3:Ship carrying
C1, after flat bed transport vehicle comes to a complete stop, operation flat bed transport vehicle jacks some height;
After C2, flat bed transport vehicle are hydraulically locked in appropriate jacking state, several wood are arranged on bridge section underneath, main deck Pier;
C3, operation flat bed transport vehicle entire lowering so that sleeper departs from bridge segmentation, and bridge segmentation gravity is delivered to by plancon On the main deck of ship;
Minimum decline state is constant residing for C4, flat bed transport vehicle, removes sleeper, increases flat bed transport vehicle and bridge overlap span;
C5, flat bed transport vehicle is recalled, after flat bed transport vehicle disembarkation, the springboard on withdrawal ship;
C6, cargo ship drag riverbank away from the case of carrying with towboat.
CN201710809048.0A 2017-09-09 2017-09-09 A kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship Pending CN107618625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710809048.0A CN107618625A (en) 2017-09-09 2017-09-09 A kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710809048.0A CN107618625A (en) 2017-09-09 2017-09-09 A kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship

Publications (1)

Publication Number Publication Date
CN107618625A true CN107618625A (en) 2018-01-23

Family

ID=61089781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710809048.0A Pending CN107618625A (en) 2017-09-09 2017-09-09 A kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship

Country Status (1)

Country Link
CN (1) CN107618625A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212129Y (en) * 2008-06-25 2009-03-25 中铁宝桥股份有限公司 Large steel box girder barge transport frame for steel structure bridge
CN201321148Y (en) * 2008-12-29 2009-10-07 吴方春 Stone carrying vessel
CN102514953A (en) * 2011-12-28 2012-06-27 江苏中泰桥梁钢构股份有限公司 Method for loading whole span grider section of bridge on board in rolling mode
CN102556691A (en) * 2011-12-29 2012-07-11 武船重型工程有限公司 Roll-on/roll-off shipping method for long large steel box girder segment across obstacles
CN102602712A (en) * 2012-03-29 2012-07-25 武船重型工程有限公司 Method for shipping of segments of steel box girders by rolling
CN202624591U (en) * 2011-12-31 2012-12-26 江苏道达海洋装备技术有限公司 Wind turbine installation vessel structure
CN103498420A (en) * 2013-10-18 2014-01-08 中交一公局厦门工程有限公司 Large-scale steel box beam ashore construction method
CN205524835U (en) * 2016-03-17 2016-08-31 深圳市舜鑫源船务有限公司 Shipcraft
CN105926466A (en) * 2016-04-22 2016-09-07 上海市机械施工集团有限公司 Device and construction method for steel truss bridge integral transporting
CN106542054A (en) * 2016-12-08 2017-03-29 宜昌东江造船有限公司 LNG tank formula container loading and unloading ship
CN207208388U (en) * 2017-09-09 2018-04-10 湖南金海集团有限公司 A kind of bridge roll-on transport ship

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201212129Y (en) * 2008-06-25 2009-03-25 中铁宝桥股份有限公司 Large steel box girder barge transport frame for steel structure bridge
CN201321148Y (en) * 2008-12-29 2009-10-07 吴方春 Stone carrying vessel
CN102514953A (en) * 2011-12-28 2012-06-27 江苏中泰桥梁钢构股份有限公司 Method for loading whole span grider section of bridge on board in rolling mode
CN102556691A (en) * 2011-12-29 2012-07-11 武船重型工程有限公司 Roll-on/roll-off shipping method for long large steel box girder segment across obstacles
CN202624591U (en) * 2011-12-31 2012-12-26 江苏道达海洋装备技术有限公司 Wind turbine installation vessel structure
CN102602712A (en) * 2012-03-29 2012-07-25 武船重型工程有限公司 Method for shipping of segments of steel box girders by rolling
CN103498420A (en) * 2013-10-18 2014-01-08 中交一公局厦门工程有限公司 Large-scale steel box beam ashore construction method
CN205524835U (en) * 2016-03-17 2016-08-31 深圳市舜鑫源船务有限公司 Shipcraft
CN105926466A (en) * 2016-04-22 2016-09-07 上海市机械施工集团有限公司 Device and construction method for steel truss bridge integral transporting
CN106542054A (en) * 2016-12-08 2017-03-29 宜昌东江造船有限公司 LNG tank formula container loading and unloading ship
CN207208388U (en) * 2017-09-09 2018-04-10 湖南金海集团有限公司 A kind of bridge roll-on transport ship

Similar Documents

Publication Publication Date Title
CN103233452B (en) The pre-splicing 1/4 cylinder transportation resources of a kind of lattice steel sheet pile large cylinder nominative sheet pile
CN101879932B (en) Method for lengthening and lading steel piles of large deepwater jacket
CN203021962U (en) Floating dock
CN111608133B (en) Movable floating wharf anchoring device and fastening method
CN207208388U (en) A kind of bridge roll-on transport ship
CN102140789A (en) Novel shallow water jacket design and installation method
CN101767634A (en) Self-chambering self-discharging container ship
CN207045637U (en) A kind of floating ship terminals
CN208183643U (en) A kind of dock structure taking into account large ship and heavy mail mast and hanging
CN101941510A (en) Method for improving ship handling efficiency of containers (or bulk cargo) and equipment thereof
CN111188324A (en) Overwater folding process for offshore wind power installation platform lifting system
CN201212129Y (en) Large steel box girder barge transport frame for steel structure bridge
CN202642027U (en) Floating fitting-out device
CN212149193U (en) Ship reversible radar mast
CN204979163U (en) A overhang slope multilane rolls adorns landing stage for inland river
CN203129082U (en) Wharf framed bent with triangular framing pier
CN107618625A (en) A kind of bridge roll-on transport ship and the method that bridge transportation is carried out using the cargo ship
CN201538941U (en) Wharf flying bridge
CN212896121U (en) Disconnect-type high stake ore pier structure
CN201587808U (en) Track system for moving ship unloaders
CN116142832A (en) Roll-on method for loading SPMT for portal crane
CN202765875U (en) Oversized rail gauge crane transportation equipment
CN204527539U (en) Rotary boarding ladder
CN211642531U (en) Semi-submersible type mounting and transporting platform for bridge section
CN110451081B (en) Transverse roll-on and roll-off method for chemical tower equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180123