CN107609134A - Building enterprise's certificate management method and system - Google Patents
Building enterprise's certificate management method and system Download PDFInfo
- Publication number
- CN107609134A CN107609134A CN201710843952.3A CN201710843952A CN107609134A CN 107609134 A CN107609134 A CN 107609134A CN 201710843952 A CN201710843952 A CN 201710843952A CN 107609134 A CN107609134 A CN 107609134A
- Authority
- CN
- China
- Prior art keywords
- enterprise
- certificate
- variety
- certificates
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiment of the present invention provides a kind of building enterprise's certificate management method and system, is related to technical field of information management.This method includes:Enterprise's certificate database is established, enterprise's certificate database includes the information of a variety of enterprise's certificates, and a variety of enterprise's certificates include at least two in business license, qualification certificates, safety production permit, digital certificate;By being associated for a variety of enterprise's certificates;When a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, the prompting whether information of enterprise's certificate of association needs to change is sent;The mobility status of a variety of enterprise's certificates is recorded;Mobility status according to a variety of enterprise's certificates changes to enterprise's certificate database.Building enterprise's certificate management system of the embodiment of the present invention meets the demand of building enterprise's qualification certificates management, improves the efficiency of enterprise qualification certificate management.
Description
Technical field
The present invention relates to technical field of information management, in particular to a kind of building enterprise's certificate management method and is
System.
Background technology
In today of information technology rapid development, enterprise itself is improved by informationization technology by increasing enterprise
The efficiency of management and managerial skills.On the premise of national correlation department management increasingly specification, as Operation of Construction Enterprise management
Important content, " enterprise's certificate " through enterprise operation and management various aspects manage, low there is an urgent need to change efficiency in the past
Way to manage, it is allowed to standardize, is information-based, helps to improve the competitiveness of enterprise.
At present, substantial portion of building enterprise, the management for qualification certificates are still managed using paper trail mode, wave
Taken a large amount of manpower and materials, and efficiency is low, usually occur enterprise qualification certificate because expired failure and caused by unnecessary loss.
The content of the invention
In view of this, the purpose of the embodiment of the present invention is to provide a kind of building enterprise's certificate management method and system, with
Improve above mentioned problem.
In a first aspect, a kind of building enterprise's certificate management method provided in an embodiment of the present invention, including:Establish enterprise's certificate
Database, enterprise's certificate database include the information of a variety of enterprise's certificates, a variety of enterprise's certificates include business license,
At least two in qualification certificates, safety production permit, digital certificate;By being associated for a variety of enterprise's certificates;When
When a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, send association enterprise's certificate information whether
Need the prompting changed;The mobility status of a variety of enterprise's certificates is recorded;Stream according to a variety of enterprise's certificates
Emotionally condition changes to enterprise's certificate database.
Preferably, a variety of enterprise's certificates are included the step of being associated:According to a variety of enterprise's certificates
Information, determine the correlation model between the information of a variety of enterprise's certificates;According to the correlation model by a variety of enterprises
Certificate is associated.
Preferably, also wrapped after the step of whether information of the enterprise's certificate for sending association needs the prompting changed
Include:If user changes to the information of enterprise's certificate of association, the information of enterprise's certificate of association is changed;If user is to association
The information of enterprise's certificate wouldn't change, then send the prompting for setting change time next time.
Preferably, methods described also includes:Staff credentials' database is established, staff credentials' database includes a variety of people
The information of member's certificate, a variety of staff credentials include accredited personnel's certificate, title for technical personnel staff credentials, special operation workers card
At least two in book, site administrator's certificate, skilled worker's certificate, three class staff credentials of safety;By a variety of personnel
Certificate is associated with engineering project;Situation is associated according to the staff credentials and engineering project, records the personnel
The project status of certificate;According to the mobility status of the staff credentials, the flow regime of the staff credentials is recorded;As the people
When the project status and flow regime of member's certificate change, staff credentials' database is changed.
Preferably, methods described also includes:To a variety of enterprise's certificates and the period of validity of a variety of staff credentials
It is monitored with the examination & verification time limit;Predetermined time before period of validity or examination & verification time limit, according to a variety of enterprise's certificates and institute
The classification of a variety of staff credentials is stated, sends different alarm commands.
Second aspect, the embodiment of the present invention also provide a kind of building enterprise's certificate management system, including:Database mould
Block, for establishing enterprise's certificate database, enterprise's certificate database includes the information of a variety of enterprise's certificates, a variety of enterprises
Industry certificate includes at least two in business license, qualification certificates, safety production permit, digital certificate;Relating module, it is used for
By being associated for a variety of enterprise's certificates;Reminding module is changed, for when a kind of enterprise in a variety of enterprise's certificates
When the information of certificate changes, the prompting whether information of enterprise's certificate of association needs to change is sent;Whereabouts logging modle,
For being recorded to the mobility status of a variety of enterprise's certificates;Editor module, for according to a variety of enterprise's certificates
Mobility status changes to enterprise's certificate database.
Preferably, the relating module is additionally operable to:According to the information of a variety of enterprise's certificates, a variety of enterprises are determined
Correlation model between the information of certificate;According to the correlation model being associated a variety of enterprise's certificates.
Preferably, in addition to modified module, if being changed for user to the information of enterprise's certificate of association, modification association
Enterprise's certificate information;If user wouldn't change to the information of enterprise's certificate of association, the change reminding module is used to send out
Go out to set the prompting of change time next time.
Preferably, the Database module, it is additionally operable to establish staff credentials' database, staff credentials' database
Include the information of a variety of staff credentials, a variety of staff credentials include accredited personnel's certificate, title for technical personnel staff credentials, special type
At least two in operating personnel's certificate, site administrator's certificate, skilled worker's certificate, three class staff credentials of safety;It is described
Relating module is additionally operable to being associated a variety of staff credentials with engineering project;The system also includes project status and remembered
Module is recorded, for the project status for associating situation, recording the staff credentials with engineering project according to the staff credentials;
The whereabouts logging modle, is additionally operable to the mobility status according to the staff credentials, records the flow regime of the staff credentials;
The editor module, it is additionally operable to when the project status and flow regime of the staff credentials change, to staff credentials' number
Changed according to storehouse.
Preferably, in addition to warning module, for the effective of a variety of enterprise's certificates and a variety of staff credentials
Time limit and examination & verification time limit are monitored;Predetermined time before period of validity or examination & verification time limit, according to a variety of enterprise's certificates
With the classification of a variety of staff credentials, different alarm commands is sent.
Compared with prior art, building enterprise's certificate management method provided in an embodiment of the present invention and system, this method bag
Include:Enterprise's certificate database is established, enterprise's certificate database includes the information of a variety of enterprise's certificates, a variety of enterprise's cards
School bag includes at least two in business license, qualification certificates, safety production permit, digital certificate;A variety of enterprises are demonstrate,proved
Book is associated;When a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, the enterprise of association is sent
Whether the information of industry certificate needs the prompting changed;The mobility status of a variety of enterprise's certificates is recorded;According to described in
The mobility status of a variety of enterprise's certificates changes to enterprise's certificate database., can by establishing enterprise's certificate database
To store the essential information of enterprise's certificate, when a certain enterprise's certificate information makes change, system can be according to the enterprise stored
The information of certificate is judged, associated certificate is verified, and whether prompting needs to change;When certificate is borrowed, verification
Book is tracked, and establishes certificate management information record, and corresponding change is made to certificate database.It is meanwhile real to warning information
Row classification push and differentiated control, enterprise is preferably promoted for the hierarchical of qualification certificates management and standardization.By to four
The actual motion use of river building constructor shows that building enterprise's certificate management system of the embodiment of the present invention meets building enterprise
The demand of industry qualification certificates management, the efficiency of enterprise qualification certificate management is improved, there is height for building trade enterprise
The application value of degree.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate
Appended accompanying drawing, is described in detail below.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the block diagram for the terminal that present pre-ferred embodiments provide.
Fig. 2 is the high-level schematic functional block diagram for building enterprise's certificate management system that present pre-ferred embodiments provide.
Fig. 3 is the flow chart for building enterprise's certificate management method that present pre-ferred embodiments provide.
Fig. 4 is the flow that building enterprise's certificate management method that present pre-ferred embodiments provide is managed staff credentials
Figure.
Fig. 5 is the alarm mode flow chart for building enterprise's certificate management method that present pre-ferred embodiments provide.
Icon:10- terminals;101- memories;102- storage controls;103- processors;200- building enterprises certificate pipe
Reason system;201- Database modules;202- relating modules;203- changes reminding module;204- whereabouts logging modles;205-
Editor module;206- modified modules;207- project status logging modles;208- warning modules.
Embodiment
Below in conjunction with accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Ground describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Generally exist
The component of the embodiment of the present invention described and illustrated in accompanying drawing can be configured to arrange and design with a variety of herein.Cause
This, the detailed description of the embodiments of the invention to providing in the accompanying drawings is not intended to limit claimed invention below
Scope, but it is merely representative of the selected embodiment of the present invention.Based on embodiments of the invention, those skilled in the art are not doing
The every other embodiment obtained on the premise of going out creative work, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.Meanwhile the present invention's
In description, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that instruction or hint relative importance.
Fig. 1 is refer to, is the block diagram for the terminal 10 that present pre-ferred embodiments provide.The embodiment of the present invention provides
Building enterprise's certificate management method and system be applied to terminal 10 in, terminal 10 can be smart mobile phone, PC
(personal computer, PC), tablet personal computer, personal digital assistant (personal digital assistant, PDA),
Mobile internet surfing equipment (mobile Internet device, MID) etc..The operating system of the terminal 10 can be, but unlimited
In, Android (Android) system, IOS (iPhone operating system) system, Windows phone systems,
Windows systems etc..The terminal 10 includes memory 101, storage control 102, processor 103 and building enterprise's certificate
Management system 200.
The memory 101, storage control 102, processor 103, each element are directly or indirectly electrical between each other
Connection, to realize the transmission of data or interaction.For example, these elements can pass through one or more communication bus or letter between each other
Number line, which is realized, to be electrically connected with.Building enterprise's certificate management system 200 include it is at least one can be with software or firmware
(firmware) form is stored in the memory 101 or is solidificated in the operating system (operating of the terminal 10
System, OS) in software function module.The processor 103 is used to perform the executable module stored in memory 101,
For example, software function module or computer program that building enterprise's certificate management system 200 includes.
Wherein, memory 101 may be, but not limited to, random access memory (Random Access Memory,
RAM), read-only storage (Read Only Memory, ROM), programmable read only memory (Programmable Read-Only
Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only Memory, EPROM),
Electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only Memory, EEPROM) etc..
Wherein, memory 101 is used for storage program, and the processor 103 performs described program, this hair after execute instruction is received
The method performed by server that the stream process that bright embodiment any embodiment discloses defines can apply in processor 103,
Or realized by processor 103.
Processor 103 is probably a kind of IC chip, has the disposal ability of signal.Above-mentioned processor 103 can
To be general processor, including central processing unit (Central Processing Unit, abbreviation CPU), network processing unit
(Network Processor, abbreviation NP) etc.;Can also be digital signal processor (DSP), application specific integrated circuit (ASIC),
Ready-made programmable gate array (FPGA) either other PLDs, discrete gate or transistor logic, discrete hard
Part component.It can realize or perform disclosed each method, step and the logic diagram in the embodiment of the present invention.General processor
Can be microprocessor or the processor 103 can also be any conventional processor etc..
At present, neither one product in market is specific to the management of the qualification certificates of building trade enterprise, although having
Part OA system integrations enterprise certificate administration function, but substantially belong to the general-purpose version of all enterprises of all industries, Wu Fashi
Answer the individual demand of different industries enterprise.And diversity and the complexity of content due to building trade enterprise certificate, mesh
Preceding certificate management system in the storage of certificate and way to manage there is certificate information storage not exclusively, system suitability
Difference, early warning prompting function missing, Data Migration share the problems such as difficult.The present embodiment provides a kind of building enterprise's certificate management system
System 200, for solving the above problems, and can adapt to enterprise's certificate of building enterprise or the diversity of staff credentials.
Fig. 2 is refer to, is that the functional module for building enterprise's certificate management system 200 that present pre-ferred embodiments provide is shown
It is intended to.Building enterprise's certificate management system 200 includes Database module 201, relating module 202, change prompting mould
Block 203, whereabouts logging modle 204, editor module 205, modified module 206, project status logging modle 207 and warning module
208。
The Database module 201 is used to establish enterprise's certificate database and staff credentials' database.Based on XUML
Database design method, according to enterprise's certificate and the curriculum offering respective field of staff credentials, design XML certificate databases,
Corresponding database schema and document are defined, with compatible a variety of enterprise's certificates and staff credentials.Wherein, XUML is a kind of new
XML conceptual models, it is based on UML standards.
Enterprise's certificate includes but is not limited to, business license, qualification certificates, safety production permit, digital certificate, institute
State staff credentials to include but is not limited to, accredited personnel's certificate, title for technical personnel staff credentials, special operation workers certificate, field pipes
Staff credentials, skilled worker's certificate, three class staff credentials of safety are managed, accredited personnel's certificate can be structure art certificate etc..
User can be by building enterprise's certificate management system 200 of the present embodiment default certificate template or self-defined card
Book template typing enterprise's certificate and the information of staff credentials.The information of enterprise's certificate includes but is not limited to, unified social credibility generation
Code, Business Name, legal representative, registered address, business scope etc..The information of the staff credentials includes but is not limited to, certificate
Title, certificate type, duration and validity of certificate, licence issuing authority, scanned copy, remark information etc..
The relating module 202, for being associated a variety of enterprise's certificates.
Specifically, according to the information of a variety of enterprise's certificates, the pass between the information of a variety of enterprise's certificates is determined
Gang mould type;According to the correlation model being associated a variety of enterprise's certificates.For example, business license, qualification certificates and
Safety production permit, all includes the information such as enterprise name, legal representative and registered address, and relating module 202 will can be sought
Industry license, qualification certificates are identical to safety production permit or related information is established as correlation model, such as business license, money
The enterprise name all same of cross-examination book and safety production permit, it is a correlation model.By under same correlation model not
It is associated with enterprise's certificate.
Reminding module 203 is changed, for being changed when a kind of information of enterprise's certificate in a variety of enterprise's certificates
When, send the prompting whether information of enterprise's certificate of association needs to change.Such as in the business license of enterprise, enterprise name,
Legal representative or be that registered address is changed, then the qualification such as corresponding qualification certificates and safety production permit is demonstrate,proved
The information such as enterprise name, legal person or registered address it have been related in part, change reminding module 203 can prompt the user whether to need
Make corresponding change.
If user changes to the information of enterprise's certificate of association, modified module 206 then changes the letter of enterprise's certificate of association
Breath.For example, when the enterprise name of business license changes, user is received after prompting, it is necessary to change the enterprise of production licence
Industry title, then the information of enterprise's certificate of association can be changed by modified module 206.If user is to the letter of enterprise's certificate of association
Breath wouldn't change, and the change reminding module 203 can send the prompting for setting change time next time, and user can be according to the prompting
The time that next time reminds is set, and when reminding change next time, user can contemplate actual conditions and judge whether to need to change, and pass through
User is repeatedly reminded, makes user be not easy to forget.
The whereabouts logging modle 204, for being recorded to the mobility status of a variety of enterprise's certificates.When enterprise demonstrate,proves
Book lend when, the mobility status of enterprise's certificate is recorded by whereabouts logging modle 204, realize to enterprise's certificate with
Track, the mobility status of record may be stored in memory 101.Whereabouts logging modle 204 is additionally operable to demonstrate,prove according to the personnel
The mobility status of book, record the flow regime of the staff credentials.It is when staff credentials lend, then unavailable, work as staff credentials
When on the regular payroll, then it can use.To be tracked to enterprise's certificate and staff credentials, the management of effective and safe is realized.
The relating module 202 is additionally operable to being associated a variety of staff credentials with engineering project.The building
Enterprise's certificate management system 200 also includes project status logging modle 207, for according to it is described staff credentials' and engineering project
Association situation, record the project status of the staff credentials.When staff credentials in engineering project when, the staff credentials are just not
It can use, when staff credentials are not in engineering project, the staff credentials just can use.
The editor module 205, for the mobility status according to a variety of enterprise's certificates to enterprise's certificate data
Changed in storehouse.Enterprise's certificate is in lending or on the regular payroll or when giving back several states, and enterprise's certificate database can be demonstrate,proved enterprise
The state of book is recorded, and in enterprise's certificate lending, the flow direction of borrow can be also recorded in enterprise's certificate database, and to enterprise
Industry certificate database is modified.
The editor module 205, it is additionally operable to when the project status and flow regime of the staff credentials change, it is right
Staff credentials' database is changed.When the flow regime and project status of staff credentials change, system can be to flowing
The change situation of whereabouts or state is made to be recorded, it is necessary to be changed to staff credentials' database accordingly.
The warning module 208, for the period of validity to a variety of enterprise's certificates and a variety of staff credentials and
The examination & verification time limit is monitored;Period of validity or examination & verification the time limit before predetermined time, according to a variety of enterprise's certificates with it is described
The classification of a variety of staff credentials, send different alarm commands.
Most enterprise's certificate and staff credentials have period of validity.Such as built according to the regulation for firmly building portion, a two level
Teacher of the make'ing certificate of registry term of validity is 3 years, and structure art must reach construction authorities of State Council in each term of validity
Defined continuing education requires, can apply continuing registration.Therefore during staff credentials are registered to enterprise, such as occur it is expired and
Situation about not continuing educating, it will influence to continue registration, by the warning function of system, give remind in time, prevent from omitting and wrong
Lose.
Warning module 208 can also set the self-defined early warning moment to enterprise's certificate and staff credentials, when reaching
When stating the self-defined early warning moment, alarm command is sent.By setting period of validity, examination & verification time limit and self-defined early warning moment,
So as to avoid the loss that the factors such as the expired of certificate, failure, locking are brought to enterprise.Simultaneously as the alarm of different certificates
Instruction is different, can carry out warning information classification push and differentiated control, preferably promote layer of the enterprise for certificate management
Levelization and standardization.By the period of validity according to enterprise's certificate and staff credentials and audit the time limit accordingly, certificate is carried out
Tracking, establishes certificate expiration early warning mechanism, prevents from omitting and miss.
The mode that building enterprise's certificate management system 200 sends alarm command can be by being carried in the station in system
The modes such as message, short message, the wechat of waking up send alarm to corresponding director.
In addition, in other embodiments, building enterprise's certificate management system 200 can also include digital certificate pipe
Manage module, engineering achievement management module, query statistic module and system management module.Digital certificate management module is used to be directed to
Enterprise and the digital certificate of enterprise individual, according to its period of validity, update digital certificate status, close on and expire when the term of validity at any time
When, system actively carries out early warning, to facilitate enterprise to decide whether to be continued as needed.Engineering achievement management module is used
Record upload is carried out in the essential information of engineering, and engineering management is effectively configured with workmen according to requirement of engineering,
Building or be completed according to project status simultaneously, associate people certificate status, staff credentials' state is very clear, so as to be advantageous to
Enterprise administrator more preferably grasps certificate service condition.The query statistic module is used for the operation according to user, inquires about enterprise
Certificate, the information of staff credentials, and counted to enterprise's certificate, staff credentials and project, dynamic monitoring to certificate and
Corresponding data analysis, intuitively it can provide auxiliary information for business decision in time.The system management module be used for
Family, role and authority are managed.
Fig. 3 is refer to, is the flow chart for building enterprise's certificate management method that present pre-ferred embodiments provide.This implementation
Building enterprise's certificate management method of example is applied to terminal 10, and building enterprise's certificate management method includes:
Step S11, establish enterprise's certificate database.Enterprise's certificate database includes the information of a variety of enterprise's certificates, described
Enterprise's certificate includes but is not limited to, business license, qualification certificates, safety production permit, digital certificate.User can pass through this
The letter of the default certificate template of building enterprise's certificate management system 200 of embodiment or self-defined certificate template typing enterprise certificate
Breath.The information of enterprise's certificate includes but is not limited to, unified social credibility code, Business Name, legal representative, registered address, warp
Seek scope etc..
In the embodiment of the present invention, the step S11 can be performed by Database module 201.
Step S12, by being associated for a variety of enterprise's certificates.
Specifically, according to the information of a variety of enterprise's certificates, the pass between the information of a variety of enterprise's certificates is determined
Gang mould type.According to the correlation model being associated a variety of enterprise's certificates.For example, business license, qualification certificates and
Safety production permit, all includes the information such as enterprise name, legal representative and registered address, and relating module 202 will can be sought
Industry license, qualification certificates are identical to safety production permit or related information is established as correlation model, such as business license, money
The enterprise name all same of cross-examination book and safety production permit, it is a correlation model.By under same correlation model not
It is associated with enterprise's certificate.
In the embodiment of the present invention, the step S12 can be performed by relating module 202.
Step S13, when a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, send association
Whether the information of enterprise's certificate needs the prompting changed.
Such as in the business license of enterprise, enterprise name, legal representative or be that registered address is changed, then
It has been related to the letter such as enterprise name, legal person or registered address in the qualification certificates such as corresponding qualification certificates and safety production permit
Breath, change reminding module 203 can prompt the user whether that needs make corresponding change.
In the embodiment of the present invention, the step S13 can be performed by change reminding module 203.
Step S14, the mobility status of a variety of enterprise's certificates is recorded.
When enterprise's certificate lending, the mobility status of enterprise's certificate is recorded by whereabouts logging modle 204, realized
Tracking to enterprise's certificate, the mobility status of record may be stored in memory 101.
In the embodiment of the present invention, the step S14 can be performed by whereabouts logging modle 204.
Step S15, the mobility status according to a variety of enterprise's certificates change to enterprise's certificate database.
Enterprise's certificate is in lending or on the regular payroll or when giving back several states, and enterprise's certificate database can be to enterprise's certificate
State is recorded, and in enterprise's certificate lending, the flow direction of borrow can be also recorded in enterprise's certificate database, and enterprise is demonstrate,proved
Book database is modified.
In the embodiment of the present invention, the step S15 can be performed by editor module 205.
Fig. 4 is refer to, is that building enterprise's certificate management method that present pre-ferred embodiments provide is managed staff credentials
Flow chart.Building enterprise's certificate management method of the embodiment of the present invention also includes:
Step S21, establish staff credentials' database.
Family can be by building enterprise's certificate management system 200 of the present embodiment default certificate template or self-defined certificate
The information of template typing staff credentials.Staff credentials' database includes the information of a variety of staff credentials, the staff credentials
Including but not limited to, accredited personnel's certificate, title for technical personnel staff credentials, special operation workers certificate, site administrator's certificate,
Skilled worker's certificate, three class staff credentials of safety.The information of the staff credentials includes but is not limited to, certificate name, certificate class
Type, duration and validity of certificate, licence issuing authority, scanned copy, remark information etc..
In the embodiment of the present invention, the step S21 can be performed by Database module 201.
Step S22, by being associated with engineering project for a variety of staff credentials.
In the embodiment of the present invention, the step S22 can be performed by relating module 202.
Step S23, the project for associating situation, recording the staff credentials with engineering project according to the staff credentials
State.When staff credentials in engineering project when, the staff credentials are with regard to unavailable, when staff credentials are not in engineering project, should
Staff credentials just can use.
In the embodiment of the present invention, the step S23 can be performed by project status logging modle 207.
Step S24, according to the mobility status of the staff credentials, record the flow regime of the staff credentials.Work as personnel
It is when certificate is lent, then unavailable, when staff credentials are on the regular payroll, then can use.It is real to be tracked to enterprise's certificate and staff credentials
The management of existing effective and safe.
In the embodiment of the present invention, the step S24 can be from performing to logging modle.
Step S25, when the project status and flow regime of the staff credentials change, to staff credentials' database
Changed.When the flow regime and project status of staff credentials change, system can change to flowing whereabouts or state
Change situation is made to be recorded, it is necessary to be changed to staff credentials' database accordingly.
In the embodiment of the present invention, the step S25 can be performed by editor module 205.
Fig. 5 is refer to, is the alarm mode flow for building enterprise's certificate management method that present pre-ferred embodiments provide
Figure.Building enterprise of embodiment of the present invention certificate management method can also supervise to the time state of enterprise's certificate and staff credentials
Control, including:
Step S31, the period of validity and examination & verification time limit of a variety of enterprise's certificates and a variety of staff credentials are carried out
Monitoring.
Most enterprise's certificate and staff credentials have period of validity and examination & verification time limit, such as according to the rule for firmly building portion
Fixed, a two level structure art certificate of registry term of validity is 3 years, and structure art must reach State Council and build in each term of validity
If continuing education requires as defined in authorities, can apply continuing registration.Therefore, it is necessary to enterprise's certificate and staff credentials
Period of validity and examination & verification time limit are monitored.
Step S32, period of validity or examination & verification the time limit before predetermined time, according to a variety of enterprise's certificates with it is described more
The classification of kind staff credentials, sends different alarm commands.
When reaching the predetermined time before period of validity or examination & verification time limit in the standard time (such as Beijing time) of system, if any
Imitate the time limit or audit the time limit before 90 days when, can send alarm command for different certificates.The enterprise can also be demonstrate,proved
Book and staff credentials set the self-defined early warning moment, when reaching the self-defined early warning moment, send alarm command.By setting
Time limit, examination & verification time limit and self-defined early warning moment are set effective, so as to avoid the factors pair such as the expired of certificate, failure, locking
The loss that enterprise brings.Simultaneously as the alarm command of different certificates is different, classification push can be carried out warning information and divided
Level management, enterprise is preferably promoted for the hierarchical of certificate management and standardization.
In the embodiment of the present invention, the step S31 and step S32 can be performed by warning module 208.
In summary, building enterprise's certificate management method provided in an embodiment of the present invention and system, this method include:Establish
Enterprise's certificate database, enterprise's certificate database include the information of a variety of enterprise's certificates, and a variety of enterprise's certificates include
At least two in business license, qualification certificates, safety production permit, digital certificate;By entering for a variety of enterprise's certificates
Row association;When a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, enterprise's certificate of association is sent
Information whether need the prompting changed;The mobility status of a variety of enterprise's certificates is recorded;According to a variety of enterprises
The mobility status of industry certificate changes to enterprise's certificate database.By establishing enterprise's certificate database, can store
The essential information of enterprise's certificate, when a certain enterprise's certificate information makes change, system can be according to the enterprise's certificate stored
Information is judged, associated certificate is verified, and whether prompting needs to change;When certificate is borrowed, certificate is carried out
Tracking, establishes certificate management information record, and corresponding change is made to certificate database.In addition, by being looked forward to based on building trade
Industry certificate and the characteristic of staff credentials, develop early warning for the period of validity and audit time of enterprise's certificate and staff credentials and carry
Awake function, can be achieved active forewarning and self-defined early warning, so as to avoid the factors such as the expired of certificate, failure, locking to enterprise
The loss brought.Meanwhile classification push and differentiated control are carried out warning information, enterprise is preferably promoted for qualification certificates pipe
The hierarchical and standardization of reason.Shown by the actual motion use to Sichuan building constructor, the building of the embodiment of the present invention
Enterprise's certificate management system meets the demand of building enterprise's qualification certificates management, improves the effect of enterprise qualification certificate management
Rate.Managed system solves the problem current building trade enterprise using other category systems progress enterprise's certificate and staff credentials
Some problems present in journey, there is the application value of height for building trade enterprise.
In several embodiments provided herein, it should be understood that disclosed apparatus and method, can also pass through
Other modes are realized.Device embodiment described above is only schematical, for example, flow chart and block diagram in accompanying drawing
Show the device of multiple embodiments according to the present invention, method and computer program product architectural framework in the cards,
Function and operation.At this point, each square frame in flow chart or block diagram can represent the one of a module, program segment or code
Part, a part for the module, program segment or code include one or more and are used to realize holding for defined logic function
Row instruction.It should also be noted that at some as in the implementation replaced, the function that is marked in square frame can also with different from
The order marked in accompanying drawing occurs.For example, two continuous square frames can essentially perform substantially in parallel, they are sometimes
It can perform in the opposite order, this is depending on involved function.It is it is also noted that every in block diagram and/or flow chart
The combination of individual square frame and block diagram and/or the square frame in flow chart, function or the special base of action as defined in performing can be used
Realize, or can be realized with the combination of specialized hardware and computer instruction in the system of hardware.
In addition, each functional module in each embodiment of the present invention can integrate to form an independent portion
Point or modules individualism, can also two or more modules be integrated to form an independent part.
If the function is realized in the form of software function module and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part to be contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are causing a computer equipment (can be
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the present invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.Need
Illustrate, herein, such as first and second or the like relational terms be used merely to by an entity or operation with
Another entity or operation make a distinction, and not necessarily require or imply between these entities or operation any this reality be present
The relation or order on border.Moreover, term " comprising ", "comprising" or its any other variant are intended to the bag of nonexcludability
Contain, so that process, method, article or equipment including a series of elements not only include those key elements, but also including
The other element being not expressly set out, or also include for this process, method, article or the intrinsic key element of equipment.
In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that including the key element
Process, method, other identical element also be present in article or equipment.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included in the scope of the protection.It should be noted that:Similar label and letter exists
Similar terms is represented in following accompanying drawing, therefore, once being defined in a certain Xiang Yi accompanying drawing, is then not required in subsequent accompanying drawing
It is further defined and explained.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained
Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by scope of the claims.
Claims (10)
- A kind of 1. building enterprise's certificate management method, it is characterised in that including:Enterprise's certificate database is established, enterprise's certificate database includes the information of a variety of enterprise's certificates, a variety of enterprises Certificate includes at least two in business license, qualification certificates, safety production permit, digital certificate;By being associated for a variety of enterprise's certificates;When a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, the letter of enterprise's certificate of association is sent Whether breath needs the prompting changed;The mobility status of a variety of enterprise's certificates is recorded;Mobility status according to a variety of enterprise's certificates changes to enterprise's certificate database.
- 2. building enterprise's certificate management method according to claim 1, it is characterised in that by a variety of enterprise's certificates The step of being associated includes:According to the information of a variety of enterprise's certificates, the correlation model between the information of a variety of enterprise's certificates is determined;According to the correlation model being associated a variety of enterprise's certificates.
- 3. building enterprise's certificate management method according to claim 2, it is characterised in that in the enterprise for sending association Also include after the step of whether information of certificate needs the prompting changed:If user changes to the information of enterprise's certificate of association, the information of enterprise's certificate of association is changed;If user wouldn't change to the information of enterprise's certificate of association, the prompting that change time next time is set is sent.
- 4. building enterprise's certificate management method according to claim 1, it is characterised in that methods described also includes:Staff credentials' database is established, staff credentials' database includes the information of a variety of staff credentials, a variety of personnel Certificate includes accredited personnel's certificate, title for technical personnel staff credentials, special operation workers certificate, site administrator's certificate, technology At least two in worker's certificate, three class staff credentials of safety;By being associated with engineering project for a variety of staff credentials;The project status for associating situation, recording the staff credentials with engineering project according to the staff credentials;According to the mobility status of the staff credentials, the flow regime of the staff credentials is recorded;When the project status and flow regime of the staff credentials change, staff credentials' database is changed.
- 5. building enterprise's certificate management method according to claim 4, it is characterised in that methods described also includes:A variety of enterprise's certificates and the period of validity of a variety of staff credentials and examination & verification time limit are monitored;Predetermined time before period of validity or examination & verification time limit, according to a variety of enterprise's certificates with a variety of staff credentials' Classification, send different alarm commands.
- A kind of 6. building enterprise's certificate management system, it is characterised in that including:Database module, for establishing enterprise's certificate database, enterprise's certificate database includes a variety of enterprise's certificates Information, a variety of enterprise's certificates include business license, qualification certificates, safety production permit, in digital certificate at least Two kinds;Relating module, for being associated a variety of enterprise's certificates;Reminding module is changed, for when a kind of information of enterprise's certificate in a variety of enterprise's certificates changes, sending Whether the information of enterprise's certificate of association needs the prompting changed;Whereabouts logging modle, for being recorded to the mobility status of a variety of enterprise's certificates;Editor module, for being changed according to the mobility status of a variety of enterprise's certificates to enterprise's certificate database.
- 7. building enterprise's certificate management system according to claim 6, it is characterised in that the relating module is additionally operable to: According to the information of a variety of enterprise's certificates, the correlation model between the information of a variety of enterprise's certificates is determined;According to the correlation model being associated a variety of enterprise's certificates.
- 8. building enterprise's certificate management system according to claim 7, it is characterised in that also including modified module, be used for If user changes to the information of enterprise's certificate of association, the information of enterprise's certificate of association is changed;If user wouldn't change to the information of enterprise's certificate of association, the change reminding module is used to send setting change next time The prompting of time.
- 9. building enterprise's certificate management system according to claim 6, it is characterised in that the Database module, It is additionally operable to establish staff credentials' database, staff credentials' database includes the information of a variety of staff credentials, a variety of people Member's certificate includes accredited personnel's certificate, title for technical personnel staff credentials, special operation workers certificate, site administrator's certificate, skill At least two in art worker certificate, three class staff credentials of safety;The relating module is additionally operable to being associated a variety of staff credentials with engineering project;The system also includes project status logging modle, for associating feelings according to the staff credentials and engineering project Condition, record the project status of the staff credentials;The whereabouts logging modle, is additionally operable to the mobility status according to the staff credentials, records the flowing of the staff credentials State;The editor module, it is additionally operable to when the project status and flow regime of the staff credentials change, personnel is demonstrate,proved Book database is changed.
- 10. building enterprise's certificate management system according to claim 9, it is characterised in that also including warning module, be used for A variety of enterprise's certificates and the period of validity of a variety of staff credentials and examination & verification time limit are monitored;Predetermined time before period of validity or examination & verification time limit, according to a variety of enterprise's certificates with a variety of staff credentials' Classification, send different alarm commands.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710843952.3A CN107609134A (en) | 2017-09-18 | 2017-09-18 | Building enterprise's certificate management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710843952.3A CN107609134A (en) | 2017-09-18 | 2017-09-18 | Building enterprise's certificate management method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107609134A true CN107609134A (en) | 2018-01-19 |
Family
ID=61060825
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710843952.3A Pending CN107609134A (en) | 2017-09-18 | 2017-09-18 | Building enterprise's certificate management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107609134A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108683504A (en) * | 2018-04-24 | 2018-10-19 | 湖南东方华龙信息科技有限公司 | Certificate issuance method based on diverse identities |
CN109978544A (en) * | 2019-04-03 | 2019-07-05 | 国网山东省电力公司 | The control of enterprise's key and intelligent analysis method and system based on big data technology |
CN110569828A (en) * | 2019-07-19 | 2019-12-13 | 云南昆钢电子信息科技有限公司 | Safety qualification certificate management system and management method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105225176A (en) * | 2015-09-02 | 2016-01-06 | 南京信息工程大学 | Warrant basic information system |
CN105321049A (en) * | 2015-11-24 | 2016-02-10 | 裴兆欣 | An enterprise management system |
CN107146024A (en) * | 2017-05-08 | 2017-09-08 | 合肥工业大学 | The three-dimensional dynamic safety management method of building enterprise's overall process |
-
2017
- 2017-09-18 CN CN201710843952.3A patent/CN107609134A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105225176A (en) * | 2015-09-02 | 2016-01-06 | 南京信息工程大学 | Warrant basic information system |
CN105321049A (en) * | 2015-11-24 | 2016-02-10 | 裴兆欣 | An enterprise management system |
CN107146024A (en) * | 2017-05-08 | 2017-09-08 | 合肥工业大学 | The three-dimensional dynamic safety management method of building enterprise's overall process |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108683504A (en) * | 2018-04-24 | 2018-10-19 | 湖南东方华龙信息科技有限公司 | Certificate issuance method based on diverse identities |
CN108683504B (en) * | 2018-04-24 | 2021-06-29 | 湖南东方华龙信息科技有限公司 | Certificate issuing method based on multi-identity |
CN109978544A (en) * | 2019-04-03 | 2019-07-05 | 国网山东省电力公司 | The control of enterprise's key and intelligent analysis method and system based on big data technology |
CN109978544B (en) * | 2019-04-03 | 2021-07-23 | 国网山东省电力公司 | Enterprise key control and intelligent analysis method and system based on big data technology |
CN110569828A (en) * | 2019-07-19 | 2019-12-13 | 云南昆钢电子信息科技有限公司 | Safety qualification certificate management system and management method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11256777B2 (en) | Data processing user interface monitoring systems and related methods | |
US10762236B2 (en) | Data processing user interface monitoring systems and related methods | |
CN114981821A (en) | System and method for data driven infrastructure control | |
CN110957025A (en) | Medical health information safety management system | |
US8176060B2 (en) | Online tool for registering media | |
US11636171B2 (en) | Data processing user interface monitoring systems and related methods | |
CN111680310B (en) | Authority control method and device, electronic equipment and storage medium | |
CN107609134A (en) | Building enterprise's certificate management method and system | |
CN101069215A (en) | Delicate metering of computer usage | |
CN101833617A (en) | Methods and systems for applying parental-control policies to media files | |
US20190268377A1 (en) | Platform for automated regulatory compliance monitoring of messaging services | |
CN111429191A (en) | Block chain-based electronic invoice flow management method, device and system | |
CN107689018A (en) | Building enterprise's staff credentials' management method and system | |
US9613359B2 (en) | Distribution interconnection information systems and methods | |
CN113836218A (en) | Distributed heterogeneous processing system based on workflow | |
CN112764737A (en) | Intelligent low-code technology platform system | |
CN108427554A (en) | A kind of the cloud mode software method for automatically constructing and system of table- driven | |
CN106452815B (en) | A kind of informatization management method, apparatus and system | |
CN108965317A (en) | A kind of network data guard system | |
CN103473635A (en) | Agency account system and method | |
CN112365938A (en) | Method for realizing power grid IT asset data management by adopting block chain technology | |
US12038734B2 (en) | Managing access for a manufacturing system | |
CN106993032A (en) | The embedded accurate communication cloud service platform applied based on mobile Internet | |
CN106815714A (en) | Training project and training resource management method and system | |
CN112100599B (en) | Management platform and method for demand documents |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |
|
RJ01 | Rejection of invention patent application after publication |