CN107606598A - Discontinuous stoving process used in a kind of noncontinuity rubber processing - Google Patents

Discontinuous stoving process used in a kind of noncontinuity rubber processing Download PDF

Info

Publication number
CN107606598A
CN107606598A CN201710597964.2A CN201710597964A CN107606598A CN 107606598 A CN107606598 A CN 107606598A CN 201710597964 A CN201710597964 A CN 201710597964A CN 107606598 A CN107606598 A CN 107606598A
Authority
CN
China
Prior art keywords
boiler
variant
gas
pipe
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710597964.2A
Other languages
Chinese (zh)
Other versions
CN107606598B (en
Inventor
张荣华
邓文华
孙志清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xishuangbanna Jing Yang Ltd Rubber Responsible Co
Original Assignee
Xishuangbanna Jing Yang Ltd Rubber Responsible Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xishuangbanna Jing Yang Ltd Rubber Responsible Co filed Critical Xishuangbanna Jing Yang Ltd Rubber Responsible Co
Priority to CN201710597964.2A priority Critical patent/CN107606598B/en
Publication of CN107606598A publication Critical patent/CN107606598A/en
Application granted granted Critical
Publication of CN107606598B publication Critical patent/CN107606598B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

The invention discloses discontinuous stoving process used in a kind of noncontinuity rubber processing,Boiler is carried out in advance when rubber granule needs and dried to restrike heating,Boiler is restriked is dried car cleaning in order successively while heating,Sizing material is cased,Cleaning size material,Treat that after the completion of the normal hot blast yield stabilization of boiler operatiopn and cleaning size material heated-air drying can be started,Packaging can be rechecked after briquetting on inspection by completing the sizing material after heated-air drying,Shutdown is carried out after completion stoving process again and treats that stove operates,The glue agriculture that the stoving process is supplied aiming at discontinuous is come the production technology that sets,The technique can be less use coal-burning boiler,Few use heat as far as possible,Overall boiler combustion cost input is farthest reduced in the case that stove is not put out in guarantee using new boiler combustion mode while farthest reducing rubber drying energy consumption.

Description

Discontinuous stoving process used in a kind of noncontinuity rubber processing
Technical field
The present invention relates to process for processing nature rubber class discontinuous rubber processing to correspond to stoving process and its equipment neck Domain, discontinuous stoving process used in espespecially a kind of noncontinuity rubber processing.
Background technology
The processing technology of natural rubber it is extensive can be divided into two stages, first stage is the glue agriculture rubber tapping stage, the Two stages are rubber mill's production mark glue stages, and the supply situation of wherein first stage determines the production feelings of second stage Condition, it is maximum the characteristics of be exactly that the production of rubber is different from common rice production, although the two is all to be broadly divided into the farmland stage Collected the process segment with industrialization, but the difference maximum with rice of the latex tapped of glue agriculture is shelf-life, the shelf-life of latex It is shorter, it will soon condense, and the plantation of rubber tree is more scattered, while process equipment is not cheap, can not realize one One processing factory of rubber forest, although simultaneously because glue agriculture rubber tapping month is same period, rubber tapping date of each family not phase Together, it can not accomplish that mountain rubber tapping is entered in all glue agricultures of requirement on the same day, rubber forest is in the torrid zone, the torrid zone changeable rain fall and height Tender feeling condition also limit the realization of the unified rubber tapping of glue agriculture, and this just brings the significant problem in production, when without glue whether It is to close down all equipment, this is not difficult matter for current consuming apparatus, but for boiler, steam heat-exchanging/heating system For here it is being difficult to what is realized, each time put out stove and again igniting be required for substantial amounts of cost input, if not extinguishing pot Although stove be always maintained at a low degree of combustion then etc. have material enter factory add fuel rekindle cost can be than putting out stove Cost input of lighting a fire again is few, and whole boiler so is maintained at into one will extinguish but core still has the state of burning things which may cause a fire disaster, but boiler Core although have heat but outer layer nearly all be burning after coal ash, can not realize quickly point combusting boiler in fire coal, quickly Heat supply but requirement to operation it is higher, while how this coal-fired mode controls air to how to control the input amount of fire coal Intake, the setting of the air intake position of burner hearth is all particularly important, if control the bad cost with putting out stove it is also similar, even Also higher than put out stove cost.
The content of the invention
To solve the above problems, the invention provides discontinuous drying work used in a kind of noncontinuity rubber processing Skill, the glue agriculture that the stoving process is supplied aiming at discontinuous is come the production technology set, the use combustion that the technique can be less Coal burning boiler, few use heat, is farthest reduced while rubber dries energy consumption using new boiler combustion mode as far as possible Farthest ensure do not put out stove in the case of reduce overall boiler combustion cost input, ensure dump central temperature it is same When provide penetrability stronger combustion air current, make dump central temperature high but exospheric temperature be relatively low does not burn even, this just brings The quick heat supply of whole boiler can be ensured by only needing to increase intake when secondary heat supply, rather than will be whole as prior art Individual boiler is maintained at a state that will extinguish, and although boiler core has heat but outer layer is nearly all coal ash after burning, The fire coal quickly in point combusting boiler, quick heat supply can not be realized.
To reach above-mentioned purpose, the present invention is realized using following technology, used in a kind of noncontinuity rubber processing Discontinuous stoving process, including boiler restrike heating, drying cart cleaning, sizing material vanning, cleaning size material, heated-air drying, check pressure Block, packaging is rechecked, shuts down and treats stove, restriked heating wherein carrying out boiler in advance when rubber granule needs and dried, boiler is restriked Car cleaning, sizing material vanning, cleaning size material is dried while heating in order successively, treats the normal hot blast yield of boiler operatiopn Heated-air drying can be started after the completion of stable and cleaning size material, completing the sizing material after heated-air drying can answer after briquetting on inspection Inspection is packed, and is carried out shutdown after completion stoving process again and is treated that stove operates.
As a further improvement on the present invention, boiler heating of restriking is by the lift in imperfect combustion state The cyclone furnace State Transferring of variant boiler is combustion furnace state, and opens in constant-pressure gas storage tower the carbon monoxide of deposit and combustion-supporting Oxygen is lighted under combustion furnace state together, stops the supply of carbon monoxide and oxygen after furnace body temperature rises to normal temperature When the recovered heat supply completely of the coal-fired and original fire coal supplemented in boiler or stop during normal combustion state carbon monoxide and The supply of oxygen.
As a further improvement on the present invention, the lift variant boiler is by pressure-bearing gas receiver, variant boiler, exhaust system System composition, wherein pressure-bearing gas receiver are the pressure-bearing gas receiver with stirring structure and constant-pressure structure of cylindrical seal, when variant pot Pressure-bearing gas receiver opens and closes discontinuity by the switch in air inlet pipe and corresponded to variant boiler when stove is in cyclone furnace state The mixed gas of structure oxygen-carbon dioxide, variant boiler top counter structure connection gas extraction system, gas extraction system is by threeway Pipe, blast pipe, carbon monoxide discharge, pumping blower fan composition, wherein the inlet end of three-way pipe passes through pipeline and variant boiler top Blast pipe connection set by portion, the one of outlet side of three-way pipe connect perseverance after installing pumping blower fan by carbon monoxide discharge Gas storage tower, another outlet side is pressed to connect boiler exhaust gas cleaning system after pumping blower fan is installed by blast pipe, when lift becomes The valve passage of three-way pipe is variant boiler-carbon monoxide discharge-pumping blower fan-constant pressure when body boiler is in cyclone furnace state Gas storage tower, when lift variant boiler is in combustion furnace state, the valve passage of three-way pipe is variant boiler-blast pipe-pumping Blower fan-boiler exhaust gas cleaning system.
As a further improvement on the present invention, the variant boiler by exhaust opening, heat exchanger, body of heater, lifting become body device, Fire door, oxygen feeding tube, carbon monoxide air inlet pipe, igniter, base, air inlet pipe composition, body of heater are both ends open and are provided with base Hollow cylindrical structure, body of heater top be provided with hemispherical capping, capping top be provided with exhaust opening, exhaust opening passes through pipeline It is connected with gas extraction system counter structure, upper of furnace body is provided with heat exchanger, and cyclone separator is pressed on the outside of the body of heater of heat exchanger bottom The mounting means installation air inlet pipe of air inlet pipe, air inlet pipe are connected by pipeline with pressure-bearing gas receiver respective tube road, body of heater middle and lower part The lifting change body device for extending to bottom of furnace body is provided with inwall, lifting becomes body device and is installed in lift cylinders, and body of heater passes through Floor installation in for pedestal on, lower portion of furnace body is provided with the oxygen feeding tube in the same area, carbon monoxide air inlet pipe and igniting Device, carbon monoxide air inlet pipe are connected to constant-pressure gas storage tower escape pipe, oxygen feeding tube connection combustion oxygen bottle, and lower portion of furnace body is provided with stove Door, lift cylinders are hydraulic lifting cylinder or screw thread elevating lever, and lift cylinders lifting shape is in when lifting set by variant boiler becomes body device Variant boiler is in cyclone furnace state during state, when when set by variant boiler lifting become body device be in lift cylinders contraction state time-varying Body boiler is in combustion furnace state.
As a further improvement on the present invention, the lifting becomes body device by burner hearth, lifting collection slag cylinder, blast pipe, air intake Blower fan, slag-drip opening, socket carriage composition, wherein burner hearth is installed on by the socket carriage being movably installed in body of heater In body of heater, burner hearth basal surface is provided with hollow cone shape lifting collection slag cylinder, and lifting collection slag cylinder bottom is provided with slag-drip opening, entered Airduct one end is provided with the air intake blower fan other end and is installed on lifting collection slag cylinder barrel and extends to below burner hearth, and two to the six roots of sensation enter Airduct is uniformly distributed on lifting collection slag cylinder by the center of circle of slag-drip opening, and three to four liftings are provided with lifting collection slag drum outer wall Cylinder, lift cylinders are installed on fixed pedestal.
As a further improvement on the present invention, the socket carriage is made up of chute, scraper, firm ring, support ring, Wherein support ring is installed on inboard wall of furnace body bottom, and chute is provided with body of heater to body of heater upper zone more than support ring, sliding Groove forms a slide rail region to body of heater sunken inside, and the firm ring for being installed on burner hearth edge, burner hearth upper surface are provided with chute It is tiltedly installed with the scraper for being attached at body of heater inner surface.
As a further improvement on the present invention, the constant-pressure structure is provided with admission line to be arranged in pressure-bearing gas receiver With the air bag of discharge duct.
As a further improvement on the present invention, the constant-pressure gas storage tower by counterweight, tower section gas receiver, aqua calcis, Filler plate, escape pipe, blow-off pipe, gas distribution pipe composition, are wherein provided with counterweight bottom at the top of tower section gas receiver and are provided with triangular prism The gas washing pond of shape, gas washing bottom of pond portion are provided with blow-off pipe, and gas washing pond middle and lower part is provided with gas distribution pipe, gas distribution pipe connection gas extraction system Counter structure, filler plate is provided with the gas washing pond directly over gas distribution pipe, gas washing pond is provided with the extraneous escape pipe of connection, Escape pipe is connected with variant boiler counter structure, and tower section gas receiver bottom is provided with bearing.
As a further improvement on the present invention, the drying cart cleaning is that drying cart inner and outer wall is carried out using clear water Rinse, rinse on drying cart inner and outer wall all without remain rubber grain untill.
As a further improvement on the present invention, the cleaning size material is the rubber to being seated in drying cart using clear water Grain is rinsed, and is washed by water to dry car bottom and is started timing when starting uniformly to drip, timing is 6~30mins.
As a further improvement on the present invention, it is described to check that briquetting is to the rubber after completion hot-air drying technology in drying cart Glue particle is checked, sees whether particle is uniform, is delivered in cuber and is pressed after the excessive or block rubber of particle is rejected Block, the molded rubber block after briquetting deliver to reinspection packing department.
As a further improvement on the present invention, described shut down after stewing stove all machines for the gum material of the period is worked as The rubber of preceding batch has been machined, and the other equipment in addition to lift variant boiler is shut down, and by lift variant Boiler is cyclone furnace state by combustion furnace State Transferring.
The present invention has the advantages that compared with prior art:
1st, more preferable penetrability can be obtained by the way of whirlwind air inlet, the coal of storage in body of heater can be ensured incomplete The condition of burning still inside and outside can obtain consistent combustion efficiency, be unlikely to occur the burning of dump outer surface for ashes dump Inside but should be oxygen supply deficiency and extinguish, while can also keep dump as far as possible using the intake method of cyclonic separation cartridge type The ashes after burning are taken away as far as possible in the case of not stirring;
2nd, the mixed gas of interim supply oxygen and thermal oxide carbon, fully produces carbon monoxide, carbon dioxide needs high temperature Lower and carbon, which reacts, can just produce carbon monoxide, and coal burning is insufficient can also obtain carbon monoxide, but imperfect combustion The coal of state is difficult to meet the needs of carbon dioxide conversion is carbon monoxide, and the pure oxygen at this time provided can ensure that coal exists Resume combustion is to sufficient temp in the section time, you can the effect for reaching dedusting can reach the effect of gas high-penetration and can also ensure again Enough carbon monoxide yields, the second incendiary source is provided for the normal combustion next time of boiler;
3rd, the glue agriculture that the stoving process is supplied aiming at discontinuous is come the production technology set, the use that the technique can be less Coal-burning boiler, few use heat, is farthest reduced while rubber dries energy consumption using new boiler combustion side as far as possible Formula farthest reduces overall boiler combustion cost input in the case that stove is not put out in guarantee, ensures the central temperature of dump There is provided penetrability stronger combustion air current simultaneously, make dump central temperature high but exospheric temperature is relatively low does not burn even, this is with regard to band Only to need increasing intake can ensure the quick heat supply of whole boiler when secondary heat supply, rather than will as prior art Whole boiler is maintained at a state that will extinguish, and although boiler core has heat but outer layer is nearly all coal after burning Ash, the fire coal quickly in point combusting boiler, quick heat supply can not be realized.
Brief description of the drawings
Fig. 1 is lift variant boiler knot set by discontinuous stoving process used in a kind of noncontinuity rubber processing Structure schematic diagram;
Fig. 2 is that lift variant boiler set by discontinuous stoving process used is set in a kind of noncontinuity rubber processing It is socketed carriage structural representation;
Fig. 3 is that lift variant boiler set by discontinuous stoving process used is set in a kind of noncontinuity rubber processing Weighing apparatus pressure gas receiver structural representation;
1- air inlet pipe in figure;2- exhaust openings;3- three-way pipes;4- blast pipes;5- carbon monoxide discharges;6- is evacuated blower fan;7- is changed Hot device;8- bodies of heater;9- chutes;10- fire doors;11- oxygen feeding tubes;12- coal cinders;13- burner hearths;14- bases;15- lifting collection slag cylinders; 16- blast pipes;17- expansion links;18- air intake blower fans;19- lift cylinders;20- slag-drip openings;21- pressure-bearing gas receivers;22- scrapers;23- Carbon monoxide air inlet pipe;24- internal protecting walls;25- outer furnace walls;26- air admission holes;27- support rings;28- consolidates ring;29- burner hearth sliding blocks; 30- counterweights;31- tower section gas receivers;32- aqua calcises;33- filler plates;34- escape pipes;35- blow-off pipes;36- gas distributions Pipe;37- bearings.
Embodiment
Embodiment 1
Discontinuous stoving process used in a kind of noncontinuity rubber processing as shown in Figure 1 to Figure 3, including boiler are restriked liter Stove is treated in temperature, drying cart cleaning, sizing material vanning, cleaning size material, heated-air drying, inspection briquetting, reinspection packaging, shutdown, wherein working as rubber Micelle needs to carry out when being dried boiler in advance and restriked heating, and boiler is restriked is dried car in order successively while heating Cleaning, sizing material vanning, cleaning size material, treat to start after the completion of the normal hot blast yield stabilization of boiler operatiopn and cleaning size material Heated-air drying, packaging can be rechecked after briquetting on inspection by completing the sizing material after heated-air drying, be stopped again after completion stoving process Machine treats that stove operates, and boiler heating of restriking is by the cyclone furnace state of the lift variant boiler in imperfect combustion state Combustion furnace state is converted to, and opens the carbon monoxide laid in constant-pressure gas storage tower and combustion-supporting oxygen together in combustion furnace state Under light, stop the supply of carbon monoxide and oxygen after furnace body temperature rises to normal temperature or when the fire coal supplemented in boiler Stop the supply of carbon monoxide and oxygen, the lift when heat supply completely recovered with original fire coal or normal combustion state Variant boiler is made up of pressure-bearing gas receiver, variant boiler, gas extraction system, and wherein pressure-bearing gas receiver stirs for the band of cylindrical seal The pressure-bearing gas receiver 21 of structure and constant-pressure structure, when variant boiler is in cyclone furnace state, pressure-bearing gas receiver 21 passes through air inlet pipe On switch open and close discontinuity to the mixed gas of variant boiler counter structure oxygen-carbon dioxide, variant boiler Top counter structure connection gas extraction system, gas extraction system is by three-way pipe 3, blast pipe 4, carbon monoxide discharge 5, pumping blower fan 6 Composition, the wherein inlet end of three-way pipe 3 are connected by pipeline with the blast pipe 4 set by variant boiler top, three-way pipe 3 wherein one Individual outlet side connects constant-pressure gas storage tower after installing pumping blower fan 6 by carbon monoxide discharge 5, and another outlet side passes through exhaust Boiler exhaust gas cleaning system, the three-way pipe when lift variant boiler is in cyclone furnace state are connected after the installation pumping blower fan 6 of pipe 4 3 valve passage is that variant boiler-carbon monoxide discharge 5- is evacuated blower fan 6- constant-pressure gas storage towers, at lift variant boiler The valve passage of three-way pipe is that variant boiler-blast pipe 4- is evacuated blower fan 6- boiler exhaust gas cleaning systems when combustion furnace state, The variant boiler becomes body device, fire door 10, oxygen feeding tube 11, carbon monoxide air inlet by exhaust opening 2, heat exchanger 7, body of heater 8, lifting Pipe 23, igniter, base 14, air inlet pipe 1 form, and body of heater 8 is both ends open and is provided with the hollow cylindrical structure of base, stove The top of body 8 is provided with hemispherical capping, and capping top is provided with exhaust opening 2, and exhaust opening 2 passes through pipeline knot corresponding with gas extraction system Structure is connected, and the top of body of heater 8 is provided with heat exchanger 7, and the installation of cyclone separator admission line is pressed on the outside of the body of heater of the bottom of heat exchanger 7 Mode installs air inlet pipe 1, and air inlet pipe 1 is connected with 21 corresponding pipeline of pressure-bearing gas receiver by pipeline, set on the middle and lower part inwall of body of heater 8 The lifting change body device for extending to the bottom of body of heater 8 is equipped with, lifting becomes body device and is installed in lift cylinders 19, and body of heater 8 passes through base 14 be installed on for pedestal on, the bottom of body of heater 8 is provided with the oxygen feeding tube 11 in the same area, carbon monoxide air inlet pipe 23 and point Firearm, carbon monoxide air inlet pipe 23 are connected to constant-pressure gas storage tower escape pipe, and oxygen feeding tube 11 connects combustion oxygen bottle, the bottom of body of heater 8 Fire door 10 is provided with, lift cylinders 19 are hydraulic lifting cylinder or screw thread elevating lever, are in when lifting set by variant boiler becomes body device Variant boiler is in cyclone furnace state during 19 lifting state of lift cylinders, is lifted when when lifting change body device set by variant boiler is in Variant boiler is in combustion furnace state during 19 contraction state of cylinder, and the lifting becomes body device and collects slag cylinder 15 by burner hearth 13, lifting, enters Airduct 16, air intake blower fan 18, slag-drip opening 20, socket carriage composition, wherein burner hearth 13 is by being movably installed in body of heater 8 Socket carriage is installed in body of heater 8, and the basal surface of burner hearth 13 is provided with hollow cone shape lifting collection slag cylinder 15, lifting collection The bottom of slag cylinder 15 is provided with slag-drip opening 20, and the one end of blast pipe 16 is provided with the other end of air intake blower fan 18 and is installed on lifting collection slag cylinder 15 On barrel and the lower section of burner hearth 13 is extended to, two to six roots of sensation blast pipe 16 are uniformly distributed in lifting collection slag cylinder with slag-drip opening 20 for the center of circle On 15, three to four lift cylinders 19 are installed on the outer wall of lifting collection slag cylinder 15, lift cylinders 19 are installed on fixed pedestal, the set Connect carriage to be made up of chute 9, scraper 22, firm ring 28, support ring 27, wherein support ring 27 is installed on the inwall bottom of body of heater 8 Hold, chute 9 is provided with body of heater 8 to the upper zone of body of heater 8 of support ring more than 27, chute 9 forms one to the sunken inside of body of heater 8 Individual slide rail region, the firm ring 28 for being installed on the edge of burner hearth 13 is provided with chute 9, the upper surface of burner hearth 13 is tiltedly installed with attaching In the scraper 22 of the inner surface of body of heater 8, the constant-pressure structure is provided with admission line and exhaust to be arranged in pressure-bearing gas receiver 21 The air bag of pipeline, the constant-pressure gas storage tower is by counterweight 30, tower section gas receiver 31, aqua calcis 32, filler plate 33, escape pipe 34th, blow-off pipe 35, gas distribution pipe 36 form, and wherein the top of tower section gas receiver 31 is provided with the bottom of counterweight 30 and is provided with Mitsubishi's column Gas washing pond, gas washing bottom of pond portion are provided with blow-off pipe 35, and gas washing pond middle and lower part is provided with gas distribution pipe 36, and gas distribution pipe 36 connects exhaust system Unite counter structure, filler plate 33 is provided with the gas washing pond directly over gas distribution pipe 36, it is extraneous that gas washing pond is provided with connection Escape pipe 34, escape pipe 34 are connected with variant boiler counter structure, and the bottom of tower section gas receiver 31 is provided with bearing 37, the drying Car cleaning is rinsed to all not remaining on drying cart inner and outer wall to be rinsed using clear water to drying cart inner and outer wall Rubber grain untill, the cleaning size material is washed by water to be rinsed using clear water to the rubber grain being seated in drying cart Start timing to drying when car bottom starts uniformly to drip, timing is 6~30mins, and the inspection briquetting is to complete in drying cart Checked into the rubber grain after hot-air drying technology, see whether particle is uniform, the excessive or block rubber of particle is rejected After deliver to briquetting carried out in cuber, the molded rubber block after briquetting delivers to reinspection packing department, described when to shut down stewing stove be this The rubber of i.e. present lot has machined after the gum material of section all machines, by addition to lift variant boiler Other equipment is shut down, and is cyclone furnace state by combustion furnace State Transferring by lift variant boiler.

Claims (10)

1. discontinuous stoving process used in a kind of noncontinuity rubber processing, including restrike heating, drying cart of boiler is clear Wash, sizing material vanning, cleaning size material, heated-air drying, check briquetting, recheck packaging, shut down treat stove, it is characterised in that:Work as rubber granule Boiler is carried out when needing to be dried in advance to restrike heating, boiler restrike heating while that car is dried in order successively is clear Wash, sizing material vanning, cleaning size material, treat that the normal hot blast yield of boiler operatiopn is stable and can start heat after the completion of cleaning size material Air-dry dry, packaging can be rechecked after briquetting on inspection by completing the sizing material after heated-air drying, be shut down again after completion stoving process Treat that stove operates.
2. requiring discontinuous stoving process used in a kind of 1 noncontinuity rubber processing according to asking inner, its feature exists In:The boiler, which is restriked, to heat up to be combustion by the cyclone furnace State Transferring of the lift variant boiler in imperfect combustion state Oven-like state is burnt, and opens the carbon monoxide of deposit and combustion-supporting oxygen in constant-pressure gas storage tower and is lighted together under combustion furnace state, Stop the supply or coal-fired and original when what is supplemented in boiler of carbon monoxide and oxygen after furnace body temperature rises to normal temperature Stop the supply of carbon monoxide and oxygen when coal-fired recovered heat supply completely or normal combustion state.
3. requiring discontinuous stoving process used in a kind of 2 noncontinuity rubber processings according to asking inner, its feature exists In:The lift variant boiler is made up of pressure-bearing gas receiver, variant boiler, gas extraction system, and wherein pressure-bearing gas receiver is cylinder The pressure-bearing gas receiver with stirring structure and constant-pressure structure of shape sealing(21), the pressure bearing stored when variant boiler is in cyclone furnace state Inflator(21)Discontinuity is opened and closed to variant boiler counter structure oxygen-carbon dioxide by the switch in air inlet pipe Mixed gas, variant boiler top counter structure connection gas extraction system, gas extraction system is by three-way pipe(3), blast pipe(4), an oxygen Change carbon discharge(5), pumping blower fan(6)Composition, wherein three-way pipe(3)Inlet end pass through set by the top of pipeline and variant boiler Blast pipe(4)Connection, three-way pipe(3)One of outlet side passes through carbon monoxide discharge(5)Installation pumping blower fan(6)Afterwards Constant-pressure gas storage tower is connected, another outlet side passes through blast pipe(4)Installation pumping blower fan(6)Boiler exhaust gas purification system is connected afterwards System, the three-way pipe when lift variant boiler is in cyclone furnace state(3)Valve passage be variant boiler-carbon monoxide gas collection Pipe(5)- pumping blower fan(6)- constant-pressure gas storage tower, the valve passage of three-way pipe when lift variant boiler is in combustion furnace state For variant boiler-blast pipe(4)- pumping blower fan(6)- boiler exhaust gas cleaning system.
4. requiring discontinuous stoving process used in a kind of 3 noncontinuity rubber processings according to asking inner, its feature exists In:The variant boiler is by exhaust opening(2), heat exchanger(7), body of heater(8), lifting become body device, fire door(10), oxygen feeding tube (11), carbon monoxide air inlet pipe(23), igniter, base(14), air inlet pipe(1)Composition, body of heater(8)For both ends open and set There are the hollow cylindrical structure of base, body of heater(8)Top is provided with hemispherical capping, and capping top is provided with exhaust opening(2), row Mouth(2)It is connected by pipeline with gas extraction system counter structure, body of heater(8)Top is provided with heat exchanger(7), heat exchanger(7)Under By the mounting means installation air inlet pipe of cyclone separator admission line on the outside of the body of heater in portion(1), air inlet pipe(1)By pipeline with holding Press gas receiver(21)Corresponding pipeline connection, body of heater(8)It is provided with the inwall of middle and lower part and extends to body of heater(8)The lifting variant of bottom Device, lifting become body device and are installed on lift cylinders(19)On, body of heater(8)Pass through base(14)Be installed on for pedestal on, stove Body(8)Bottom is provided with the oxygen feeding tube in the same area(11), carbon monoxide air inlet pipe(23)And igniter, carbon monoxide air inlet Pipe(23)It is connected to constant-pressure gas storage tower escape pipe, oxygen feeding tube(11)Connect combustion oxygen bottle, body of heater(8)Bottom is provided with fire door (10), lift cylinders(19)For hydraulic lifting cylinder or screw thread elevating lever, lift cylinders are in when lifting set by variant boiler becomes body device (19)Variant boiler is in cyclone furnace state during lifting state, when when set by variant boiler lifting become body device be in lift cylinders (19)Variant boiler is in combustion furnace state during contraction state.
5. requiring discontinuous stoving process used in a kind of 4 noncontinuity rubber processings according to asking inner, its feature exists In:The lifting becomes body device by burner hearth(13), lifting collection slag cylinder(15), blast pipe(16), air intake blower fan(18), slag-drip opening (20), socket carriage composition, wherein burner hearth(13)By being movably installed in body of heater(8)Interior socket carriage is installed on Body of heater(8)It is interior, burner hearth(13)Basal surface is provided with hollow cone shape lifting collection slag cylinder(15), lifting collection slag cylinder(15)Bottom It is provided with slag-drip opening(20), blast pipe(16)One end is provided with air intake blower fan(18)The other end is installed on lifting collection slag cylinder(15)Cylinder On wall and extend to burner hearth(13)Lower section, two to six roots of sensation blast pipe(16)With slag-drip opening(20)Lifting collection is uniformly distributed in for the center of circle Slag cylinder(15)On, lifting collection slag cylinder(15)Three to four lift cylinders are installed on outer wall(19), lift cylinders(19)It is installed on fixation On pedestal.
6. requiring discontinuous stoving process used in a kind of 5 noncontinuity rubber processings according to asking inner, its feature exists In:The socket carriage is by chute(9), scraper(22), firm ring(28), support ring(27)Composition, wherein support ring (27)It is installed on body of heater(8)Inwall bottom, support ring(27)Body of heater above(8)To body of heater(8)It is provided with upper zone Chute(9), chute(9)To body of heater(8)Sunken inside forms a slide rail region, chute(9)Inside it is provided with and is installed on burner hearth(13) The firm ring at edge(28), burner hearth(13)Upper surface, which is tiltedly installed with, is attached at body of heater(8)The scraper of inner surface(22).
7. requiring discontinuous stoving process used in a kind of 3 noncontinuity rubber processings according to asking inner, its feature exists In:The constant-pressure gas storage tower is by counterweight(30), tower section gas receiver(31), aqua calcis(32), filler plate(33), escape pipe (34), blow-off pipe(35), gas distribution pipe(36)Composition, wherein tower section gas receiver(31)Top is provided with counterweight(30)Bottom is provided with The gas washing pond of Mitsubishi's column, gas washing bottom of pond portion are provided with blow-off pipe(35), gas washing pond middle and lower part is provided with gas distribution pipe(36), gas distribution Pipe(36)Connect gas extraction system counter structure, gas distribution pipe(36)Filler plate is provided with the gas washing pond of surface(33), through washing Gas pond is provided with the extraneous escape pipe of connection(34), escape pipe(34)It is connected with variant boiler counter structure, tower section gas receiver (31)Bottom is provided with bearing(37).
8. requiring discontinuous stoving process used in a kind of 1 noncontinuity rubber processing according to asking inner, its feature exists In:The drying cart cleaning is rinsed to drying cart inner and outer wall to be rinsed using clear water to drying cart inner and outer wall On all without residual rubber grain untill.
9. requiring discontinuous stoving process used in a kind of 1 noncontinuity rubber processing according to asking inner, its feature exists In:The cleaning size material is washed by water to dry car bottom to be rinsed using clear water to the rubber grain being seated in drying cart Start to start timing when uniformly dripping, timing is 6~30mins.
10. requiring discontinuous stoving process used in a kind of 1 noncontinuity rubber processing according to asking inner, its feature exists In:It is described to check that briquetting is that the rubber grain after completion hot-air drying technology in drying cart is checked, see whether particle is equal It is even, delivered to after the excessive or block rubber of particle is rejected and briquetting is carried out in cuber, the molded rubber block after briquetting is delivered to multiple Examine packing department.
CN201710597964.2A 2017-07-21 2017-07-21 Discontinuous drying process used in discontinuous rubber processing technology Active CN107606598B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710597964.2A CN107606598B (en) 2017-07-21 2017-07-21 Discontinuous drying process used in discontinuous rubber processing technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710597964.2A CN107606598B (en) 2017-07-21 2017-07-21 Discontinuous drying process used in discontinuous rubber processing technology

Publications (2)

Publication Number Publication Date
CN107606598A true CN107606598A (en) 2018-01-19
CN107606598B CN107606598B (en) 2021-12-28

Family

ID=61059797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710597964.2A Active CN107606598B (en) 2017-07-21 2017-07-21 Discontinuous drying process used in discontinuous rubber processing technology

Country Status (1)

Country Link
CN (1) CN107606598B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110464196A (en) * 2018-05-10 2019-11-19 佛山市顺德区美的电热电器制造有限公司 Progress control method, device, cooking apparatus and computer readable storage medium
CN113715129A (en) * 2021-09-01 2021-11-30 中国热带农业科学院橡胶研究所 Method for producing root carving and wood pier by using rubber tree log and tree root material

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2416427Y (en) * 1999-12-24 2001-01-24 俞建荣 Environment protection vertical boiler
CN102706107A (en) * 2012-06-04 2012-10-03 宜兴能达环保科技有限公司 Dehydration method and device for water-containing materials
SE1351363A1 (en) * 2013-11-18 2015-05-19 Coldbay Ab Method and system for drying wood in a drying room
CN205425646U (en) * 2016-03-10 2016-08-03 山东荣创机械科技有限公司 Silica gel drying device
CN205748010U (en) * 2016-06-21 2016-11-30 西双版纳佳力轮橡胶有限公司 A kind of rubber energy-saving device of boiler

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2416427Y (en) * 1999-12-24 2001-01-24 俞建荣 Environment protection vertical boiler
CN102706107A (en) * 2012-06-04 2012-10-03 宜兴能达环保科技有限公司 Dehydration method and device for water-containing materials
SE1351363A1 (en) * 2013-11-18 2015-05-19 Coldbay Ab Method and system for drying wood in a drying room
CN205425646U (en) * 2016-03-10 2016-08-03 山东荣创机械科技有限公司 Silica gel drying device
CN205748010U (en) * 2016-06-21 2016-11-30 西双版纳佳力轮橡胶有限公司 A kind of rubber energy-saving device of boiler

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110464196A (en) * 2018-05-10 2019-11-19 佛山市顺德区美的电热电器制造有限公司 Progress control method, device, cooking apparatus and computer readable storage medium
CN113715129A (en) * 2021-09-01 2021-11-30 中国热带农业科学院橡胶研究所 Method for producing root carving and wood pier by using rubber tree log and tree root material
CN113715129B (en) * 2021-09-01 2022-07-19 中国热带农业科学院橡胶研究所 Method for producing root carving and wood pier by using rubber tree log and tree root material

Also Published As

Publication number Publication date
CN107606598B (en) 2021-12-28

Similar Documents

Publication Publication Date Title
CN106895414A (en) Kitchen castoff cooperates with handling process with domestic garbage burning electricity generation
CN105444183B (en) Stoker fired grate formula rubbish list furnace gas CIU and its processing method
CN103939911B (en) One way of life refuse gasification processes and heat-energy utilizing device with burning
CN100432532C (en) Combined incineration treatment method for refuse and special vertical oxygen-enriched continuous incinerator
CN204554840U (en) A kind of industrial waste gas combustion apparatus
CN107606598A (en) Discontinuous stoving process used in a kind of noncontinuity rubber processing
CN203364172U (en) Biomass cooking hating stove
CN103900111A (en) Biomass fuel waste heat recycling cooking range
CN203810456U (en) Multifunctional biomass stove
CN104033928B (en) Multifunctional cooking stove
CN206369246U (en) A kind of band slaughterhouse Cantonese fuel gas frying stove of recoverable fume afterheat
CN208704163U (en) A kind of high-efficient hot air furnace and efficient circulation hot-blast stove
CN106287820B (en) Power air-supply energy-saving heating stove
CN104896480B (en) A kind of bilingual processing unit of rubbish
CN203785006U (en) Underground flue heating oven
CN207316981U (en) A kind of firewood and gas double-purpose kitchen range
CN202675264U (en) Cyclone type boiler
CN202432525U (en) Garbage incinerator
CN201615594U (en) High-efficient energy-saving normal pressure hot water boiler
CN104848261A (en) Efficient return air furnace
CN209622807U (en) The gas-liquid cycle mechanism of waste incinerator dual firing chamber
CN205842741U (en) A kind of energy-saving coal stove
CN205939224U (en) Special boiler of blue charcoal
CN205480951U (en) Under raise backfire formula combustor
CN208504408U (en) A kind of yellow phosphoric tail gas heating burner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 666100 142 Xuanwei Road, Jinghong, Xishuangbanna Dai Autonomous Prefecture, Yunnan

Applicant after: Yunnan natural rubber industry group Xishuangbanna Jingyang Co., Ltd.

Address before: 666100 142 Xuanwei Road, Jinghong, Xishuangbanna Dai Autonomous Prefecture, Yunnan

Applicant before: Xishuangbanna Jing Yang limited rubber responsible company

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant