CN107604819A - A kind of straddle type monorail rail tracks erection method using transition apparatus - Google Patents

A kind of straddle type monorail rail tracks erection method using transition apparatus Download PDF

Info

Publication number
CN107604819A
CN107604819A CN201710830506.9A CN201710830506A CN107604819A CN 107604819 A CN107604819 A CN 107604819A CN 201710830506 A CN201710830506 A CN 201710830506A CN 107604819 A CN107604819 A CN 107604819A
Authority
CN
China
Prior art keywords
framework
transition apparatus
track girder
groove
rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710830506.9A
Other languages
Chinese (zh)
Other versions
CN107604819B (en
Inventor
刘阳明
彭华春
李靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201710830506.9A priority Critical patent/CN107604819B/en
Publication of CN107604819A publication Critical patent/CN107604819A/en
Application granted granted Critical
Publication of CN107604819B publication Critical patent/CN107604819B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Railway Tracks (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to rail traffic bridge structure correlative technology field, and it discloses a kind of straddle type monorail rail tracks erection method using transition apparatus, this method comprises the following steps:(1) the first track girder and the second track girder are placed on same pedestal beam, offers the first groove and the second groove on the periphery of both relative one end respectively;(2) transition apparatus is provided, the transition apparatus is the box-structure without bottom surface and top surface, and it includes the first framework and second framework;(3) first framework and the second framework block the track girder, and thus the transition apparatus forms hoop type with the track girder and is connected;(4) beam car by post-cast strip cast limited and directly from the transition apparatus by and the transport and erection of next track girder being carried out, until erection of track beam is completed.The beam car of the present invention passes through directly from transition apparatus, it is not necessary to waits post-cast strip casting complete, saves the time of post-cast strip cast, improve speed of setting a roof beam in place.

Description

A kind of straddle type monorail rail tracks erection method using transition apparatus
Technical field
The invention belongs to rail traffic bridge structure correlative technology field, and transition apparatus is used more particularly, to one kind Straddle type monorail rail tracks erection method.
Background technology
The linear required precision for needing to meet that train is out of shape of straddle type monorail rail tracks, construction precision require high.In order to full Sufficient required precision, continuous beam or the continuous construction method of continuous steel construction generally use elder generation freely-supported, i.e., simply-supported state is in factory Prefabricated, cast-in-site post-cast strip is continuous to be formed.
There is system transform in this method, bridge pier pier top need to set post-cast strip, be influenceed by post-cast strip, and erection of track beam is only Truck crane or crane can be selected to hang, lifting mode needs to take road width under bridge, larger to traffic impact under bridge, therefore greatly More options are carrying on construction work at night or enclosure portion road is constructed, and the influence to the duration is also larger.Beam is transported according to beam car, Due to the presence of pier top post-cast strip, beam car could pass through after only waiting a continuous beam or continuous Construction of Steel Structure The transport and erection of next binding beam are carried out, greatly reduces efficiency of construction.
The content of the invention
For the disadvantages described above or Improvement requirement of prior art, the invention provides a kind of straddle-type using transition apparatus Monorail track beam erection method, its characteristic based on existing straddle type monorail rail tracks, studies and devises a kind of use The straddle type monorail rail tracks erection method of transition apparatus.The straddle type monorail rail tracks erection method passes through first frame Body and the second framework block first track girder and described second from the opposite both sides of first track girder Track girder, thus the transition apparatus and first track girder and second track girder form hoop type and be connected, make Beam car directly by being limited without being poured into a mould by post-cast strip, can save time of post-cast strip cast, it is economical and practical, carry High efficiency of construction.In addition, multiple bolts hole are respectively used to house multiple bolts, first groove and described Two grooves with multiple rib clampings, thus make transition apparatus be connected with track girder respectively, easy installation and removal, and can weigh It is multiple to utilize.
To achieve the above object, the invention provides a kind of straddle type monorail rail tracks erection side using transition apparatus Method, this method comprise the following steps:
(1) track girder is transported to position by beam car, and the track girder is placed on pedestal beam by Bridge Erector, on same pedestal beam It is placed with the first track girder and the second track girder, first track girder and the relative one end of second track girder Periphery on offer the first groove and the second groove respectively;
(2) provide transition apparatus, the transition apparatus is the box-structure without bottom surface and top surface, it include the first framework, Second framework, multiple ribs and multiple bolts, spaced multiple rows of institute is vertically and fixedly provided with the inner surface of first framework Rib is stated, spaced multiple rows of rib is vertically and fixedly provided with the inner surface of the second framework, the transition apparatus is also Offer multiple interval settings and through the bolt hole of first framework and the second framework;
(3) multiple bolts are contained in multiple bolts hole respectively, while multiple ribs is respectively clamped into In first groove and second groove, first framework and the second framework are opposite from first track girder Both sides block first track girder and second track girder, the thus transition apparatus and first track Beam and second track girder form hoop type connection;
(4) beam car by post-cast strip cast limited and directly from the transition apparatus by and carrying out next Join the transport and erection of track girder, until erection of track beam is completed.
Further, the row of the rib in first framework and the row of the rib in the second framework are equal, And it is equal to the quantity and the number of the second groove on second track girder of the first groove on first track girder Measure sum.
Further, the row of the rib in first framework and the row of the rib in the second framework are two Row, the position with rib described in two rows in the second framework respectively of the position of rib described in two rows in first framework It is corresponding.
Further, the spacing between two row's ribs in first framework is equal to first groove and described second Spacing between groove.
Further, the spacing between two row's ribs in the second framework is equal to first groove and described second Spacing between groove.
Further, the transition apparatus is rectangular perpendicular to the cross section in its length direction, and first framework is in Concave character type, the second framework are also in concave character type.
Further, the transition apparatus is rectangle that is trapezoidal, having opening perpendicular to the cross section in its length direction It is and any of trapezoidal with opening.
Further, the transition apparatus is made of steel plate welds.
In general, by the contemplated above technical scheme of the present invention compared with prior art, it is provided by the invention to adopt Mainly had the advantages that with the straddle type monorail rail tracks erection method of transition apparatus:
1. beam car by post-cast strip cast limited and directly from the transition apparatus by and carrying out next track The transport and erection of beam, it is not necessary to wait post-cast strip to pour to become a useful person and can carry out the transport and erection of next track girder, after saving The time of Strip casting is poured, improves erection of track beam efficiency, it is economical and practical;
2. multiple bolts are contained in into multiple bolts hole respectively, while multiple ribs are respectively clamped into institute State in the first groove and second groove, thus make between transition apparatus and track girder formed hoop type connection, globality compared with It is good, easy installation and removal, and repeatable utilization;
3. the transition apparatus is the box-structure without bottom surface and top surface, easy to process, simple structure is easy to implement;
4. using beam car fortune beam, Bridge Erector sets up track girder, can accelerate speed of setting a roof beam in place, while road under bridge is influenceed It is smaller.
Brief description of the drawings
Fig. 1 is the straddle type monorail rail tracks erection method using transition apparatus that better embodiment of the present invention provides Flow chart;
Fig. 2 is that the transition apparatus being related to using the straddle type monorail rail tracks erection method of transition apparatus in Fig. 1 is used When schematic diagram;
Interface schematic diagram when a, b in Fig. 3 are two different conditions of the transition apparatus in Fig. 2 respectively.
In all of the figs, identical reference is used for representing identical element or structure, wherein:10- bridge piers, 20- Pedestal beam, the track girders of 30- first, the grooves of 31- first, the track girders of 40- second, the grooves of 41- second, 50- transition apparatus, 51- bolts hole, the frameworks of 52- first, 53- second frameworks, 54- ribs, 60- bolts.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in each embodiment of invention described below Conflict can is not formed each other to be mutually combined.
Refer to a, b figure in Fig. 1, Fig. 2 and Fig. 3, better embodiment of the present invention provide using transition apparatus across Type monorail erection of track beam method, the straddle type monorail rail tracks erection method mainly include the following steps that:
Track girder is transported to position by step 1, beam car, and the track girder is placed on pedestal beam 20 by Bridge Erector, same branch The first track girder 30 and the second track girder 40, first track girder 30 and second rail are placed with seat beam 20 The first groove 31 and the second groove 41 are offered on the periphery of the relative one end of road beam 40 respectively.The rack beams are arranged on bridge pier On 10.
Step 2, there is provided transition apparatus 50, the transition apparatus 50 are the box-structure without bottom surface and top surface, and it includes One framework 52, second framework 53, multiple ribs 54 and multiple bolts 60, it is vertically and fixedly provided with the inner surface of first framework 52 Spaced multiple rows of rib 54, it is vertically and fixedly provided with the inner surface of the second framework 53 spaced multiple rows of described Rib 54, the transition apparatus 50 are further opened with multiple interval settings and run through first framework 52 and the second framework 53 Bolt hole 51.
In present embodiment, first framework 52 is in concave character type substantially, and two row's ribs are vertically and fixedly provided with its inner surface 54;The second framework 53 is in concave character type substantially, and spaced two rows rib 54 is vertically and fixedly provided with its inner surface;Described The position of two row's ribs 54 in one framework 53 is corresponding with the position of two row's ribs 54 in the second framework 54 respectively.
The transition apparatus 50 is the box-structure without bottom surface and top surface that steel plate is welded into, and it is perpendicular to its length side To cross section it is rectangular (box section of as remaining silent).The transition apparatus 50 is used to connect two adjacent tracks when installing Beam, so that freight volume car without being poured into a mould by post-cast strip by being limited.In present embodiment, the transition apparatus 50 is applied to track The straightway of beam.It is appreciated that in other embodiments, the transition apparatus 50 is perpendicular to the cross section in its length direction Can be for rectangle trapezoidal, with opening or with the trapezoidal of opening.
The bolt hole 51 is used to house the bolt 60 so that first framework 52 and the second framework 53 are connected Connect.In present embodiment, the quantity of the bolt hole 51 is identical with the quantity of the bolt 60.
In present embodiment, first groove 31 is used to house rib described in the row in corresponding first framework 52 Rib 54 described in a row on bar 54 and the second framework 52.Second groove 41 is used to house corresponding first frame Rib 54 described in rib 54 described in another row on body 52 and another row in the second framework 52.
The depth of first groove 31 and the depth of second groove 41 are 2 centimetres, first groove 31 and Length of second groove 41 along bridge axle direction is 5 centimetres;Between first groove 31 and second groove 41 Distance is equal with the distance between two row's ribs 54 in first framework 52, two row's ribs 54 in the second framework 53 The distance between the distance between two row's ribs 54 in first framework 52 it is equal;Rib in first framework 52 Row and the rib in the second framework 53 row it is equal, and first be equal on first track girder 30 is recessed The quantity of groove 31 and the quantity sum of the second groove 41 on second track girder 40.
Step 3, multiple bolts 60 are contained in multiple bolts hole 51 respectively, while by multiple ribs 54 are respectively clamped into first groove 31 and second groove 41, and first framework 52 and the second framework 53 are from institute State the opposite both sides of the first track girder 30 and block first track girder 30 and second track girder 40, it is thus described Transition apparatus 50 forms hoop type with first track girder 30 and second track girder 40 and is connected.
Step 4, the beam car by post-cast strip cast limited and directly from the transition apparatus by, with carry out The transport and erection of next track girder, until erection of track beam is completed.
Straddle type monorail rail tracks erection method provided by the invention using transition apparatus, it passes through first framework And the second framework blocks first track girder and second rail from the opposite both sides of first track girder Road beam, thus the transition apparatus and first track girder and second track girder form hoop type and are connected so that Beam car can save the time of post-cast strip cast, economical and practical, raising directly by being limited without being poured into a mould by post-cast strip Efficiency of construction.In addition, multiple bolts hole are respectively used to house multiple bolts, first groove and described second Groove with multiple rib clampings, thus makes transition apparatus be connected with track girder respectively, easy installation and removal, and repeatable Utilize.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, all any modification, equivalent and improvement made within the spirit and principles of the invention etc., all should be included Within protection scope of the present invention.

Claims (8)

1. a kind of straddle type monorail rail tracks erection method using transition apparatus, it is characterised in that this method includes following step Suddenly:
(1) track girder is transported to position by beam car, and the track girder is placed on pedestal beam by Bridge Erector, is placed on same pedestal beam Have the first track girder and the second track girder, first track girder and the relative one end of second track girder it is outer The first groove and the second groove are offered on week respectively;
(2) transition apparatus is provided, the transition apparatus is the box-structure without bottom surface and top surface, and it includes the first framework, second Framework, multiple ribs and multiple bolts, spaced multiple rows of rib is vertically and fixedly provided with the inner surface of first framework Bar, spaced multiple rows of rib is vertically and fixedly provided with the inner surface of the second framework, the transition apparatus also opens up There are multiple interval settings and through the bolt hole of first framework and the second framework;
(3) multiple bolts are contained in multiple bolts hole respectively, while multiple ribs are respectively clamped into described In first groove and second groove, first framework and the second framework from first track girder it is opposite two First track girder and second track girder are blocked in side, thus the transition apparatus and first track girder and Second track girder forms hoop type connection;
(4) beam car by post-cast strip cast limited and directly from the transition apparatus by and carrying out next rail The transport and erection of road beam, until erection of track beam is completed.
2. the straddle type monorail rail tracks erection method of transition apparatus is used as claimed in claim 1, it is characterised in that:It is described The row of rib in first framework and the row of the rib in the second framework are equal, and are equal to first track The quantity of the first groove on beam and the quantity sum of the second groove on second track girder.
3. the straddle type monorail rail tracks erection method of transition apparatus is used as claimed in claim 2, it is characterised in that:It is described The row of rib in first framework and the row of the rib in the second framework are two rows, and two in first framework The position for arranging the rib is corresponding with the position of rib described in two rows in the second framework respectively.
4. the straddle type monorail rail tracks erection method of transition apparatus is used as claimed in claim 3, it is characterised in that:It is described The spacing between two row's ribs in first framework is equal to the spacing between first groove and second groove.
5. the straddle type monorail rail tracks erection method of transition apparatus is used as claimed in claim 3, it is characterised in that:It is described The spacing between two row's ribs in second framework is equal to the spacing between first groove and second groove.
6. the straddle type monorail rail tracks erection method using transition apparatus as described in claim any one of 1-5, its feature It is:The transition apparatus is rectangular perpendicular to the cross section in its length direction, and first framework is in concave character type, and described Two frameworks are also in concave character type.
7. the straddle type monorail rail tracks erection method using transition apparatus as described in claim any one of 1-5, its feature It is:The transition apparatus is perpendicular to the cross section in its length direction for rectangle trapezoidal, with opening and with opening It is any of trapezoidal.
8. the straddle type monorail rail tracks erection method using transition apparatus as described in claim any one of 1-5, its feature It is:The transition apparatus is made of steel plate welds.
CN201710830506.9A 2017-09-14 2017-09-14 A kind of straddle type monorail rail tracks erection method using transition apparatus Active CN107604819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710830506.9A CN107604819B (en) 2017-09-14 2017-09-14 A kind of straddle type monorail rail tracks erection method using transition apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710830506.9A CN107604819B (en) 2017-09-14 2017-09-14 A kind of straddle type monorail rail tracks erection method using transition apparatus

Publications (2)

Publication Number Publication Date
CN107604819A true CN107604819A (en) 2018-01-19
CN107604819B CN107604819B (en) 2019-06-25

Family

ID=61063995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710830506.9A Active CN107604819B (en) 2017-09-14 2017-09-14 A kind of straddle type monorail rail tracks erection method using transition apparatus

Country Status (1)

Country Link
CN (1) CN107604819B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002212903A (en) * 2001-01-17 2002-07-31 Hitachi Ltd Straddle monorail track girder and its installation method
CN203174446U (en) * 2013-04-12 2013-09-04 北京交通大学 Straddle-type monorail traffic rigid frame system
KR20140139703A (en) * 2013-05-28 2014-12-08 주식회사 케이씨이엔지니어링 Steel Connector Between Precast Segments and Connection Method
CN105178163A (en) * 2015-09-10 2015-12-23 重庆市轨道交通设计研究院有限责任公司 Novel continuous beam type rail
CN105274939A (en) * 2015-09-10 2016-01-27 重庆市轨道交通设计研究院有限责任公司 Connecting device for PC track beam
CN106703432A (en) * 2016-12-28 2017-05-24 北京城建亚泰建设集团有限公司 Newly-added steel girder and original reinforced concrete column hoop connecting joint and connecting method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002212903A (en) * 2001-01-17 2002-07-31 Hitachi Ltd Straddle monorail track girder and its installation method
CN203174446U (en) * 2013-04-12 2013-09-04 北京交通大学 Straddle-type monorail traffic rigid frame system
KR20140139703A (en) * 2013-05-28 2014-12-08 주식회사 케이씨이엔지니어링 Steel Connector Between Precast Segments and Connection Method
CN105178163A (en) * 2015-09-10 2015-12-23 重庆市轨道交通设计研究院有限责任公司 Novel continuous beam type rail
CN105274939A (en) * 2015-09-10 2016-01-27 重庆市轨道交通设计研究院有限责任公司 Connecting device for PC track beam
CN106703432A (en) * 2016-12-28 2017-05-24 北京城建亚泰建设集团有限公司 Newly-added steel girder and original reinforced concrete column hoop connecting joint and connecting method thereof

Also Published As

Publication number Publication date
CN107604819B (en) 2019-06-25

Similar Documents

Publication Publication Date Title
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN105735101B (en) A kind of high-speed railway repairing beam and its emergency repair method that can be exchanged into permanent bridge structure
JP6986656B1 (en) Construction method of lifting directly above a bridge with a large tonnage box girder and its erection method
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN101586330A (en) Receding construction method of cradle of continuous girder bridge made of prestressing concrete
CN102192368A (en) Large-span overhead pipeline sliding installation method
CN108505405A (en) A kind of suspension type monorail and highway bridge build structure jointly
CN109610327A (en) A kind of Bridge Erector free cantilever erection construction method
CN107244534A (en) Prefabricated box culvert transport vehicle
CN207227876U (en) A kind of transition apparatus suitable for straddle type monorail rail tracks installation
CN107513906A (en) A kind of transition apparatus suitable for straddle type monorail rail tracks installation
CN107604819A (en) A kind of straddle type monorail rail tracks erection method using transition apparatus
CN105568785B (en) Implementation method of bottom plate overhanging combined box type track beam rigid frame system
WO2016082689A1 (en) Rail holding type magnetic levitation track transit box girder
JP2002021024A (en) Erection method of corrugated web bridge
CN205604089U (en) Whole sideslip system of cast -in -situ box girder gate -type full framing
CN208471390U (en) Cast-in-situ box girder framework of steel reinforcement Integral hoisting equipment
CN110792040B (en) Hoisting method for hoisting T-shaped beam of separated bridge deck
CN105350453B (en) Method for hoisting mountain land overhead pedestrian way
CN207061159U (en) prefabricated box culvert transport vehicle
CN201268973Y (en) Midair sliding apparatus used for installing engineering arch slab of horizontal warehouse
CN104088232A (en) Emergency repair method for concrete box girders
JPH10204830A (en) Method for bridging bridge girder
CN212771764U (en) Novel tram fastener type prefabricated track plate structure
JPS5841107A (en) Traverse drawing constructing method of bridge beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant