CN107598824A - Hatchcover rubber installation method - Google Patents

Hatchcover rubber installation method Download PDF

Info

Publication number
CN107598824A
CN107598824A CN201710988087.1A CN201710988087A CN107598824A CN 107598824 A CN107598824 A CN 107598824A CN 201710988087 A CN201710988087 A CN 201710988087A CN 107598824 A CN107598824 A CN 107598824A
Authority
CN
China
Prior art keywords
rubber
hatchcover
supporting sleeve
expansion link
lifting body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710988087.1A
Other languages
Chinese (zh)
Inventor
陈利兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengxi Shipyard Co Ltd
Original Assignee
Chengxi Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengxi Shipyard Co Ltd filed Critical Chengxi Shipyard Co Ltd
Priority to CN201710988087.1A priority Critical patent/CN107598824A/en
Publication of CN107598824A publication Critical patent/CN107598824A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The present invention relates to a kind of hatchcover rubber installation method, the described method comprises the following steps:Step 1: taking a mounting tool, it is fixed and is arranged at hatchcover side;The mounting tool includes supporting sleeve, expansion link is fitted with the supporting sleeve, the positioning hole that a row are evenly arranged is provided with the supporting sleeve, it is connected between the supporting sleeve and expansion link by clamping screw, lifting body is provided with the top of the expansion link, the lifting body includes support base, and lever is hinged with the support base, and described lever one end is provided with tip-cambered ascending part;Step 2: taking a hatchcover rubber, glue is coated on hatchcover rubber;Step 3: hatchcover rubber is positioned at hatchcover rubber groove, rubber is pressed into rubber groove by the lifting body of mounting tool.A kind of hatchcover rubber installation method of the present invention, its is easy to operate, can greatly improve site operation efficiency, reduces labor strength.

Description

Hatchcover rubber installation method
Technical field
The present invention relates to a kind of hatchcover rubber installation method, belong to and build ship technical field.
Background technology
This engineering that renews of hatchcover rubber is that a coolie lives all the time, and hatchcover rubber is provided with following characteristics:
1st, rubber and rubber groove are interference fits, typically all in 3-5 millimeters;
2nd, hatchcover rubber is the upside-down mounting from bottom to top at the lower section of hatchcover, installation;
3rd, under hatchcover after be all located in what is carried out on the moulding bed of harbour, moulding bed away from ground level be 1.2 meters or so;
4th, rubber needs to smear glue special, at a fixed time interior installation in a pre-installation.
In the past in the installation to hatchcover rubber, fulcrum sled is mainly used as by the moulding bed at scene such as near moulding bed Rod coordinates, and can only be resisted stubbornly into by manpower if no moulding bed fulcrum near rubber groove, and this consumption to muscle power is very big, It is simultaneously inefficient.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of hatchcover rubber installation method for above-mentioned prior art, its It is easy to operate, site operation efficiency can be greatly improved, reduces labor strength.
Technical scheme is used by the present invention solves the above problems:A kind of hatchcover rubber installation method, methods described bag Include following steps:
Step 1: taking a mounting tool, it is fixed and is arranged at hatchcover side;
The mounting tool includes supporting sleeve, and expansion link is fitted with the supporting sleeve, is provided with the supporting sleeve The positioning hole that one row are evenly arranged, is connected between the supporting sleeve and expansion link by clamping screw, the expansion link top Portion is provided with lifting body, and the lifting body includes support base, and lever, the lever one are hinged with the support base End is provided with tip-cambered ascending part;
Step 2: taking a hatchcover rubber, glue is coated on hatchcover rubber;
Step 3: hatchcover rubber is positioned at hatchcover rubber groove, rubber is pressed into by rubber by the lifting body of mounting tool In groove.
The supporting sleeve bottom is provided with spacer pin.
The tip-cambered ascending part uses semicircular pipe, and the cambered surface of semicircular pipe is arranged upwards.
Compared with prior art, the advantage of the invention is that:
1st, the present invention is easy to operate, can greatly improve site operation efficiency, reduces labor strength;
2nd, because rubber surface is softer, it is impossible to use pointed object to enter as jacking part, the present invention using the cambered surface of semi-circular tube Row jacking, prevent from producing damage to rubber surface;
3rd, in view of ground and the height disunity of hatchcover, present invention employs the principle of expansion link, highly controllable system 0.9 ~ 1.7 rice;
4th, lifting body of the present invention employs the principle of lever, and original upward top power is converted into present downward pressure Power, convenient operation;
5th, Weight control of the present invention is within 10 kilograms, can one operated.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the mounting tool used of hatchcover rubber installation method of the present invention.
Fig. 2 is the structural representation of support base in Fig. 1.
Fig. 3 is the side view of lever in Fig. 2.
Wherein:
Supporting sleeve 1
Expansion link 2
Positioning hole 3
Clamping screw 4
Lifting body 5
Support base 5.1
Lever 5.2
Tip-cambered ascending part 5.3
Spacer pin 6.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing embodiment.
A kind of hatchcover rubber installation method in the present embodiment, it comprises the following steps;
Step 1: taking a mounting tool, it is fixed and is arranged at hatchcover side;
As shown in Fig. 1 ~ Fig. 3, the mounting tool includes supporting sleeve 1, and expansion link 2 is fitted with the supporting sleeve 1, described The positioning hole 3 that a row are evenly arranged is provided with supporting sleeve 1, passes through clamping screw between the supporting sleeve 1 and expansion link 2 4 are connected, and the top of expansion link 2 is provided with lifting body 5, and the lifting body 5 includes support base 5.1, the support Lever 5.2 is hinged with base 5.1, described one end of lever 5.2 is provided with tip-cambered ascending part 5.3;
The bottom of supporting sleeve 1 is provided with spacer pin 6;
The tip-cambered ascending part 5.3 uses semicircular pipe, and the cambered surface of semicircular pipe is arranged upwards;
Step 2: taking a hatchcover rubber, glue is coated on hatchcover rubber;
Step 3: hatchcover rubber is positioned at hatchcover rubber groove, rubber is pressed into by rubber by the lifting body of mounting tool In groove.
In addition to the implementation, it is all to use equivalent transformation or equivalent replacement present invention additionally comprises there is other embodiment The technical scheme that mode is formed, it all should fall within the scope of the hereto appended claims.

Claims (3)

1. a kind of hatchcover rubber installation method, it is characterised in that the described method comprises the following steps:
Step 1: taking a mounting tool, it is fixed and is arranged at hatchcover side;
The mounting tool includes supporting sleeve, and expansion link is fitted with the supporting sleeve, is provided with the supporting sleeve The positioning hole that one row are evenly arranged, is connected between the supporting sleeve and expansion link by clamping screw, the expansion link top Portion is provided with lifting body, and the lifting body includes support base, and lever, the lever one are hinged with the support base End is provided with tip-cambered ascending part;
Step 2: taking a hatchcover rubber, glue is coated on hatchcover rubber;
Step 3: hatchcover rubber is positioned at hatchcover rubber groove, rubber is pressed into by rubber by the lifting body of mounting tool In groove.
A kind of 2. hatchcover rubber installation method according to claim 1, it is characterised in that:The supporting sleeve bottom is set Limited location pin.
A kind of 3. hatchcover rubber installation method according to claim 1, it is characterised in that:The tip-cambered ascending part is using half Round tube, the cambered surface of semicircular pipe are arranged upwards.
CN201710988087.1A 2017-10-21 2017-10-21 Hatchcover rubber installation method Pending CN107598824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710988087.1A CN107598824A (en) 2017-10-21 2017-10-21 Hatchcover rubber installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710988087.1A CN107598824A (en) 2017-10-21 2017-10-21 Hatchcover rubber installation method

Publications (1)

Publication Number Publication Date
CN107598824A true CN107598824A (en) 2018-01-19

Family

ID=61078894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710988087.1A Pending CN107598824A (en) 2017-10-21 2017-10-21 Hatchcover rubber installation method

Country Status (1)

Country Link
CN (1) CN107598824A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4074411A (en) * 1977-04-29 1978-02-21 Willard David A Ring removing wrench
CN201400293Y (en) * 2009-04-17 2010-02-10 天津新港船舶重工有限责任公司 Device for mounting ship hatch board sealing rubber strip
CN201410657Y (en) * 2009-06-04 2010-02-24 青岛港(集团)有限公司 Assembling and disassembling tool for valve split collets of diesel engines
CN201415389Y (en) * 2009-06-15 2010-03-03 姜玉玺 Air compression spring device
CN202106340U (en) * 2011-05-25 2012-01-11 大连船舶重工集团装备制造有限公司 Installation device for marine hatch cover rubber
CN104002270A (en) * 2014-05-22 2014-08-27 杭州中亚机械股份有限公司 Assembling tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4074411A (en) * 1977-04-29 1978-02-21 Willard David A Ring removing wrench
CN201400293Y (en) * 2009-04-17 2010-02-10 天津新港船舶重工有限责任公司 Device for mounting ship hatch board sealing rubber strip
CN201410657Y (en) * 2009-06-04 2010-02-24 青岛港(集团)有限公司 Assembling and disassembling tool for valve split collets of diesel engines
CN201415389Y (en) * 2009-06-15 2010-03-03 姜玉玺 Air compression spring device
CN202106340U (en) * 2011-05-25 2012-01-11 大连船舶重工集团装备制造有限公司 Installation device for marine hatch cover rubber
CN104002270A (en) * 2014-05-22 2014-08-27 杭州中亚机械股份有限公司 Assembling tool

Similar Documents

Publication Publication Date Title
CN207414759U (en) The strutting assembly of o-ring erecting device
CN201544357U (en) Portable dedicated device for suspended ceiling drilling
CN203037472U (en) Static-load test apparatus for petroleum drilling machine
CN207448355U (en) Hatchcover rubber mounting tool
CN107598824A (en) Hatchcover rubber installation method
CN107618002A (en) Hatchcover rubber mounting tool
CN206494685U (en) A kind of pipeline lifting apparatus
CN206200889U (en) A kind of internal jump ring assembly tooling
CN205279745U (en) Vault with adjustable
CN205583474U (en) Firm rig mobile power station fixes a position
CN205931358U (en) Promotion formula cosmetic cases installation mechanism
CN202390145U (en) Fixing tool for assembling jacking frame cylinder of steel ladle of refining furnace
CN201202585Y (en) Full-automatic independent wind power generator tower frame
CN204984325U (en) Operation device is pressed in compact area
CN202575762U (en) Electric lifting rod for construction elevator
CN202416787U (en) Adjustable supporting seat for raised floor and connecting structure of combination thereof
CN206088975U (en) Cable well cover opening device
CN215886257U (en) Convenient jacking device
CN2746812Y (en) Adjustable tube feet
CN203335097U (en) Pneumatic beam lifting device for mining
CN205675077U (en) A kind of domatic haulage vehicle
CN206591902U (en) Electric power pylon hoisting frame
CN204265249U (en) A kind of transfer crane and portal frame thereof
CN215969464U (en) Roof bar planting drilling equipment
CN108217521A (en) A kind of steel tower hydraulic lifting apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180119